SlideShare ist ein Scribd-Unternehmen logo
1 von 24
1 
Data Center Life Cycle Services 
What is needed to make your data center available, efficient and safe 
throughout its life cycle
2 
Importance of data centers 
Life 
Critical 
Life 
Critical 
Business 
Critical 
Business 
Critical 
Mission 
Critical 
Mission 
Critical
3 
Data centers have changed 
Designs need to come on-line 
faster and be more reliable and 
resilient 
Visibility into domains to maintain availability and 
perform root cause analysis and post mortem is 
mandatory 
Operators want to simplify their lives and lower costs
4 
Top causes of data center downtime 
1. Human Error - Allowing unqualified persons into the data center 
2. Lack of a SOP, MOP, or emergency procedures 
3. Lack of predictive measures, including testing and maintenance 
4. Failure to maintain or replace UPS and UPS batteries 
5. Lack of redundancy resulting in a single point of failure including lack of a 
back-up generator 
6. Primary cooling failure
5 
How Schneider Electric Can Work 
With You
6 
We provide the supply model you prefer 
Subsystems 
Complex Data Center systems 
that are key pieces of Data 
Center domains – IT Room, 
Facility Power, Facility Cooling, 
Security, DCIM 
Solutions 
Innovative combination of 
technology, products, and 
services providing an integrated, 
high value response to Data 
Center customer needs 
Components 
100,000+ catalog of Data 
Center components and 
individual software modules
7 
We can work with you in many ways 
To solve your business challenges 
HHaarrddwwaarree & & S Sooffttwwaarree SSeerrvviciceess 
Turnkey 
Provider 
Trusted 
Advisor 
Facility 
Operator 
DCIM 
Integrator 
UPS Supplier 
Power Quality 
Software Supplier 
Building Operations 
Software Supplier 
Switchgear Supplier 
IT Rack Supplier 
IT Room 
Management 
Supplier 
Remote Monitoring 
Provider 
UPS Maintenance 
Provider 
Software Installer 
Arc-flash Assessor 
Project Manager 
Design Assistant 
Solutions
8 
Services for the life cycle
9 
Holistic service… 
One company to assess, plan, design, manufacture/build and operate your 
data center....to improve performance, cost, and speed
10 
Schneider Electric as a Data Center service provider 
 Can support all projects 
> Small and large 
> New and retrofit 
 Offer complete range of 
life cycle services 
 On-site and off-site 
support 
> Depth and bench 
strength 
 Minimize risks, 
expenses, and 
timeframe 
 Toolsets with standardized 
record keeping 
> History 
> Data access 
> Entitlements 
 Processes are documented 
and mature 
 Clear escalation paths 
 Globally consistent standards, 
offer, coverage, and support 
 Simplified experience means a 
“one-stop-shop” for managing 
all physical infrastructure 
service needs 
 Service personnel are 
trained and certified 
 Considered to be 
industry and subject 
matter experts 
 Leverage experience to 
implement and improve 
best practices 
 Can attain “Trusted 
Advisor” status
11 
With the largest 
team of experts 
Schneider Electric is here for you 
With over 7,000 service experts 
including 
>Technicians 
>Program managers 
>Support staff 
>Solution Architects 
And a dedicated service supply 
chain
12 
Our tools and designs are the best around 
Customer Access to White Papers, TradeOff Tools, and Education 
White Papers Education 
Library of Complete Data Center Reference Designs from 200 kW to 20MW 
Reference 
Designs
13 
Data Center Reference Designs 
> Library of engineered reference 
designs 
> 1, 2, 3.3 and 20 MW deployment 
sizes 
> Uptime Tier II and III designs 
> Design Methodology and Explanation 
> System level technical specifications 
> Available load, PUE, Density, Layout 
> Complete schematics and BOMs
1144 
DCIM Software as a services enabler
15 
Data Center Expert 
Resource Advisor 
Cooling Monitoring 
Expert 
Monitor and control 
data center cooling 
Power 
Monitoring Expert 
Advanced power monitoring and 
power quality analysis 
Data Center Operation 
Manage Data Center assets, 
operational and capital costs 
Advanced monitoring 
and automation 
Track and manage 
enterprise energy and 
carbon costs 
Comprehensive DCIM
16 
StruxureWare Expert software monitors and manages power, 
cooling and security 
Data Center 
Expert 
•PDU’s, RPP’s 
•RM PDU’s, 
Environmental 
•Busway, Security 
•Panelboards 
•UPS 
• Security 
Power Monitoring 
Expert 
•Switchgear MV & LV 
•Metered Breakers & 
Panelboards, PDU’s, 
RPP’s 
•Busway, Transformers, 
UPS 
•Generators and ATS
17 
We make it easy to manage all of your data center 
assets and operational costs 
Data Center Operation 
● Improved electrical and operational efficiency 
● View of overall energy asset utilization to better plan for growth and 
dynamic change
1188 
Case studies
19 
Case Studies 
Amazon Web Services Service Disruption 
Virginia, June 2012 
One of the main breakers on a back-up power distribution circuit was 
incorrectly configured to open at too low a power threshold and opened 
when the load transferred to this circuit. 
The army of Cisco and Microsoft guys on staff couldn’t troubleshoot why 
the power went out. 
Could this have been prevented or remedied faster? 
•Breaker coordination study–When new electrical distribution systems are added to the fold, a 
re-coordination of the entire system should be done 
•MOP & mock drills–more thorough testing methodologies probably could have caught the issue 
sooner
20 
Case Studies 
Power Restored After Outage at San Diego Airport 
The Associated Press 
Saturday, May 25, 2013 | SAN DIEGO 
Power has been restored to a San Diego Airport terminal, after an outage caused minor flight delays and 
forced security workers to hand-screen luggage and passengers. 
According to San Diego Airport Authority spokeswoman Cheryl Brown: 
A high-voltage transformer blew on the terminal's roof Saturday evening. The outage shut down computers, 
jet ways and the baggage delivery system. 
Could this have been prevented or remedied faster? 
•Monitor Services–Power Monitoring with waveform and capacity management
Case Studies 
RagingWire offers a new level of redundancy, reliability, and service for their customers. 
May 2011 | Ashburn VA 
Designing and Operating Data Centers for 100% Availability 
RagingWire knew that utility outages were just the tip of the availability iceberg. Equipment failures, 
insufficient maintenance practices, human error, and improper equipment testing and commissioning all lurk 
beneath the surface. 
21 
Design Services 
•Integrated & redundant low voltage switchgear, UPS, PDU’s, BMS, and Power Monitoring 
•Develop the code allowing the crucial integration between the physical electrical equipment and 
the controls architecture 
•Failover and automation technology and processes to allow live IT power load to be moved or 
shared
22 
Customer focused experts 
Worldwide teams of experts… 
>Planning and Design experts 
>Data Center Solution Architects 
>Project Managers 
>Strategic Partners 
>Solution Centers 
Leveraging teamwork to support you
23 
The Schneider Electric difference… 
Team of over 7,000 trained specialists covering every phase and 
system in the data center 
Standardized, documented, and validated methodology leveraging 
automation tools and repeatable processes developed over 45 
years 
Complete portfolio of services to solve your technical or business 
challenge, simplify your 
life, and reduce costs
24 
Schneider Electric leads the Data Center solutions industry 
as a life cycle services provider 
Opportunity & 
Knowledge 
Close the Loop 
Schneider Electric gains enhanced understanding of the 
customers’ current and latent needs by being in more sites 
Feedback from the field results in solution development that 
enhances performance and serviceability 
Effective 
& 
Efficient 
Solution design, installation, integration, and operation services 
are performed more on Schneider Electric solutions leveraging 
Schneider Electric Software

Weitere ähnliche Inhalte

Mehr von Schneider Electric

Zelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingZelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingSchneider Electric
 
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSpacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSchneider Electric
 
Relay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingRelay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingSchneider Electric
 
Magelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingMagelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingSchneider Electric
 
Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Schneider Electric
 
EcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesEcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesSchneider Electric
 
Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Schneider Electric
 
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.Schneider Electric
 
It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580Schneider Electric
 
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...Schneider Electric
 
Connected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTConnected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTSchneider Electric
 
Telemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingTelemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingSchneider Electric
 
Telemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingTelemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingSchneider Electric
 
Telemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingTelemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingSchneider Electric
 
Telemecanique Pressure Switches Briefing
Telemecanique Pressure Switches BriefingTelemecanique Pressure Switches Briefing
Telemecanique Pressure Switches BriefingSchneider Electric
 
Telemecanique Sensors Briefing - Safety Rope Switches
Telemecanique Sensors Briefing - Safety Rope SwitchesTelemecanique Sensors Briefing - Safety Rope Switches
Telemecanique Sensors Briefing - Safety Rope SwitchesSchneider Electric
 
Telemecanique Sensors Briefing - Safety
Telemecanique Sensors Briefing - SafetyTelemecanique Sensors Briefing - Safety
Telemecanique Sensors Briefing - SafetySchneider Electric
 
Will DCIM-driven cloud services change the game for data center management?
Will DCIM-driven cloud services change the game for data center management?Will DCIM-driven cloud services change the game for data center management?
Will DCIM-driven cloud services change the game for data center management?Schneider Electric
 
Redefining IoT with Innovation At Every Level - Prith Banerjee, Chief Technol...
Redefining IoT with Innovation At Every Level - Prith Banerjee, Chief Technol...Redefining IoT with Innovation At Every Level - Prith Banerjee, Chief Technol...
Redefining IoT with Innovation At Every Level - Prith Banerjee, Chief Technol...Schneider Electric
 

Mehr von Schneider Electric (20)

Zelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingZelio Time Electronic Relay Briefing
Zelio Time Electronic Relay Briefing
 
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSpacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
 
Relay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingRelay Control Zelio SSR Briefing
Relay Control Zelio SSR Briefing
 
Magelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingMagelis HMI, iPC and software Briefing
Magelis HMI, iPC and software Briefing
 
Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?
 
EcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesEcoStruxure for Intuitive Industries
EcoStruxure for Intuitive Industries
 
Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017
 
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
 
It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580
 
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
 
Connected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTConnected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoT
 
Telemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingTelemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories Briefing
 
Telemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingTelemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors Briefing
 
Telemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingTelemecanique Limit Switches Briefing
Telemecanique Limit Switches Briefing
 
Telemecanique Pressure Switches Briefing
Telemecanique Pressure Switches BriefingTelemecanique Pressure Switches Briefing
Telemecanique Pressure Switches Briefing
 
Proximity Switches Briefing
Proximity Switches BriefingProximity Switches Briefing
Proximity Switches Briefing
 
Telemecanique Sensors Briefing - Safety Rope Switches
Telemecanique Sensors Briefing - Safety Rope SwitchesTelemecanique Sensors Briefing - Safety Rope Switches
Telemecanique Sensors Briefing - Safety Rope Switches
 
Telemecanique Sensors Briefing - Safety
Telemecanique Sensors Briefing - SafetyTelemecanique Sensors Briefing - Safety
Telemecanique Sensors Briefing - Safety
 
Will DCIM-driven cloud services change the game for data center management?
Will DCIM-driven cloud services change the game for data center management?Will DCIM-driven cloud services change the game for data center management?
Will DCIM-driven cloud services change the game for data center management?
 
Redefining IoT with Innovation At Every Level - Prith Banerjee, Chief Technol...
Redefining IoT with Innovation At Every Level - Prith Banerjee, Chief Technol...Redefining IoT with Innovation At Every Level - Prith Banerjee, Chief Technol...
Redefining IoT with Innovation At Every Level - Prith Banerjee, Chief Technol...
 

Kürzlich hochgeladen

The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxBkGupta21
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rick Flair
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 

Kürzlich hochgeladen (20)

The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptx
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 

Data Center Life Cycle Services - Key to Performance and Availability

  • 1. 1 Data Center Life Cycle Services What is needed to make your data center available, efficient and safe throughout its life cycle
  • 2. 2 Importance of data centers Life Critical Life Critical Business Critical Business Critical Mission Critical Mission Critical
  • 3. 3 Data centers have changed Designs need to come on-line faster and be more reliable and resilient Visibility into domains to maintain availability and perform root cause analysis and post mortem is mandatory Operators want to simplify their lives and lower costs
  • 4. 4 Top causes of data center downtime 1. Human Error - Allowing unqualified persons into the data center 2. Lack of a SOP, MOP, or emergency procedures 3. Lack of predictive measures, including testing and maintenance 4. Failure to maintain or replace UPS and UPS batteries 5. Lack of redundancy resulting in a single point of failure including lack of a back-up generator 6. Primary cooling failure
  • 5. 5 How Schneider Electric Can Work With You
  • 6. 6 We provide the supply model you prefer Subsystems Complex Data Center systems that are key pieces of Data Center domains – IT Room, Facility Power, Facility Cooling, Security, DCIM Solutions Innovative combination of technology, products, and services providing an integrated, high value response to Data Center customer needs Components 100,000+ catalog of Data Center components and individual software modules
  • 7. 7 We can work with you in many ways To solve your business challenges HHaarrddwwaarree & & S Sooffttwwaarree SSeerrvviciceess Turnkey Provider Trusted Advisor Facility Operator DCIM Integrator UPS Supplier Power Quality Software Supplier Building Operations Software Supplier Switchgear Supplier IT Rack Supplier IT Room Management Supplier Remote Monitoring Provider UPS Maintenance Provider Software Installer Arc-flash Assessor Project Manager Design Assistant Solutions
  • 8. 8 Services for the life cycle
  • 9. 9 Holistic service… One company to assess, plan, design, manufacture/build and operate your data center....to improve performance, cost, and speed
  • 10. 10 Schneider Electric as a Data Center service provider  Can support all projects > Small and large > New and retrofit  Offer complete range of life cycle services  On-site and off-site support > Depth and bench strength  Minimize risks, expenses, and timeframe  Toolsets with standardized record keeping > History > Data access > Entitlements  Processes are documented and mature  Clear escalation paths  Globally consistent standards, offer, coverage, and support  Simplified experience means a “one-stop-shop” for managing all physical infrastructure service needs  Service personnel are trained and certified  Considered to be industry and subject matter experts  Leverage experience to implement and improve best practices  Can attain “Trusted Advisor” status
  • 11. 11 With the largest team of experts Schneider Electric is here for you With over 7,000 service experts including >Technicians >Program managers >Support staff >Solution Architects And a dedicated service supply chain
  • 12. 12 Our tools and designs are the best around Customer Access to White Papers, TradeOff Tools, and Education White Papers Education Library of Complete Data Center Reference Designs from 200 kW to 20MW Reference Designs
  • 13. 13 Data Center Reference Designs > Library of engineered reference designs > 1, 2, 3.3 and 20 MW deployment sizes > Uptime Tier II and III designs > Design Methodology and Explanation > System level technical specifications > Available load, PUE, Density, Layout > Complete schematics and BOMs
  • 14. 1144 DCIM Software as a services enabler
  • 15. 15 Data Center Expert Resource Advisor Cooling Monitoring Expert Monitor and control data center cooling Power Monitoring Expert Advanced power monitoring and power quality analysis Data Center Operation Manage Data Center assets, operational and capital costs Advanced monitoring and automation Track and manage enterprise energy and carbon costs Comprehensive DCIM
  • 16. 16 StruxureWare Expert software monitors and manages power, cooling and security Data Center Expert •PDU’s, RPP’s •RM PDU’s, Environmental •Busway, Security •Panelboards •UPS • Security Power Monitoring Expert •Switchgear MV & LV •Metered Breakers & Panelboards, PDU’s, RPP’s •Busway, Transformers, UPS •Generators and ATS
  • 17. 17 We make it easy to manage all of your data center assets and operational costs Data Center Operation ● Improved electrical and operational efficiency ● View of overall energy asset utilization to better plan for growth and dynamic change
  • 19. 19 Case Studies Amazon Web Services Service Disruption Virginia, June 2012 One of the main breakers on a back-up power distribution circuit was incorrectly configured to open at too low a power threshold and opened when the load transferred to this circuit. The army of Cisco and Microsoft guys on staff couldn’t troubleshoot why the power went out. Could this have been prevented or remedied faster? •Breaker coordination study–When new electrical distribution systems are added to the fold, a re-coordination of the entire system should be done •MOP & mock drills–more thorough testing methodologies probably could have caught the issue sooner
  • 20. 20 Case Studies Power Restored After Outage at San Diego Airport The Associated Press Saturday, May 25, 2013 | SAN DIEGO Power has been restored to a San Diego Airport terminal, after an outage caused minor flight delays and forced security workers to hand-screen luggage and passengers. According to San Diego Airport Authority spokeswoman Cheryl Brown: A high-voltage transformer blew on the terminal's roof Saturday evening. The outage shut down computers, jet ways and the baggage delivery system. Could this have been prevented or remedied faster? •Monitor Services–Power Monitoring with waveform and capacity management
  • 21. Case Studies RagingWire offers a new level of redundancy, reliability, and service for their customers. May 2011 | Ashburn VA Designing and Operating Data Centers for 100% Availability RagingWire knew that utility outages were just the tip of the availability iceberg. Equipment failures, insufficient maintenance practices, human error, and improper equipment testing and commissioning all lurk beneath the surface. 21 Design Services •Integrated & redundant low voltage switchgear, UPS, PDU’s, BMS, and Power Monitoring •Develop the code allowing the crucial integration between the physical electrical equipment and the controls architecture •Failover and automation technology and processes to allow live IT power load to be moved or shared
  • 22. 22 Customer focused experts Worldwide teams of experts… >Planning and Design experts >Data Center Solution Architects >Project Managers >Strategic Partners >Solution Centers Leveraging teamwork to support you
  • 23. 23 The Schneider Electric difference… Team of over 7,000 trained specialists covering every phase and system in the data center Standardized, documented, and validated methodology leveraging automation tools and repeatable processes developed over 45 years Complete portfolio of services to solve your technical or business challenge, simplify your life, and reduce costs
  • 24. 24 Schneider Electric leads the Data Center solutions industry as a life cycle services provider Opportunity & Knowledge Close the Loop Schneider Electric gains enhanced understanding of the customers’ current and latent needs by being in more sites Feedback from the field results in solution development that enhances performance and serviceability Effective & Efficient Solution design, installation, integration, and operation services are performed more on Schneider Electric solutions leveraging Schneider Electric Software

Hinweis der Redaktion

  1. Traditional data center approaches involve what we call the “craft” built process. Engineers and contractors assembling best of breed components that are put together in a one-of-a-kind custom design. We look at the issue as an opportunity to Solve the whole problem – look at the data center as a complete system not just components. Sure we also make the best components, but standardizing and simplifying the design, plan build and operate process has exponential benefits in reliability, compatibility, efficiency and TCO. 1908 – mass production of the automobile (model T) killed to craft built automobile industry. This is the path of the data center. Our goal is to make building a data center more like buying a car and less like building a custom house.
  2. SO ancillary functions like a bank – if the main computer that controls al deposits And loans goes down it cripples the bank. If an ATM at a branch goes down it effects A piece of the business but not all. Life critical applies to loss of life due to lack of availability of information. Mainly for medical emergencies Business critical business function Vital function (such as production and sales) without which a firm cannot operate or remain viable. If a critical business function is interrupted, a firm could suffer serious financial, legal, or other damages or penalties. Earliest possible restoration of such functions after a disruption is the main objective of business continuity planning. Mission critical refers to any factor of a system (equipment, process, procedure, software, etc.) whose failure will result in the failure of business operations.
  3. Historically data centers were all one offs and built to order Today in the world of cloud things have to move At a much faster pace. Plus one offs are inherently less reliable And people understand the world of open source and leveraging lessons Learned and mistakes made buy other people that they can now benefit from. Another thing that has become popular is operating and actively monitoring your data center. Not only IT room, but all of the domains that effect availability like the emergency generator an chillers. This has value on the preventative side as well as the repair side. Also when you need to understand why something may have gone wrong its extremely helpful to have a history of data Most companies that are not in the data center business generally do not want to spend the time and money to become data center experts. There are exceptions of course but for the most part – its far better for everyone involved to let experts plan design build, operatite and maintain data centers.
  4. Components Examples: • 100,000+ catalog of data center components • Individual software modules Subsystems Examples: • UPS with distribution and maintenance bypass • Busway distribution with metering • DCIM – Expert or Operations management Solutions examples: • Complete data center solutions • Complete facility power (UPS, switchgear, transformer) • Complete DCIM implementation
  5. One or Schneider Electric’s key differentiators is the vide variety and competencies of customer engagement. We can work with you in many ways to solve your business challenges. If you have systems, process and designs and just need the best hardware or software component there are many channels to purchase from. If you are in need of a a certain a la carte service - maybe in planning or design of part of your electrical power train we can do that. If you want us to maintain or monitor part or all of your physical infrastructure we can do that. We can manage all or part of your project and even supply complete “turnkey” data centers if you want us to do the whole project. Plus we are available to operate that data center if you need that as well.
  6. Your customers may already be familiar with some of our class leading service offers like MGE UPS maintenance, APC IT room remote management, Lee Technology facility operations or Square D arc flash assessments. These services are not changing, but how we talk about them is. We are consolidating all of these data center services under our Schneider Electric life cycle services umbrella that has 6 phases. Assess Plan Design Operate Segmenting services this way makes it easier for our customers to understand where they are in the cycle and makes it much easier for us to explain services available to enable them. We can work with the customer on any single stage of the lifecycle, multiple phases or be their partner from beginning through optimization. We support all projects small or large, new or retrofit. Basic services or advanced. We are simplifying Design and Build process with modular Data Centers We are streamlining Plan and Design phases with Reference Designs We are investing in Facility Operations and Energy Assessment services
  7. Data center service providers are very fragmented – some only work on power systems, some cooling, some just the IT equipment, software, etc. Then you have areas of specialty – designers, maintainers, consultants, monitoring specialists, etc Only Schneider Electric can support all projects with mature and automated Toolsets and record keeping performed bt service personnel that are certified and considered industry and subject matter experts.
  8. Schneider Electric has a global team of over 7000 trained service specialists that cover every phase and system in the data center. We use standardized, documented, and validated methodology that leverages our own software automation tools. These repeatable processes were developed and refined over the last 45 years – starting when data centers were invented. Our Schneider Electric life cycle services can help in 3 ways - solves your customers’ technical or business challenges, simplifies their life, and reduces costs.
  9. Data center infrastructure is complicated -power and cooling systems can present a daunting tangle of variables, dependencies, and interactions Decisions will have long-term impact on the performance and Total Cost of Ownership of the data center lifecycle The “right” decisions need to be made early in the planning and design phases to insure the desired availability and cost Thats why we make a complete portfolio of tools and collateral for education and decisions making early in the planning process Decisions can now be made quickly – minutes using these tools rather than the weeks and months it takes using the legacy process where you are paying to have a proposal made and then any questions requests or changes require a new proposal. Quickly remove expensive planning roadblocks Align data center costs with budgeting goals Align availability targets with business goals Develop ROI for Green Initiatives including Carbon Committments
  10. Schneider Electric has put its broad engineering Design Expertise to use by developing a full portfolio of data center reference designs. Those are here to facilitate comparison and setting starting points to make informed decision before investing. So now you can quickly visualize layouts, determine costs, efficiency, physical weight as well as … Density Redundancy Architecture With a one-line schematic and full bill of materials
  11. Our DCIM software is the most comprehensive available. We have IT Infrastructure and Device Monitoring for Advanced cooling, monitoring, and automation in the IT room Facility Cooling Monitoring to Monitor and control data center power, cooling, and security Facility Power Monitoring for Advanced power monitoring analysis and power quality Data Center Operations Management to Manage data center assets, operational and capital costs And Energy and sustainability to Track and manage enterprise energy and carbon costs capital costs Energy and sustainability: Track and manage enterprise energy and carbon costs IT Infrastructure and Device Monitoring: Advanced cooling, monitoring, and automation FROM DELETED SLIDE: Schneider Electric has a history of building effective, powerful software tools. But, our offering has been a complex network of various applications that have little in common. This far reaching offer can be difficult for customers to understand and select the right applications for their situation. So, we selected some of our best, most robust software applications and organized them into a framework across 3 levels and 7 functions. Different users at different levels have different needs. The machine operator needs millisecond data delivered by a SCADA that allows him to make split second decisions on the plant floor or within a building. The plant manager needs analytics that allow him to analyze trends and optimize assets. The CFO or CEO needs aggregated, monthly or weekly reports that give her a trendline for energy use, cost, carbon, etc. Schneider Electric now has software that perfectly fits each level and business function. Sustainability Planning: To view energy and sustainability issues strategically ensuring all decisions support the financial and operational integrity of your entire enterprise. Energy Management: Flexible and scalable energy management information system that aggregates energy data into a single view to support your energy efficiency initiatives. Business Operations: To maximize business performance and enhance operational efficiency throughout all facilities and processes. Asset Management: To validate that each asset is performing at optimal level and ensure the asset lifecycle is fully optimized. Power Availability: To protect your business from damage and disruptions caused by power outages and power quality issues. Process Control: To control facility processes completely to drive maximum production performance and ensure operational safety. Security: To verify occupants are both protected and able to perform their jobs securely.
  12. Data Center Expert provides an efficient way for organizations to monitor their company-wide multi-vendor physical infrastructure: power, cooling, security, and IT environment. Real-time monitoring, user-defined reports and graphs, and instant fault notification and escalation enable quick assessment and resolution of critical infrastructure events that can adversely affect IT system availability.
  13. StruxureWare Operations software manages assets, operational and capital costs Data Center Operation enables vendor-agnostic inventory management with real-time data shown within your data center physical layout. A location-based drill-down view provides a structured overview of data center locations, from a global to local view down to single assets. Our modular approach combines all the benefits of real-time monitoring and inventory management through to detailed planning and predictive simulation tools. Energy usage of their data centers and supporting facilities Metering plus intelligent modeling of the electrical and mechanical topology Energy efficiency analysis—Simulating, modeling risks, cost and business impact View of overall energy asset utilization to better plan for growth and dynamic change
  14. There were a couple of very high profile outages – this one was famous Mainly because of the length of the outage Best thing to do is build with a reference design where functionality is well understood Maintenance Operational Procedures, Maintenance Operations Program
  15. There are no shortage of experts available to help you at any stage of the data center life cycle. Planning and design experts can help make the hard decisions early in the process utilizing the many tools and years of experience. Data center solution architects will put together the exact solution that meets your specific needs. Our project managers can assist with managing a small part of the overall project or even serve as prime to bring the project on time and on busget. We can leverage our extensive reach and bring in partners that may have a special area of expertise or knowledge to make the overall experience the best possible. And we have solutions centers WW so the you can have local support for you data center project.
  16. /