This document provides the resume of Sayed Asghar Mosavi, including his contact information, education history, professional affiliations, work experience, positions held, and responsibilities in those positions. It details his experience as CEO of Green Tech Construction & Engineering Co. from 2008-2016, Manager of the water and wastewater division at Omran Construction Co. from 2005-2008, and various engineering roles on water and wastewater projects in Afghanistan from 2015-2012.
1. Name: Sayed Asghar Mosavi
mosavi@greentech.af
mosavi2007@gmail.com
+93789529565
Skype: mosavi80
Date of Birth: 1981 Nationality: Afghan
Education:
1999-2004 B.Sc. in Sanitation Engineering (University of Tehran, Iran)
6. Membership of Professional Associations:
Afghan Engineering Association (AEA)
Afghanistan Builders Associations (ABA)
Countries of Work Experience:
Afghanistan
Languages:
English Fluent
Dari mother tongue
Employment Record:
From [Year]: 2008 To [2016]
Employer: Green Tech Construction & Engineering Co.
Number of staff in organization: more than 200 people
Positions held: CEO (ChiefExecutive Officer)
Position task assignments:
Develop a strategic plan to advance the company's mission and objectives and to promote
revenue, profitability, and growth as an organization.
Expand in country company operations to insure production efficiency, quality, service, and cost-
effective management of resources.
2. Plan, develop, and implement strategies for generating resources and/or revenues for the
company.
Identify acquisition and merger opportunities and direct implementation activities.
Propose / develop company operational procedures, policies, and standards.
Review activity reports and financial statements to determine progress and status in attaining
objectives and revise objectives and plans in accordance with current conditions.
Evaluate performance of executives for compliance with established policies and objectives of the
company and contributions in attaining objectives.
Represent the company at legislative sessions, committee meetings, and at formal functions.
Promote the company to local, regional, national, and international constituencies.
Build a fundraising network using personal contacts, direct mail, special events, and foundation
support.
Present company report at Annual Stockholder and Board of Director meetings.
Direct company planning and policy-making committees.
Oversee foreign operations to include evaluating operating and financial performance.
From [Year]: 2005 To [Year]: 2008
Manager of water and wastewater division, Omran Construction Co.
Position task assignments:
• Perform all tasks at the assigned location related to water supply and sewerage works
installations
• Install new water supply and sewerage works
• Maintain existing systems
• Coordinate the water supply and sewerage works installations
• Ensure that the water supply and sewerage works installations meet the safety standards in
accordance with international codes and regulations
3. • Install maintain a service and repair water supply systems water treatment plants, water storage
facilities, sewerage networks, waste/sewage treatment plant, pumps, control panels of all
plants/pumps and other allied equipment.
• Carry out scheduled periodic and emergency maintenance services on all installations and
equipment
• Periodically inspect ongoing projects and report to the Project Manager on progress, timelines
and any setbacks or alterations that may occur
• Inspect engineering work carried out by local/international contractors and ensure all stages are
completed satisfactorily prior to payment
• Manage the daily task of contractors plumbers and other working in the area of water and
sanitation
• Perform surveys and prepare technical reports, drawing and material quantities
• Review; analyze Task Order Proposals on Water & Sanitation works submitted by contractors
and report to the Project Manager regarding the accuracy of technical aspect of the proposal.
• Supervise the implementation of Task Orders on water and sanitation works to be executed by
local/international contractors in an assigned projects / locations
Prepare material specifications for the purpose of raising requisitions
Provide lists of spare parts for water supply and sewerage works and control panel as well as
necessary tools and equipment well in advance
• Monitor the tools/equipment and spare parts inventory
• Ensure the use of spare parts in the most productive manner
• Liaise with Water and Sanitation Engineer for expert advice on water supply and sewerage
works, electrician on electrical matters and other reengineering sub-units as necessary
• Monitor the quantity levels of supply of spare parts for routine scheduled maintenance as well
as maintenance of log books, maintenance of records and spare parts consumption records
• Perform other duties in Water and Sanitation field as required.
Computer skill
Microsoft office package, EPA NET , Quick book , Water james, Sewer james, AutoCad
4. Year Employer Position
Held
Project Name and Location
2015
GreenTech
Sr.sanitation
Engineer
Qala-e-Naw, Badghis WTP & Generator upgrade , Badgheis ,
Afghanistan
Project was consist design & build for 250 m3 /day WTP including
Reverse’ Osmosis –RO- plant. In design phase, site investigation,
concept design, process design, flow diagram and detailed engineering
drawings in close cooperation with electr-mechanical design team
members considered.
2014
GreenTech
Sr.sanitationEngineer
Company: Green Tech Construction and Engineering Co.
Project Name: Water Supply System in Aybak City of Samangan
Province, Afghanistan
Prime contractor : Omran Holding Group
Responsibility:
Design of Water Supply System including 33 KM water
transmission (HDPE pipe, diameter 18”) with 12 No branch
connection to concreted reservoir.
Design of pressure breaking system
Water Hammer (WH) analysis
2013
GreenTech
Sr.Advisor
Company: Green Tech Construction and Engineering Co.
Prime contractor : Omran Holding Group
Client: USACE-AED
Projects Name:
MeS RLC/ANCOP WWTS Upgrade
Responsibility:
Water distribution system, including 6 KM water distribution
network (2-8 inch-) and house connections to ANP unit and
barracks.
Sewer collection system including 4 KM sewerage system
(Forced and gravity type), diameter 8-10 inch.
Sewer lift station including duplex grinder sewage pump with VFD
control system , one in WWTP area and another one in sewerage
system
Design and site supervision Wastewater treatment plant ;
Including two 50,000 gpd WWTP activated sludge extended aeration
system with 4 No sludge drying beds, headwork , grit removal system,
DAF system, and sand filtration.
5. 2012
Greentech
Sr.SanitationEngineer
Company: Green Tech Construction and Engineering Co.
Prime contractor : Afghan Construction Company Umbrella (ACCU)
Client: USACE-AED
Water supply system improvements and water storage tanks
included 10 KM of 2 to 10 inch PVC pipes, Sch. 80, twin concreted
water tanks each 500 m3.
Sanitary sewer collection system design improvement, including 7
KM of 10 inch gravity sewer system and 2 KM forced main.
Wastewater treatment plant expansion design and site supervision
, including 2x 100,000 gpd activated sludge extended aeration
system, disinfection units and pre- treatment system.
Sludge drying bed (SDB) improvement, including add 2 no of
concreted SDB each 30 m * 8 m to existing SDB system.
WWTP startup and operator training
2012
Greentech
Sr.SanitationEngineer
Company: Green Tech Construction Co.
Prime Contractor : Omran Holding Group
Client : USACE-AED
Project Name: ANA, Pole-Charkhi- Utility Build-Out PEC#3
Responsibility:
Water and wastewater engineering; included improvement of
4 KM existing 4-6 inch , PVC type ,Sch 80 water distribution
network, pressure evaluation on site, leakage detection system
improvement, sewerage system improvement included 34 No
manholes and 8 KM PVC pipe , 10 inch , Sch 40
QC Design of Water distribution ،sewer system and surface water
included 5 KM new water distribution network with air release
system and blow off valves consideration. verify Water hammer –
WH- system calculation and recommendation to reduce WH side
effects on site,
QC Design of water and wastewater treatment plant,
included 2* 65, 000 gpd activated sludge system, extended
aeration with pre-treatment and disinfection units (Calcium hypo
chloride system 65%).
Clouse out document preparation included commissioning plan,
start-up plan for WWTP and training plan.
6. 2012
Greentech
Sr.MechanicalEngineer
COMPANY : Green tech
Prime Contractor: ECC Intl.
Client: USACE -AED
Project Name: UP Provincial HQ Kunduz WWTP
Position: Sr Mechanical Engineer
Responsibility:
Design and calculation of WWTP and Sludge Draying bed,
included a 25,000 gpd activated sludge extended aeration system
with
pre-treatment and post disinfection system.
Start-up & Commissioning and Training for WWTP
Design & supervision of Water Supply System , included 6 KM
PVC pipe ( Sch 80 , vary 1 inch to 8 inch) , pump station with one
juky pump and two main booster system, 150 m deep well with all well head
and control system.
2012
Greentech
SrSanitationengineer
COMPANY : Green tech
Prime Contractor: ECC Intl.
Project Name: : 209th Infantry, Hazrat Sultan, Samangan, Afghanistan
Position:
Responsibility:
Design & supervision of Water Supply System , included 11 KM
PVC pipe ( Sch 80 , vary 1 inch to 10 inch) , pump station with one
juky pump and two main booster system, 200 m deep well with all
well head and control system.
Design of Site sewer supply system
Water and wastewater engineering
Design and sizing of wastewater treatment plant (WWTP) ,
included two number of steel type above ground packaged
system;
2 * 40,000 gpd activated sludge extended aeration system,
Sludge drying beds, pre-treatment and post treatment.
7. 2012
GreenTech
Environmental/Processadvisor
COMPANY : Green tech
Prime Contractor: KBR Intl. and Yuksel Insaat
Project Name: : Water quality monitoring , KIA
Position:
Responsibility:
Analysis of water quality lab result
Recommendation to improve water quality on KIA
( Kabul International airport), a 2000 m3/day Water Treatment
Plant (WTP) with pre- treatment , Softener, reverse Osmosis (RO) plant
and related units.
Drafted WTP (Water Treatment Plant) system technical proposal
Preparation of BOQ to proposed WTP system
2012
GreenTech
Sr.SanitationEngineer
COMPANY : Green tech
Prime Contractor: JMCC (JAMI MASHAL CONSTRUCTION CO.)
Project Name: : WWTP & Utility upgrade ANA GArdiz ,Paktya
Client :USACE -AED
Responsibility:
Design and site consultancy for WWTP Lagoon system handled
12,000 ANA soldiers
WWTP Lagoon system sizing and calculation
WWTP head work design
Sewerage system design
Out fall system design based on site limitation and consideration
2011-2012
Green
Tech
Design
QC
RPTC Shindand WWTP Herat , Afghanistan
2010-2011
Green
Tech
Design
Manager
Camp Shaheen ANA Base -Mazar, Afghanistan
2009-2010
Green
Tech
Mechanic
al advisor
ANA Gamberi , WWTP Jbad , Afghanistan
2008-2009
Green
Tech
Environm
ental
Expert
ANA base , WWTP Kunduz , Afghanistan
2007-2010 Omran
Mechanic
al
Engineer
6 ANP District HQ, Heart, Afghanistan
2008-2009
Green
Tech
Mechanic
al
Engineer
Guard Training Center, Kabul , Afghanistan