What is a busbar?
 An electrical bus bar can be defined as a conductor or groups of
conductors which collects electrical power from the incoming feeder
and distributes them to outgoing feeder.
 Busbars distribute electricity with greater ease and flexibility than
some other more permanent forms of installation and distribution.
 They are often metallic strips of copper, brass, or aluminum that
both ground and conduct electricity.
4/19/2019 Power Systems-I 2
Busbar Arrangements.
 The choice of particular arrangement depends upon viz., system
voltage, position of substation, system flexibility and cost.
 In addition, the following technical considerations must be borne in
the mind while deciding an arrangement:
1) Simplicity is the keynote of a dependable system.
2) Maintenance should be possible without interruption of supply.
3) Alternative arrangements should be available in case of outage of
any apparatus.
4) The installation should be as economical as possible.
4/19/2019 Power Systems-I 3
Single Busbar
Arrangement.
 The arrangement is the
cheapest possible and simple
in construction.
 But, it suffers from two
major defects,
I. Maintenance without
interruption of supply is
not possible.
II. Extension of substation
without shutdown is not
possible.
4/19/2019 Power Systems-I 4
Fig A : Single Busbar Scheme.
Single Bus-bar
Arrangement with
Sectionalizer.
 It is used as an alternative for the
single bus-bar arrangement
because any breaker can be
taken for maintenance.
 Though it requires an extra
breaker, and the switching is
more complex.
 A fault in the bus may shut down
the whole system.
 Generally, used for 110kv
substations.
Fig B: Single busbar scheme
with sectionaliser.
4/19/2019 Power Systems-I 5
Comparison.
Single Bus-bar Scheme.
 It is simplest scheme with artless
protection system.
 Any fault on bus results in
disconnection of power. Any
maintenance on any breaker will lead
to disconnection of relevant breaker,
relevant line or whole system in some
cases.
Single Bus-bar with sectionalizer.
 Single breaker single busbar scheme is
slightly improved by dividing the bus
into two sections.
 This scheme is only effective if there
are two incoming lines and outgoing
lines are distributed evenly in each
section.
4/19/2019 Power Systems-I 6
Main and Transfer
Bus Scheme.
 It is more flexible because half
number of feeders are connected
on each bus.
 But, it needs an extra breaker
coupler circuit.
 Line breaker fault may result in
taking of all the circuits
connected to out of service and
also failure in the bus-bar results
in shutdown of complete system.
 Mostly used for substations of
66kv, 132kv and up to 220kv.
Fig C: Main and transfer bus-
bar scheme.4/19/2019 Power Systems-I 7
Double Bus-bar
Arrangement.
 It is more flexible as we can
connect feeders on either of
buses.
 This scheme is highly reliable as
any breaker can be taken for
maintenance whenever required.
 It is far more expensive when
compared to normal double bus-
bar scheme.
 Generally, used for high voltage
or EHV substations. Fig D: Double bus arrangement.
4/19/2019 Power Systems-I 8
Comparison.
Double Bus-bar Arrangement.
 In double bus system load can be
connected on either of the bus.
 The infeed and the load circuit can be
separated in two if needed from
operational considerations.
 Either bus can be taken out of
maintenance.
Main and Transfer Bus-bar System.
 This is alternative for double bus
scheme.
 It provides facility for breaker
maintenance but not bud
maintenance.
 Whenever maintenance is required the
circuit can be shifted to another bus
and controlled using bus coupler.
4/19/2019 Power Systems-I 9
One and Half
Breaker Scheme.
 More flexible in operation as all
the switching is done by
breakers.
 Selective tripping is possible.
 But any breaker can’t be
removed without interruption of
supply.
 Generally, used for substations
for 220kv to 440kv ratings.
Fig E: One and half breaker scheme.
4/19/2019 Power Systems-I 10
Ring/Mesh
Arrangement.
 Bus-bars gives more operational
flexibility.
 Any fault in the unit separates
the ring into two halves thereby
increasing the complexity of
reclosing and protection.
 Breaker failure during fault on
one circuit causes loss of
additional circuit because of
breaker failure.
 Mostly used for very high power
rating generating stations.
Fig F: Ring Bus-bar Arrangement.
4/19/2019 Power Systems-I 11
Single Bus-bar Scheme using Simulink.
4/19/2019 Power Systems-I 12
Double Bus-bar Scheme using Simulink.
4/19/2019 Power Systems-I 13
Thank You.
4/19/2019 Power Systems-I 14

More Related Content

What's hot

Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1
Md Irshad Ahmad
 
Chapter 4 mechanical design of transmission lines
Chapter 4  mechanical design of transmission linesChapter 4  mechanical design of transmission lines
Chapter 4 mechanical design of transmission lines
firaoltemesgen1
 
POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION
moiz89
 

What's hot (20)

Current transformer (ct)
Current transformer (ct)Current transformer (ct)
Current transformer (ct)
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
Unit 03 Protective relays
Unit  03 Protective relaysUnit  03 Protective relays
Unit 03 Protective relays
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformers
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
Distribution System
Distribution SystemDistribution System
Distribution System
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1
 
Circuit Breakers
Circuit BreakersCircuit Breakers
Circuit Breakers
 
Protection and Switchgear
Protection and SwitchgearProtection and Switchgear
Protection and Switchgear
 
Visit to 400 kV substation, Hadala
Visit to 400 kV substation, HadalaVisit to 400 kV substation, Hadala
Visit to 400 kV substation, Hadala
 
Double Bus Single Breaker Scheme
Double Bus Single Breaker SchemeDouble Bus Single Breaker Scheme
Double Bus Single Breaker Scheme
 
Protective relay
Protective relay Protective relay
Protective relay
 
Chapter 4 mechanical design of transmission lines
Chapter 4  mechanical design of transmission linesChapter 4  mechanical design of transmission lines
Chapter 4 mechanical design of transmission lines
 
Switchgear - complete guide
Switchgear - complete guideSwitchgear - complete guide
Switchgear - complete guide
 
POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION
 
Presentation on substations
Presentation on substationsPresentation on substations
Presentation on substations
 
Transformer protection
Transformer protectionTransformer protection
Transformer protection
 
TDU Unit 03 Distribution Systems
TDU Unit  03 Distribution SystemsTDU Unit  03 Distribution Systems
TDU Unit 03 Distribution Systems
 
Buchholz relay
Buchholz relayBuchholz relay
Buchholz relay
 

Similar to Various Bus-Bar Arrangements.

power grid design
power grid designpower grid design
power grid design
susanta das
 
Primary substations and bus layouts in the distribution system of an industri...
Primary substations and bus layouts in the distribution system of an industri...Primary substations and bus layouts in the distribution system of an industri...
Primary substations and bus layouts in the distribution system of an industri...
Mohammad Raza
 
EEE Unit , electronic and electrical engineering
EEE Unit , electronic and electrical engineeringEEE Unit , electronic and electrical engineering
EEE Unit , electronic and electrical engineering
prithvijr056
 
14 Busbars in Sub-station and It's Protection.pdf
14 Busbars in Sub-station and It's Protection.pdf14 Busbars in Sub-station and It's Protection.pdf
14 Busbars in Sub-station and It's Protection.pdf
satish20012310
 
Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02
Mohit Kothari
 
Gssherap 110901224655-phpapp0
Gssherap 110901224655-phpapp0Gssherap 110901224655-phpapp0
Gssherap 110901224655-phpapp0
Mohit Kothari
 
Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02
Mohit Kothari
 

Similar to Various Bus-Bar Arrangements. (20)

Sub Critical & Super Critical Power Plants in INDIA.
Sub Critical & Super Critical Power Plants in INDIA.Sub Critical & Super Critical Power Plants in INDIA.
Sub Critical & Super Critical Power Plants in INDIA.
 
Template ppt power engg.
Template ppt power engg.Template ppt power engg.
Template ppt power engg.
 
A Review on Selection of Proper Busbar Arrangement for Typical Substation (Bu...
A Review on Selection of Proper Busbar Arrangement for Typical Substation (Bu...A Review on Selection of Proper Busbar Arrangement for Typical Substation (Bu...
A Review on Selection of Proper Busbar Arrangement for Typical Substation (Bu...
 
power grid design
power grid designpower grid design
power grid design
 
Substation
SubstationSubstation
Substation
 
Primary substations and bus layouts in the distribution system of an industri...
Primary substations and bus layouts in the distribution system of an industri...Primary substations and bus layouts in the distribution system of an industri...
Primary substations and bus layouts in the distribution system of an industri...
 
IRJET- Design and Analysis of Typical Chemical Industry Electrical Distributi...
IRJET- Design and Analysis of Typical Chemical Industry Electrical Distributi...IRJET- Design and Analysis of Typical Chemical Industry Electrical Distributi...
IRJET- Design and Analysis of Typical Chemical Industry Electrical Distributi...
 
Psp unit 3
Psp unit 3Psp unit 3
Psp unit 3
 
Power station practice (NEE-702) unit-3
Power station practice (NEE-702) unit-3Power station practice (NEE-702) unit-3
Power station practice (NEE-702) unit-3
 
BEEE-UNIT 5.pptx
BEEE-UNIT 5.pptxBEEE-UNIT 5.pptx
BEEE-UNIT 5.pptx
 
EEE Unit , electronic and electrical engineering
EEE Unit , electronic and electrical engineeringEEE Unit , electronic and electrical engineering
EEE Unit , electronic and electrical engineering
 
14 Busbars in Sub-station and It's Protection.pdf
14 Busbars in Sub-station and It's Protection.pdf14 Busbars in Sub-station and It's Protection.pdf
14 Busbars in Sub-station and It's Protection.pdf
 
Substations
SubstationsSubstations
Substations
 
Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02
 
Gssherap 110901224655-phpapp0
Gssherap 110901224655-phpapp0Gssherap 110901224655-phpapp0
Gssherap 110901224655-phpapp0
 
Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02Gssherap 110901224655-phpapp02
Gssherap 110901224655-phpapp02
 
Module 05 - Distribution Systems Overview (1).pptx
Module 05 - Distribution Systems Overview (1).pptxModule 05 - Distribution Systems Overview (1).pptx
Module 05 - Distribution Systems Overview (1).pptx
 
LEC #01 INTRODUCTION to power distribution system
LEC #01 INTRODUCTION to power distribution systemLEC #01 INTRODUCTION to power distribution system
LEC #01 INTRODUCTION to power distribution system
 
Single breaker
Single breakerSingle breaker
Single breaker
 
IRJET- Power Loss Reduction in Radial Network using Flower Pollination Approach
IRJET- Power Loss Reduction in Radial Network using Flower Pollination ApproachIRJET- Power Loss Reduction in Radial Network using Flower Pollination Approach
IRJET- Power Loss Reduction in Radial Network using Flower Pollination Approach
 

Recently uploaded

"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 

Various Bus-Bar Arrangements.

  • 1. RAGHU ENGINEERING COLLEGE (AUTONOMOUS) DEPARTMENT OF EEE Academic year: 2018-2019 II year II-semester Power Systems-I Generation and Utilization CASE STUDY ON VARIOUS BUSBAR ARRANGEMENTS. BATCH-2 A.Snehitha-18985A0206 A.S.S.R.Murthy-18985A0207 A.Sai Sampath-18985A0208 B.Naga Venkatesh-18985A0209 B.Chaitanya-18985A0210 FACULTY: V.Pramadha Rani. Assosiate Professor. 4/19/2019 Power Systems-I 1
  • 2. What is a busbar?  An electrical bus bar can be defined as a conductor or groups of conductors which collects electrical power from the incoming feeder and distributes them to outgoing feeder.  Busbars distribute electricity with greater ease and flexibility than some other more permanent forms of installation and distribution.  They are often metallic strips of copper, brass, or aluminum that both ground and conduct electricity. 4/19/2019 Power Systems-I 2
  • 3. Busbar Arrangements.  The choice of particular arrangement depends upon viz., system voltage, position of substation, system flexibility and cost.  In addition, the following technical considerations must be borne in the mind while deciding an arrangement: 1) Simplicity is the keynote of a dependable system. 2) Maintenance should be possible without interruption of supply. 3) Alternative arrangements should be available in case of outage of any apparatus. 4) The installation should be as economical as possible. 4/19/2019 Power Systems-I 3
  • 4. Single Busbar Arrangement.  The arrangement is the cheapest possible and simple in construction.  But, it suffers from two major defects, I. Maintenance without interruption of supply is not possible. II. Extension of substation without shutdown is not possible. 4/19/2019 Power Systems-I 4 Fig A : Single Busbar Scheme.
  • 5. Single Bus-bar Arrangement with Sectionalizer.  It is used as an alternative for the single bus-bar arrangement because any breaker can be taken for maintenance.  Though it requires an extra breaker, and the switching is more complex.  A fault in the bus may shut down the whole system.  Generally, used for 110kv substations. Fig B: Single busbar scheme with sectionaliser. 4/19/2019 Power Systems-I 5
  • 6. Comparison. Single Bus-bar Scheme.  It is simplest scheme with artless protection system.  Any fault on bus results in disconnection of power. Any maintenance on any breaker will lead to disconnection of relevant breaker, relevant line or whole system in some cases. Single Bus-bar with sectionalizer.  Single breaker single busbar scheme is slightly improved by dividing the bus into two sections.  This scheme is only effective if there are two incoming lines and outgoing lines are distributed evenly in each section. 4/19/2019 Power Systems-I 6
  • 7. Main and Transfer Bus Scheme.  It is more flexible because half number of feeders are connected on each bus.  But, it needs an extra breaker coupler circuit.  Line breaker fault may result in taking of all the circuits connected to out of service and also failure in the bus-bar results in shutdown of complete system.  Mostly used for substations of 66kv, 132kv and up to 220kv. Fig C: Main and transfer bus- bar scheme.4/19/2019 Power Systems-I 7
  • 8. Double Bus-bar Arrangement.  It is more flexible as we can connect feeders on either of buses.  This scheme is highly reliable as any breaker can be taken for maintenance whenever required.  It is far more expensive when compared to normal double bus- bar scheme.  Generally, used for high voltage or EHV substations. Fig D: Double bus arrangement. 4/19/2019 Power Systems-I 8
  • 9. Comparison. Double Bus-bar Arrangement.  In double bus system load can be connected on either of the bus.  The infeed and the load circuit can be separated in two if needed from operational considerations.  Either bus can be taken out of maintenance. Main and Transfer Bus-bar System.  This is alternative for double bus scheme.  It provides facility for breaker maintenance but not bud maintenance.  Whenever maintenance is required the circuit can be shifted to another bus and controlled using bus coupler. 4/19/2019 Power Systems-I 9
  • 10. One and Half Breaker Scheme.  More flexible in operation as all the switching is done by breakers.  Selective tripping is possible.  But any breaker can’t be removed without interruption of supply.  Generally, used for substations for 220kv to 440kv ratings. Fig E: One and half breaker scheme. 4/19/2019 Power Systems-I 10
  • 11. Ring/Mesh Arrangement.  Bus-bars gives more operational flexibility.  Any fault in the unit separates the ring into two halves thereby increasing the complexity of reclosing and protection.  Breaker failure during fault on one circuit causes loss of additional circuit because of breaker failure.  Mostly used for very high power rating generating stations. Fig F: Ring Bus-bar Arrangement. 4/19/2019 Power Systems-I 11