INTRODUCTION
• The foundation stone of workshop is laid on
08/02/1952.
• Repairing of broad gauge rolling stock i.e.
wagon and coaches.
• Target of 1150 units of wagon and 135 coaches
per month.
• Main objective of company is to provide best
maintenance for railway coaches.
• Main shops on workshop includes carriage bogie
shop, roller bearing shop, wheel shop, A.C
electrician shop, paint shop, wagon shop .
INTRODUCTION TO LIFTING SHOP:
• In lifting shop the rolling stock
is lifted and chassis and other
body parts is repaired.
• The main outer frame of the
rolling stock is assembled and
according to type of rolling
stock the introduction to parts
like brake system or power
system, wheels etc. is done.
• Over head cranes are used to
lift heavy body of trains.
CLASSIFICATION OF ROLLING
STOCK :
• LOCOMOTIVE:-the vehicle containing the source of
power to pull the train is called locomotive. Usually
attached in front of train.
• COACHES :- Vehicles designed for carrying passengers
are called coaches. In addition , certain vehicles
attached to passenger trains are also covered under the
coaches. These includes postal vans, inspection
carriages, etc.
• WAGONS:- Vehicles designed for carrying commodities
are called wagons. These may be open , covered, flat,
tanks etc depending on material to be carried.
CNC PLASMA CUTTER
Plasma cutting is a process that is
used to cut steel and other metals of
different thicknesses (or sometimes
other materials) using a plasma torch.
In this process, an inert gas (in some
units, compressed air) is blown at
high speed out of a nozzle; at the
same time an electrical arc is formed
through that gas from the nozzle to
the surface being cut, turning some of
that gas to plasma. The plasma is
sufficiently hot to melt the metal being
cut and moves sufficiently fast to
blow molten metal away from the cut.
BRAKING SYSTEM
VACUUM BRAKE SYSTEM
As the term indicates vacuum is the moving is the
working medium. The equipment consists of a vacuum brake
cylinder with piston and brake rigging provided under each
vehicle. The amount of vacuum maintained on one side of
piston in the vacuum cylinder to operate the brake System IS
about the 29 Inch of mercury which gives an effective working
pressure of about 100 Lbs per Square inch on the piston
when brake are applied. The 'vacuums, Cylinder are designed
to give the required amount of brake power at the wheel the
vacuum cylinders are continuously evacuated by exhausters
provided the locomotive.
AIR BRAKE SYSTEM
• In this, Compressed Air is used for operating the brake
system.
• The locomotive compressor charges the feed pipe and
the brake pipe throughout the length of the train.
• The feed pipe is connected to the auxiliary reservoir and
the brake pipe is connected to the brake cylinder through
the distributor valve.
• Brake application takes place by dropping the pressure in
the bakes pipe.
• TYPES OF AIR BRAKE SYSTEM
1. Single-pipe air brake system
2. Twin-pipe air brake system
PRINCIPAL PARTS OF AIR
BRAKE SYSTEM
OPERATIONS IN AIR BRAKE
SYSTEM
Consists of Three Stages: -
• Release Stage
• Application Stage
• Lap Stage
RELEASE STAGE
The driver places the brake valve in the “release” position.
Pressure in the brake pipe is rising and enters the triple valve
on each car, pushing the side valve towards left. The
movement allows a feed groove to open between brake pipe
and auxiliary reservoir and another connection bellow it to open
between brake cylinder and exhaust port. The pressurized air
recharges the auxiliary cylinder and air pressure in brake
cylinder escapes through exhaust port . The spring get released
and brake block comes back to its position.
The driver places the brake valve in the “application” position.
This causes air pressure in brake pipe to escape. The loss of
pressure is detected by the side valve in triplet valve
,because the pressure on one side has fallen, the auxiliary
reservoir on other side pushes the valve so that feed groove
get closed. The connection between auxiliary cylinder and
brake cylinder get opened and air get feed into the brake
cylinder. The air pressure forces the piston against spring
and causes the break block to attach the wheel.
APPLICATION STAGE
LAP STAGE
The driver places the brake valve in the “lap” position, the air
escaping from the brake pipe is suspended (pressure stop
falling). This pressure drop is detected by side valve because
the auxiliary pressure continue to fall while brake pipe pressure
stop falling. The side valve moves towards the auxiliary
reservoir until connection to brake cylinder is cut off. The brake
is now “lapped”. lap does not work after release has been
initiated.
TWIN PIPE AIR BRAKE
SYSTEM
Thank You

More Related Content

What's hot

What's hot (20)

Bogie
BogieBogie
Bogie
 
RAILWAY PPT
RAILWAY PPTRAILWAY PPT
RAILWAY PPT
 
Railway carriage workshop Ajmer
Railway carriage workshop AjmerRailway carriage workshop Ajmer
Railway carriage workshop Ajmer
 
Coach care centre new delhi
Coach care centre new delhiCoach care centre new delhi
Coach care centre new delhi
 
Lhb coach documentation
Lhb coach  documentationLhb coach  documentation
Lhb coach documentation
 
Summer Internship/Training report at Indian Railway
Summer Internship/Training report at Indian RailwaySummer Internship/Training report at Indian Railway
Summer Internship/Training report at Indian Railway
 
Northern railway
Northern railwayNorthern railway
Northern railway
 
Railway Training Report
Railway Training ReportRailway Training Report
Railway Training Report
 
Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)
 
Gorakhpur mechanical workshop summer training report
Gorakhpur mechanical workshop summer training reportGorakhpur mechanical workshop summer training report
Gorakhpur mechanical workshop summer training report
 
Coach Care Complex,NWR Jaipur
Coach Care Complex,NWR JaipurCoach Care Complex,NWR Jaipur
Coach Care Complex,NWR Jaipur
 
Study on Coach interior fittings of ICF and LHB coaches
Study on Coach interior fittings of ICF and LHB coachesStudy on Coach interior fittings of ICF and LHB coaches
Study on Coach interior fittings of ICF and LHB coaches
 
indian railway gorakhpur training report for mechanical engineering 2016
indian railway gorakhpur training report for mechanical engineering 2016 indian railway gorakhpur training report for mechanical engineering 2016
indian railway gorakhpur training report for mechanical engineering 2016
 
Project Report on railway workshop Jhansi
Project Report on railway workshop JhansiProject Report on railway workshop Jhansi
Project Report on railway workshop Jhansi
 
Summer training report on electric loco shed
Summer training report on electric loco shedSummer training report on electric loco shed
Summer training report on electric loco shed
 
railway_plant_layout
railway_plant_layoutrailway_plant_layout
railway_plant_layout
 
central railway internship report
central railway internship reportcentral railway internship report
central railway internship report
 
Hand book on C&W
Hand book on C&W Hand book on C&W
Hand book on C&W
 
STUDY OF ICF BOGIE
STUDY OF ICF BOGIESTUDY OF ICF BOGIE
STUDY OF ICF BOGIE
 
Summer Training Report on Indian Railways , C& W Workshop, NBQ, Assam
Summer Training Report on Indian Railways , C& W Workshop, NBQ, AssamSummer Training Report on Indian Railways , C& W Workshop, NBQ, Assam
Summer Training Report on Indian Railways , C& W Workshop, NBQ, Assam
 

Similar to RAILWAY WORKSHOP TRANING PPT

abes engineering college ghaziabad
abes engineering college  ghaziabadabes engineering college  ghaziabad
abes engineering college ghaziabad
Palash Awasthi
 
Mini Project PPT Kondi Naveen Finals.pdf
Mini Project PPT Kondi Naveen Finals.pdfMini Project PPT Kondi Naveen Finals.pdf
Mini Project PPT Kondi Naveen Finals.pdf
Naveenkondi1
 

Similar to RAILWAY WORKSHOP TRANING PPT (20)

REPORT OF VBS
REPORT OF VBSREPORT OF VBS
REPORT OF VBS
 
Abes engineering college ghaziabad
Abes engineering college  ghaziabadAbes engineering college  ghaziabad
Abes engineering college ghaziabad
 
abes engineering college ghaziabad
abes engineering college  ghaziabadabes engineering college  ghaziabad
abes engineering college ghaziabad
 
vaccum braking system
vaccum braking systemvaccum braking system
vaccum braking system
 
Applications of fluid hydraulics
Applications of fluid hydraulicsApplications of fluid hydraulics
Applications of fluid hydraulics
 
Air brake system of locomotives
Air brake system of locomotivesAir brake system of locomotives
Air brake system of locomotives
 
Vaccum braking system
Vaccum braking systemVaccum braking system
Vaccum braking system
 
Project
ProjectProject
Project
 
61667012 vaccuum-braking-system
61667012 vaccuum-braking-system61667012 vaccuum-braking-system
61667012 vaccuum-braking-system
 
AUTOMOTIVE CLUTCHE SYSTEM
AUTOMOTIVE CLUTCHE SYSTEM AUTOMOTIVE CLUTCHE SYSTEM
AUTOMOTIVE CLUTCHE SYSTEM
 
Spark ignition engine (I.C. Engine).pptx
Spark ignition engine (I.C. Engine).pptxSpark ignition engine (I.C. Engine).pptx
Spark ignition engine (I.C. Engine).pptx
 
Automatic Transmission
Automatic TransmissionAutomatic Transmission
Automatic Transmission
 
Mini Project PPT Kondi Naveen Finals.pdf
Mini Project PPT Kondi Naveen Finals.pdfMini Project PPT Kondi Naveen Finals.pdf
Mini Project PPT Kondi Naveen Finals.pdf
 
CHAP_4_AERO_ENGINE_MAINTENANCE_AND_REPAIR__1_.pptx
CHAP_4_AERO_ENGINE_MAINTENANCE_AND_REPAIR__1_.pptxCHAP_4_AERO_ENGINE_MAINTENANCE_AND_REPAIR__1_.pptx
CHAP_4_AERO_ENGINE_MAINTENANCE_AND_REPAIR__1_.pptx
 
Valves
ValvesValves
Valves
 
Hydraulic actuators and motors
Hydraulic actuators and motors Hydraulic actuators and motors
Hydraulic actuators and motors
 
Air brakes project
Air brakes projectAir brakes project
Air brakes project
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
 
Air brakes in BOXNHL wagon
Air brakes in BOXNHL wagonAir brakes in BOXNHL wagon
Air brakes in BOXNHL wagon
 
Ic engine parts
Ic engine partsIc engine parts
Ic engine parts
 

More from Sahil arora (7)

Design and analysis of engine blower REPORT
Design and analysis of engine blower  REPORTDesign and analysis of engine blower  REPORT
Design and analysis of engine blower REPORT
 
Synopsis ON ENGINE BLOWER PROJECT
Synopsis  ON ENGINE BLOWER PROJECTSynopsis  ON ENGINE BLOWER PROJECT
Synopsis ON ENGINE BLOWER PROJECT
 
REPORT OF FOOT STEP POWER GENERATION PROJECT
REPORT OF FOOT STEP POWER GENERATION PROJECTREPORT OF FOOT STEP POWER GENERATION PROJECT
REPORT OF FOOT STEP POWER GENERATION PROJECT
 
Major project synopsis ON FOOT STEP POWER GENERATION
Major project synopsis ON FOOT STEP POWER GENERATIONMajor project synopsis ON FOOT STEP POWER GENERATION
Major project synopsis ON FOOT STEP POWER GENERATION
 
PANIPAT THERMAL POWER PLANT
PANIPAT THERMAL POWER PLANTPANIPAT THERMAL POWER PLANT
PANIPAT THERMAL POWER PLANT
 
thermal power plant
thermal power plantthermal power plant
thermal power plant
 
Ppt of fm
Ppt of fmPpt of fm
Ppt of fm
 

Recently uploaded

1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
MateoGardella
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
SanaAli374401
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 

Recently uploaded (20)

microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 

RAILWAY WORKSHOP TRANING PPT

  • 1. Training Report Presentation on Carriage & wagon workshop, Jagadhri PRESENTED BY: Sahil Arora ROLL NO. 1213422 MECHANICAL ENGINEERING SETH JAI PARKASH MUKAND LAL INSTITUTE OF ENGINEERING & TECHNOLOGY , RADAUR, YAMUNA NAGAR
  • 2. JAGADHRI WORKSHOP INTRODUCTION • The foundation stone of workshop is laid on 08/02/1952. • Repairing of broad gauge rolling stock i.e. wagon and coaches. • Target of 1150 units of wagon and 135 coaches per month. • Main objective of company is to provide best maintenance for railway coaches. • Main shops on workshop includes carriage bogie shop, roller bearing shop, wheel shop, A.C electrician shop, paint shop, wagon shop .
  • 3. INTRODUCTION TO LIFTING SHOP: • In lifting shop the rolling stock is lifted and chassis and other body parts is repaired. • The main outer frame of the rolling stock is assembled and according to type of rolling stock the introduction to parts like brake system or power system, wheels etc. is done. • Over head cranes are used to lift heavy body of trains.
  • 4. CLASSIFICATION OF ROLLING STOCK : • LOCOMOTIVE:-the vehicle containing the source of power to pull the train is called locomotive. Usually attached in front of train. • COACHES :- Vehicles designed for carrying passengers are called coaches. In addition , certain vehicles attached to passenger trains are also covered under the coaches. These includes postal vans, inspection carriages, etc. • WAGONS:- Vehicles designed for carrying commodities are called wagons. These may be open , covered, flat, tanks etc depending on material to be carried.
  • 5. CNC PLASMA CUTTER Plasma cutting is a process that is used to cut steel and other metals of different thicknesses (or sometimes other materials) using a plasma torch. In this process, an inert gas (in some units, compressed air) is blown at high speed out of a nozzle; at the same time an electrical arc is formed through that gas from the nozzle to the surface being cut, turning some of that gas to plasma. The plasma is sufficiently hot to melt the metal being cut and moves sufficiently fast to blow molten metal away from the cut.
  • 7. VACUUM BRAKE SYSTEM As the term indicates vacuum is the moving is the working medium. The equipment consists of a vacuum brake cylinder with piston and brake rigging provided under each vehicle. The amount of vacuum maintained on one side of piston in the vacuum cylinder to operate the brake System IS about the 29 Inch of mercury which gives an effective working pressure of about 100 Lbs per Square inch on the piston when brake are applied. The 'vacuums, Cylinder are designed to give the required amount of brake power at the wheel the vacuum cylinders are continuously evacuated by exhausters provided the locomotive.
  • 8. AIR BRAKE SYSTEM • In this, Compressed Air is used for operating the brake system. • The locomotive compressor charges the feed pipe and the brake pipe throughout the length of the train. • The feed pipe is connected to the auxiliary reservoir and the brake pipe is connected to the brake cylinder through the distributor valve. • Brake application takes place by dropping the pressure in the bakes pipe. • TYPES OF AIR BRAKE SYSTEM 1. Single-pipe air brake system 2. Twin-pipe air brake system
  • 9. PRINCIPAL PARTS OF AIR BRAKE SYSTEM
  • 10. OPERATIONS IN AIR BRAKE SYSTEM Consists of Three Stages: - • Release Stage • Application Stage • Lap Stage
  • 11. RELEASE STAGE The driver places the brake valve in the “release” position. Pressure in the brake pipe is rising and enters the triple valve on each car, pushing the side valve towards left. The movement allows a feed groove to open between brake pipe and auxiliary reservoir and another connection bellow it to open between brake cylinder and exhaust port. The pressurized air recharges the auxiliary cylinder and air pressure in brake cylinder escapes through exhaust port . The spring get released and brake block comes back to its position.
  • 12. The driver places the brake valve in the “application” position. This causes air pressure in brake pipe to escape. The loss of pressure is detected by the side valve in triplet valve ,because the pressure on one side has fallen, the auxiliary reservoir on other side pushes the valve so that feed groove get closed. The connection between auxiliary cylinder and brake cylinder get opened and air get feed into the brake cylinder. The air pressure forces the piston against spring and causes the break block to attach the wheel. APPLICATION STAGE
  • 13. LAP STAGE The driver places the brake valve in the “lap” position, the air escaping from the brake pipe is suspended (pressure stop falling). This pressure drop is detected by side valve because the auxiliary pressure continue to fall while brake pipe pressure stop falling. The side valve moves towards the auxiliary reservoir until connection to brake cylinder is cut off. The brake is now “lapped”. lap does not work after release has been initiated.
  • 14. TWIN PIPE AIR BRAKE SYSTEM