SlideShare ist ein Scribd-Unternehmen logo
1 von 25
Downloaden Sie, um offline zu lesen
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
1
SEVERNSIDE, BRISTOL AND AVON
This Theme area contains the Policy Units BRIS 1, BRIS 2, BRIS 3, BRIS 4, BRIS 5 and BRIS
6.
It encompasses the shoreline on the east bank of the River Severn from Aust to Portishead
Pier and includes both banks of the River Avon up to Netham Weir.
The Key Policy Drivers in this area are:
• International nature conservation sites – Severn Estuary SAC, SPA and Ramsar, Avon
Gorge Woodlands SAC;
• Critical infrastructure – M4 (including the Severn Road Crossing), M5, M49, railway network
(including the Severn Tunnels), sewage treatment works (Bedwick, Avonmouth, Portbury),
Seabank Power Station, electricity distribution network (including the Severn power line
crossing), electricity substations (Bristol), Avonmouth Docks, Fire and police stations
(Bristol), hospitals (Bristol), lighthouses;
• Industrial, commercial and economic assets - chemical processing plants, Avonmouth port
fuel depots, Bristol docks, Bristol;
• Residential areas – Bristol.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
2
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
3
Policy Unit: BRIS 1 – Aust Ferry to New Passage (east bank of the
River Severn)
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
4
Preferred Policies to Implement the Plan:
Epoch
Preferred
Policy
Comments
0 to 20
years
(2025)
HTL
The Short Term policy for this unit is Hold The Line.
The current defences are expected to remain in place for this epoch but will
require maintenance. Actions should take account of potential impacts in all
linked Policy Units (BRIS 2, BRIS 3, BRIS 4, and BRIS 5).
HTL will manage the risk of impacts from flooding to Key Policy Drivers in
this and linked Policy Units, such as the Severn road, rail and electricity
crossings. The saltmarsh in front of defences is expected to remain stable.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
20 to 50
years
(2055)
HTL
The medium term policy for this unit is Hold The Line.
The existing defences will come to the end of their serviceable life in this
epoch. HTL recommends that defences are replaced. New defences should
tie in with the high ground at Aust Cliff (in SEV 6). The location and type of
defence should be determined by the SEFRMS.
HTL will manage the risk of impacts from flooding to Key Policy Drivers in
this and linked Policy Units (BRIS 2, BRIS 3, BRIS 4, BRIS 5), such as the
Severn road, rail and electricity crossings.
Saltmarsh in front of new defences will erode as sea level rises – other,
similar habitat should be created elsewhere in the estuary to
maintain/improve the condition of the European protected sites.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
50 to 100
years
(2105)
HTL
The long term policy for this unit is Hold The Line.
New defences should be maintained. HTL will manage the risk of impacts
from flooding to Key Policy Drivers in this and linked Policy Units (BRIS 2,
BRIS 3, BRIS 4, BRIS 5), such as the Severn road, rail and electricity
crossings.
Saltmarsh in front of new defences will erode as sea level rises – other,
similar habitat should be created elsewhere in the estuary to
maintain/improve the condition of the European protected sites.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
5
Economics
Policy
Unit
Existing
SMP1
Policy
Time Period
(epoch)
SMP2 Assessment
0-
20
20-
50
50-
100
Preferred Plan Present Value
Damages
Preferred Plan Present Value
Defence Costs
BRI 1 HTL HTL HTL HTL
£461m
(BRIS1-5 total)
£58.4m
(BRIS1-5 total)
The preferred policy for this unit is economically viable. The preferred policy is economically viable for the
linked Policy Units of BRIS 1, BRIS 2, BRIS 3, BRIS 4 and BRIS 5. The costs and damages of the
preferred policy in the table above relate to actions taken in all linked policy units.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
6
Predicted Implication of the Preferred Plan for the BRIS 1 Policy Unit
Time
Period
Management Activities
Property, Land Use and
Human Health
Nature Conservation –
including Earth
Heritage, Geology and
Biodiversity
Landscape Character
and Visual Amenity
Historic Environment
Amenity and
Recreational Use
0 – 20
years
The maintenance of
defences will manage the
risk of flooding from large
scale flooding to this unit
and adjacent cells.
The maintenance of
defences will manage the
risk of impacts of flooding
to residential properties,
agricultural land and key
infrastructure in this and
linked Policy Units.
A HTL policy will not
impact the nature
conservation sites during
this time period. Works
should take account of
possible environmental
impacts and the need for
an EIA.
Maintaining defences will
not impact on existing
landscape and visual
amenity
Defences will manage the
risk of impacts to the
historic environment
Defences will manage the
risk to amenity or
recreational value of the
land
20 – 50
years
The current earth
embankment defences
are expected to come to
the end of their
serviceable life in this
epoch and should be
replaced. Hydraulic
linkage to a number of
units would result in a
large floodplain should
defences not be replaced.
The maintenance of
defences will manage the
risk of impacts of flooding
to residential properties,
agricultural land and key
infrastructure in this and
linked Policy Units.
Coastal squeeze will
occur which will result in
loss of intertidal habitats.
Works should take
account of possible
environmental impacts
and the need for an EIA.
Defences are likely to
come to the end of their
serviceable life in this
epoch. Increased height
of defences or change in
defence construction
materials will affect local
landscape - increasing
presence in the
landscape and disrupting
views.
Defences will manage the
risk of impacts to the
historic environment
Defences will manage the
risk to amenity or
recreational value of the
land
50 – 100
years
An on-going maintenance
programme should be
established including the
monitoring of shoreline
erosion as sea level rise
increases.
The maintenance of
defences will manage the
risk of impacts of flooding
to residential properties,
agricultural land and key
infrastructure in this and
linked Policy Units.
Coastal squeeze will
occur which will result in
loss of intertidal habitats.
Works should take
account of possible
environmental impacts
and the need for an EIA.
Increased height of
defences or change in
defence construction
materials will affect local
landscape - increasing
presence in the
landscape and disrupting
views.
Defences will manage the
risk of impacts to the
historic environment
Defences will manage the
risk to amenity or
recreational value of the
land
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
7
Policy Unit: BRIS 2 – New Passage to Severnside Works, nr Smoke
Lane/Chittening Road (east bank of the River Severn)
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
8
Preferred Policies to Implement the Plan:
Epoch
Preferred
Policy
Comments
0 to 20
years
(2025)
HTL
The short term policy for this unit is Hold The Line.
The current defences (concrete revetment and railway embankment) are
expected to remain in place but will require maintenance.
HTL will manage the risk of impacts from flooding to important economic
assets in this Policy Unit and to Key Policy Drivers in this and linked Policy
Units (BRIS 1, BRIS 3, BRIS 4, BRIS 5), e.g. Severn road, rail and electricity
crossings.
The saltmarsh (Chittening Warth) in front of defences has historically been
accreting and is expected to remain stable.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
20 to 50
years
(2055)
HTL
The medium term policy for this unit is Hold The Line.
The existing defences will come to the end of their serviceable life in this
epoch. HTL recommends that defences are replaced. New defences should
tie in with other defences in linked Policy Units (BRIS 1, BRIS 3, BRIS 4, and
BRIS 5). High ground naturally limits the risk of coastal flooding in some
areas. The location and type of defence should be determined by the
SEFRMS.
HTL will manage the risk of impacts from flooding to important economic
assets in this Policy Unit and to Key Policy Drivers in this and linked Policy
Units.
The saltmarsh has historically been accreting but will begin to erode as sea
level rises – other, similar habitat should be created elsewhere in the estuary
to maintain/improve the condition of the European protected sites.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
50 to 100
years
(2105)
HTL
The long term policy for this unit is Hold The Line.
New defences should be maintained. HTL will manage the risk of impacts
from flooding to Key Policy Drivers in this and linked Policy Units (BRIS 2,
BRIS 3, BRIS 4, and BRIS 5).
Saltmarsh in front of new defences will erode as sea level rises – other,
similar habitat should be created elsewhere in the estuary to
maintain/improve the condition of the European protected sites.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
9
Economics
Policy
Unit
Existing
SMP1
Policy
Time Period
(epoch)
SMP2 Assessment
0-
20
20-
50
50-
100
Preferred Plan Present Value
Damages
Preferred Plan Present Value
Defence Costs
BRI 2 HTL HTL HTL HTL
£461m
(BRIS1-5 total)
£58.4m
(BRIS1-5 total)
The preferred policy for this unit is economically viable. The preferred policy is economically viable for the
linked Policy Units of BRIS 1, BRIS 2, BRIS 3, BRIS 4 and BRIS 5. The costs and damages of the
preferred policy in the table above relate to actions taken in all linked policy units.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
10
Predicted Implication of the Preferred Plan for the BRIS 2 Policy Unit
Time
Period
Management Activities
Property, Land Use and
Human Health
Nature Conservation –
including Earth
Heritage, Geology and
Biodiversity
Landscape Character
and Visual Amenity
Historic Environment
Amenity and
Recreational Use
0 – 20
years
The maintenance of
defences will manage the
risk of flooding from large
scale flooding to this unit
and adjacent cells.
The maintenance of
defences will manage the
risk of impacts to
residential properties,
agricultural land and key
infrastructure in this and
linked Policy Units.
A HTL policy will not
impact the nature
conservation sites during
this time period. Works
should take account of
possible environmental
impacts and the need for
an EIA.
Maintaining defences will
not impact on existing
landscape and visual
amenity
Defences will manage the
risk of impacts to the
historic environment
Defences will manage the
risk to amenity or
recreational value of the
land
20 – 50
years
The current defences are
expected to come to the
end of their serviceable
life in this epoch and
should be replaced.
Hydraulic linkage to a
number of units would
result in a large floodplain
should defences not be
replaced.
The maintenance of
defences will manage the
risk of impacts to
residential properties,
agricultural land and key
infrastructure in this and
linked Policy Units.
Coastal squeeze will
occur which will result in
loss of intertidal habitats
and saltmarsh. Works
should take account of
possible environmental
impacts and the need for
an EIA.
Defences are likely to
come to the end of their
serviceable life in this
epoch. Increased height
of defences or change in
defence construction
materials will affect local
landscape - increasing
presence in the
landscape and disrupting
views.
Defences will manage the
risk of impacts to the
historic environment
Defences will manage the
risk to amenity or
recreational value of the
land
50 – 100
years
An on-going maintenance
programme should be
established including the
monitoring of shoreline
erosion as sea level rise
increases.
The maintenance of
defences will manage the
risk of impacts to
residential properties,
agricultural land and key
infrastructure in this and
linked Policy Units.
Coastal squeeze will
occur which will result in
loss of intertidal habitats
and saltmarsh. Works
should take account of
possible environmental
impacts and the need for
an EIA.
Increased height of
defences or change in
defence construction
materials will affect local
landscape - increasing
presence in the
landscape and disrupting
views.
Defences will manage the
risk of impacts to the
historic environment
Defences will manage the
risk to amenity or
recreational value of the
land
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
11
Policy Unit: BRIS 3 - Severnside Works, Nr Smoke Lane/ Chittening
Road (east bank of the River Severn) to Avonmouth Pier
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
12
Preferred Policies to Implement the Plan:
Epoch
Preferred
Policy
Comments
0 to 20
years
(2025)
HTL
The short term policy for this unit is Hold The Line.
The existing defences will come to the end of their serviceable life in this
epoch. HTL recommends that defences are replaced. High ground naturally
limits the risk of coastal flooding in some areas. The positions, size and type
of defence should take account of those in linked Policy Units (BRIS 1, BRIS
2, BRIS 4, and BRIS 5). The location and type of defence should be
determined by the SEFRMS.
HTL will manage the risk of impacts from flooding to the docks and other Key
Policy Drivers in this and linked Policy Units, such as the Severn road, rail
and electricity crossings.
Any land reclamation as part of the Bristol Port deep water terminal
development should be managed to ensure that it does not impact on flood
risk management in this or linked Policy Units.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
20 to 50
years
(2055)
HTL
The medium term policy for this unit is Hold The Line.
New defences should be maintained. HTL will manage the risk of impacts
from flooding to the docks and other Key Policy Drivers in this and linked
Policy Units (BRIS 1, BRIS 2, BRIS 4, BRIS 5), such as the Severn road, rail
and electricity crossings.
Saltmarsh in front of new defences will erode as sea level rises – other,
similar habitat should be created elsewhere in the estuary to
maintain/improve the condition of the European protected sites.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
50 to 100
years
(2105)
HTL
The long term policy for this unit is Hold The Line.
New defences should be maintained. HTL will manage the risk of impacts
from flooding to the docks and other Key Policy Drivers in this and linked
Policy Units (BRIS 1, BRIS 2, BRIS 4, BRIS 5), such as the Severn road, rail
and electricity crossings.
Saltmarsh in front of new defences will erode as sea level rises – other,
similar habitat should be created elsewhere in the estuary to
maintain/improve the condition of the European protected sites.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
13
Economics
Policy
Unit
Existing
SMP1
Policy
Time Period
(epoch)
SMP2 Assessment
0-
20
20-
50
50-
100
Preferred Plan Present Value
Damages
Preferred Plan Present Value
Defence Costs
BRI 3 HTL HTL HTL HTL
£461m
(BRIS1-5 total)
£58.4m
(BRIS1-5 total)
The preferred policy for this unit is economically viable. The preferred policy is economically viable for the
linked Policy Units of BRIS 1, BRIS 2, BRIS 3, BRIS 4 and BRIS 5. The costs and damages of the
preferred policy in the table above relate to actions taken in all linked policy units.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
14
Predicted Implication of the Preferred Plan for the BRIS 3 Policy Unit
Time
Period
Management Activities
Property, Land Use and
Human Health
Nature Conservation –
including Earth
Heritage, Geology and
Biodiversity
Landscape Character
and Visual Amenity
Historic Environment
Amenity and
Recreational Use
0 – 20
years
The current earth
embankment defences
are expected to come to
the end of their
serviceable life in this
epoch and should be
replaced. A maintenance
programme should be
established for the new
defences.
The maintenance of
defences will manage the
risk of flooding from large
scale flooding to
residential properties,
agricultural land and key
infrastructure in this and
linked Policy Units.
A HTL policy will not
impact the nature
conservation sites during
this time period. Works
should take account of
possible environmental
impacts and the need for
an EIA.
Defences are likely to
come to the end of their
serviceable life in this
epoch. Increased height
of defences or change in
defence construction
materials will affect local
landscape - increasing
presence in the
landscape and disrupting
views.
Defences will manage the
risk to the historic
environment
Defences will manage the
risk to amenity or
recreational value of the
land
20 – 50
years
On-going maintenance
should continue.
Monitoring of shoreline
erosion as sea level rise
increases should be
undertaken.
The maintenance of
defences will manage the
risk of flooding from large
scale flooding to
residential properties,
agricultural land and key
infrastructure in this and
linked Policy Units.
Coastal squeeze will
occur which will result in
loss of intertidal habitats
and saltmarsh. Works
should take account of
possible environmental
impacts and the need for
an EIA.
Increased height of
defences or change in
defence construction
materials will affect local
landscape - increasing
presence in the
landscape and disrupting
views.
Defences will manage the
risk to the historic
environment
Defences will manage the
risk to amenity or
recreational value of the
land
50 – 100
years
On-going maintenance
should continue.
Monitoring of shoreline
erosion as sea level rise
increases should be
undertaken.
The maintenance of
defences will manage the
risk of flooding from large
scale flooding to
residential properties,
agricultural land and key
infrastructure in this and
linked Policy Units.
Coastal squeeze will
occur which will result in
loss of intertidal habitats
and saltmarsh. Works
should take account of
possible environmental
impacts and the need for
an EIA.
Increased height of
defences or change in
defence construction
materials will affect local
landscape - increasing
presence in the
landscape and disrupting
views.
Defences will manage the
risk to the historic
environment
Defences will manage the
risk to amenity or
recreational value of the
land
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
15
Policy Unit: BRIS 4 - Avonmouth Pier to Netham Weir (north bank of
the River Avon)
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
16
Preferred Policies to Implement the Plan:
Epoch
Preferred
Policy
Comments
0 to 20
years
(2025)
HTL
The short term policy for this unit is Hold The Line.
The current defences (mix of earth embankments, concrete walls and dock
defences) are expected to remain in place for this epoch but will require
maintenance. Some sections may need to be replaced. The positions, size
and type of defence should take account of impacts in linked Policy Units
(BRIS 1, BRIS 2, BRIS 3, and BRIS 5). The location and type of defence
should be determined by local flood risk management studies.
HTL will manage the risk of impacts from flooding to Key Policy Drivers in
this and linked Policy Units, such as residential properties (Bristol), economic
assets (docks) and critical infrastructure (Bristol General Hospital).
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
20 to 50
years
(2055)
HTL
The medium term policy for this unit is Hold The Line.
The existing defences will come to the end of their serviceable life in this
epoch. HTL recommends that defences are replaced. The position, size and
type of defence should be determined by local flood risk management
studies and take account of impacts in linked Policy Units (BRIS 1, BRIS 2,
BRIS 3, and BRIS 5).
HTL will manage the risk of impacts to Key Policy Drivers in this and linked
Policy Units.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
50 to 100
years
(2105)
HTL
The long term policy for this unit is Hold The Line.
New defences should be maintained. Some defences replaced in the first
epoch may require significant repair / replacement by the end of this epoch.
The positions, size and type of defence should take account of impacts in
linked Policy Units.
HTL will manage the risk of impacts to Key Policy Drivers in this and linked
Policy Units (BRIS 1, BRIS 2, BRIS 3, and BRIS 5). The shape of the river
channel (morphology) should be monitored.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
17
Economics
Policy
Unit
Existing
SMP1
Policy
Time Period
(epoch)
SMP2 Assessment
0-
20
20-
50
50-
100
Preferred Plan Present Value
Damages
Preferred Plan Present Value
Defence Costs
BRI 4 HTL HTL HTL HTL
£461m
(BRIS1-5 total)
£58.4m
(BRIS1-5 total)
The preferred policy for this unit is economically viable. The preferred policy is economically viable for the
linked Policy Units of BRIS 1, BRIS 2, BRIS 3, BRIS 4 and BRIS 5. The costs and damages of the
preferred policy in the table above relate to actions taken in all linked policy units.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
18
Predicted Implication of the Preferred Plan for the BRIS 4 Policy Unit
Time
Period
Management Activities
Property, Land Use and
Human Health
Nature Conservation –
including Earth
Heritage, Geology and
Biodiversity
Landscape Character
and Visual Amenity
Historic Environment
Amenity and
Recreational Use
0 – 20
years
A HTL policy will require
maintenance to earth
embankment and
concrete/masonry walls.
Some constrained tidal
flood risk to property or
land.
A HTL policy will support
the stable, hard geology
shoreline. Works should
take account of possible
environmental impacts
and the need for an EIA.
Limited erosion and flood
risk under a HTL policy
will not impact on existing
landscape and visual
amenity
Limited erosion and flood
risk under a HTL policy
will not impact on the
historic environment
Limited erosion and flood
risk under a HTL policy
will not impact on amenity
or recreational value of
the land
20 – 50
years
A HTL policy will require
significant maintenance/
replacement to earth
embankment and
concrete/masonry walls.
Some constrained tidal
flood risk to property or
land.
A HTL policy will support
the stable, hard geology
shoreline. Works should
take account of possible
environmental impacts
and the need for an EIA.
Limited erosion and flood
risk under a HTL policy
will not impact on existing
landscape and visual
amenity
Limited erosion and flood
risk under a HTL policy
will not impact on the
historic environment
Limited erosion and flood
risk under a HTL policy
will not impact on amenity
or recreational value of
the land
50 – 100
years
A HTL policy will require
maintenance/
replacement to earth
embankment and
concrete/masonry walls.
Some constrained tidal
flood risk to property or
land.
A HTL policy will support
the stable, hard geology
shoreline. Works should
take account of possible
environmental impacts
and the need for an EIA.
Limited erosion and flood
risk under a HTL policy
will not impact on existing
landscape and visual
amenity
Limited erosion and flood
risk under a HTL policy
will not impact on the
historic environment
Limited erosion and flood
risk under a HTL policy
will not impact on amenity
or recreational value of
the land
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
19
Policy Unit: BRIS 5 Netham Weir to Avon Road, Easton-in-Gordano
(south bank of the River Avon)
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
20
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
21
Preferred Policies to Implement the Plan:
Epoch
Preferred
Policy
Comments
0 to 20
years
(2025)
HTL
The short term policy for this unit is Hold The Line.
The current defences (earth embankments / concrete walls) are expected to
remain in place for this epoch but will require maintenance. Some sections
may need to be replaced. The positions, size and type of defence should be
determined by local flood risk management studies and take account of
impacts in linked Policy Units (BRIS 1, BRIS 2, BRIS 3, and BRIS 4).
HTL will manage the risk of impacts from flooding to Key Policy Drivers in
this and linked Policy Units, including residential properties (Bristol),
economic assets and critical infrastructure.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
20 to 50
years
(2055)
HTL
The medium term policy for this unit is Hold The Line.
The existing defences will come to the end of their serviceable life in this
epoch. HTL recommends that defences are replaced. The positions, size
and type of defence should be determined by local flood risk management
studies and take account of impacts in linked Policy Units (BRIS 1, BRIS 2,
BRIS 3, and BRIS 4). HTL will manage the risk of impacts from flooding.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
50 to 100
years
(2105)
HTL
The long term policy for this unit is Hold The Line.
New defences should be maintained. Some defences replaced in the first
epoch may require significant repair / replacement by the end of this epoch.
The positions, size and type of defence should take account of impacts in
linked Policy Units (BRIS 1, BRIS 2, BRIS 3, and BRIS 4). The shape of the
river channel (morphology) should be monitored. HTL will manage the risk of
impacts from flooding.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
Economics
Policy
Unit
Existing
SMP1
Policy
Time Period
(epoch)
SMP2 Assessment
0-
20
20-
50
50-
100
Preferred Plan Present Value
Damages
Preferred Plan Present Value
Defence Costs
BRI 5 HTL HTL HTL HTL
£461m
(BRIS1-5 total)
£58.4m
(BRIS1-5 total)
The preferred policy for this unit is economically viable. The preferred policy is economically viable for the
linked Policy Units of BRIS 1, BRIS 2, BRIS 3, BRIS 4 and BRIS 5. The costs and damages of the
preferred policy in the table above relate to actions taken in all linked policy units.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
22
Predicted Implication of the Preferred Plan for the BRIS 5 Policy Unit
Time
Period
Management Activities
Property, Land Use and
Human Health
Nature Conservation –
including Earth
Heritage, Geology and
Biodiversity
Landscape Character
and Visual Amenity
Historic Environment
Amenity and
Recreational Use
0 – 20
years
A HTL policy will require
maintenance to earth
embankment and
concrete/masonry walls.
Some constrained tidal
flood risk to property or
land.
A HTL policy will support
the stable, hard geology
shoreline. Works should
take account of possible
environmental impacts
and the need for an EIA.
Limited erosion and flood
risk under a HTL policy
will not impact on existing
landscape and visual
amenity
Limited erosion and flood
risk under a HTL policy
will not impact on the
historic environment
Limited erosion and flood
risk under a HTL policy
will not impact on amenity
or recreational value of
the land
20 – 50
years
A HTL policy will require
significant maintenance/
replacement to earth
embankment and
concrete/masonry walls.
Some constrained tidal
flood risk to property or
land.
A HTL policy will support
the stable, hard geology
shoreline. Works should
take account of possible
environmental impacts
and the need for an EIA.
Limited erosion and flood
risk under a HTL policy
will not impact on existing
landscape and visual
amenity
Limited erosion and flood
risk under a HTL policy
will not impact on the
historic environment
Limited erosion and flood
risk under a HTL policy
will not impact on amenity
or recreational value of
the land
50 – 100
years
A HTL policy will require
significant maintenance/
replacement to earth
embankment and
concrete/masonry walls.
Some constrained tidal
flood risk to property or
land.
A HTL policy will support
the stable, hard geology
shoreline. Works should
take account of possible
environmental impacts
and the need for an EIA.
Limited erosion and flood
risk under a HTL policy
will not impact on existing
landscape and visual
amenity
Limited erosion and flood
risk under a HTL policy
will not impact on the
historic environment
Limited erosion and flood
risk under a HTL policy
will not impact on amenity
or recreational value of
the land
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
23
Policy Unit: BRIS 6 – Avon Road, Easton-in-Gordano (south bank of
the River Avon) to Portishead Pier (east bank of the River Severn)
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
24
Preferred Policies to Implement the Plan:
Epoch
Preferred
Policy
Comments
0 to 20
years
(2025)
HTL
The Short Term policy for this unit is Hold The Line.
The existing defences will come to the end of their serviceable life in this
epoch. HTL recommends that defences are replaced. High ground naturally
limits the risk of coastal flooding in some areas. The positions, size and type
of defence should be determined by local flood risk management studies.
HTL will manage the risk of impacts to the docks and other Key Policy
Drivers in this Policy Units, e.g. lighthouse, sewage treatment works. This
Policy Unit is not linked to any others.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
20 to 50
years
(2055)
HTL
The medium term policy for this unit is Hold The Line.
New defences should be maintained. HTL will manage the risk of impacts to
the docks and other Key Policy Drivers in this Policy Units, e.g. lighthouse,
sewage treatment works. This Policy Unit is not linked to any others.
Saltmarsh in front of new defences will erode as sea level rises – other,
similar habitat should be created elsewhere in the estuary to
maintain/improve the condition of the European protected sites.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
50 to 100
years
(2105)
HTL
The long term policy for this unit is Hold The Line.
Defences should be maintained. HTL will manage the risk of impacts to the
docks and other Key Policy Drivers in this Policy Units, e.g. lighthouse,
sewage treatment works. This Policy Unit is not linked to any others.
Saltmarsh in front of new defences will erode as sea level rises – other,
similar habitat should be created elsewhere in the estuary to
maintain/improve the condition of the European protected sites.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
Economics
Policy
Unit
Existing
SMP1
Policy
Time Period
(epoch)
SMP2 Assessment
0-
20
20-
50
50-
100
Preferred Plan Present Value
Damages
Preferred Plan Present Value
Defence Costs
BRI 6 HTL HTL HTL HTL £268m £6m
The preferred policy for this unit is economically viable. This Policy Unit is not linked to any others.
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review – Final Report
25
Predicted Implication of the Preferred Plan for the BRIS 6 Policy Unit
Time
Period
Management Activities
Property, Land Use and
Human Health
Nature Conservation –
including Earth
Heritage, Geology and
Biodiversity
Landscape Character
and Visual Amenity
Historic Environment
Amenity and
Recreational Use
0 – 20
years
The current earth
embankment defences
are expected to come to
the end of their
serviceable life in this
epoch and should be
replaced. Recently
completed defences will
require minimal
maintenance.
The maintenance of
defences will manage the
risk of flooding from large
scale flooding to
residential properties,
agricultural land and key
infrastructure in this and
linked Policy Units.
A HTL policy will not
impact the nature
conservation sites during
this time period. Works
should take account of
possible environmental
impacts and the need for
an EIA.
Defences are likely to
come to the end of their
serviceable life in this
epoch. Increased height
of defences or change in
defence construction
materials will affect local
landscape - increasing
presence in the
landscape and disrupting
views.
Defences will manage the
risk to the historic
environment
Defences will manage the
risk to amenity or
recreational value of the
land
20 – 50
years
On-going maintenance
should continue.
Monitoring of shoreline
erosion as sea level rise
increases should be
undertaken.
The maintenance of
defences will manage the
risk of flooding from large
scale flooding to
residential properties,
agricultural land and key
infrastructure in this and
linked Policy Units.
Coastal squeeze will
occur which will result in
loss of intertidal habitats
and saltmarsh. Works
should take account of
possible environmental
impacts and the need for
an EIA.
Increased height of
defences or change in
defence construction
materials will affect local
landscape - increasing
presence in the
landscape and disrupting
views.
Defences will manage the
risk to the historic
environment
Defences will manage the
risk to amenity or
recreational value of the
land
50 – 100
years
On-going maintenance
should continue.
Monitoring of shoreline
erosion as sea level rise
increases should be
undertaken.
The maintenance of
defences will manage the
risk of flooding from large
scale flooding to
residential properties,
agricultural land and key
infrastructure in this and
linked Policy Units.
Coastal squeeze will
occur which will result in
loss of intertidal habitats
and saltmarsh. Works
should take account of
possible environmental
impacts and the need for
an EIA.
Increased height of
defences or change in
defence construction
materials will affect local
landscape - increasing
presence in the
landscape and disrupting
views.
Defences will manage the
risk to the historic
environment
Defences will manage the
risk to amenity or
recreational value of the
land

Weitere ähnliche Inhalte

Was ist angesagt?

Appendix f policy development and appraisal final_dec2010
Appendix f policy development and appraisal final_dec2010Appendix f policy development and appraisal final_dec2010
Appendix f policy development and appraisal final_dec2010Severn Estuary
 
Appendix a development of the smp2 final_dec2010
Appendix a development of the smp2 final_dec2010Appendix a development of the smp2 final_dec2010
Appendix a development of the smp2 final_dec2010Severn Estuary
 
Appendix c baseline understanding final_dec2010
Appendix c baseline understanding final_dec2010Appendix c baseline understanding final_dec2010
Appendix c baseline understanding final_dec2010Severn Estuary
 
Appendix h economics final dec2010
Appendix h economics final dec2010Appendix h economics final dec2010
Appendix h economics final dec2010Severn Estuary
 
Appendix j wfd assessment final_dec2010
Appendix j wfd assessment final_dec2010Appendix j wfd assessment final_dec2010
Appendix j wfd assessment final_dec2010Severn Estuary
 
Smp2 part c action plan final
Smp2 part c action plan finalSmp2 part c action plan final
Smp2 part c action plan finalSevern Estuary
 
Appendix k metadata and bibliographic database final_dec2010
Appendix k metadata and bibliographic database final_dec2010Appendix k metadata and bibliographic database final_dec2010
Appendix k metadata and bibliographic database final_dec2010Severn Estuary
 
Appendix i part a sea annexes_final_dec2010
Appendix i part a sea annexes_final_dec2010Appendix i part a sea annexes_final_dec2010
Appendix i part a sea annexes_final_dec2010Severn Estuary
 
Smp2 part b policy statements tidenham only_final
Smp2 part b policy statements tidenham only_finalSmp2 part b policy statements tidenham only_final
Smp2 part b policy statements tidenham only_finalSevern Estuary
 
Smp2 part b policy statements wentlooge only_final
Smp2 part b policy statements wentlooge only_finalSmp2 part b policy statements wentlooge only_final
Smp2 part b policy statements wentlooge only_finalSevern Estuary
 
Smp2 part b policy statements sharpness-sev cross only_final
Smp2 part b policy statements sharpness-sev cross only_finalSmp2 part b policy statements sharpness-sev cross only_final
Smp2 part b policy statements sharpness-sev cross only_finalSevern Estuary
 
Smp2 part b policy statements portishead only_final
Smp2 part b policy statements portishead only_finalSmp2 part b policy statements portishead only_final
Smp2 part b policy statements portishead only_finalSevern Estuary
 
Smp2 part b policy statements cardiff only_final
Smp2 part b policy statements cardiff only_finalSmp2 part b policy statements cardiff only_final
Smp2 part b policy statements cardiff only_finalSevern Estuary
 
Smp2 part b policy statements glos-haw bridge only_final
Smp2 part b policy statements glos-haw bridge only_finalSmp2 part b policy statements glos-haw bridge only_final
Smp2 part b policy statements glos-haw bridge only_finalSevern Estuary
 
Smp2 part b policy statements caldicot only_final
Smp2 part b policy statements caldicot only_finalSmp2 part b policy statements caldicot only_final
Smp2 part b policy statements caldicot only_finalSevern Estuary
 
Smp2 part b policy statements lydney-glos only_final
Smp2 part b policy statements lydney-glos only_finalSmp2 part b policy statements lydney-glos only_final
Smp2 part b policy statements lydney-glos only_finalSevern Estuary
 
Moving Towards Resilience in Vermont
Moving Towards Resilience in VermontMoving Towards Resilience in Vermont
Moving Towards Resilience in VermontRPO America
 
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...Iwl Pcu
 
Environmentally sensitive areas
Environmentally sensitive areasEnvironmentally sensitive areas
Environmentally sensitive areasgscplanning
 

Was ist angesagt? (20)

Appendix f policy development and appraisal final_dec2010
Appendix f policy development and appraisal final_dec2010Appendix f policy development and appraisal final_dec2010
Appendix f policy development and appraisal final_dec2010
 
Appendix a development of the smp2 final_dec2010
Appendix a development of the smp2 final_dec2010Appendix a development of the smp2 final_dec2010
Appendix a development of the smp2 final_dec2010
 
Appendix c baseline understanding final_dec2010
Appendix c baseline understanding final_dec2010Appendix c baseline understanding final_dec2010
Appendix c baseline understanding final_dec2010
 
Appendix h economics final dec2010
Appendix h economics final dec2010Appendix h economics final dec2010
Appendix h economics final dec2010
 
Appendix j wfd assessment final_dec2010
Appendix j wfd assessment final_dec2010Appendix j wfd assessment final_dec2010
Appendix j wfd assessment final_dec2010
 
Smp2 part c action plan final
Smp2 part c action plan finalSmp2 part c action plan final
Smp2 part c action plan final
 
Appendix k metadata and bibliographic database final_dec2010
Appendix k metadata and bibliographic database final_dec2010Appendix k metadata and bibliographic database final_dec2010
Appendix k metadata and bibliographic database final_dec2010
 
Appendix i part a sea annexes_final_dec2010
Appendix i part a sea annexes_final_dec2010Appendix i part a sea annexes_final_dec2010
Appendix i part a sea annexes_final_dec2010
 
Smp2 part b policy statements tidenham only_final
Smp2 part b policy statements tidenham only_finalSmp2 part b policy statements tidenham only_final
Smp2 part b policy statements tidenham only_final
 
Smp2 part b policy statements wentlooge only_final
Smp2 part b policy statements wentlooge only_finalSmp2 part b policy statements wentlooge only_final
Smp2 part b policy statements wentlooge only_final
 
Smp2 part b policy statements sharpness-sev cross only_final
Smp2 part b policy statements sharpness-sev cross only_finalSmp2 part b policy statements sharpness-sev cross only_final
Smp2 part b policy statements sharpness-sev cross only_final
 
Smp2 part b policy statements portishead only_final
Smp2 part b policy statements portishead only_finalSmp2 part b policy statements portishead only_final
Smp2 part b policy statements portishead only_final
 
Smp2 part b policy statements cardiff only_final
Smp2 part b policy statements cardiff only_finalSmp2 part b policy statements cardiff only_final
Smp2 part b policy statements cardiff only_final
 
Smp2 part b policy statements glos-haw bridge only_final
Smp2 part b policy statements glos-haw bridge only_finalSmp2 part b policy statements glos-haw bridge only_final
Smp2 part b policy statements glos-haw bridge only_final
 
Smp2 part b policy statements caldicot only_final
Smp2 part b policy statements caldicot only_finalSmp2 part b policy statements caldicot only_final
Smp2 part b policy statements caldicot only_final
 
Smp2 part b policy statements lydney-glos only_final
Smp2 part b policy statements lydney-glos only_finalSmp2 part b policy statements lydney-glos only_final
Smp2 part b policy statements lydney-glos only_final
 
Moving Towards Resilience in Vermont
Moving Towards Resilience in VermontMoving Towards Resilience in Vermont
Moving Towards Resilience in Vermont
 
Alaska
AlaskaAlaska
Alaska
 
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
 
Environmentally sensitive areas
Environmentally sensitive areasEnvironmentally sensitive areas
Environmentally sensitive areas
 

Andere mochten auch

Offshore Ind Gases J Grover 11 Dec 07
Offshore Ind Gases J Grover 11 Dec 07Offshore Ind Gases J Grover 11 Dec 07
Offshore Ind Gases J Grover 11 Dec 07John Grover
 
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...John Grover
 
Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15John Grover
 
Smp2 part b policy statements kingston seymour only_final
Smp2 part b policy statements kingston seymour only_finalSmp2 part b policy statements kingston seymour only_final
Smp2 part b policy statements kingston seymour only_finalSevern Estuary
 
PII Paper for PetroMin Gas Pipeline Conference
PII Paper for PetroMin Gas Pipeline ConferencePII Paper for PetroMin Gas Pipeline Conference
PII Paper for PetroMin Gas Pipeline ConferenceJohn Grover
 
26-grover-john-final
26-grover-john-final26-grover-john-final
26-grover-john-finalJohn Grover
 
OSEA 2006 - Precom Impact final
OSEA 2006 - Precom Impact finalOSEA 2006 - Precom Impact final
OSEA 2006 - Precom Impact finalJohn Grover
 
BHI NSP Final 14_6_12
BHI NSP Final 14_6_12BHI NSP Final 14_6_12
BHI NSP Final 14_6_12John Grover
 
Paper 43 - OPT 2015_BHI 9_2_15
Paper 43 - OPT 2015_BHI 9_2_15Paper 43 - OPT 2015_BHI 9_2_15
Paper 43 - OPT 2015_BHI 9_2_15John Grover
 
Assignment2 nadiamis
Assignment2 nadiamisAssignment2 nadiamis
Assignment2 nadiamisAhmad Fayad
 
Global Lens - Visualize World Bank Data
Global Lens - Visualize World Bank DataGlobal Lens - Visualize World Bank Data
Global Lens - Visualize World Bank Dataan_yang
 
SI-658 instagram
SI-658 instagramSI-658 instagram
SI-658 instagraman_yang
 

Andere mochten auch (15)

Offshore Ind Gases J Grover 11 Dec 07
Offshore Ind Gases J Grover 11 Dec 07Offshore Ind Gases J Grover 11 Dec 07
Offshore Ind Gases J Grover 11 Dec 07
 
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
 
Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15
 
Tasnia
TasniaTasnia
Tasnia
 
Smp2 part b policy statements kingston seymour only_final
Smp2 part b policy statements kingston seymour only_finalSmp2 part b policy statements kingston seymour only_final
Smp2 part b policy statements kingston seymour only_final
 
PII Paper for PetroMin Gas Pipeline Conference
PII Paper for PetroMin Gas Pipeline ConferencePII Paper for PetroMin Gas Pipeline Conference
PII Paper for PetroMin Gas Pipeline Conference
 
26-grover-john-final
26-grover-john-final26-grover-john-final
26-grover-john-final
 
OSEA 2006 - Precom Impact final
OSEA 2006 - Precom Impact finalOSEA 2006 - Precom Impact final
OSEA 2006 - Precom Impact final
 
PII_IQPC_May_04
PII_IQPC_May_04PII_IQPC_May_04
PII_IQPC_May_04
 
OGJ Nordstream
OGJ NordstreamOGJ Nordstream
OGJ Nordstream
 
BHI NSP Final 14_6_12
BHI NSP Final 14_6_12BHI NSP Final 14_6_12
BHI NSP Final 14_6_12
 
Paper 43 - OPT 2015_BHI 9_2_15
Paper 43 - OPT 2015_BHI 9_2_15Paper 43 - OPT 2015_BHI 9_2_15
Paper 43 - OPT 2015_BHI 9_2_15
 
Assignment2 nadiamis
Assignment2 nadiamisAssignment2 nadiamis
Assignment2 nadiamis
 
Global Lens - Visualize World Bank Data
Global Lens - Visualize World Bank DataGlobal Lens - Visualize World Bank Data
Global Lens - Visualize World Bank Data
 
SI-658 instagram
SI-658 instagramSI-658 instagram
SI-658 instagram
 

Ähnlich wie Smp2 part b policy statements bristol only_final

Smp2 part b policy statements newport-usk only_final
Smp2 part b policy statements newport-usk only_finalSmp2 part b policy statements newport-usk only_final
Smp2 part b policy statements newport-usk only_finalSevern Estuary
 
Smp2 part b policy statements glos-sharpness only_final
Smp2 part b policy statements glos-sharpness only_finalSmp2 part b policy statements glos-sharpness only_final
Smp2 part b policy statements glos-sharpness only_finalSevern Estuary
 
Smp2 part b policy statements chepstow-wye only_final
Smp2 part b policy statements chepstow-wye only_finalSmp2 part b policy statements chepstow-wye only_final
Smp2 part b policy statements chepstow-wye only_finalSevern Estuary
 
2009 06 Department of Energy and Climate Change - Juliet Austin
2009 06 Department of Energy and Climate Change - Juliet Austin 2009 06 Department of Energy and Climate Change - Juliet Austin
2009 06 Department of Energy and Climate Change - Juliet Austin SevernEstuary
 
Climate Tipping Points and the Insurance Sector
Climate Tipping Points and the Insurance SectorClimate Tipping Points and the Insurance Sector
Climate Tipping Points and the Insurance SectorOpen Knowledge
 
2012 06 Bristol Channel Strategic Coastal Group – Shoreline and Flood Risk Ma...
2012 06 Bristol Channel Strategic Coastal Group – Shoreline and Flood Risk Ma...2012 06 Bristol Channel Strategic Coastal Group – Shoreline and Flood Risk Ma...
2012 06 Bristol Channel Strategic Coastal Group – Shoreline and Flood Risk Ma...SevernEstuary
 
DEIR Resiliency Plan San Tim Canyon
DEIR Resiliency Plan San Tim CanyonDEIR Resiliency Plan San Tim Canyon
DEIR Resiliency Plan San Tim CanyonBrian Robey
 
Hawkesbury-Nepean River System Coastal Management Program Stage 1 Scoping Study
Hawkesbury-Nepean River System Coastal Management Program Stage 1 Scoping StudyHawkesbury-Nepean River System Coastal Management Program Stage 1 Scoping Study
Hawkesbury-Nepean River System Coastal Management Program Stage 1 Scoping StudyNeil Dufty
 
Hydropower Development on the Mekong and 3S
 Hydropower Development on the Mekong and 3S  Hydropower Development on the Mekong and 3S
Hydropower Development on the Mekong and 3S stimson
 
Community engagement on adaptation to sea level change
Community engagement on adaptation to sea level changeCommunity engagement on adaptation to sea level change
Community engagement on adaptation to sea level changeNeil Dufty
 
NAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific Islands
NAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific IslandsNAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific Islands
NAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific IslandsNAP Events
 
Climate Change Impact On Cliff Instability And Erosion
Climate Change Impact On Cliff Instability And ErosionClimate Change Impact On Cliff Instability And Erosion
Climate Change Impact On Cliff Instability And ErosionRoger_Moore
 
ANCOLD 2014-Ayre-Toombes
ANCOLD 2014-Ayre-ToombesANCOLD 2014-Ayre-Toombes
ANCOLD 2014-Ayre-ToombesRob Ayre
 

Ähnlich wie Smp2 part b policy statements bristol only_final (18)

Smp2 part b policy statements newport-usk only_final
Smp2 part b policy statements newport-usk only_finalSmp2 part b policy statements newport-usk only_final
Smp2 part b policy statements newport-usk only_final
 
Smp2 part b policy statements glos-sharpness only_final
Smp2 part b policy statements glos-sharpness only_finalSmp2 part b policy statements glos-sharpness only_final
Smp2 part b policy statements glos-sharpness only_final
 
Smp2 part b policy statements chepstow-wye only_final
Smp2 part b policy statements chepstow-wye only_finalSmp2 part b policy statements chepstow-wye only_final
Smp2 part b policy statements chepstow-wye only_final
 
backgrounder_lmfls
backgrounder_lmflsbackgrounder_lmfls
backgrounder_lmfls
 
2009 06 Department of Energy and Climate Change - Juliet Austin
2009 06 Department of Energy and Climate Change - Juliet Austin 2009 06 Department of Energy and Climate Change - Juliet Austin
2009 06 Department of Energy and Climate Change - Juliet Austin
 
Climate Tipping Points and the Insurance Sector
Climate Tipping Points and the Insurance SectorClimate Tipping Points and the Insurance Sector
Climate Tipping Points and the Insurance Sector
 
2012 06 Bristol Channel Strategic Coastal Group – Shoreline and Flood Risk Ma...
2012 06 Bristol Channel Strategic Coastal Group – Shoreline and Flood Risk Ma...2012 06 Bristol Channel Strategic Coastal Group – Shoreline and Flood Risk Ma...
2012 06 Bristol Channel Strategic Coastal Group – Shoreline and Flood Risk Ma...
 
DEIR Resiliency Plan San Tim Canyon
DEIR Resiliency Plan San Tim CanyonDEIR Resiliency Plan San Tim Canyon
DEIR Resiliency Plan San Tim Canyon
 
Topic paper (Central Baltic Case) - Energy*
Topic paper (Central Baltic Case) - Energy*Topic paper (Central Baltic Case) - Energy*
Topic paper (Central Baltic Case) - Energy*
 
Hawkesbury-Nepean River System Coastal Management Program Stage 1 Scoping Study
Hawkesbury-Nepean River System Coastal Management Program Stage 1 Scoping StudyHawkesbury-Nepean River System Coastal Management Program Stage 1 Scoping Study
Hawkesbury-Nepean River System Coastal Management Program Stage 1 Scoping Study
 
Local Coastal Program Update_062215
Local Coastal Program Update_062215Local Coastal Program Update_062215
Local Coastal Program Update_062215
 
Hydropower Development on the Mekong and 3S
 Hydropower Development on the Mekong and 3S  Hydropower Development on the Mekong and 3S
Hydropower Development on the Mekong and 3S
 
East Cornwall CFMP
East Cornwall CFMPEast Cornwall CFMP
East Cornwall CFMP
 
Community engagement on adaptation to sea level change
Community engagement on adaptation to sea level changeCommunity engagement on adaptation to sea level change
Community engagement on adaptation to sea level change
 
NAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific Islands
NAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific IslandsNAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific Islands
NAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific Islands
 
Climate Change Adaptation Strategy
Climate Change Adaptation StrategyClimate Change Adaptation Strategy
Climate Change Adaptation Strategy
 
Climate Change Impact On Cliff Instability And Erosion
Climate Change Impact On Cliff Instability And ErosionClimate Change Impact On Cliff Instability And Erosion
Climate Change Impact On Cliff Instability And Erosion
 
ANCOLD 2014-Ayre-Toombes
ANCOLD 2014-Ayre-ToombesANCOLD 2014-Ayre-Toombes
ANCOLD 2014-Ayre-Toombes
 

Kürzlich hochgeladen

'Upcycling Research' presentation for SNU GSES
'Upcycling Research' presentation for SNU GSES'Upcycling Research' presentation for SNU GSES
'Upcycling Research' presentation for SNU GSESKyungeun Sung
 
Title-Role of forestry in restoration of degraded lands.pptx
Title-Role of forestry in restoration of degraded lands.pptxTitle-Role of forestry in restoration of degraded lands.pptx
Title-Role of forestry in restoration of degraded lands.pptxSagar Chaudhary
 
Air Pollution Control Technique and application.
Air Pollution Control Technique and application.Air Pollution Control Technique and application.
Air Pollution Control Technique and application.yadavsuyash008
 
Group 4The Species of the Atlantic Forest.pdf
Group 4The Species of the Atlantic Forest.pdfGroup 4The Species of the Atlantic Forest.pdf
Group 4The Species of the Atlantic Forest.pdfs2015004
 
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...alexsharmaa01
 
EMP (Environment Management Plan . .pptx
EMP (Environment Management Plan . .pptxEMP (Environment Management Plan . .pptx
EMP (Environment Management Plan . .pptxSarmad Naeem
 
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...Aqsa Yasmin
 
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证jdkhjh
 
Science, Technology and Nation Building.pptx
Science, Technology and Nation Building.pptxScience, Technology and Nation Building.pptx
Science, Technology and Nation Building.pptxgrandmarshall132
 
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作f3774p8b
 
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170simranguptaxx69
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for fooddrsk203
 
Making a Difference: Understanding the Upcycling and Recycling Difference
Making a Difference: Understanding the Upcycling and Recycling DifferenceMaking a Difference: Understanding the Upcycling and Recycling Difference
Making a Difference: Understanding the Upcycling and Recycling DifferenceSwag Cycle
 
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdfsrivastavaakshat51
 
NO1 Certified Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil...
NO1 Certified Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil...NO1 Certified Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil...
NO1 Certified Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil...Amil baba
 
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一z xss
 
LESSON 1- Eyong Pantahanan at Pangkabuhayan.pptx
LESSON 1- Eyong Pantahanan at Pangkabuhayan.pptxLESSON 1- Eyong Pantahanan at Pangkabuhayan.pptx
LESSON 1- Eyong Pantahanan at Pangkabuhayan.pptxPascualJaniceC
 
885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Educationz xss
 
التغيرات المناخية وتاثيرها على القطاع الزراعي المصري
التغيرات المناخية وتاثيرها على القطاع الزراعي المصريالتغيرات المناخية وتاثيرها على القطاع الزراعي المصري
التغيرات المناخية وتاثيرها على القطاع الزراعي المصريRawhyaShaheen
 

Kürzlich hochgeladen (20)

'Upcycling Research' presentation for SNU GSES
'Upcycling Research' presentation for SNU GSES'Upcycling Research' presentation for SNU GSES
'Upcycling Research' presentation for SNU GSES
 
Title-Role of forestry in restoration of degraded lands.pptx
Title-Role of forestry in restoration of degraded lands.pptxTitle-Role of forestry in restoration of degraded lands.pptx
Title-Role of forestry in restoration of degraded lands.pptx
 
Air Pollution Control Technique and application.
Air Pollution Control Technique and application.Air Pollution Control Technique and application.
Air Pollution Control Technique and application.
 
Group 4The Species of the Atlantic Forest.pdf
Group 4The Species of the Atlantic Forest.pdfGroup 4The Species of the Atlantic Forest.pdf
Group 4The Species of the Atlantic Forest.pdf
 
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
 
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
 
EMP (Environment Management Plan . .pptx
EMP (Environment Management Plan . .pptxEMP (Environment Management Plan . .pptx
EMP (Environment Management Plan . .pptx
 
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
EARTH DAY Slide show EARTHDAY.ORG is unwavering in our commitment to end plas...
 
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
 
Science, Technology and Nation Building.pptx
Science, Technology and Nation Building.pptxScience, Technology and Nation Building.pptx
Science, Technology and Nation Building.pptx
 
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
 
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for food
 
Making a Difference: Understanding the Upcycling and Recycling Difference
Making a Difference: Understanding the Upcycling and Recycling DifferenceMaking a Difference: Understanding the Upcycling and Recycling Difference
Making a Difference: Understanding the Upcycling and Recycling Difference
 
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
 
NO1 Certified Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil...
NO1 Certified Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil...NO1 Certified Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil...
NO1 Certified Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil...
 
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
 
LESSON 1- Eyong Pantahanan at Pangkabuhayan.pptx
LESSON 1- Eyong Pantahanan at Pangkabuhayan.pptxLESSON 1- Eyong Pantahanan at Pangkabuhayan.pptx
LESSON 1- Eyong Pantahanan at Pangkabuhayan.pptx
 
885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education
 
التغيرات المناخية وتاثيرها على القطاع الزراعي المصري
التغيرات المناخية وتاثيرها على القطاع الزراعي المصريالتغيرات المناخية وتاثيرها على القطاع الزراعي المصري
التغيرات المناخية وتاثيرها على القطاع الزراعي المصري
 

Smp2 part b policy statements bristol only_final

  • 1. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 1 SEVERNSIDE, BRISTOL AND AVON This Theme area contains the Policy Units BRIS 1, BRIS 2, BRIS 3, BRIS 4, BRIS 5 and BRIS 6. It encompasses the shoreline on the east bank of the River Severn from Aust to Portishead Pier and includes both banks of the River Avon up to Netham Weir. The Key Policy Drivers in this area are: • International nature conservation sites – Severn Estuary SAC, SPA and Ramsar, Avon Gorge Woodlands SAC; • Critical infrastructure – M4 (including the Severn Road Crossing), M5, M49, railway network (including the Severn Tunnels), sewage treatment works (Bedwick, Avonmouth, Portbury), Seabank Power Station, electricity distribution network (including the Severn power line crossing), electricity substations (Bristol), Avonmouth Docks, Fire and police stations (Bristol), hospitals (Bristol), lighthouses; • Industrial, commercial and economic assets - chemical processing plants, Avonmouth port fuel depots, Bristol docks, Bristol; • Residential areas – Bristol.
  • 2. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 2
  • 3. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 3 Policy Unit: BRIS 1 – Aust Ferry to New Passage (east bank of the River Severn)
  • 4. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 4 Preferred Policies to Implement the Plan: Epoch Preferred Policy Comments 0 to 20 years (2025) HTL The Short Term policy for this unit is Hold The Line. The current defences are expected to remain in place for this epoch but will require maintenance. Actions should take account of potential impacts in all linked Policy Units (BRIS 2, BRIS 3, BRIS 4, and BRIS 5). HTL will manage the risk of impacts from flooding to Key Policy Drivers in this and linked Policy Units, such as the Severn road, rail and electricity crossings. The saltmarsh in front of defences is expected to remain stable. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 20 to 50 years (2055) HTL The medium term policy for this unit is Hold The Line. The existing defences will come to the end of their serviceable life in this epoch. HTL recommends that defences are replaced. New defences should tie in with the high ground at Aust Cliff (in SEV 6). The location and type of defence should be determined by the SEFRMS. HTL will manage the risk of impacts from flooding to Key Policy Drivers in this and linked Policy Units (BRIS 2, BRIS 3, BRIS 4, BRIS 5), such as the Severn road, rail and electricity crossings. Saltmarsh in front of new defences will erode as sea level rises – other, similar habitat should be created elsewhere in the estuary to maintain/improve the condition of the European protected sites. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 50 to 100 years (2105) HTL The long term policy for this unit is Hold The Line. New defences should be maintained. HTL will manage the risk of impacts from flooding to Key Policy Drivers in this and linked Policy Units (BRIS 2, BRIS 3, BRIS 4, BRIS 5), such as the Severn road, rail and electricity crossings. Saltmarsh in front of new defences will erode as sea level rises – other, similar habitat should be created elsewhere in the estuary to maintain/improve the condition of the European protected sites. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise.
  • 5. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 5 Economics Policy Unit Existing SMP1 Policy Time Period (epoch) SMP2 Assessment 0- 20 20- 50 50- 100 Preferred Plan Present Value Damages Preferred Plan Present Value Defence Costs BRI 1 HTL HTL HTL HTL £461m (BRIS1-5 total) £58.4m (BRIS1-5 total) The preferred policy for this unit is economically viable. The preferred policy is economically viable for the linked Policy Units of BRIS 1, BRIS 2, BRIS 3, BRIS 4 and BRIS 5. The costs and damages of the preferred policy in the table above relate to actions taken in all linked policy units.
  • 6. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 6 Predicted Implication of the Preferred Plan for the BRIS 1 Policy Unit Time Period Management Activities Property, Land Use and Human Health Nature Conservation – including Earth Heritage, Geology and Biodiversity Landscape Character and Visual Amenity Historic Environment Amenity and Recreational Use 0 – 20 years The maintenance of defences will manage the risk of flooding from large scale flooding to this unit and adjacent cells. The maintenance of defences will manage the risk of impacts of flooding to residential properties, agricultural land and key infrastructure in this and linked Policy Units. A HTL policy will not impact the nature conservation sites during this time period. Works should take account of possible environmental impacts and the need for an EIA. Maintaining defences will not impact on existing landscape and visual amenity Defences will manage the risk of impacts to the historic environment Defences will manage the risk to amenity or recreational value of the land 20 – 50 years The current earth embankment defences are expected to come to the end of their serviceable life in this epoch and should be replaced. Hydraulic linkage to a number of units would result in a large floodplain should defences not be replaced. The maintenance of defences will manage the risk of impacts of flooding to residential properties, agricultural land and key infrastructure in this and linked Policy Units. Coastal squeeze will occur which will result in loss of intertidal habitats. Works should take account of possible environmental impacts and the need for an EIA. Defences are likely to come to the end of their serviceable life in this epoch. Increased height of defences or change in defence construction materials will affect local landscape - increasing presence in the landscape and disrupting views. Defences will manage the risk of impacts to the historic environment Defences will manage the risk to amenity or recreational value of the land 50 – 100 years An on-going maintenance programme should be established including the monitoring of shoreline erosion as sea level rise increases. The maintenance of defences will manage the risk of impacts of flooding to residential properties, agricultural land and key infrastructure in this and linked Policy Units. Coastal squeeze will occur which will result in loss of intertidal habitats. Works should take account of possible environmental impacts and the need for an EIA. Increased height of defences or change in defence construction materials will affect local landscape - increasing presence in the landscape and disrupting views. Defences will manage the risk of impacts to the historic environment Defences will manage the risk to amenity or recreational value of the land
  • 7. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 7 Policy Unit: BRIS 2 – New Passage to Severnside Works, nr Smoke Lane/Chittening Road (east bank of the River Severn)
  • 8. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 8 Preferred Policies to Implement the Plan: Epoch Preferred Policy Comments 0 to 20 years (2025) HTL The short term policy for this unit is Hold The Line. The current defences (concrete revetment and railway embankment) are expected to remain in place but will require maintenance. HTL will manage the risk of impacts from flooding to important economic assets in this Policy Unit and to Key Policy Drivers in this and linked Policy Units (BRIS 1, BRIS 3, BRIS 4, BRIS 5), e.g. Severn road, rail and electricity crossings. The saltmarsh (Chittening Warth) in front of defences has historically been accreting and is expected to remain stable. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 20 to 50 years (2055) HTL The medium term policy for this unit is Hold The Line. The existing defences will come to the end of their serviceable life in this epoch. HTL recommends that defences are replaced. New defences should tie in with other defences in linked Policy Units (BRIS 1, BRIS 3, BRIS 4, and BRIS 5). High ground naturally limits the risk of coastal flooding in some areas. The location and type of defence should be determined by the SEFRMS. HTL will manage the risk of impacts from flooding to important economic assets in this Policy Unit and to Key Policy Drivers in this and linked Policy Units. The saltmarsh has historically been accreting but will begin to erode as sea level rises – other, similar habitat should be created elsewhere in the estuary to maintain/improve the condition of the European protected sites. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 50 to 100 years (2105) HTL The long term policy for this unit is Hold The Line. New defences should be maintained. HTL will manage the risk of impacts from flooding to Key Policy Drivers in this and linked Policy Units (BRIS 2, BRIS 3, BRIS 4, and BRIS 5). Saltmarsh in front of new defences will erode as sea level rises – other, similar habitat should be created elsewhere in the estuary to maintain/improve the condition of the European protected sites. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise.
  • 9. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 9 Economics Policy Unit Existing SMP1 Policy Time Period (epoch) SMP2 Assessment 0- 20 20- 50 50- 100 Preferred Plan Present Value Damages Preferred Plan Present Value Defence Costs BRI 2 HTL HTL HTL HTL £461m (BRIS1-5 total) £58.4m (BRIS1-5 total) The preferred policy for this unit is economically viable. The preferred policy is economically viable for the linked Policy Units of BRIS 1, BRIS 2, BRIS 3, BRIS 4 and BRIS 5. The costs and damages of the preferred policy in the table above relate to actions taken in all linked policy units.
  • 10. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 10 Predicted Implication of the Preferred Plan for the BRIS 2 Policy Unit Time Period Management Activities Property, Land Use and Human Health Nature Conservation – including Earth Heritage, Geology and Biodiversity Landscape Character and Visual Amenity Historic Environment Amenity and Recreational Use 0 – 20 years The maintenance of defences will manage the risk of flooding from large scale flooding to this unit and adjacent cells. The maintenance of defences will manage the risk of impacts to residential properties, agricultural land and key infrastructure in this and linked Policy Units. A HTL policy will not impact the nature conservation sites during this time period. Works should take account of possible environmental impacts and the need for an EIA. Maintaining defences will not impact on existing landscape and visual amenity Defences will manage the risk of impacts to the historic environment Defences will manage the risk to amenity or recreational value of the land 20 – 50 years The current defences are expected to come to the end of their serviceable life in this epoch and should be replaced. Hydraulic linkage to a number of units would result in a large floodplain should defences not be replaced. The maintenance of defences will manage the risk of impacts to residential properties, agricultural land and key infrastructure in this and linked Policy Units. Coastal squeeze will occur which will result in loss of intertidal habitats and saltmarsh. Works should take account of possible environmental impacts and the need for an EIA. Defences are likely to come to the end of their serviceable life in this epoch. Increased height of defences or change in defence construction materials will affect local landscape - increasing presence in the landscape and disrupting views. Defences will manage the risk of impacts to the historic environment Defences will manage the risk to amenity or recreational value of the land 50 – 100 years An on-going maintenance programme should be established including the monitoring of shoreline erosion as sea level rise increases. The maintenance of defences will manage the risk of impacts to residential properties, agricultural land and key infrastructure in this and linked Policy Units. Coastal squeeze will occur which will result in loss of intertidal habitats and saltmarsh. Works should take account of possible environmental impacts and the need for an EIA. Increased height of defences or change in defence construction materials will affect local landscape - increasing presence in the landscape and disrupting views. Defences will manage the risk of impacts to the historic environment Defences will manage the risk to amenity or recreational value of the land
  • 11. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 11 Policy Unit: BRIS 3 - Severnside Works, Nr Smoke Lane/ Chittening Road (east bank of the River Severn) to Avonmouth Pier
  • 12. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 12 Preferred Policies to Implement the Plan: Epoch Preferred Policy Comments 0 to 20 years (2025) HTL The short term policy for this unit is Hold The Line. The existing defences will come to the end of their serviceable life in this epoch. HTL recommends that defences are replaced. High ground naturally limits the risk of coastal flooding in some areas. The positions, size and type of defence should take account of those in linked Policy Units (BRIS 1, BRIS 2, BRIS 4, and BRIS 5). The location and type of defence should be determined by the SEFRMS. HTL will manage the risk of impacts from flooding to the docks and other Key Policy Drivers in this and linked Policy Units, such as the Severn road, rail and electricity crossings. Any land reclamation as part of the Bristol Port deep water terminal development should be managed to ensure that it does not impact on flood risk management in this or linked Policy Units. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 20 to 50 years (2055) HTL The medium term policy for this unit is Hold The Line. New defences should be maintained. HTL will manage the risk of impacts from flooding to the docks and other Key Policy Drivers in this and linked Policy Units (BRIS 1, BRIS 2, BRIS 4, BRIS 5), such as the Severn road, rail and electricity crossings. Saltmarsh in front of new defences will erode as sea level rises – other, similar habitat should be created elsewhere in the estuary to maintain/improve the condition of the European protected sites. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 50 to 100 years (2105) HTL The long term policy for this unit is Hold The Line. New defences should be maintained. HTL will manage the risk of impacts from flooding to the docks and other Key Policy Drivers in this and linked Policy Units (BRIS 1, BRIS 2, BRIS 4, BRIS 5), such as the Severn road, rail and electricity crossings. Saltmarsh in front of new defences will erode as sea level rises – other, similar habitat should be created elsewhere in the estuary to maintain/improve the condition of the European protected sites. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise.
  • 13. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 13 Economics Policy Unit Existing SMP1 Policy Time Period (epoch) SMP2 Assessment 0- 20 20- 50 50- 100 Preferred Plan Present Value Damages Preferred Plan Present Value Defence Costs BRI 3 HTL HTL HTL HTL £461m (BRIS1-5 total) £58.4m (BRIS1-5 total) The preferred policy for this unit is economically viable. The preferred policy is economically viable for the linked Policy Units of BRIS 1, BRIS 2, BRIS 3, BRIS 4 and BRIS 5. The costs and damages of the preferred policy in the table above relate to actions taken in all linked policy units.
  • 14. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 14 Predicted Implication of the Preferred Plan for the BRIS 3 Policy Unit Time Period Management Activities Property, Land Use and Human Health Nature Conservation – including Earth Heritage, Geology and Biodiversity Landscape Character and Visual Amenity Historic Environment Amenity and Recreational Use 0 – 20 years The current earth embankment defences are expected to come to the end of their serviceable life in this epoch and should be replaced. A maintenance programme should be established for the new defences. The maintenance of defences will manage the risk of flooding from large scale flooding to residential properties, agricultural land and key infrastructure in this and linked Policy Units. A HTL policy will not impact the nature conservation sites during this time period. Works should take account of possible environmental impacts and the need for an EIA. Defences are likely to come to the end of their serviceable life in this epoch. Increased height of defences or change in defence construction materials will affect local landscape - increasing presence in the landscape and disrupting views. Defences will manage the risk to the historic environment Defences will manage the risk to amenity or recreational value of the land 20 – 50 years On-going maintenance should continue. Monitoring of shoreline erosion as sea level rise increases should be undertaken. The maintenance of defences will manage the risk of flooding from large scale flooding to residential properties, agricultural land and key infrastructure in this and linked Policy Units. Coastal squeeze will occur which will result in loss of intertidal habitats and saltmarsh. Works should take account of possible environmental impacts and the need for an EIA. Increased height of defences or change in defence construction materials will affect local landscape - increasing presence in the landscape and disrupting views. Defences will manage the risk to the historic environment Defences will manage the risk to amenity or recreational value of the land 50 – 100 years On-going maintenance should continue. Monitoring of shoreline erosion as sea level rise increases should be undertaken. The maintenance of defences will manage the risk of flooding from large scale flooding to residential properties, agricultural land and key infrastructure in this and linked Policy Units. Coastal squeeze will occur which will result in loss of intertidal habitats and saltmarsh. Works should take account of possible environmental impacts and the need for an EIA. Increased height of defences or change in defence construction materials will affect local landscape - increasing presence in the landscape and disrupting views. Defences will manage the risk to the historic environment Defences will manage the risk to amenity or recreational value of the land
  • 15. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 15 Policy Unit: BRIS 4 - Avonmouth Pier to Netham Weir (north bank of the River Avon)
  • 16. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 16 Preferred Policies to Implement the Plan: Epoch Preferred Policy Comments 0 to 20 years (2025) HTL The short term policy for this unit is Hold The Line. The current defences (mix of earth embankments, concrete walls and dock defences) are expected to remain in place for this epoch but will require maintenance. Some sections may need to be replaced. The positions, size and type of defence should take account of impacts in linked Policy Units (BRIS 1, BRIS 2, BRIS 3, and BRIS 5). The location and type of defence should be determined by local flood risk management studies. HTL will manage the risk of impacts from flooding to Key Policy Drivers in this and linked Policy Units, such as residential properties (Bristol), economic assets (docks) and critical infrastructure (Bristol General Hospital). HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 20 to 50 years (2055) HTL The medium term policy for this unit is Hold The Line. The existing defences will come to the end of their serviceable life in this epoch. HTL recommends that defences are replaced. The position, size and type of defence should be determined by local flood risk management studies and take account of impacts in linked Policy Units (BRIS 1, BRIS 2, BRIS 3, and BRIS 5). HTL will manage the risk of impacts to Key Policy Drivers in this and linked Policy Units. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 50 to 100 years (2105) HTL The long term policy for this unit is Hold The Line. New defences should be maintained. Some defences replaced in the first epoch may require significant repair / replacement by the end of this epoch. The positions, size and type of defence should take account of impacts in linked Policy Units. HTL will manage the risk of impacts to Key Policy Drivers in this and linked Policy Units (BRIS 1, BRIS 2, BRIS 3, and BRIS 5). The shape of the river channel (morphology) should be monitored. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise.
  • 17. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 17 Economics Policy Unit Existing SMP1 Policy Time Period (epoch) SMP2 Assessment 0- 20 20- 50 50- 100 Preferred Plan Present Value Damages Preferred Plan Present Value Defence Costs BRI 4 HTL HTL HTL HTL £461m (BRIS1-5 total) £58.4m (BRIS1-5 total) The preferred policy for this unit is economically viable. The preferred policy is economically viable for the linked Policy Units of BRIS 1, BRIS 2, BRIS 3, BRIS 4 and BRIS 5. The costs and damages of the preferred policy in the table above relate to actions taken in all linked policy units.
  • 18. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 18 Predicted Implication of the Preferred Plan for the BRIS 4 Policy Unit Time Period Management Activities Property, Land Use and Human Health Nature Conservation – including Earth Heritage, Geology and Biodiversity Landscape Character and Visual Amenity Historic Environment Amenity and Recreational Use 0 – 20 years A HTL policy will require maintenance to earth embankment and concrete/masonry walls. Some constrained tidal flood risk to property or land. A HTL policy will support the stable, hard geology shoreline. Works should take account of possible environmental impacts and the need for an EIA. Limited erosion and flood risk under a HTL policy will not impact on existing landscape and visual amenity Limited erosion and flood risk under a HTL policy will not impact on the historic environment Limited erosion and flood risk under a HTL policy will not impact on amenity or recreational value of the land 20 – 50 years A HTL policy will require significant maintenance/ replacement to earth embankment and concrete/masonry walls. Some constrained tidal flood risk to property or land. A HTL policy will support the stable, hard geology shoreline. Works should take account of possible environmental impacts and the need for an EIA. Limited erosion and flood risk under a HTL policy will not impact on existing landscape and visual amenity Limited erosion and flood risk under a HTL policy will not impact on the historic environment Limited erosion and flood risk under a HTL policy will not impact on amenity or recreational value of the land 50 – 100 years A HTL policy will require maintenance/ replacement to earth embankment and concrete/masonry walls. Some constrained tidal flood risk to property or land. A HTL policy will support the stable, hard geology shoreline. Works should take account of possible environmental impacts and the need for an EIA. Limited erosion and flood risk under a HTL policy will not impact on existing landscape and visual amenity Limited erosion and flood risk under a HTL policy will not impact on the historic environment Limited erosion and flood risk under a HTL policy will not impact on amenity or recreational value of the land
  • 19. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 19 Policy Unit: BRIS 5 Netham Weir to Avon Road, Easton-in-Gordano (south bank of the River Avon)
  • 20. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 20
  • 21. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 21 Preferred Policies to Implement the Plan: Epoch Preferred Policy Comments 0 to 20 years (2025) HTL The short term policy for this unit is Hold The Line. The current defences (earth embankments / concrete walls) are expected to remain in place for this epoch but will require maintenance. Some sections may need to be replaced. The positions, size and type of defence should be determined by local flood risk management studies and take account of impacts in linked Policy Units (BRIS 1, BRIS 2, BRIS 3, and BRIS 4). HTL will manage the risk of impacts from flooding to Key Policy Drivers in this and linked Policy Units, including residential properties (Bristol), economic assets and critical infrastructure. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 20 to 50 years (2055) HTL The medium term policy for this unit is Hold The Line. The existing defences will come to the end of their serviceable life in this epoch. HTL recommends that defences are replaced. The positions, size and type of defence should be determined by local flood risk management studies and take account of impacts in linked Policy Units (BRIS 1, BRIS 2, BRIS 3, and BRIS 4). HTL will manage the risk of impacts from flooding. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 50 to 100 years (2105) HTL The long term policy for this unit is Hold The Line. New defences should be maintained. Some defences replaced in the first epoch may require significant repair / replacement by the end of this epoch. The positions, size and type of defence should take account of impacts in linked Policy Units (BRIS 1, BRIS 2, BRIS 3, and BRIS 4). The shape of the river channel (morphology) should be monitored. HTL will manage the risk of impacts from flooding. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. Economics Policy Unit Existing SMP1 Policy Time Period (epoch) SMP2 Assessment 0- 20 20- 50 50- 100 Preferred Plan Present Value Damages Preferred Plan Present Value Defence Costs BRI 5 HTL HTL HTL HTL £461m (BRIS1-5 total) £58.4m (BRIS1-5 total) The preferred policy for this unit is economically viable. The preferred policy is economically viable for the linked Policy Units of BRIS 1, BRIS 2, BRIS 3, BRIS 4 and BRIS 5. The costs and damages of the preferred policy in the table above relate to actions taken in all linked policy units.
  • 22. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 22 Predicted Implication of the Preferred Plan for the BRIS 5 Policy Unit Time Period Management Activities Property, Land Use and Human Health Nature Conservation – including Earth Heritage, Geology and Biodiversity Landscape Character and Visual Amenity Historic Environment Amenity and Recreational Use 0 – 20 years A HTL policy will require maintenance to earth embankment and concrete/masonry walls. Some constrained tidal flood risk to property or land. A HTL policy will support the stable, hard geology shoreline. Works should take account of possible environmental impacts and the need for an EIA. Limited erosion and flood risk under a HTL policy will not impact on existing landscape and visual amenity Limited erosion and flood risk under a HTL policy will not impact on the historic environment Limited erosion and flood risk under a HTL policy will not impact on amenity or recreational value of the land 20 – 50 years A HTL policy will require significant maintenance/ replacement to earth embankment and concrete/masonry walls. Some constrained tidal flood risk to property or land. A HTL policy will support the stable, hard geology shoreline. Works should take account of possible environmental impacts and the need for an EIA. Limited erosion and flood risk under a HTL policy will not impact on existing landscape and visual amenity Limited erosion and flood risk under a HTL policy will not impact on the historic environment Limited erosion and flood risk under a HTL policy will not impact on amenity or recreational value of the land 50 – 100 years A HTL policy will require significant maintenance/ replacement to earth embankment and concrete/masonry walls. Some constrained tidal flood risk to property or land. A HTL policy will support the stable, hard geology shoreline. Works should take account of possible environmental impacts and the need for an EIA. Limited erosion and flood risk under a HTL policy will not impact on existing landscape and visual amenity Limited erosion and flood risk under a HTL policy will not impact on the historic environment Limited erosion and flood risk under a HTL policy will not impact on amenity or recreational value of the land
  • 23. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 23 Policy Unit: BRIS 6 – Avon Road, Easton-in-Gordano (south bank of the River Avon) to Portishead Pier (east bank of the River Severn)
  • 24. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 24 Preferred Policies to Implement the Plan: Epoch Preferred Policy Comments 0 to 20 years (2025) HTL The Short Term policy for this unit is Hold The Line. The existing defences will come to the end of their serviceable life in this epoch. HTL recommends that defences are replaced. High ground naturally limits the risk of coastal flooding in some areas. The positions, size and type of defence should be determined by local flood risk management studies. HTL will manage the risk of impacts to the docks and other Key Policy Drivers in this Policy Units, e.g. lighthouse, sewage treatment works. This Policy Unit is not linked to any others. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 20 to 50 years (2055) HTL The medium term policy for this unit is Hold The Line. New defences should be maintained. HTL will manage the risk of impacts to the docks and other Key Policy Drivers in this Policy Units, e.g. lighthouse, sewage treatment works. This Policy Unit is not linked to any others. Saltmarsh in front of new defences will erode as sea level rises – other, similar habitat should be created elsewhere in the estuary to maintain/improve the condition of the European protected sites. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 50 to 100 years (2105) HTL The long term policy for this unit is Hold The Line. Defences should be maintained. HTL will manage the risk of impacts to the docks and other Key Policy Drivers in this Policy Units, e.g. lighthouse, sewage treatment works. This Policy Unit is not linked to any others. Saltmarsh in front of new defences will erode as sea level rises – other, similar habitat should be created elsewhere in the estuary to maintain/improve the condition of the European protected sites. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. Economics Policy Unit Existing SMP1 Policy Time Period (epoch) SMP2 Assessment 0- 20 20- 50 50- 100 Preferred Plan Present Value Damages Preferred Plan Present Value Defence Costs BRI 6 HTL HTL HTL HTL £268m £6m The preferred policy for this unit is economically viable. This Policy Unit is not linked to any others.
  • 25. The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review – Final Report 25 Predicted Implication of the Preferred Plan for the BRIS 6 Policy Unit Time Period Management Activities Property, Land Use and Human Health Nature Conservation – including Earth Heritage, Geology and Biodiversity Landscape Character and Visual Amenity Historic Environment Amenity and Recreational Use 0 – 20 years The current earth embankment defences are expected to come to the end of their serviceable life in this epoch and should be replaced. Recently completed defences will require minimal maintenance. The maintenance of defences will manage the risk of flooding from large scale flooding to residential properties, agricultural land and key infrastructure in this and linked Policy Units. A HTL policy will not impact the nature conservation sites during this time period. Works should take account of possible environmental impacts and the need for an EIA. Defences are likely to come to the end of their serviceable life in this epoch. Increased height of defences or change in defence construction materials will affect local landscape - increasing presence in the landscape and disrupting views. Defences will manage the risk to the historic environment Defences will manage the risk to amenity or recreational value of the land 20 – 50 years On-going maintenance should continue. Monitoring of shoreline erosion as sea level rise increases should be undertaken. The maintenance of defences will manage the risk of flooding from large scale flooding to residential properties, agricultural land and key infrastructure in this and linked Policy Units. Coastal squeeze will occur which will result in loss of intertidal habitats and saltmarsh. Works should take account of possible environmental impacts and the need for an EIA. Increased height of defences or change in defence construction materials will affect local landscape - increasing presence in the landscape and disrupting views. Defences will manage the risk to the historic environment Defences will manage the risk to amenity or recreational value of the land 50 – 100 years On-going maintenance should continue. Monitoring of shoreline erosion as sea level rise increases should be undertaken. The maintenance of defences will manage the risk of flooding from large scale flooding to residential properties, agricultural land and key infrastructure in this and linked Policy Units. Coastal squeeze will occur which will result in loss of intertidal habitats and saltmarsh. Works should take account of possible environmental impacts and the need for an EIA. Increased height of defences or change in defence construction materials will affect local landscape - increasing presence in the landscape and disrupting views. Defences will manage the risk to the historic environment Defences will manage the risk to amenity or recreational value of the land