Dhaka Metro Rail
Introduction of Dhaka Metro Rail:
 The Dhaka Metro is an approved metro rail system under construction in Dhaka, the capital and largest city
of Bangladesh. Together with a separate BRT (Bus Rapid Transit) system it has been long called for to solve
the extreme amount of traffic jams and congestion that occur throughout the entire city on a daily basis,
among the heaviest in the world. It is a part of the 20-year long Strategic Transport Plan (STP) chalked out by
the Government's Transport Coordination Authority (DTCA).
 Currently the metro rail system consists of one line referred to as the MRT (Mass Rapid Transit) Line-6, with
other metro rail lines being added in the future. This Wikipedia article focuses mainly on Dhaka MRT Line-6.
 The Dhaka Metro Rail Line-6 consists of 16 elevated stations each of 180m long and 20.1 km of electricity
powered light rail tracks. MRT Line-6. All of Line-6, save for the depot, as well as some of its accompanying
BRT, will be elevated above current roads primarily above road medians to allow traffic flow underneath, with
stations also elevated.[
 Construction began on 26 June 2016 with an inauguration ceremony presided over by Sheikh Hasina. The
civil work is being done by the Italian-Thai Development Public Company Limited and Sinohydro Corporation
Limited JV and a Tokyo based construction company is developing the depot’s land.
Overview:
 The deal for construction of the 20.1 kilometres (12.5 mi) Line 6, costing $2.8 billion, was signed by
the Government of Bangladesh with the Japan International Cooperation Agency on 20 February 2013.This first
route, originally projected to start from uttara, a northern suburb of Dhaka, to Sayedabad, in the south of the
capital, was eventually extended north to Uttara and truncated south to Motijheel.
 Each train will hold up to 1800 passengers. With 56 trains to be in service by 2019, Dhaka Metro is projected to
serve more than 60,000 passengers per hour by 2021, with wait times of approximately 4 minutes. The entire
route will be able to be travelled in less than 40 minutes at an average speed of 100 km/h (62 mph), expected to
drastically reduce the number of private cars on Dhaka's streets as well as their potentially 7-hour-long
standstills.
 During an interview with a local news paper, Md Mofazzel Hossain, Project Director of Dhaka Mass Rapid Transit
Development Project said "The metro rail would be noise-free, with noise barriers and vibration-free lines, and
the cars would be made of stainless steel and aluminium alloy". The system plans to use magnetic contactless
Integrated Circuit Ticketing commonly also known as smart cards. Platform screening door (PSD) barriers used
in the platform level will increase safety and increase efficiency.
 When the service is in full operation, trains of six air-conditioned spacious cars will arrive every four minutes
going each way at each of the 16 stations.
 The project is being managed by the Communications Ministry's Dhaka Transport Co-ordination Authority, and a
consortium of foreign as well as Bangladeshi firms known as NKDM Association is acting as General Consultant
(GC). NKDM Association consists of: Nippon Koei Japan, Nippon Koei India, Delhi Metro Rail Corp (India), Mott
MacDonald UK, Mott MacDonald India and Development Design Consultants (local consultant-Bangladesh).
Conception and Origin:
 In a view to implement Dhaka City's 20-year long Strategic Transport (STP), Bangladesh Government
invited Japan International Cooperation Agency (JICA) to conduct a primary survey and feasibility study
on the transport system of Dhaka back in 2009–2010. In 2012 the Government’s Executive Committee of
National Economic Council (ECNEC) approved the project. A loan agreement between Bangladesh
Government and JICA was signed in January 2013. The same year, Dhaka Mass Transit Company Ltd.
(DMTC), the implementing agency of MRT Line-6 project was formed. The General Consultant (GC)
namely the NKDM Association (See above) commenced work from February 2014.
 In June 2013, Dhaka Mass Transit Company Limited (DMTC) was established by the Government to
implement the Metro Rail Lines across the City. The project will be constructed under the supervision of
(DMTCL) under the jurisdiction of Road Transport and Highway Division, Ministry of Road Transport and
Bridges, Government of Bangladesh. Once complete, metro rail services would be operated by DMTCL.
Project Components, Dates and Progress:
 During an interview with daily sun, Md Mofazzel Hossain, Project Director of Dhaka Mass Rapid Transit
Development Project said that the project will be implemented under eight construction packages (CP). The
development components or construction packages include – CP-01 (Depot Land Development), CP-02 (Depot
Civil & Buildings), CP-03, CP-04 (Viaduct & Stations, Uttara-Agargaon), CP-05, CP-06 (Viaduct & Stations,
Agargaon-Motijheel), CP-07 (Electro-Mechanical Systems) and CP-08 (Rolling Stock & Depot Equipment).
 Utility relocation from Mirpur-10 to Agargaon was planned to start August 2016, Other surveys have already
been completed during the period of 2014 – October 2016 as mentioned by the project director Topographic
Survey, Traffic Survey, Geotechnical Survey, Right of Way (ROW) Survey, Historical Importance/ Archeological
(HIA) Survey, Environmental Baseline (EBL) Survey, Soil Electric Resistivity (SER) Survey and Utility
Verification Survey.
 As of May 2015, soil testing for the line was completed, with construction for the first section having begun on
26 June 2016, and construction for the second section planned to begin in July 2017, for planned public
operation by the end of 2019 and sometime in 2020, respectively.
 A Japanese firm Tokyo Construction Ltd, is carrying out the depot land development work (CP-01). Tokyu
Construction Ltd will develop the depot on a 23.84-hectare of land during the construction period at the cost of
around ৳5.67 billion (US$73 million). He said the Pre-Qualification (PQ) of CP-02 has already done and 15
firms are qualified for this. Tender for CP-02 is already floated and the last date of the submission is 6
September this year. While asked about CP-03 and CP-04, he said PQ process has been done on 20 April this
year. Tender has been invited and the last date of submission is 8 August 2016. But the date may be extended,
he mentioned.
Tentative alignments have been decided upon for the three initial metro lines. Only Line 6, as of
27 June 2016, has a definite station layout.
Uttara North Agargaon
Uttara Center Bijoy Sarani
Uttara South Farmgate
Pallabi Karwan Bazar
Mirpur-11 Shahbag
Mirpur-10 Dhaka University
Kazipara Bangladesh Secretariat
Shewrapara Motijheel
Route Alignment List:
Route Alignment Map:
Benefits of Metro Rail:
 Fuel Cost saving
 Number of Vehicles off the road
 Vehicle cost saving
 Reduction in emission of greenhouse gases
 Emission cost saving
 Number of Road accidents avoided
Under Construction of Dhaka Metro Rail:
Long Span of Shewrapara Metro Rail Station :
Proposed 3D View Of Kazipara Metro Rail Station :
Proposed Train of Dhaka Metro Rail
The End

More Related Content

What's hot

Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
Sourav Paul
 

What's hot (20)

Metro Rail in Dhaka City
Metro Rail in Dhaka CityMetro Rail in Dhaka City
Metro Rail in Dhaka City
 
Delhi metro - Project Finance
Delhi metro - Project FinanceDelhi metro - Project Finance
Delhi metro - Project Finance
 
Padma multipurpose bridge
Padma multipurpose bridgePadma multipurpose bridge
Padma multipurpose bridge
 
36551105 delhi-metro
36551105 delhi-metro36551105 delhi-metro
36551105 delhi-metro
 
Bharat mala project and pradhan mantri gram sadak
Bharat mala project and pradhan mantri gram sadakBharat mala project and pradhan mantri gram sadak
Bharat mala project and pradhan mantri gram sadak
 
Delhi metro project
Delhi metro projectDelhi metro project
Delhi metro project
 
padma bridge presention
padma bridge presentionpadma bridge presention
padma bridge presention
 
Delhi metro and Economics
Delhi metro and EconomicsDelhi metro and Economics
Delhi metro and Economics
 
IMPACT OF BRTS ON CITIES
IMPACT OF BRTS ON CITIESIMPACT OF BRTS ON CITIES
IMPACT OF BRTS ON CITIES
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India ppt
 
Rail rapid transit system (india)
Rail rapid transit system (india)Rail rapid transit system (india)
Rail rapid transit system (india)
 
Delhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysisDelhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysis
 
delhi metro
delhi metrodelhi metro
delhi metro
 
Metro Rail and the City
Metro Rail and the CityMetro Rail and the City
Metro Rail and the City
 
Delhi Metro
Delhi MetroDelhi Metro
Delhi Metro
 
All about Bangladesh Railway
All about Bangladesh RailwayAll about Bangladesh Railway
All about Bangladesh Railway
 
Presentation about Padma Bridge.pptx
Presentation about Padma Bridge.pptxPresentation about Padma Bridge.pptx
Presentation about Padma Bridge.pptx
 
Delhi Metro Rail Project Management
Delhi Metro Rail Project ManagementDelhi Metro Rail Project Management
Delhi Metro Rail Project Management
 
Railway project
Railway projectRailway project
Railway project
 

Similar to Presentation for Dhaka Metro Rail.pptx

DFC Decongesting Indian Railways
DFC Decongesting Indian RailwaysDFC Decongesting Indian Railways
DFC Decongesting Indian Railways
Abeer Ray
 
Rampura-Amulia-Demra Expressway (RAD) Market Awareness Brochure
Rampura-Amulia-Demra Expressway (RAD) Market Awareness BrochureRampura-Amulia-Demra Expressway (RAD) Market Awareness Brochure
Rampura-Amulia-Demra Expressway (RAD) Market Awareness Brochure
Pratish Halady
 
Bangalore metro rail project
Bangalore metro rail projectBangalore metro rail project
Bangalore metro rail project
Saravanan rulez
 
India’s largest highway project -The Golden Quadrilateral project
India’s largest highway project -The Golden Quadrilateral projectIndia’s largest highway project -The Golden Quadrilateral project
India’s largest highway project -The Golden Quadrilateral project
Suresh Mandal
 
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiDFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
Shobhit Acharya
 

Similar to Presentation for Dhaka Metro Rail.pptx (20)

DFC Decongesting Indian Railways
DFC Decongesting Indian RailwaysDFC Decongesting Indian Railways
DFC Decongesting Indian Railways
 
Rampura-Amulia-Demra Expressway (RAD) Market Awareness Brochure
Rampura-Amulia-Demra Expressway (RAD) Market Awareness BrochureRampura-Amulia-Demra Expressway (RAD) Market Awareness Brochure
Rampura-Amulia-Demra Expressway (RAD) Market Awareness Brochure
 
BULLET TRAIN - A Preview on India's FIRST fastest High-Speed Railway Corriodor
BULLET TRAIN - A Preview on India's FIRST fastest High-Speed Railway CorriodorBULLET TRAIN - A Preview on India's FIRST fastest High-Speed Railway Corriodor
BULLET TRAIN - A Preview on India's FIRST fastest High-Speed Railway Corriodor
 
“Gujarat Metro Rail Project”
“Gujarat Metro Rail Project”“Gujarat Metro Rail Project”
“Gujarat Metro Rail Project”
 
Bullet train in India
Bullet train in IndiaBullet train in India
Bullet train in India
 
LMRC summer training
LMRC summer trainingLMRC summer training
LMRC summer training
 
Lmrc - Lucknow Metro Rail Co-orporation
Lmrc - Lucknow Metro Rail Co-orporationLmrc - Lucknow Metro Rail Co-orporation
Lmrc - Lucknow Metro Rail Co-orporation
 
Infrastructures in City of Kolkata & West Bengal
Infrastructures in City of Kolkata & West BengalInfrastructures in City of Kolkata & West Bengal
Infrastructures in City of Kolkata & West Bengal
 
Bridge development in chhattisgarh
Bridge development in chhattisgarhBridge development in chhattisgarh
Bridge development in chhattisgarh
 
Bridge development in chhattisgarh
Bridge development in chhattisgarhBridge development in chhattisgarh
Bridge development in chhattisgarh
 
Bangalore metro rail project
Bangalore metro rail projectBangalore metro rail project
Bangalore metro rail project
 
Padma Brige Project 2017
Padma Brige Project 2017Padma Brige Project 2017
Padma Brige Project 2017
 
Presentation1
Presentation1Presentation1
Presentation1
 
Road Developments in India.pptx
Road Developments in India.pptxRoad Developments in India.pptx
Road Developments in India.pptx
 
Nl infrastructure oct 24 - oct 30, 2015
Nl infrastructure oct 24 - oct 30, 2015Nl infrastructure oct 24 - oct 30, 2015
Nl infrastructure oct 24 - oct 30, 2015
 
BMRCL In-Plant Training Report
BMRCL In-Plant Training ReportBMRCL In-Plant Training Report
BMRCL In-Plant Training Report
 
India (6).pdf
India (6).pdfIndia (6).pdf
India (6).pdf
 
India’s largest highway project -The Golden Quadrilateral project
India’s largest highway project -The Golden Quadrilateral projectIndia’s largest highway project -The Golden Quadrilateral project
India’s largest highway project -The Golden Quadrilateral project
 
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_KoiDFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
DFCC-WDFC-Sojitz_L&T-Rites_Nippon_Koi
 
wdfcil
wdfcilwdfcil
wdfcil
 

Recently uploaded

Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 

Recently uploaded (20)

Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 

Presentation for Dhaka Metro Rail.pptx

  • 2. Introduction of Dhaka Metro Rail:  The Dhaka Metro is an approved metro rail system under construction in Dhaka, the capital and largest city of Bangladesh. Together with a separate BRT (Bus Rapid Transit) system it has been long called for to solve the extreme amount of traffic jams and congestion that occur throughout the entire city on a daily basis, among the heaviest in the world. It is a part of the 20-year long Strategic Transport Plan (STP) chalked out by the Government's Transport Coordination Authority (DTCA).  Currently the metro rail system consists of one line referred to as the MRT (Mass Rapid Transit) Line-6, with other metro rail lines being added in the future. This Wikipedia article focuses mainly on Dhaka MRT Line-6.  The Dhaka Metro Rail Line-6 consists of 16 elevated stations each of 180m long and 20.1 km of electricity powered light rail tracks. MRT Line-6. All of Line-6, save for the depot, as well as some of its accompanying BRT, will be elevated above current roads primarily above road medians to allow traffic flow underneath, with stations also elevated.[  Construction began on 26 June 2016 with an inauguration ceremony presided over by Sheikh Hasina. The civil work is being done by the Italian-Thai Development Public Company Limited and Sinohydro Corporation Limited JV and a Tokyo based construction company is developing the depot’s land.
  • 3. Overview:  The deal for construction of the 20.1 kilometres (12.5 mi) Line 6, costing $2.8 billion, was signed by the Government of Bangladesh with the Japan International Cooperation Agency on 20 February 2013.This first route, originally projected to start from uttara, a northern suburb of Dhaka, to Sayedabad, in the south of the capital, was eventually extended north to Uttara and truncated south to Motijheel.  Each train will hold up to 1800 passengers. With 56 trains to be in service by 2019, Dhaka Metro is projected to serve more than 60,000 passengers per hour by 2021, with wait times of approximately 4 minutes. The entire route will be able to be travelled in less than 40 minutes at an average speed of 100 km/h (62 mph), expected to drastically reduce the number of private cars on Dhaka's streets as well as their potentially 7-hour-long standstills.  During an interview with a local news paper, Md Mofazzel Hossain, Project Director of Dhaka Mass Rapid Transit Development Project said "The metro rail would be noise-free, with noise barriers and vibration-free lines, and the cars would be made of stainless steel and aluminium alloy". The system plans to use magnetic contactless Integrated Circuit Ticketing commonly also known as smart cards. Platform screening door (PSD) barriers used in the platform level will increase safety and increase efficiency.  When the service is in full operation, trains of six air-conditioned spacious cars will arrive every four minutes going each way at each of the 16 stations.  The project is being managed by the Communications Ministry's Dhaka Transport Co-ordination Authority, and a consortium of foreign as well as Bangladeshi firms known as NKDM Association is acting as General Consultant (GC). NKDM Association consists of: Nippon Koei Japan, Nippon Koei India, Delhi Metro Rail Corp (India), Mott MacDonald UK, Mott MacDonald India and Development Design Consultants (local consultant-Bangladesh).
  • 4. Conception and Origin:  In a view to implement Dhaka City's 20-year long Strategic Transport (STP), Bangladesh Government invited Japan International Cooperation Agency (JICA) to conduct a primary survey and feasibility study on the transport system of Dhaka back in 2009–2010. In 2012 the Government’s Executive Committee of National Economic Council (ECNEC) approved the project. A loan agreement between Bangladesh Government and JICA was signed in January 2013. The same year, Dhaka Mass Transit Company Ltd. (DMTC), the implementing agency of MRT Line-6 project was formed. The General Consultant (GC) namely the NKDM Association (See above) commenced work from February 2014.  In June 2013, Dhaka Mass Transit Company Limited (DMTC) was established by the Government to implement the Metro Rail Lines across the City. The project will be constructed under the supervision of (DMTCL) under the jurisdiction of Road Transport and Highway Division, Ministry of Road Transport and Bridges, Government of Bangladesh. Once complete, metro rail services would be operated by DMTCL.
  • 5. Project Components, Dates and Progress:  During an interview with daily sun, Md Mofazzel Hossain, Project Director of Dhaka Mass Rapid Transit Development Project said that the project will be implemented under eight construction packages (CP). The development components or construction packages include – CP-01 (Depot Land Development), CP-02 (Depot Civil & Buildings), CP-03, CP-04 (Viaduct & Stations, Uttara-Agargaon), CP-05, CP-06 (Viaduct & Stations, Agargaon-Motijheel), CP-07 (Electro-Mechanical Systems) and CP-08 (Rolling Stock & Depot Equipment).  Utility relocation from Mirpur-10 to Agargaon was planned to start August 2016, Other surveys have already been completed during the period of 2014 – October 2016 as mentioned by the project director Topographic Survey, Traffic Survey, Geotechnical Survey, Right of Way (ROW) Survey, Historical Importance/ Archeological (HIA) Survey, Environmental Baseline (EBL) Survey, Soil Electric Resistivity (SER) Survey and Utility Verification Survey.  As of May 2015, soil testing for the line was completed, with construction for the first section having begun on 26 June 2016, and construction for the second section planned to begin in July 2017, for planned public operation by the end of 2019 and sometime in 2020, respectively.  A Japanese firm Tokyo Construction Ltd, is carrying out the depot land development work (CP-01). Tokyu Construction Ltd will develop the depot on a 23.84-hectare of land during the construction period at the cost of around ৳5.67 billion (US$73 million). He said the Pre-Qualification (PQ) of CP-02 has already done and 15 firms are qualified for this. Tender for CP-02 is already floated and the last date of the submission is 6 September this year. While asked about CP-03 and CP-04, he said PQ process has been done on 20 April this year. Tender has been invited and the last date of submission is 8 August 2016. But the date may be extended, he mentioned.
  • 6. Tentative alignments have been decided upon for the three initial metro lines. Only Line 6, as of 27 June 2016, has a definite station layout. Uttara North Agargaon Uttara Center Bijoy Sarani Uttara South Farmgate Pallabi Karwan Bazar Mirpur-11 Shahbag Mirpur-10 Dhaka University Kazipara Bangladesh Secretariat Shewrapara Motijheel Route Alignment List:
  • 8. Benefits of Metro Rail:  Fuel Cost saving  Number of Vehicles off the road  Vehicle cost saving  Reduction in emission of greenhouse gases  Emission cost saving  Number of Road accidents avoided
  • 9. Under Construction of Dhaka Metro Rail:
  • 10. Long Span of Shewrapara Metro Rail Station :
  • 11. Proposed 3D View Of Kazipara Metro Rail Station :
  • 12. Proposed Train of Dhaka Metro Rail