Sarfraz Ashraf (Sarfrax.ashraf@gmail.com)
University of Sargodha Gujranwala Campus
For process improvement, one of the best approaches is
developed by Dr. Joseph Juran. It has three components:
1. Planning
2. Control
3. Improvement
It is based loosely on financial processes such as
 budgeting (planning)
 expense measurement (control)
 cost reduction (improvement)
1. Determine customers
 Planning begins with external customers. Marketing determines the
external customers.
 Organizational personnel (managers, members of multifunctional teams,
or work groups) determine the internal customers.
2. Determine customer needs
After determining customers, their needs are discovered. This activity
requires the customers to state needs in their own words and from
their own viewpoint. Needs can be defined in two ways,
• stated needs (what is stated by customer? - automobile)
• real needs (what does customer actually need? - status)
 It is difficult to find real needs for following reasons
1. Customer do not tell real needs as they think it is not necessary.
2. Customers may not tell real needs due to fear of consequences.
 Company might discover these needs by,
(1) Being a user of the product or service
(2) getting information about customer satisfaction and dissatisfaction
about the product or service
(3) Simulation in the laboratory
3. Developing product/service features
The next step is to develop product or service features that
 respond to customer needs
 meet the needs of the organization and its suppliers
 are competitive
 optimize the costs of all stakeholders
 Quality function deployment, Taguchi's quality engineering, and quality
by design are some of the approaches that can be used.
 It is important that the design team, rather than a single department,
approve the final design. The team should be composed of all functional
areas within an organization as well as customers and suppliers.
4. Develop the processes
 The fourth step is to develop the processes which is able to produce
the product or service features.
 This step is also performed by a multifunctional team with a liaison
to the design team.
 Activities include
determining the necessary facilities
control, and maintenance of the facilities
training
operations management
Most important activities are related to "scaling up" from the lab or
prototype environment to the real process environment.
5. Transferring plans to operations
It is the final step of the planning process. A
multifunctional team with a liaison to the other teams is
used.
When training is necessary, it should be performed by
members of the process planning team.
Process validation and reliability check are necessary to
ensure that a process will consistently produce a product or
service while meeting the requirements.
Control is used to help meet the product, process, and service
requirements.
It consists of the following steps:
1. Determine items/subjects to be controlled and their units of
measure.
2. Set goals for the controls and determine what sensors need to
be put in place to measure the product, process, or service.
3. Measure actual performance.
4. Compare actual performance to goals.
5. Act on the difference.
Statistical process control (SPC) is the primary technique
for achieving control. The basic SPC tools are,
Pareto diagrams
Flow diagrams
Cause-and-effect diagrams
Histograms
Control charts
Scatter diagrams
 Purpose of improvement is to attain those levels of performance that
are higher than current levels.
 It begin with the establishment of an effective infrastructure such as
the quality council.
 Some of the duties of the council are to,
1. identify the improvement projects
2. establish the project teams with a project owner
3. provide the teams with the resources to determine the causes,
create solutions, and establish controls to hold the gains
4. ensure that improvement is continuous and never-ending.
Process improvement can be incremental or breakthrough.
1. Incremental Improvement
Incremental improvement is focused on improving existing elements of
product/service or system by
 reducing inefficiency
 lowering costs
 improving quality.
2. Breakthrough Improvement
 It takes place across the boundaries of what is known or acceptable.
 It is all about disruption. If you want a breakthrough, something needs
to break.
 It has the power to transform an entire business or market sector.
The Juran trilogy diagram
This figure shows how the three continuous improvement
processes interrelate.
In this figure, Juran provides a distinction between sporadic
waste and chronic waste.
1. Sporadic waste
This waste can be identified and corrected through quality control.
2. Chronic waste
This waste requires an improvement process.
As a solution is found through the improvement process,
lessons learned are brought back to the quality planning
process so that new goals for the organization may be
established.
 The basic Plan-Do-Study-Act
(PDSA) cycle was first developed
by Shewhart and then modified by
Deming.
 It is an effective improvement
technique.
The four steps in the cycle are,
1. Plan: Plan carefully what is to be done.
2. Do: Carry out the plan (do it).
3. Study: Study the results. Did the plan work as planned, or
were the results different?
4. Act: Finally, act on the results by identifying what worked as
planned and what didn't. Using the knowledge learned,
develop an improved plan and repeat the cycle.
 Kaizen is a Japanese word for the philosophy that defines management's
role in encouraging and implementing small improvements involving
everyone.
 It is the process of continuous improvement in small increments that
make the process more efficient, effective, under control, and adaptable.
 Kaizen relies heavily on a culture that encourages suggestions by
employees who continually try to incrementally improve their job or
process.
 Improvements are usually accomplished at little or no expense, without
sophisticated techniques or expensive equipment.
 It focuses on simplification by breaking down complex processes into their
sub-processes and then improving them.
 The Kaizen improvement focuses on the use of:
1. Value-added and non-value-added work activities.
2. Muda, which refers to the seven classes of waste.
1) Over-production
2) Delay
3) Transportation
4) Processing
5) Inventory
6) Wasted motion
7) Defective parts
3. Principles of motion study and the use of cell technology.
4. Principles of materials handling and use of one-piece flow.
5. Documentation of standard operating procedures.
6. The five S's for workplace organization, which are five
Japanese words.
1) Seiko (proper arrangement)
2) Seiton (orderliness)
3) Seiketso (personal cleanliness)
4) Seiso (cleanup)
5) Shitsuke (discipline)
7. Visual management by means of visual displays that
everyone in the plant can use for better communications.
8. Just-in-time principles to produce only the units in the
right quantities, at the right time, and with the right
resources.
9. Poka-yoke (mistake proofing) to prevent or detect errors.
10.Team dynamics, which include problem solving,
communication skills, and conflict resolution.
 According to Hammer and Champy, reengineering is the
fundamental rethinking and radical redesign of business processes
to achieve dramatic improvements in critical measures of
performance
 Opposite to kaizen, re-engineering is breakthrough improvement.
 The Japanese have not only relied on kaizen (incremental
improvement) but have also developed policy management (hoshin
kanri) and policy deployment (hoshin tenkai) to produce large-scale
breakthroughs that Hammer and Champy promote.
Six Sigma is a methodology for eliminating defects in any processes.
It helps us focus on developing and delivering near-perfect products
and services.
Originally introduced by the Motorola Corporation in 1986, it has
evolved to become the most successful business improvement
strategies. It is attributed with reducing the number of defects to less
than 3.4 per 1 million units.
A Six Sigma defect is defined as anything outside of customer
specifications.
A Six Sigma opportunity is the total quantity of chances for a defect.
The word is a statistical term that measures how much a
given process deviates from perfection. The central idea
behind Six Sigma is that if you can measure how many
“defects” you have in a process, you can figure out how to
eliminate them and get as close to “zero defects” as
possible.
The fundamental objective of the Six Sigma methodology
is the implementation of a measurement based strategy that
focuses on process improvement and variation reduction.
This is accomplished through the use of two Six Sigma
sub-methodologies:
1. DMAIC
2. DMADV
The Six Sigma DMAIC process is an improvement system for existing
processes which need incremental improvement. It is a process for
continued improvement. This process eliminates unproductive steps and
applies technology for improvement.
• DMAIC includes these project stages:
Define - identification of specific processes to be examined
Measure - record data and use metrics to track effectiveness and evaluate
efficiencies
Analyze - utilize critical thinking skills to review data and clarify goals
Improve - create changes in business processes for improvement
Control - build a system of checks and adjustments for ongoing improvement
in production processes
 The Six Sigma DMADV process is an improvement system used to develop new
processes or products at Six Sigma quality levels. It can also be employed if a
current process requires breakthrough improvement.
• DMADV
DMADV includes these project stages:
Define - address customer needs in relation to a product or service
Measure - involve use of electronic data collection to measure customer needs, response to
product, or review of services
Analyze - utilize metrics to evaluate areas where product or service can be better aligned to
customer goals and needs
Design - use the improvement of business processes that organize corporate goals to meet
client and customer needs
Verify - build a system of tests and models to check that customer specifications are being
met through on-going improvements
Six Sigma professionals exist at every level – each with a different role
to play. Here is a basic guide to who does what.
Champions
Company executives who lead Six Sigma Projects.
Individuals who receive instructions regarding the basic principles of
Six Sigma and its methodology.
Responsible for choosing employees to be “Belts” and mentoring
project leaders.
Those who implement and back the introduction of Six Sigma within
the firm.
Master Black Belts
Aligned with the Champion to offer support.
Professionals with widespread project management knowledge.
Masters of Six Sigma Methodologies with proven track records.
Individuals with an advanced understanding of the Statistical
Tools used within Six Sigma.
They advise and instruct Green Belts and Black Belts.
Black Belts
 They receive four weeks of instruction that focus on the Six Sigma road map. This
training will include an extensive look at statistical methodologies.
 Successful Black Belts are project leaders whose job requires at least 75% of their
time dedicated to completing four to six month Six Sigma Projects.
Green Belts
 They receive two weeks of class time which will cover the important aspects of the
statistical methods needed to complete Six Sigma projects, while learning the Six
Sigma road map.
 Green Belts spend up to 50% of their time working on Six Sigma projects that last
for four to six months each.

More Related Content

What's hot

Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)
Operational Excellence Consulting
 
DMAIC-Six sigma process Improvement Approach
DMAIC-Six sigma process Improvement ApproachDMAIC-Six sigma process Improvement Approach
DMAIC-Six sigma process Improvement Approach
Confiz
 
Total Quality Management
Total Quality ManagementTotal Quality Management
Total Quality Management
Onkar Satam
 
Total Quality Management PowerPoint Presentation Slide
Total Quality Management PowerPoint Presentation SlideTotal Quality Management PowerPoint Presentation Slide
Total Quality Management PowerPoint Presentation Slide
SlideTeam
 

What's hot (20)

Presentation about kaizen
Presentation about kaizenPresentation about kaizen
Presentation about kaizen
 
PERFORMANCE EVALUATION POWERPOINT
PERFORMANCE EVALUATION POWERPOINTPERFORMANCE EVALUATION POWERPOINT
PERFORMANCE EVALUATION POWERPOINT
 
Kaizen
KaizenKaizen
Kaizen
 
Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)
 
Dmaic
DmaicDmaic
Dmaic
 
DMAIC-Six sigma process Improvement Approach
DMAIC-Six sigma process Improvement ApproachDMAIC-Six sigma process Improvement Approach
DMAIC-Six sigma process Improvement Approach
 
Operational Excellence model
Operational Excellence modelOperational Excellence model
Operational Excellence model
 
Kaizen
KaizenKaizen
Kaizen
 
Introduction to DMAIC Training
Introduction to DMAIC TrainingIntroduction to DMAIC Training
Introduction to DMAIC Training
 
Total Quality Management
Total Quality ManagementTotal Quality Management
Total Quality Management
 
10 Continuous Improvement Strategies That Work
10 Continuous Improvement Strategies That Work10 Continuous Improvement Strategies That Work
10 Continuous Improvement Strategies That Work
 
Lean Management
Lean ManagementLean Management
Lean Management
 
Lean 6sigma and DMAIC
Lean 6sigma and DMAICLean 6sigma and DMAIC
Lean 6sigma and DMAIC
 
Lean Six Sigma: DMAIC In-Depth
Lean Six Sigma: DMAIC In-DepthLean Six Sigma: DMAIC In-Depth
Lean Six Sigma: DMAIC In-Depth
 
Lean thinking
Lean thinkingLean thinking
Lean thinking
 
Introduction to Lean Six Sigma
Introduction to Lean Six SigmaIntroduction to Lean Six Sigma
Introduction to Lean Six Sigma
 
Total Quality Management PowerPoint Presentation Slide
Total Quality Management PowerPoint Presentation SlideTotal Quality Management PowerPoint Presentation Slide
Total Quality Management PowerPoint Presentation Slide
 
Dmaic overview for slideshare
Dmaic overview for slideshareDmaic overview for slideshare
Dmaic overview for slideshare
 
Total Quality Management
Total Quality ManagementTotal Quality Management
Total Quality Management
 
Kaizen
KaizenKaizen
Kaizen
 

Similar to Continous process improvement

TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENTTOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENT
Reaz Uddin
 
Quality in operations management
Quality in operations managementQuality in operations management
Quality in operations management
selinasimpson1301
 
Process management (improvement)
Process management (improvement)Process management (improvement)
Process management (improvement)
Faisal Syukrillah
 
Sixsigmadtifactsheet
SixsigmadtifactsheetSixsigmadtifactsheet
Sixsigmadtifactsheet
illangakoon
 
Running Head QUALITY CONTROL MANUAL 1 .docx
Running Head QUALITY CONTROL MANUAL          1        .docxRunning Head QUALITY CONTROL MANUAL          1        .docx
Running Head QUALITY CONTROL MANUAL 1 .docx
toltonkendal
 
The discussion assignment for this week will be a review of the Ke.docx
The discussion assignment for this week will be a review of the Ke.docxThe discussion assignment for this week will be a review of the Ke.docx
The discussion assignment for this week will be a review of the Ke.docx
mehek4
 

Similar to Continous process improvement (20)

TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENTTOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENT
 
Assignment kaizen
Assignment kaizenAssignment kaizen
Assignment kaizen
 
Encouraging Business Excellence through Continuous Improvement
Encouraging Business Excellence through Continuous ImprovementEncouraging Business Excellence through Continuous Improvement
Encouraging Business Excellence through Continuous Improvement
 
Six Sigma
Six Sigma Six Sigma
Six Sigma
 
TOTAL QUALITY MANAGEMENT (TQM)
TOTAL QUALITY MANAGEMENT (TQM)TOTAL QUALITY MANAGEMENT (TQM)
TOTAL QUALITY MANAGEMENT (TQM)
 
Quality in operations management
Quality in operations managementQuality in operations management
Quality in operations management
 
Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
final presentation - نسخة العرض [Autosaved].pptx
final presentation - نسخة العرض [Autosaved].pptxfinal presentation - نسخة العرض [Autosaved].pptx
final presentation - نسخة العرض [Autosaved].pptx
 
PQMS.pptx
PQMS.pptxPQMS.pptx
PQMS.pptx
 
Process management (improvement)
Process management (improvement)Process management (improvement)
Process management (improvement)
 
Sixsigmadtifactsheet
SixsigmadtifactsheetSixsigmadtifactsheet
Sixsigmadtifactsheet
 
Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)
 
Pharmaceutical Quality Management System
Pharmaceutical Quality Management SystemPharmaceutical Quality Management System
Pharmaceutical Quality Management System
 
Lean management
Lean managementLean management
Lean management
 
Theories in total quality management
Theories in total quality managementTheories in total quality management
Theories in total quality management
 
Running Head QUALITY CONTROL MANUAL 1 .docx
Running Head QUALITY CONTROL MANUAL          1        .docxRunning Head QUALITY CONTROL MANUAL          1        .docx
Running Head QUALITY CONTROL MANUAL 1 .docx
 
Kaizen Costing – A Management Technique
Kaizen Costing – A Management TechniqueKaizen Costing – A Management Technique
Kaizen Costing – A Management Technique
 
The discussion assignment for this week will be a review of the Ke.docx
The discussion assignment for this week will be a review of the Ke.docxThe discussion assignment for this week will be a review of the Ke.docx
The discussion assignment for this week will be a review of the Ke.docx
 
Five Step Methodology To Implement Bpr
Five Step Methodology To Implement BprFive Step Methodology To Implement Bpr
Five Step Methodology To Implement Bpr
 

More from Sarfraz Ashraf

More from Sarfraz Ashraf (18)

Optimize digital Media Impact
Optimize digital Media ImpactOptimize digital Media Impact
Optimize digital Media Impact
 
Consumer behaviour in service marketing
Consumer behaviour in service marketingConsumer behaviour in service marketing
Consumer behaviour in service marketing
 
NAB Ordinance 1999 MCQs
NAB Ordinance 1999 MCQsNAB Ordinance 1999 MCQs
NAB Ordinance 1999 MCQs
 
Theories of selling
Theories of sellingTheories of selling
Theories of selling
 
Theories of Leadership
Theories of LeadershipTheories of Leadership
Theories of Leadership
 
Project manager as leader
Project manager as leaderProject manager as leader
Project manager as leader
 
A project of supply chain management
A project of supply chain managementA project of supply chain management
A project of supply chain management
 
Managing project team
Managing project teamManaging project team
Managing project team
 
Pizza hut in Pakistan
Pizza hut in PakistanPizza hut in Pakistan
Pizza hut in Pakistan
 
Sale Management and Personal Selling
Sale Management and Personal SellingSale Management and Personal Selling
Sale Management and Personal Selling
 
Pizza hut Marketing Promotion in Pakistan
Pizza hut Marketing Promotion in PakistanPizza hut Marketing Promotion in Pakistan
Pizza hut Marketing Promotion in Pakistan
 
Ch.13 contempory issue in leadership
Ch.13 contempory issue in leadershipCh.13 contempory issue in leadership
Ch.13 contempory issue in leadership
 
MCB Islamic Banking
MCB  Islamic BankingMCB  Islamic Banking
MCB Islamic Banking
 
Types of advertising media
Types of advertising mediaTypes of advertising media
Types of advertising media
 
Brand mantra
Brand mantraBrand mantra
Brand mantra
 
Execution style for advertisement
Execution style for advertisementExecution style for advertisement
Execution style for advertisement
 
Product line
Product lineProduct line
Product line
 
Tagline
TaglineTagline
Tagline
 

Recently uploaded

4 TRIK CARA MENGGUGURKAN JANIN ATAU ABORSI KANDUNGAN
4 TRIK CARA MENGGUGURKAN JANIN ATAU ABORSI KANDUNGAN4 TRIK CARA MENGGUGURKAN JANIN ATAU ABORSI KANDUNGAN
4 TRIK CARA MENGGUGURKAN JANIN ATAU ABORSI KANDUNGAN
Cara Menggugurkan Kandungan 087776558899
 

Recently uploaded (20)

VIP Call Girls Dongri WhatsApp +91-9833363713, Full Night Service
VIP Call Girls Dongri WhatsApp +91-9833363713, Full Night ServiceVIP Call Girls Dongri WhatsApp +91-9833363713, Full Night Service
VIP Call Girls Dongri WhatsApp +91-9833363713, Full Night Service
 
Major SEO Trends in 2024 - Banyanbrain Digital
Major SEO Trends in 2024 - Banyanbrain DigitalMajor SEO Trends in 2024 - Banyanbrain Digital
Major SEO Trends in 2024 - Banyanbrain Digital
 
W.H.Bender Quote 61 -Influential restaurant and food service industry network...
W.H.Bender Quote 61 -Influential restaurant and food service industry network...W.H.Bender Quote 61 -Influential restaurant and food service industry network...
W.H.Bender Quote 61 -Influential restaurant and food service industry network...
 
Elevate Your Advertising Game: Introducing Billion Broadcaster Lift Advertising
Elevate Your Advertising Game: Introducing Billion Broadcaster Lift AdvertisingElevate Your Advertising Game: Introducing Billion Broadcaster Lift Advertising
Elevate Your Advertising Game: Introducing Billion Broadcaster Lift Advertising
 
Unlocking the Mystery of the Voynich Manuscript
Unlocking the Mystery of the Voynich ManuscriptUnlocking the Mystery of the Voynich Manuscript
Unlocking the Mystery of the Voynich Manuscript
 
Distribution Ad Platform_ The Role of Distribution Ad Network.pdf
Distribution Ad Platform_ The Role of  Distribution Ad Network.pdfDistribution Ad Platform_ The Role of  Distribution Ad Network.pdf
Distribution Ad Platform_ The Role of Distribution Ad Network.pdf
 
Rise and fall of Kulula.com, an airline won consumers by different marketing ...
Rise and fall of Kulula.com, an airline won consumers by different marketing ...Rise and fall of Kulula.com, an airline won consumers by different marketing ...
Rise and fall of Kulula.com, an airline won consumers by different marketing ...
 
4 TRIK CARA MENGGUGURKAN JANIN ATAU ABORSI KANDUNGAN
4 TRIK CARA MENGGUGURKAN JANIN ATAU ABORSI KANDUNGAN4 TRIK CARA MENGGUGURKAN JANIN ATAU ABORSI KANDUNGAN
4 TRIK CARA MENGGUGURKAN JANIN ATAU ABORSI KANDUNGAN
 
TAM_AdEx-Cross_Media_Report-Banking_Finance_Investment_(BFSI)_2023.pdf
TAM_AdEx-Cross_Media_Report-Banking_Finance_Investment_(BFSI)_2023.pdfTAM_AdEx-Cross_Media_Report-Banking_Finance_Investment_(BFSI)_2023.pdf
TAM_AdEx-Cross_Media_Report-Banking_Finance_Investment_(BFSI)_2023.pdf
 
Elevating Your Digital Presence by Evitha.pdf
Elevating Your Digital Presence by Evitha.pdfElevating Your Digital Presence by Evitha.pdf
Elevating Your Digital Presence by Evitha.pdf
 
20180928 Hofstede Insights Conference Milan The Power of Culture Led Brands.pptx
20180928 Hofstede Insights Conference Milan The Power of Culture Led Brands.pptx20180928 Hofstede Insights Conference Milan The Power of Culture Led Brands.pptx
20180928 Hofstede Insights Conference Milan The Power of Culture Led Brands.pptx
 
10 Email Marketing Best Practices to Increase Engagements, CTR, And ROI
10 Email Marketing Best Practices to Increase Engagements, CTR, And ROI10 Email Marketing Best Practices to Increase Engagements, CTR, And ROI
10 Email Marketing Best Practices to Increase Engagements, CTR, And ROI
 
Alpha Media March 2024 Buyers Guide.pptx
Alpha Media March 2024 Buyers Guide.pptxAlpha Media March 2024 Buyers Guide.pptx
Alpha Media March 2024 Buyers Guide.pptx
 
Choosing the Right White Label SEO Services to Boost Your Agency's Growth.pdf
Choosing the Right White Label SEO Services to Boost Your Agency's Growth.pdfChoosing the Right White Label SEO Services to Boost Your Agency's Growth.pdf
Choosing the Right White Label SEO Services to Boost Your Agency's Growth.pdf
 
personal branding kit for music business
personal branding kit for music businesspersonal branding kit for music business
personal branding kit for music business
 
Press Release Distribution Evolving with Digital Trends.pdf
Press Release Distribution Evolving with Digital Trends.pdfPress Release Distribution Evolving with Digital Trends.pdf
Press Release Distribution Evolving with Digital Trends.pdf
 
Five Essential Tools for International SEO - Natalia Witczyk - SearchNorwich 15
Five Essential Tools for International SEO - Natalia Witczyk - SearchNorwich 15Five Essential Tools for International SEO - Natalia Witczyk - SearchNorwich 15
Five Essential Tools for International SEO - Natalia Witczyk - SearchNorwich 15
 
The Science of Landing Page Messaging.pdf
The Science of Landing Page Messaging.pdfThe Science of Landing Page Messaging.pdf
The Science of Landing Page Messaging.pdf
 
Martal Group - B2B Lead Gen Agency - Onboarding Overview
Martal Group - B2B Lead Gen Agency - Onboarding OverviewMartal Group - B2B Lead Gen Agency - Onboarding Overview
Martal Group - B2B Lead Gen Agency - Onboarding Overview
 
Social media, ppt. Features, characteristics
Social media, ppt. Features, characteristicsSocial media, ppt. Features, characteristics
Social media, ppt. Features, characteristics
 

Continous process improvement

  • 2.
  • 3. For process improvement, one of the best approaches is developed by Dr. Joseph Juran. It has three components: 1. Planning 2. Control 3. Improvement It is based loosely on financial processes such as  budgeting (planning)  expense measurement (control)  cost reduction (improvement)
  • 4. 1. Determine customers  Planning begins with external customers. Marketing determines the external customers.  Organizational personnel (managers, members of multifunctional teams, or work groups) determine the internal customers. 2. Determine customer needs After determining customers, their needs are discovered. This activity requires the customers to state needs in their own words and from their own viewpoint. Needs can be defined in two ways, • stated needs (what is stated by customer? - automobile) • real needs (what does customer actually need? - status)
  • 5.  It is difficult to find real needs for following reasons 1. Customer do not tell real needs as they think it is not necessary. 2. Customers may not tell real needs due to fear of consequences.  Company might discover these needs by, (1) Being a user of the product or service (2) getting information about customer satisfaction and dissatisfaction about the product or service (3) Simulation in the laboratory
  • 6. 3. Developing product/service features The next step is to develop product or service features that  respond to customer needs  meet the needs of the organization and its suppliers  are competitive  optimize the costs of all stakeholders  Quality function deployment, Taguchi's quality engineering, and quality by design are some of the approaches that can be used.  It is important that the design team, rather than a single department, approve the final design. The team should be composed of all functional areas within an organization as well as customers and suppliers.
  • 7. 4. Develop the processes  The fourth step is to develop the processes which is able to produce the product or service features.  This step is also performed by a multifunctional team with a liaison to the design team.  Activities include determining the necessary facilities control, and maintenance of the facilities training operations management Most important activities are related to "scaling up" from the lab or prototype environment to the real process environment.
  • 8. 5. Transferring plans to operations It is the final step of the planning process. A multifunctional team with a liaison to the other teams is used. When training is necessary, it should be performed by members of the process planning team. Process validation and reliability check are necessary to ensure that a process will consistently produce a product or service while meeting the requirements.
  • 9. Control is used to help meet the product, process, and service requirements. It consists of the following steps: 1. Determine items/subjects to be controlled and their units of measure. 2. Set goals for the controls and determine what sensors need to be put in place to measure the product, process, or service. 3. Measure actual performance. 4. Compare actual performance to goals. 5. Act on the difference.
  • 10. Statistical process control (SPC) is the primary technique for achieving control. The basic SPC tools are, Pareto diagrams Flow diagrams Cause-and-effect diagrams Histograms Control charts Scatter diagrams
  • 11.  Purpose of improvement is to attain those levels of performance that are higher than current levels.  It begin with the establishment of an effective infrastructure such as the quality council.  Some of the duties of the council are to, 1. identify the improvement projects 2. establish the project teams with a project owner 3. provide the teams with the resources to determine the causes, create solutions, and establish controls to hold the gains 4. ensure that improvement is continuous and never-ending.
  • 12. Process improvement can be incremental or breakthrough. 1. Incremental Improvement Incremental improvement is focused on improving existing elements of product/service or system by  reducing inefficiency  lowering costs  improving quality. 2. Breakthrough Improvement  It takes place across the boundaries of what is known or acceptable.  It is all about disruption. If you want a breakthrough, something needs to break.  It has the power to transform an entire business or market sector.
  • 13. The Juran trilogy diagram
  • 14. This figure shows how the three continuous improvement processes interrelate. In this figure, Juran provides a distinction between sporadic waste and chronic waste. 1. Sporadic waste This waste can be identified and corrected through quality control. 2. Chronic waste This waste requires an improvement process. As a solution is found through the improvement process, lessons learned are brought back to the quality planning process so that new goals for the organization may be established.
  • 15.
  • 16.  The basic Plan-Do-Study-Act (PDSA) cycle was first developed by Shewhart and then modified by Deming.  It is an effective improvement technique.
  • 17. The four steps in the cycle are, 1. Plan: Plan carefully what is to be done. 2. Do: Carry out the plan (do it). 3. Study: Study the results. Did the plan work as planned, or were the results different? 4. Act: Finally, act on the results by identifying what worked as planned and what didn't. Using the knowledge learned, develop an improved plan and repeat the cycle.
  • 18.
  • 19.  Kaizen is a Japanese word for the philosophy that defines management's role in encouraging and implementing small improvements involving everyone.  It is the process of continuous improvement in small increments that make the process more efficient, effective, under control, and adaptable.  Kaizen relies heavily on a culture that encourages suggestions by employees who continually try to incrementally improve their job or process.  Improvements are usually accomplished at little or no expense, without sophisticated techniques or expensive equipment.  It focuses on simplification by breaking down complex processes into their sub-processes and then improving them.
  • 20.  The Kaizen improvement focuses on the use of: 1. Value-added and non-value-added work activities. 2. Muda, which refers to the seven classes of waste. 1) Over-production 2) Delay 3) Transportation 4) Processing 5) Inventory 6) Wasted motion 7) Defective parts
  • 21. 3. Principles of motion study and the use of cell technology. 4. Principles of materials handling and use of one-piece flow. 5. Documentation of standard operating procedures. 6. The five S's for workplace organization, which are five Japanese words. 1) Seiko (proper arrangement) 2) Seiton (orderliness) 3) Seiketso (personal cleanliness) 4) Seiso (cleanup) 5) Shitsuke (discipline)
  • 22. 7. Visual management by means of visual displays that everyone in the plant can use for better communications. 8. Just-in-time principles to produce only the units in the right quantities, at the right time, and with the right resources. 9. Poka-yoke (mistake proofing) to prevent or detect errors. 10.Team dynamics, which include problem solving, communication skills, and conflict resolution.
  • 23.
  • 24.  According to Hammer and Champy, reengineering is the fundamental rethinking and radical redesign of business processes to achieve dramatic improvements in critical measures of performance  Opposite to kaizen, re-engineering is breakthrough improvement.  The Japanese have not only relied on kaizen (incremental improvement) but have also developed policy management (hoshin kanri) and policy deployment (hoshin tenkai) to produce large-scale breakthroughs that Hammer and Champy promote.
  • 25.
  • 26. Six Sigma is a methodology for eliminating defects in any processes. It helps us focus on developing and delivering near-perfect products and services. Originally introduced by the Motorola Corporation in 1986, it has evolved to become the most successful business improvement strategies. It is attributed with reducing the number of defects to less than 3.4 per 1 million units. A Six Sigma defect is defined as anything outside of customer specifications. A Six Sigma opportunity is the total quantity of chances for a defect.
  • 27. The word is a statistical term that measures how much a given process deviates from perfection. The central idea behind Six Sigma is that if you can measure how many “defects” you have in a process, you can figure out how to eliminate them and get as close to “zero defects” as possible.
  • 28. The fundamental objective of the Six Sigma methodology is the implementation of a measurement based strategy that focuses on process improvement and variation reduction. This is accomplished through the use of two Six Sigma sub-methodologies: 1. DMAIC 2. DMADV
  • 29. The Six Sigma DMAIC process is an improvement system for existing processes which need incremental improvement. It is a process for continued improvement. This process eliminates unproductive steps and applies technology for improvement. • DMAIC includes these project stages: Define - identification of specific processes to be examined Measure - record data and use metrics to track effectiveness and evaluate efficiencies Analyze - utilize critical thinking skills to review data and clarify goals Improve - create changes in business processes for improvement Control - build a system of checks and adjustments for ongoing improvement in production processes
  • 30.  The Six Sigma DMADV process is an improvement system used to develop new processes or products at Six Sigma quality levels. It can also be employed if a current process requires breakthrough improvement. • DMADV DMADV includes these project stages: Define - address customer needs in relation to a product or service Measure - involve use of electronic data collection to measure customer needs, response to product, or review of services Analyze - utilize metrics to evaluate areas where product or service can be better aligned to customer goals and needs Design - use the improvement of business processes that organize corporate goals to meet client and customer needs Verify - build a system of tests and models to check that customer specifications are being met through on-going improvements
  • 31. Six Sigma professionals exist at every level – each with a different role to play. Here is a basic guide to who does what. Champions Company executives who lead Six Sigma Projects. Individuals who receive instructions regarding the basic principles of Six Sigma and its methodology. Responsible for choosing employees to be “Belts” and mentoring project leaders. Those who implement and back the introduction of Six Sigma within the firm.
  • 32. Master Black Belts Aligned with the Champion to offer support. Professionals with widespread project management knowledge. Masters of Six Sigma Methodologies with proven track records. Individuals with an advanced understanding of the Statistical Tools used within Six Sigma. They advise and instruct Green Belts and Black Belts.
  • 33. Black Belts  They receive four weeks of instruction that focus on the Six Sigma road map. This training will include an extensive look at statistical methodologies.  Successful Black Belts are project leaders whose job requires at least 75% of their time dedicated to completing four to six month Six Sigma Projects. Green Belts  They receive two weeks of class time which will cover the important aspects of the statistical methods needed to complete Six Sigma projects, while learning the Six Sigma road map.  Green Belts spend up to 50% of their time working on Six Sigma projects that last for four to six months each.