Proposal for solar roof top
1. Designand Structure
2. Installation
3. Procurement andCommissioning
4. Electrical part
Structure description:-
Rooftopstructure forsolarapplication
We produce mounting systems, which are compatible with all panel sizes, with
or without frame. It is only up to our clients to choose and order the specific
demand. We provide fastening systems, which fit into both vertical and
horizontal layout. We always design our mounting systems for the specific
analyzed place and area’s condition, thus we cover 100% of hypothetical
situations.
Shagg Energy ltd.
401-2, Gurukripa tower mahaveer marg C-scheme Jaipur.
0141-5108383 www.shaggenergies.com, shaggsolar@outlook.com,
Advantages
 Structure and moving mechanism
 Composite material bearings, no maintenance/ lubrication required.
 Proprietary surface treatment for the bearings block for long life
 Customized structure designs will be provided as per requirement
 Balanced structure designs will be provided as per tracking
Customizedrooftopstructure
When it comes to industrial roofs mounting systems we focus on very close co-operation with
our clients. For this reason are our mounting systems 100% custom made and will absolutely fit
on each specific (concrete, wood etc.)roof. We always analyze our customer’s climatic
conditions like wind, rain and design systems that are suitable enough to resist all theoretical
situations.
Advantages
 Structure and moving mechanism
 Composite material bearings, no maintenance/ lubrication required.
 Proprietary surface treatment for the bearings block for long life
 Customized structure designs will be provided as per requirement
 Balanced structure designs will be provided as per tracking
Shagg Energy ltd.
401-2, Gurukripa tower mahaveer marg C-scheme Jaipur.
0141-5108383 www.shaggenergies.com, shaggsolar@outlook.com,
Solarmanual trackingsingleaxisunitforpumping set
Single axis trackers have one degree of freedomthat acts as an axis of rotation. The axis
of rotation of single axis trackers is typically aligned along a true North meridian. It is
possible to align them in any cardinal direction with advanced tracking algorithms.
There are several common implementations of single axis trackers. These include
horizontal single axis trackers (HSAT), vertical single axis trackers (VSAT), tilted single
axis trackers (TSAT) and polar aligned single axis trackers (PSAT). The orientation of
the module with respect to the tracker axis is important when modeling performance.
 Advantages
o Structure and moving mechanism
o Composite material bearings, no maintenance/ lubrication required.
o Proprietary surface treatment for the bearings block for long life
o Customized structure designs will be provided as per requirement
o Balanced structure designs will be provided as per tracking
All the Productsare AvailableinHot-DipGalvanizedFinishORPolly-Urethane PaintedinChoicestColor
Shed
1. Pricesfor solar rooftop:-
1kwp to 10kwp Rs.5.5/watt
10kwp to 25kwp Rs.5/watt
25kwp to 50kwp Rs.4.70/watt
Above50kwp According to structure.
Shagg Energy ltd.
401-2, Gurukripa tower mahaveer marg C-scheme Jaipur.
0141-5108383 www.shaggenergies.com, shaggsolar@outlook.com,
Installationpart:-

Electrical Works
A. Wiring of Modules
B. Cabling from modules to Combiner box
C. Combiner Box assembly
D. Cabling from Combiner box to Inverter
E. Cabling from Inverter to AC Distribution box
. Module structure installation
Civil work for module mounting structure will be charged as actual.
2. Prices for installationof solar roof top:-
a) Including Complete SPV system- Procurement, Design of the plant,
Installation and Commissioning.
1kwp to 10kwp Rs.3.5/watt
10kwp to 25kwp Rs.3/watt
25kwp to 50kwp Rs.2.80/watt
Above50kwp Rs.2.50/watt
Note:- all the requiredmaterial like wire, cable, nut, bolt will be chargedas
actual.
3. Prices of Complete systeminstallationwithproduct exceptspv module
and inverter
1kwp to 10kwp Rs.14/watt
10kwp to 25kwp Rs.13/watt
25kwp to 50kwp Rs.12.5/watt
Above50kwp Rs.12/watt
Note:- In this systemall work including labor charge will be beard by shagg
energy ltd.
Shagg Energy ltd.
401-2, Gurukripa tower mahaveer marg C-scheme Jaipur.
0141-5108383 www.shaggenergies.com, shaggsolar@outlook.com,
4. Complete ongrid systeminstallationwithproduct include SPV module and
inverter
1kwp to 10kwp Rs.68/watt
10kwp to 25kwp Rs.65/watt
25kwp to 50kwp Rs.60/watt
Above50kwp Rs.59/watt
NOTE: Above mentioned rates can vary for typical structures which
will be only quoted after complete site survey.

Weitere ähnliche Inhalte

Was ist angesagt?

Design and fabrication of geneva mechanism based punching machine
Design and fabrication of geneva mechanism based punching machineDesign and fabrication of geneva mechanism based punching machine
Design and fabrication of geneva mechanism based punching machinechockalingam athilingam
 
IRJET- Solar Operated Four-Way Hacksaw Machine
IRJET-  	  Solar Operated Four-Way Hacksaw MachineIRJET-  	  Solar Operated Four-Way Hacksaw Machine
IRJET- Solar Operated Four-Way Hacksaw MachineIRJET Journal
 
Auto roll punching machine review notes r
Auto roll punching machine review notes rAuto roll punching machine review notes r
Auto roll punching machine review notes rchockalingam athilingam
 
Special bearings in mechanical engineering,MTECH SEMINAR,CAPAGS,BPUT,ROURKELA
Special bearings in mechanical engineering,MTECH SEMINAR,CAPAGS,BPUT,ROURKELASpecial bearings in mechanical engineering,MTECH SEMINAR,CAPAGS,BPUT,ROURKELA
Special bearings in mechanical engineering,MTECH SEMINAR,CAPAGS,BPUT,ROURKELASidharth Adhikari
 
Design and fabrication of motorized screw jack
Design and fabrication of motorized screw jackDesign and fabrication of motorized screw jack
Design and fabrication of motorized screw jackshashin vyas
 
Design and Development of Passive Magnetic Bearing
Design and Development of Passive Magnetic BearingDesign and Development of Passive Magnetic Bearing
Design and Development of Passive Magnetic BearingIJMER
 
AUTOMATIC PORTABLE HAMMERING MACHINE REPORT
AUTOMATIC PORTABLE HAMMERING MACHINE REPORTAUTOMATIC PORTABLE HAMMERING MACHINE REPORT
AUTOMATIC PORTABLE HAMMERING MACHINE REPORTsangeetkhule
 
Power generation using neodymium magnets in Vertical Axis Wind Turbine
Power generation using neodymium magnets in Vertical Axis Wind TurbinePower generation using neodymium magnets in Vertical Axis Wind Turbine
Power generation using neodymium magnets in Vertical Axis Wind TurbineSumit Bhattacharya
 
Power hacksaw machine
Power hacksaw machinePower hacksaw machine
Power hacksaw machineRajaa466
 
magnetically leviated vertical axis wind turbine
magnetically leviated vertical axis wind turbinemagnetically leviated vertical axis wind turbine
magnetically leviated vertical axis wind turbineHemanth kumar
 
Automated Hammering Machine
Automated Hammering MachineAutomated Hammering Machine
Automated Hammering Machinesangeetkhule
 
Magnetic bearings
Magnetic bearingsMagnetic bearings
Magnetic bearingshome!
 
Mechanical projects topics in Gagner Technologies
Mechanical projects topics in Gagner TechnologiesMechanical projects topics in Gagner Technologies
Mechanical projects topics in Gagner Technologiesgagnertechnologies
 
multi operational machine
multi operational machinemulti operational machine
multi operational machineSivarajA33
 
speed power(external)
speed power(external)speed power(external)
speed power(external)FARHAN HASHMI
 
The final project automatic screw jack ppt n2
The final project automatic screw jack ppt n2The final project automatic screw jack ppt n2
The final project automatic screw jack ppt n2Mohammad Asif
 
Time Reduction and Upgrading of Balancing Machine for Impeller
Time Reduction and Upgrading of Balancing Machine for ImpellerTime Reduction and Upgrading of Balancing Machine for Impeller
Time Reduction and Upgrading of Balancing Machine for ImpellerIJTET Journal
 

Was ist angesagt? (20)

Design and fabrication of geneva mechanism based punching machine
Design and fabrication of geneva mechanism based punching machineDesign and fabrication of geneva mechanism based punching machine
Design and fabrication of geneva mechanism based punching machine
 
IRJET- Solar Operated Four-Way Hacksaw Machine
IRJET-  	  Solar Operated Four-Way Hacksaw MachineIRJET-  	  Solar Operated Four-Way Hacksaw Machine
IRJET- Solar Operated Four-Way Hacksaw Machine
 
Auto roll punching machine review notes r
Auto roll punching machine review notes rAuto roll punching machine review notes r
Auto roll punching machine review notes r
 
Special bearings in mechanical engineering,MTECH SEMINAR,CAPAGS,BPUT,ROURKELA
Special bearings in mechanical engineering,MTECH SEMINAR,CAPAGS,BPUT,ROURKELASpecial bearings in mechanical engineering,MTECH SEMINAR,CAPAGS,BPUT,ROURKELA
Special bearings in mechanical engineering,MTECH SEMINAR,CAPAGS,BPUT,ROURKELA
 
Design and fabrication of motorized screw jack
Design and fabrication of motorized screw jackDesign and fabrication of motorized screw jack
Design and fabrication of motorized screw jack
 
Design and Development of Passive Magnetic Bearing
Design and Development of Passive Magnetic BearingDesign and Development of Passive Magnetic Bearing
Design and Development of Passive Magnetic Bearing
 
Fab.project
Fab.projectFab.project
Fab.project
 
AUTOMATIC PORTABLE HAMMERING MACHINE REPORT
AUTOMATIC PORTABLE HAMMERING MACHINE REPORTAUTOMATIC PORTABLE HAMMERING MACHINE REPORT
AUTOMATIC PORTABLE HAMMERING MACHINE REPORT
 
Power generation using neodymium magnets in Vertical Axis Wind Turbine
Power generation using neodymium magnets in Vertical Axis Wind TurbinePower generation using neodymium magnets in Vertical Axis Wind Turbine
Power generation using neodymium magnets in Vertical Axis Wind Turbine
 
Power hacksaw machine
Power hacksaw machinePower hacksaw machine
Power hacksaw machine
 
magnetically leviated vertical axis wind turbine
magnetically leviated vertical axis wind turbinemagnetically leviated vertical axis wind turbine
magnetically leviated vertical axis wind turbine
 
Automated Hammering Machine
Automated Hammering MachineAutomated Hammering Machine
Automated Hammering Machine
 
Magnetic bearings
Magnetic bearingsMagnetic bearings
Magnetic bearings
 
Mechanical projects topics in Gagner Technologies
Mechanical projects topics in Gagner TechnologiesMechanical projects topics in Gagner Technologies
Mechanical projects topics in Gagner Technologies
 
Final Hardware Report
Final Hardware ReportFinal Hardware Report
Final Hardware Report
 
multi operational machine
multi operational machinemulti operational machine
multi operational machine
 
speed power(external)
speed power(external)speed power(external)
speed power(external)
 
The final project automatic screw jack ppt n2
The final project automatic screw jack ppt n2The final project automatic screw jack ppt n2
The final project automatic screw jack ppt n2
 
MECHANICAL PROJECT
MECHANICAL PROJECTMECHANICAL PROJECT
MECHANICAL PROJECT
 
Time Reduction and Upgrading of Balancing Machine for Impeller
Time Reduction and Upgrading of Balancing Machine for ImpellerTime Reduction and Upgrading of Balancing Machine for Impeller
Time Reduction and Upgrading of Balancing Machine for Impeller
 

Andere mochten auch

Happy birthday ashleigh
Happy birthday ashleighHappy birthday ashleigh
Happy birthday ashleighLaramie Lowe
 
LOCAL ADMINISTRATION REFORM IN CYPRUS
LOCAL ADMINISTRATION REFORM IN CYPRUSLOCAL ADMINISTRATION REFORM IN CYPRUS
LOCAL ADMINISTRATION REFORM IN CYPRUSLean6Sigma4all
 
Meeting with the Co-Operative Central Bank Management Board
Meeting with the Co-Operative Central Bank Management BoardMeeting with the Co-Operative Central Bank Management Board
Meeting with the Co-Operative Central Bank Management BoardLean6Sigma4all
 
Cypriot Local Administration Reform - Project overview Final - NOTORIA INTERN...
Cypriot Local Administration Reform - Project overview Final - NOTORIA INTERN...Cypriot Local Administration Reform - Project overview Final - NOTORIA INTERN...
Cypriot Local Administration Reform - Project overview Final - NOTORIA INTERN...Lean6Sigma4all
 
Happy birthday ashleigh
Happy birthday ashleighHappy birthday ashleigh
Happy birthday ashleighLaramie Lowe
 
Backup-File Artifacts - OWASP Khartoum InfoSec Sessions 2016 - Mazin Ahmed
Backup-File Artifacts - OWASP Khartoum InfoSec Sessions 2016 - Mazin AhmedBackup-File Artifacts - OWASP Khartoum InfoSec Sessions 2016 - Mazin Ahmed
Backup-File Artifacts - OWASP Khartoum InfoSec Sessions 2016 - Mazin AhmedMazin Ahmed
 
UTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingUTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingLean6Sigma4all
 
Calculate the BOTTLENECK
Calculate the BOTTLENECKCalculate the BOTTLENECK
Calculate the BOTTLENECKLean6Sigma4all
 
Clustering general-presentation (Project Cyprus Part III)
Clustering general-presentation (Project Cyprus Part III)Clustering general-presentation (Project Cyprus Part III)
Clustering general-presentation (Project Cyprus Part III)Lean6Sigma4all
 
Sem 2 Presentation
Sem 2 PresentationSem 2 Presentation
Sem 2 PresentationShalom Cohen
 
Cross Training Model - The School of Improvement
Cross Training Model - The School of ImprovementCross Training Model - The School of Improvement
Cross Training Model - The School of ImprovementLean6Sigma4all
 
Penerapan Persamaan Diferensial Parsial
Penerapan Persamaan Diferensial ParsialPenerapan Persamaan Diferensial Parsial
Penerapan Persamaan Diferensial ParsialHidayatul Mustafidah
 

Andere mochten auch (16)

Kata Worksheet Form
Kata Worksheet Form Kata Worksheet Form
Kata Worksheet Form
 
Happy birthday ashleigh
Happy birthday ashleighHappy birthday ashleigh
Happy birthday ashleigh
 
Presentation1
Presentation1Presentation1
Presentation1
 
LOCAL ADMINISTRATION REFORM IN CYPRUS
LOCAL ADMINISTRATION REFORM IN CYPRUSLOCAL ADMINISTRATION REFORM IN CYPRUS
LOCAL ADMINISTRATION REFORM IN CYPRUS
 
Process Analysis
Process AnalysisProcess Analysis
Process Analysis
 
Meeting with the Co-Operative Central Bank Management Board
Meeting with the Co-Operative Central Bank Management BoardMeeting with the Co-Operative Central Bank Management Board
Meeting with the Co-Operative Central Bank Management Board
 
Cypriot Local Administration Reform - Project overview Final - NOTORIA INTERN...
Cypriot Local Administration Reform - Project overview Final - NOTORIA INTERN...Cypriot Local Administration Reform - Project overview Final - NOTORIA INTERN...
Cypriot Local Administration Reform - Project overview Final - NOTORIA INTERN...
 
Happy birthday ashleigh
Happy birthday ashleighHappy birthday ashleigh
Happy birthday ashleigh
 
Backup-File Artifacts - OWASP Khartoum InfoSec Sessions 2016 - Mazin Ahmed
Backup-File Artifacts - OWASP Khartoum InfoSec Sessions 2016 - Mazin AhmedBackup-File Artifacts - OWASP Khartoum InfoSec Sessions 2016 - Mazin Ahmed
Backup-File Artifacts - OWASP Khartoum InfoSec Sessions 2016 - Mazin Ahmed
 
UTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingUTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream Mapping
 
Calculate the BOTTLENECK
Calculate the BOTTLENECKCalculate the BOTTLENECK
Calculate the BOTTLENECK
 
Clustering general-presentation (Project Cyprus Part III)
Clustering general-presentation (Project Cyprus Part III)Clustering general-presentation (Project Cyprus Part III)
Clustering general-presentation (Project Cyprus Part III)
 
Sem 2 Presentation
Sem 2 PresentationSem 2 Presentation
Sem 2 Presentation
 
Cross Training Model - The School of Improvement
Cross Training Model - The School of ImprovementCross Training Model - The School of Improvement
Cross Training Model - The School of Improvement
 
Penerapan Persamaan Diferensial Parsial
Penerapan Persamaan Diferensial ParsialPenerapan Persamaan Diferensial Parsial
Penerapan Persamaan Diferensial Parsial
 
DMAIC Methodology
DMAIC MethodologyDMAIC Methodology
DMAIC Methodology
 

Ähnlich wie structure

ANALYSIS OF EFFECT OF WIND & SEISMIC FORCE ON MULTISTORIED BUILDING WITH OUTR...
ANALYSIS OF EFFECT OF WIND & SEISMIC FORCE ON MULTISTORIED BUILDING WITH OUTR...ANALYSIS OF EFFECT OF WIND & SEISMIC FORCE ON MULTISTORIED BUILDING WITH OUTR...
ANALYSIS OF EFFECT OF WIND & SEISMIC FORCE ON MULTISTORIED BUILDING WITH OUTR...IRJET Journal
 
IRJET- Energy Generation from Flywheel using Magnet
IRJET- 	  Energy Generation from Flywheel using MagnetIRJET- 	  Energy Generation from Flywheel using Magnet
IRJET- Energy Generation from Flywheel using MagnetIRJET Journal
 
Compound Chain Drive Transmission System for Automotive Vehicles
Compound Chain Drive Transmission System for Automotive VehiclesCompound Chain Drive Transmission System for Automotive Vehicles
Compound Chain Drive Transmission System for Automotive VehiclesIRJET Journal
 
IRJET-3 Fabrication of Pedal Assist Bicycle
IRJET-3 	  Fabrication of Pedal Assist BicycleIRJET-3 	  Fabrication of Pedal Assist Bicycle
IRJET-3 Fabrication of Pedal Assist BicycleIRJET Journal
 
Final semester Project
Final semester Project Final semester Project
Final semester Project Yadav Paras
 
IRJET- Static and Dynamic Analysis of Wind Energy Building under the Action o...
IRJET- Static and Dynamic Analysis of Wind Energy Building under the Action o...IRJET- Static and Dynamic Analysis of Wind Energy Building under the Action o...
IRJET- Static and Dynamic Analysis of Wind Energy Building under the Action o...IRJET Journal
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
 
DESIGN AND ANALYSIS OF FRAME FOR MOBILE SOLAR POWER STATION
DESIGN AND ANALYSIS OF FRAME FOR MOBILE SOLAR POWER STATIONDESIGN AND ANALYSIS OF FRAME FOR MOBILE SOLAR POWER STATION
DESIGN AND ANALYSIS OF FRAME FOR MOBILE SOLAR POWER STATIONIRJET Journal
 
Design requirements memo
Design requirements memoDesign requirements memo
Design requirements memogargashrut91
 
Solar Driven Asia Proposal
Solar Driven Asia Proposal Solar Driven Asia Proposal
Solar Driven Asia Proposal Maurice Williams
 
AUTOMATIC COIL WINDING MACHINE
AUTOMATIC COIL WINDING MACHINEAUTOMATIC COIL WINDING MACHINE
AUTOMATIC COIL WINDING MACHINEIRJET Journal
 
Sigma "Pure" Information Sheet
Sigma "Pure" Information SheetSigma "Pure" Information Sheet
Sigma "Pure" Information SheetQwentin McArthur
 

Ähnlich wie structure (20)

Quotation 50 kva_std_ongrid
Quotation 50 kva_std_ongridQuotation 50 kva_std_ongrid
Quotation 50 kva_std_ongrid
 
Quotation 10 kw_std_offgrid_nareshji
Quotation 10 kw_std_offgrid_nareshjiQuotation 10 kw_std_offgrid_nareshji
Quotation 10 kw_std_offgrid_nareshji
 
Quotation 10 kw_ongrid_rajkot_std
Quotation 10 kw_ongrid_rajkot_stdQuotation 10 kw_ongrid_rajkot_std
Quotation 10 kw_ongrid_rajkot_std
 
Exalta Quotation 10 kw_ongrid_rajkot_std
Exalta Quotation 10 kw_ongrid_rajkot_stdExalta Quotation 10 kw_ongrid_rajkot_std
Exalta Quotation 10 kw_ongrid_rajkot_std
 
Gensol - EPC Services
Gensol - EPC ServicesGensol - EPC Services
Gensol - EPC Services
 
ANALYSIS OF EFFECT OF WIND & SEISMIC FORCE ON MULTISTORIED BUILDING WITH OUTR...
ANALYSIS OF EFFECT OF WIND & SEISMIC FORCE ON MULTISTORIED BUILDING WITH OUTR...ANALYSIS OF EFFECT OF WIND & SEISMIC FORCE ON MULTISTORIED BUILDING WITH OUTR...
ANALYSIS OF EFFECT OF WIND & SEISMIC FORCE ON MULTISTORIED BUILDING WITH OUTR...
 
IRJET- Energy Generation from Flywheel using Magnet
IRJET- 	  Energy Generation from Flywheel using MagnetIRJET- 	  Energy Generation from Flywheel using Magnet
IRJET- Energy Generation from Flywheel using Magnet
 
Rooftop pro
Rooftop proRooftop pro
Rooftop pro
 
Compound Chain Drive Transmission System for Automotive Vehicles
Compound Chain Drive Transmission System for Automotive VehiclesCompound Chain Drive Transmission System for Automotive Vehicles
Compound Chain Drive Transmission System for Automotive Vehicles
 
IRJET-3 Fabrication of Pedal Assist Bicycle
IRJET-3 	  Fabrication of Pedal Assist BicycleIRJET-3 	  Fabrication of Pedal Assist Bicycle
IRJET-3 Fabrication of Pedal Assist Bicycle
 
EM Braking System
EM Braking SystemEM Braking System
EM Braking System
 
Final semester Project
Final semester Project Final semester Project
Final semester Project
 
My resume updated
My resume updatedMy resume updated
My resume updated
 
IRJET- Static and Dynamic Analysis of Wind Energy Building under the Action o...
IRJET- Static and Dynamic Analysis of Wind Energy Building under the Action o...IRJET- Static and Dynamic Analysis of Wind Energy Building under the Action o...
IRJET- Static and Dynamic Analysis of Wind Energy Building under the Action o...
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
DESIGN AND ANALYSIS OF FRAME FOR MOBILE SOLAR POWER STATION
DESIGN AND ANALYSIS OF FRAME FOR MOBILE SOLAR POWER STATIONDESIGN AND ANALYSIS OF FRAME FOR MOBILE SOLAR POWER STATION
DESIGN AND ANALYSIS OF FRAME FOR MOBILE SOLAR POWER STATION
 
Design requirements memo
Design requirements memoDesign requirements memo
Design requirements memo
 
Solar Driven Asia Proposal
Solar Driven Asia Proposal Solar Driven Asia Proposal
Solar Driven Asia Proposal
 
AUTOMATIC COIL WINDING MACHINE
AUTOMATIC COIL WINDING MACHINEAUTOMATIC COIL WINDING MACHINE
AUTOMATIC COIL WINDING MACHINE
 
Sigma "Pure" Information Sheet
Sigma "Pure" Information SheetSigma "Pure" Information Sheet
Sigma "Pure" Information Sheet
 

structure

  • 1. Shagg Energy ltd. 401-2, Gurukripa tower mahaveer marg C-scheme Jaipur. 0141-5108383 www.shaggenergies.com, shaggsolar@outlook.com, Proposal for solar roof top 1. Designand Structure 2. Installation 3. Procurement andCommissioning 4. Electrical part Structure description:- Rooftopstructure forsolarapplication We produce mounting systems, which are compatible with all panel sizes, with or without frame. It is only up to our clients to choose and order the specific demand. We provide fastening systems, which fit into both vertical and horizontal layout. We always design our mounting systems for the specific analyzed place and area’s condition, thus we cover 100% of hypothetical situations.
  • 2. Shagg Energy ltd. 401-2, Gurukripa tower mahaveer marg C-scheme Jaipur. 0141-5108383 www.shaggenergies.com, shaggsolar@outlook.com, Advantages  Structure and moving mechanism  Composite material bearings, no maintenance/ lubrication required.  Proprietary surface treatment for the bearings block for long life  Customized structure designs will be provided as per requirement  Balanced structure designs will be provided as per tracking Customizedrooftopstructure When it comes to industrial roofs mounting systems we focus on very close co-operation with our clients. For this reason are our mounting systems 100% custom made and will absolutely fit on each specific (concrete, wood etc.)roof. We always analyze our customer’s climatic conditions like wind, rain and design systems that are suitable enough to resist all theoretical situations. Advantages  Structure and moving mechanism  Composite material bearings, no maintenance/ lubrication required.  Proprietary surface treatment for the bearings block for long life  Customized structure designs will be provided as per requirement  Balanced structure designs will be provided as per tracking
  • 3. Shagg Energy ltd. 401-2, Gurukripa tower mahaveer marg C-scheme Jaipur. 0141-5108383 www.shaggenergies.com, shaggsolar@outlook.com, Solarmanual trackingsingleaxisunitforpumping set Single axis trackers have one degree of freedomthat acts as an axis of rotation. The axis of rotation of single axis trackers is typically aligned along a true North meridian. It is possible to align them in any cardinal direction with advanced tracking algorithms. There are several common implementations of single axis trackers. These include horizontal single axis trackers (HSAT), vertical single axis trackers (VSAT), tilted single axis trackers (TSAT) and polar aligned single axis trackers (PSAT). The orientation of the module with respect to the tracker axis is important when modeling performance.  Advantages o Structure and moving mechanism o Composite material bearings, no maintenance/ lubrication required. o Proprietary surface treatment for the bearings block for long life o Customized structure designs will be provided as per requirement o Balanced structure designs will be provided as per tracking All the Productsare AvailableinHot-DipGalvanizedFinishORPolly-Urethane PaintedinChoicestColor Shed 1. Pricesfor solar rooftop:- 1kwp to 10kwp Rs.5.5/watt 10kwp to 25kwp Rs.5/watt 25kwp to 50kwp Rs.4.70/watt Above50kwp According to structure.
  • 4. Shagg Energy ltd. 401-2, Gurukripa tower mahaveer marg C-scheme Jaipur. 0141-5108383 www.shaggenergies.com, shaggsolar@outlook.com, Installationpart:-  Electrical Works A. Wiring of Modules B. Cabling from modules to Combiner box C. Combiner Box assembly D. Cabling from Combiner box to Inverter E. Cabling from Inverter to AC Distribution box . Module structure installation Civil work for module mounting structure will be charged as actual. 2. Prices for installationof solar roof top:- a) Including Complete SPV system- Procurement, Design of the plant, Installation and Commissioning. 1kwp to 10kwp Rs.3.5/watt 10kwp to 25kwp Rs.3/watt 25kwp to 50kwp Rs.2.80/watt Above50kwp Rs.2.50/watt Note:- all the requiredmaterial like wire, cable, nut, bolt will be chargedas actual. 3. Prices of Complete systeminstallationwithproduct exceptspv module and inverter 1kwp to 10kwp Rs.14/watt 10kwp to 25kwp Rs.13/watt 25kwp to 50kwp Rs.12.5/watt Above50kwp Rs.12/watt Note:- In this systemall work including labor charge will be beard by shagg energy ltd.
  • 5. Shagg Energy ltd. 401-2, Gurukripa tower mahaveer marg C-scheme Jaipur. 0141-5108383 www.shaggenergies.com, shaggsolar@outlook.com, 4. Complete ongrid systeminstallationwithproduct include SPV module and inverter 1kwp to 10kwp Rs.68/watt 10kwp to 25kwp Rs.65/watt 25kwp to 50kwp Rs.60/watt Above50kwp Rs.59/watt NOTE: Above mentioned rates can vary for typical structures which will be only quoted after complete site survey.