QA/QC Manager-Civil

QA/QC Manager

CURRICULUM VITAE
SESHADHRI BALAKRISHNAN
Mobile: +971-556289195, E-mail: basesha@yahoo.com
Profession: Civil Engineer
Prof. Exp.: 16 Years
Nationality: INDIAN
Educational Qualifications: B.E. Civil Engineering, D.C.E, QMS
AUDITOR/LEAD AUDITOR ISO 9001 2008 (IRCA), Integrate
Management System (IMS), QMS Foundation Training (Based On
ISO 9001 2008).
Computer skills: Auto CAD, M S Office, Internet & Networking.
Objective: A qualified, experienced and enthusiastic CIVIL ENGINEER with aspiration to
continuously enhance and work with in the construction and project management seeking
professional career advancement.
Career Profile:
Professional Civil Engineer with over 16 years of comprehensive experience in planning,
execution, coordination, supervision and management of diverse construction infrastructure projects
and residential, industrial, Oil & Gas and building projects.
Presently working as an QA/QC Manager Civil with “TROJAN GNERAL CONTRACTING
COMPANY L.L.C” on the project for construction of EMIRATI HOUSING & INFRASTRUCTURE
DEVELOPMENT PROJECTS (3000 Villas) Al ain, Abu Dhabi, UAE.
Personal Details:
Age & DOB : 38 years, 23.06.1977 Fathers Name : Balakrishnan.
Marital status : Married, Visa Status: Resident Visa & Driving Licence: UAE.
Experiences : 16 Years on Buildings, Infrastructure & Oil and gas pipeline projects
Core Responsibilities:
Safety Demonstrating a commitment to safety, performing all work
Safely and Maintaining a safe working environment at all times
Quality Measuring each work product complete and accurate
Control of Scope Establishing clear scope requirements, proposals of Potential
Change and accurately identifying the cost and Schedule, Impact of changes,
client approval before proceeding
Schedule/Timeliness On time Delivery of all work products
Team work & Productive relationship with all, responding promptly and
Communications Effectively to communications, well informed of Progress
Issues or concerns
Customer Relations Responsive, Flexible, innovative, trust worthy, ethical,
Professional and fair in all dealings
IN UAE AND QATAR: (9.2 + Years) – In reverse chronological order
 TROJAN GENERAL CONTRACTING LLC CONSTRUCTION OF EMIRATI HOUSING DEVELOPENT
PROJECT (3000 Villas) JAFEL HAFFET, ALAIN, And ABUDHABI FROM: JULY 2013 TO:
PRESENT.
 Project: - Emirati Housing Scheme at Jabel Hafeet Al Ain.
 Client: - Musanda
 Developer: - Tamouh Investment LLC
 Project Management: - Royal Architects and Project Managements LLC (RAPM)
 Supervision Consultant: - International Consulting Engineers (ACE)
 Main Contractor: - Trojan General Contracting LLC (TGC)
 Designation: - QA/QC Manager
 Scope of Work: - Master Planning of Projects, Design and Built for villas, Building (Civil and MEP
Works and Infrastructure)
The total plot area for the development is 453.8 Hectare ), which will include 3,000 units of Emirati
housing units, Infrastructure including – potable water, electricity, sewage, storm water, street
lighting, fire fighting system, irrigation, telecommunications networks, landscaping and roads. The
project is mandated by Estidama 2 Pearls Rating System for New Communities, New Buildings and
New Villas.
POSITION & RESPOSIBILITES: QUALITY ASSURANCE & CONTROL MANAGER
 Work closely with the Project Director and Senior Managers to QA/QC procedure and implement
a Project Quality Management System as per ISO 9001:2008 requirements.
 Participate in the identification, writing, reviewing and publishing of Project quality plan,
Inspection tests Plans, and all other quality related documents in accordance with the Contract
and the Client’s requirements.
 Implement the QA/QC management system at site and sub contractor.
 Coordinate with quality inspections with all the site sub contractors and vendors coordinate all
the tests.
 Coordinate with the customer’s representative on all quality matters.
 Coordinate all receipt inspections to client and subcontractor.
 Distribute relevant QA/QC documentation to site subcontractors
 Verify that the quality related site activities are in accordance with the applicable codes and
standards
 Participate in the site internal and external site audits
 Coordinate all the quality site inspections through the site QC inspectors
 Ensure all quality control documentation is complied and competed for as-built hand over
through the QC turnover engineer
 Control all non-conformance reports and undertake remedial action
 Complete site quality control instructions and action remedial responses
 Review the customer’s specification and undertake relevant training to the site QC inspector
 Monitor the implementation of the approved site QC Plan and quality procedure.
 Complete and coordinate the approval of the sites QC technical submittals and material
submittal to the client.
 Coordinate with the site construction manager and project manager on all quality issues
Coordinate and their the QA/QC site weekly meetings with the projects subcontractors QC
personnel
 Elaborating inspection and test programs with client and subcontractors.
 Ensure the safety is adhered to at site
 Assure all technical documents relative to site quality control are current status.
 Monitor/conduct Quality Management System audits of Project Team Companies. Follow-up
and advice for closeout of audit findings.
 Monitor that the required Method Statements, Inspection and Test Plans are in place by
 Project Team Companies well ahead of the relevant tasks they plan to perform.
 Prepare periodical Quality reports, audit and Non Conformance Reports showing the status and
trend of Quality performance by Project Team Companies in the project.
 Review and participate in Commissioning related schedules, meetings and witnessing of tests.
 Develop Project specific Closeout procedure for project completion, handover and
documentation.
 Maintain good working relationships with Project Team Companies and other relevant parties in
delivering the project quality successfully and to meet all Quality requirements.
LARSEN & TOUBRO LTD WORKED AS A QUALITY ASSURANCE & CONTROL MANAGER
CONSTRUCTION OF BQ HOUSING STATION FACILITIES, RDS-1 & TRANSFER LINE
(PACKAGE A). CLIENT: ADCO. From July- 2011 to JUNE- 2013 – 2 YEARS
 POSITION & RESPOSIBILITES:
 Preparation, review of project quality assurance / control plan
 Guiding and organising in the field inspections of materials and workmanship with consultant
 Review of all test reports from third party laboratory prior to submission to the client.
 Monitoring of all quality observations, NCRs, analyse the root cause, remedial and preventive
measures to close out the same.
 Reviewing method statements and inspection test plans prior to submit to the client
 Preparation and review of materials submittals in coordination with project documents
 Periodical audit and verification of company quality management system with ISO requirements
and reporting to the group quality assurance manager and project manager as required.
 Factory facilities inspections for vendor assessment and review of prequalification documents
for subcontractors, vendors.
 Review of coordination between materials, shop drawings and method statements etc prior to
submit to the client, incorporation of comments by the client.
 Implement the QA/QC management system at site and sub contractor.
 Coordinate with quality inspections with all the site sub contractors and vendors coordinate all
non destructive testing on site
 Coordinate with the customer’s representative on all quality matters.
 Coordinate all receipt inspections to client and subcontractor.
 Distribute relevant QA/QC documentation to site subcontractors
 Verify that the quality related site activities are in accordance with the applicable codes and
standards
 Participate in the site internal and external site audits
 Coordinate all the quality site inspections through the site QC inspectors.
NATIONAL PROJECT CONSTRUCTION LLC. WORKED AS A QA/QC MANAGER
CONSTRUCTION OF HIGHLAND RESORT VILLAS AND INFRASTRUCTURE PROJECT
CONSULTANT: ATKINS. CLIENT: MID MAKE PROPERTIES FROM: NOVE- 2008 TO JUNE-2011.
2 YRS + 7 MONTHS
POSITION & RESPOSIBILITES:
 Preparation, review of project quality assurance / control plan
 Guiding and organising in the field inspections of materials and workmanship with consultant
 Review of all test reports from third party laboratory prior to submission to the client.
 Monitoring of all quality observations, NCRs, analyse the root cause, remedial and preventive
measures to close out the same.
 Reviewing method statements and inspection test plans prior to submit to the client
 Preparation and review of materials submittals in coordination with project documents
 Periodical audit and verification of company quality management system with ISO requirements
and reporting to the group quality assurance manager and project manager as required.
 Factory facilities inspections for vendor assessment and review of prequalification documents
for subcontractors, vendors.
 Review of coordination between materials, shop drawings and method statements etc prior to
submit to the client, incorporation of comments by the client.
DODSAL ENGINEERING CONSTRUCTION PTE LTD. QATAR. AS A QA/QC MANAGER
CONSTRUCTION OF INDUSTRIAL BUILDING AND LNG PIPELINE PROJECT (RGXII WORLD
BIGEST LNG PROJECT) FROM: SEPTEMBER.2006 TO: OCTOBER 2008. 2 YRS + 1 MONTH.
POSITION & RESPOSIBILITES:
 Preparation, review of project quality assurance / control plan
 Guiding and organising in the field inspections of materials and workmanship with consultant
 Review of all test reports from third party laboratory prior to submission to the client.
 Monitoring of all quality observations, NCRs, analyse the root cause, remedial and preventive
measures to close out the same.
 Reviewing method statements and inspection test plans prior to submit to the client
 Preparation and review of materials submittals in coordination with project documents
 Periodical audit and verification of company quality management system with ISO requirements
and reporting to the group quality assurance manager and project manager as required.
 Factory facilities inspections for vendor assessment and review of prequalification documents
for subcontractors, vendors.
 Review of coordination between materials, shop drawings and method statements etc prior to
submit to the client, incorporation of comments by the client.
IN INDIA: (6.6 Years)
1. LARSEN & TOUBRO LTD. TAMILNADU, INDIA. FROM: APRIL. 2003 TO DECEMBER-
2005. 2 YEARS +8 MONTHS
POSITION & RESPOSIBILITES: PROJECT Assistant QA/QC MANAGER Commercial and Residential Project in
Chennai.
 Managing assigned project from start to completion and hand over including snagging.
2. LAN&CO PVT LTD FROM: JULY 2001. TO MARCH 2003.1YEAR +8 MONTHS.
POSITION & RESPOSIBILITES: Senior Engineer Civil
 Arranging & Supervising everyday activities in the construction of varies types of buildings, road
works etc
3. ORION CONSTRUCTION. FROM: JUNE 1999. TO JUNE 2001. 2 YEARS.
POSITION & RESPOSIBILITES: ASSITANT ENGG
 Visit the project site for the inspection of activities with superiors to be familiar with method of
constructions and inspections.
I certify that the above information is correct and accurate as per my conscience
PLACE & DATE: Abu Dhabi, 09/11/2015 YOURS HONESTLY
(SESHADHRI BALAKRISHNAN)

Recomendados

QA/QC Civil Engineer von
QA/QC Civil EngineerQA/QC Civil Engineer
QA/QC Civil EngineerRavi chandran
2.7K views4 Folien
edwin cv for QA-QC Manager von
edwin cv for QA-QC Manageredwin cv for QA-QC Manager
edwin cv for QA-QC ManagerEdwin Aguinaldo
11.9K views3 Folien
Adnan Resume revised von
Adnan Resume revisedAdnan Resume revised
Adnan Resume revisedAdnan Rehmat
2.9K views7 Folien
Resume - Zubair Khan - Civil QC Inspector von
Resume - Zubair Khan - Civil QC InspectorResume - Zubair Khan - Civil QC Inspector
Resume - Zubair Khan - Civil QC InspectorM.ZUBAIR KHAN
9.2K views3 Folien
CV - Senior QAQC Engineer-Civil von
CV - Senior QAQC Engineer-CivilCV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-CivilAlagusundaram PatchaiMuthukkon
2.9K views4 Folien
Precast Concrete QA/QC CV von
Precast Concrete QA/QC CVPrecast Concrete QA/QC CV
Precast Concrete QA/QC CVAnwardeen Jawaharlal
2K views4 Folien

Más contenido relacionado

Was ist angesagt?

Sohail Afzaal CV for Site Engineer von
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSOHAIL SHAH
1.5K views3 Folien
QC Civil A. Afzal von
QC Civil A. AfzalQC Civil A. Afzal
QC Civil A. AfzalAEJAZ AFZAL NAKSHBANDI
827 views8 Folien
edwin cv for QA-QC Engineer von
edwin cv for QA-QC Engineeredwin cv for QA-QC Engineer
edwin cv for QA-QC EngineerEdwin Aguinaldo
4K views4 Folien
Resume-Civil - QC Engineer - Gowrijayashankar von
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarGowrijayashankar S V
2.5K views6 Folien
QA-QC_CIVIL ENGINEER von
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERSajjad Ali
1.6K views10 Folien
Sajid CV BE Civil 2007 von
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007sajid hasan
35.5K views3 Folien

Was ist angesagt?(20)

Sohail Afzaal CV for Site Engineer von SOHAIL SHAH
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
SOHAIL SHAH1.5K views
QA-QC_CIVIL ENGINEER von Sajjad Ali
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
Sajjad Ali1.6K views
Sajid CV BE Civil 2007 von sajid hasan
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007
sajid hasan35.5K views
Romy George civil site engineer. von Romy george
Romy George civil site engineer.Romy George civil site engineer.
Romy George civil site engineer.
Romy george1K views
Raja kumar Resume (Senior Civil Engineer) von RAJA KUMAR .R
Raja kumar Resume (Senior Civil Engineer)Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)
RAJA KUMAR .R46.4K views
Resume - Structural Engineer - Prasad D Kulkarni von Prasad Kulkarni
Resume - Structural Engineer - Prasad D KulkarniResume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D Kulkarni
Prasad Kulkarni3K views
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,) von Sachin Chitnis
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
Sachin Chitnis4K views
Curriculum vitae of civil engineer for construction manager or Sr. project en... von Amir Mohammed
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Amir Mohammed10K views

Similar a QA/QC Manager-Civil

Raguram palnichamy jun 2019 von
Raguram palnichamy jun 2019Raguram palnichamy jun 2019
Raguram palnichamy jun 2019RaguramPalanichamy
74 views5 Folien
UPDATED RESUME 2016 von
UPDATED RESUME 2016UPDATED RESUME 2016
UPDATED RESUME 2016mohammad rizwan
130 views7 Folien
CV for civil engineer (Updated)--- Alpesh Parmar von
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarALPESH CONTRACTOR
412 views5 Folien
Engr. Sikandar_resume von
Engr. Sikandar_resumeEngr. Sikandar_resume
Engr. Sikandar_resumesikander rehmani
92 views5 Folien
Q.C Civil Ispector von
Q.C Civil IspectorQ.C Civil Ispector
Q.C Civil IspectorImran Alam
122 views5 Folien
Qc von
QcQc
QcMohamed mohsen
751 views47 Folien

Similar a QA/QC Manager-Civil (20)

CV for civil engineer (Updated)--- Alpesh Parmar von ALPESH CONTRACTOR
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
ALPESH CONTRACTOR412 views
Q.C Civil Ispector von Imran Alam
Q.C Civil IspectorQ.C Civil Ispector
Q.C Civil Ispector
Imran Alam122 views
Sushil Kumar Jain resume (International) mod 3 von Sushil Kumar Jain
Sushil Kumar Jain resume (International) mod 3Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain239 views

Último

Design_Discover_Develop_Campaign.pptx von
Design_Discover_Develop_Campaign.pptxDesign_Discover_Develop_Campaign.pptx
Design_Discover_Develop_Campaign.pptxShivanshSeth6
49 views20 Folien
SUMIT SQL PROJECT SUPERSTORE 1.pptx von
SUMIT SQL PROJECT SUPERSTORE 1.pptxSUMIT SQL PROJECT SUPERSTORE 1.pptx
SUMIT SQL PROJECT SUPERSTORE 1.pptxSumit Jadhav
22 views26 Folien
Searching in Data Structure von
Searching in Data StructureSearching in Data Structure
Searching in Data Structureraghavbirla63
17 views8 Folien
Web Dev Session 1.pptx von
Web Dev Session 1.pptxWeb Dev Session 1.pptx
Web Dev Session 1.pptxVedVekhande
17 views22 Folien
START Newsletter 3 von
START Newsletter 3START Newsletter 3
START Newsletter 3Start Project
7 views25 Folien
MongoDB.pdf von
MongoDB.pdfMongoDB.pdf
MongoDB.pdfArthyR3
49 views6 Folien

Último(20)

Design_Discover_Develop_Campaign.pptx von ShivanshSeth6
Design_Discover_Develop_Campaign.pptxDesign_Discover_Develop_Campaign.pptx
Design_Discover_Develop_Campaign.pptx
ShivanshSeth649 views
SUMIT SQL PROJECT SUPERSTORE 1.pptx von Sumit Jadhav
SUMIT SQL PROJECT SUPERSTORE 1.pptxSUMIT SQL PROJECT SUPERSTORE 1.pptx
SUMIT SQL PROJECT SUPERSTORE 1.pptx
Sumit Jadhav 22 views
Web Dev Session 1.pptx von VedVekhande
Web Dev Session 1.pptxWeb Dev Session 1.pptx
Web Dev Session 1.pptx
VedVekhande17 views
MongoDB.pdf von ArthyR3
MongoDB.pdfMongoDB.pdf
MongoDB.pdf
ArthyR349 views
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx von lwang78
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx
lwang78180 views
Créativité dans le design mécanique à l’aide de l’optimisation topologique von LIEGE CREATIVE
Créativité dans le design mécanique à l’aide de l’optimisation topologiqueCréativité dans le design mécanique à l’aide de l’optimisation topologique
Créativité dans le design mécanique à l’aide de l’optimisation topologique
LIEGE CREATIVE8 views
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf von AlhamduKure
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdfASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf
AlhamduKure8 views
Design of machine elements-UNIT 3.pptx von gopinathcreddy
Design of machine elements-UNIT 3.pptxDesign of machine elements-UNIT 3.pptx
Design of machine elements-UNIT 3.pptx
gopinathcreddy37 views
Ansari: Practical experiences with an LLM-based Islamic Assistant von M Waleed Kadous
Ansari: Practical experiences with an LLM-based Islamic AssistantAnsari: Practical experiences with an LLM-based Islamic Assistant
Ansari: Practical experiences with an LLM-based Islamic Assistant
M Waleed Kadous9 views
GDSC Mikroskil Members Onboarding 2023.pdf von gdscmikroskil
GDSC Mikroskil Members Onboarding 2023.pdfGDSC Mikroskil Members Onboarding 2023.pdf
GDSC Mikroskil Members Onboarding 2023.pdf
gdscmikroskil63 views
REACTJS.pdf von ArthyR3
REACTJS.pdfREACTJS.pdf
REACTJS.pdf
ArthyR337 views

QA/QC Manager-Civil

  • 1. CURRICULUM VITAE SESHADHRI BALAKRISHNAN Mobile: +971-556289195, E-mail: basesha@yahoo.com Profession: Civil Engineer Prof. Exp.: 16 Years Nationality: INDIAN Educational Qualifications: B.E. Civil Engineering, D.C.E, QMS AUDITOR/LEAD AUDITOR ISO 9001 2008 (IRCA), Integrate Management System (IMS), QMS Foundation Training (Based On ISO 9001 2008). Computer skills: Auto CAD, M S Office, Internet & Networking. Objective: A qualified, experienced and enthusiastic CIVIL ENGINEER with aspiration to continuously enhance and work with in the construction and project management seeking professional career advancement. Career Profile: Professional Civil Engineer with over 16 years of comprehensive experience in planning, execution, coordination, supervision and management of diverse construction infrastructure projects and residential, industrial, Oil & Gas and building projects. Presently working as an QA/QC Manager Civil with “TROJAN GNERAL CONTRACTING COMPANY L.L.C” on the project for construction of EMIRATI HOUSING & INFRASTRUCTURE DEVELOPMENT PROJECTS (3000 Villas) Al ain, Abu Dhabi, UAE. Personal Details: Age & DOB : 38 years, 23.06.1977 Fathers Name : Balakrishnan. Marital status : Married, Visa Status: Resident Visa & Driving Licence: UAE. Experiences : 16 Years on Buildings, Infrastructure & Oil and gas pipeline projects Core Responsibilities: Safety Demonstrating a commitment to safety, performing all work Safely and Maintaining a safe working environment at all times Quality Measuring each work product complete and accurate Control of Scope Establishing clear scope requirements, proposals of Potential Change and accurately identifying the cost and Schedule, Impact of changes, client approval before proceeding
  • 2. Schedule/Timeliness On time Delivery of all work products Team work & Productive relationship with all, responding promptly and Communications Effectively to communications, well informed of Progress Issues or concerns Customer Relations Responsive, Flexible, innovative, trust worthy, ethical, Professional and fair in all dealings IN UAE AND QATAR: (9.2 + Years) – In reverse chronological order  TROJAN GENERAL CONTRACTING LLC CONSTRUCTION OF EMIRATI HOUSING DEVELOPENT PROJECT (3000 Villas) JAFEL HAFFET, ALAIN, And ABUDHABI FROM: JULY 2013 TO: PRESENT.  Project: - Emirati Housing Scheme at Jabel Hafeet Al Ain.  Client: - Musanda  Developer: - Tamouh Investment LLC  Project Management: - Royal Architects and Project Managements LLC (RAPM)  Supervision Consultant: - International Consulting Engineers (ACE)  Main Contractor: - Trojan General Contracting LLC (TGC)  Designation: - QA/QC Manager  Scope of Work: - Master Planning of Projects, Design and Built for villas, Building (Civil and MEP Works and Infrastructure) The total plot area for the development is 453.8 Hectare ), which will include 3,000 units of Emirati housing units, Infrastructure including – potable water, electricity, sewage, storm water, street lighting, fire fighting system, irrigation, telecommunications networks, landscaping and roads. The project is mandated by Estidama 2 Pearls Rating System for New Communities, New Buildings and New Villas. POSITION & RESPOSIBILITES: QUALITY ASSURANCE & CONTROL MANAGER  Work closely with the Project Director and Senior Managers to QA/QC procedure and implement a Project Quality Management System as per ISO 9001:2008 requirements.  Participate in the identification, writing, reviewing and publishing of Project quality plan, Inspection tests Plans, and all other quality related documents in accordance with the Contract and the Client’s requirements.  Implement the QA/QC management system at site and sub contractor.  Coordinate with quality inspections with all the site sub contractors and vendors coordinate all the tests.  Coordinate with the customer’s representative on all quality matters.  Coordinate all receipt inspections to client and subcontractor.  Distribute relevant QA/QC documentation to site subcontractors  Verify that the quality related site activities are in accordance with the applicable codes and standards  Participate in the site internal and external site audits  Coordinate all the quality site inspections through the site QC inspectors
  • 3.  Ensure all quality control documentation is complied and competed for as-built hand over through the QC turnover engineer  Control all non-conformance reports and undertake remedial action  Complete site quality control instructions and action remedial responses  Review the customer’s specification and undertake relevant training to the site QC inspector  Monitor the implementation of the approved site QC Plan and quality procedure.  Complete and coordinate the approval of the sites QC technical submittals and material submittal to the client.  Coordinate with the site construction manager and project manager on all quality issues Coordinate and their the QA/QC site weekly meetings with the projects subcontractors QC personnel  Elaborating inspection and test programs with client and subcontractors.  Ensure the safety is adhered to at site  Assure all technical documents relative to site quality control are current status.  Monitor/conduct Quality Management System audits of Project Team Companies. Follow-up and advice for closeout of audit findings.  Monitor that the required Method Statements, Inspection and Test Plans are in place by  Project Team Companies well ahead of the relevant tasks they plan to perform.  Prepare periodical Quality reports, audit and Non Conformance Reports showing the status and trend of Quality performance by Project Team Companies in the project.  Review and participate in Commissioning related schedules, meetings and witnessing of tests.  Develop Project specific Closeout procedure for project completion, handover and documentation.  Maintain good working relationships with Project Team Companies and other relevant parties in delivering the project quality successfully and to meet all Quality requirements. LARSEN & TOUBRO LTD WORKED AS A QUALITY ASSURANCE & CONTROL MANAGER CONSTRUCTION OF BQ HOUSING STATION FACILITIES, RDS-1 & TRANSFER LINE (PACKAGE A). CLIENT: ADCO. From July- 2011 to JUNE- 2013 – 2 YEARS  POSITION & RESPOSIBILITES:  Preparation, review of project quality assurance / control plan  Guiding and organising in the field inspections of materials and workmanship with consultant  Review of all test reports from third party laboratory prior to submission to the client.  Monitoring of all quality observations, NCRs, analyse the root cause, remedial and preventive measures to close out the same.  Reviewing method statements and inspection test plans prior to submit to the client  Preparation and review of materials submittals in coordination with project documents  Periodical audit and verification of company quality management system with ISO requirements and reporting to the group quality assurance manager and project manager as required.  Factory facilities inspections for vendor assessment and review of prequalification documents for subcontractors, vendors.  Review of coordination between materials, shop drawings and method statements etc prior to submit to the client, incorporation of comments by the client.  Implement the QA/QC management system at site and sub contractor.  Coordinate with quality inspections with all the site sub contractors and vendors coordinate all non destructive testing on site  Coordinate with the customer’s representative on all quality matters.  Coordinate all receipt inspections to client and subcontractor.  Distribute relevant QA/QC documentation to site subcontractors
  • 4.  Verify that the quality related site activities are in accordance with the applicable codes and standards  Participate in the site internal and external site audits  Coordinate all the quality site inspections through the site QC inspectors. NATIONAL PROJECT CONSTRUCTION LLC. WORKED AS A QA/QC MANAGER CONSTRUCTION OF HIGHLAND RESORT VILLAS AND INFRASTRUCTURE PROJECT CONSULTANT: ATKINS. CLIENT: MID MAKE PROPERTIES FROM: NOVE- 2008 TO JUNE-2011. 2 YRS + 7 MONTHS POSITION & RESPOSIBILITES:  Preparation, review of project quality assurance / control plan  Guiding and organising in the field inspections of materials and workmanship with consultant  Review of all test reports from third party laboratory prior to submission to the client.  Monitoring of all quality observations, NCRs, analyse the root cause, remedial and preventive measures to close out the same.  Reviewing method statements and inspection test plans prior to submit to the client  Preparation and review of materials submittals in coordination with project documents  Periodical audit and verification of company quality management system with ISO requirements and reporting to the group quality assurance manager and project manager as required.  Factory facilities inspections for vendor assessment and review of prequalification documents for subcontractors, vendors.  Review of coordination between materials, shop drawings and method statements etc prior to submit to the client, incorporation of comments by the client. DODSAL ENGINEERING CONSTRUCTION PTE LTD. QATAR. AS A QA/QC MANAGER CONSTRUCTION OF INDUSTRIAL BUILDING AND LNG PIPELINE PROJECT (RGXII WORLD BIGEST LNG PROJECT) FROM: SEPTEMBER.2006 TO: OCTOBER 2008. 2 YRS + 1 MONTH. POSITION & RESPOSIBILITES:  Preparation, review of project quality assurance / control plan  Guiding and organising in the field inspections of materials and workmanship with consultant  Review of all test reports from third party laboratory prior to submission to the client.  Monitoring of all quality observations, NCRs, analyse the root cause, remedial and preventive measures to close out the same.  Reviewing method statements and inspection test plans prior to submit to the client  Preparation and review of materials submittals in coordination with project documents  Periodical audit and verification of company quality management system with ISO requirements and reporting to the group quality assurance manager and project manager as required.  Factory facilities inspections for vendor assessment and review of prequalification documents for subcontractors, vendors.  Review of coordination between materials, shop drawings and method statements etc prior to submit to the client, incorporation of comments by the client. IN INDIA: (6.6 Years) 1. LARSEN & TOUBRO LTD. TAMILNADU, INDIA. FROM: APRIL. 2003 TO DECEMBER- 2005. 2 YEARS +8 MONTHS
  • 5. POSITION & RESPOSIBILITES: PROJECT Assistant QA/QC MANAGER Commercial and Residential Project in Chennai.  Managing assigned project from start to completion and hand over including snagging. 2. LAN&CO PVT LTD FROM: JULY 2001. TO MARCH 2003.1YEAR +8 MONTHS. POSITION & RESPOSIBILITES: Senior Engineer Civil  Arranging & Supervising everyday activities in the construction of varies types of buildings, road works etc 3. ORION CONSTRUCTION. FROM: JUNE 1999. TO JUNE 2001. 2 YEARS. POSITION & RESPOSIBILITES: ASSITANT ENGG  Visit the project site for the inspection of activities with superiors to be familiar with method of constructions and inspections. I certify that the above information is correct and accurate as per my conscience PLACE & DATE: Abu Dhabi, 09/11/2015 YOURS HONESTLY (SESHADHRI BALAKRISHNAN)