SlideShare ist ein Scribd-Unternehmen logo
1 von 34
procon Engineering private limited____________ A Statistical Quality Management Review The Statistical quality review was conducted by SaadSarfraz
Company Profile Master Group of Industries  Establishment Manufacturing Facility Standards  ISO 9002 Certification QS 9000 Series Certification
Company Profile (contd.) ,[object Object]
Sports car seats for export
Reclining mechanism
Automotive fabric
Roof headlining
Door trim
Steering wheels
Rear package tray
Sun visors
Fender liner
Engine under coversheet
Armrest
Cargo deck
Chassis frame
Suzuki
Toyota
Honda
Nissan
Hyundai
Kia Motors
Daihatsu
Hino
Nissan Diesel
Volvo
Yamaha Motorcycle
Millat Tractor
Al-Ghazi TractorProducts Clients
Statistical Quality Control Systems Categories Descriptive Statistics Statistical Process Control (SPC) Acceptance Sampling    PROCON SQCS Failure Mode and Effect Analysis (FMEA) Checks Sheets  Control Plans  Process Flow Charts  Process Quality Control Tables  Cause and Effect Diagram  Pareto Charts  Kaizen
Application of Management Strategies  Total Quality Management (TQM) Problem History Charts  Scrap and Rework Log  Quality vs. Price HACPL Quarterly Presentations Operational Manuals Diagrams  Team Work Encouraged vs. Fear of Management  Kaizen Target Monitoring Ergonomics
Eight Dimensions of Quality  ,[object Object]
Features			Seat recliners and comforters
Reliability			Performance tests (pressure/temperature)

Weitere ähnliche Inhalte

Was ist angesagt?

Pharmaceutical Company Facility Presentation
Pharmaceutical Company Facility PresentationPharmaceutical Company Facility Presentation
Pharmaceutical Company Facility PresentationPalash Das
 
Mitra matra iatf 16949 honda module 6
Mitra matra iatf 16949 honda module 6Mitra matra iatf 16949 honda module 6
Mitra matra iatf 16949 honda module 6DANANG WID
 
Facility & Equipment Quality System Outline
Facility & Equipment Quality System OutlineFacility & Equipment Quality System Outline
Facility & Equipment Quality System OutlineJoseph Busfield
 
Concept of URS,DQ,IQ,OQ,PQ
Concept of URS,DQ,IQ,OQ,PQConcept of URS,DQ,IQ,OQ,PQ
Concept of URS,DQ,IQ,OQ,PQdhavalrock24
 
Equipment Qualification by- Deepak Kumar
Equipment Qualification by- Deepak KumarEquipment Qualification by- Deepak Kumar
Equipment Qualification by- Deepak KumarDeepak Kumar
 
Qualification validation ppt_171116
Qualification validation ppt_171116Qualification validation ppt_171116
Qualification validation ppt_171116Somnath Banerjee
 
009 what are the systems validation protocol methods at atl 05 28-2015
009 what are the systems validation protocol methods at atl 05 28-2015009 what are the systems validation protocol methods at atl 05 28-2015
009 what are the systems validation protocol methods at atl 05 28-2015atlmarketing
 
Mitra matra iatf 16949 honda module 5
Mitra matra iatf 16949 honda module 5Mitra matra iatf 16949 honda module 5
Mitra matra iatf 16949 honda module 5DANANG WID
 
Equipment qualification of medical device
Equipment qualification of medical deviceEquipment qualification of medical device
Equipment qualification of medical deviceNahri Musyrif
 
90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filterFilter Expert Co.,Ltd.
 
Presentation on-change-control
Presentation on-change-controlPresentation on-change-control
Presentation on-change-controlsachin kumar
 
Swayamacademicwriting
SwayamacademicwritingSwayamacademicwriting
SwayamacademicwritingSunil P Kumar
 
Principle of Validation and Qualification
Principle of Validation and QualificationPrinciple of Validation and Qualification
Principle of Validation and QualificationPharmaguideline
 

Was ist angesagt? (20)

Pharmaceutical Company Facility Presentation
Pharmaceutical Company Facility PresentationPharmaceutical Company Facility Presentation
Pharmaceutical Company Facility Presentation
 
Equipment Qualification
Equipment QualificationEquipment Qualification
Equipment Qualification
 
Mitra matra iatf 16949 honda module 6
Mitra matra iatf 16949 honda module 6Mitra matra iatf 16949 honda module 6
Mitra matra iatf 16949 honda module 6
 
C v a.madrigal ingles
C v a.madrigal inglesC v a.madrigal ingles
C v a.madrigal ingles
 
Facility & Equipment Quality System Outline
Facility & Equipment Quality System OutlineFacility & Equipment Quality System Outline
Facility & Equipment Quality System Outline
 
Concept of URS,DQ,IQ,OQ,PQ
Concept of URS,DQ,IQ,OQ,PQConcept of URS,DQ,IQ,OQ,PQ
Concept of URS,DQ,IQ,OQ,PQ
 
Equipment Qualification by- Deepak Kumar
Equipment Qualification by- Deepak KumarEquipment Qualification by- Deepak Kumar
Equipment Qualification by- Deepak Kumar
 
Qualification validation ppt_171116
Qualification validation ppt_171116Qualification validation ppt_171116
Qualification validation ppt_171116
 
009 what are the systems validation protocol methods at atl 05 28-2015
009 what are the systems validation protocol methods at atl 05 28-2015009 what are the systems validation protocol methods at atl 05 28-2015
009 what are the systems validation protocol methods at atl 05 28-2015
 
Validation and qualification
Validation and qualificationValidation and qualification
Validation and qualification
 
Mitra matra iatf 16949 honda module 5
Mitra matra iatf 16949 honda module 5Mitra matra iatf 16949 honda module 5
Mitra matra iatf 16949 honda module 5
 
Equipment qualification of medical device
Equipment qualification of medical deviceEquipment qualification of medical device
Equipment qualification of medical device
 
90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter
 
Presentation on-change-control
Presentation on-change-controlPresentation on-change-control
Presentation on-change-control
 
Toyota Part Approval (PA) Process
Toyota Part Approval (PA) ProcessToyota Part Approval (PA) Process
Toyota Part Approval (PA) Process
 
Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)
 
Swayamacademicwriting
SwayamacademicwritingSwayamacademicwriting
Swayamacademicwriting
 
Sap qm
Sap qmSap qm
Sap qm
 
Principle of Validation and Qualification
Principle of Validation and QualificationPrinciple of Validation and Qualification
Principle of Validation and Qualification
 
V Model
V ModelV Model
V Model
 

Andere mochten auch

Andere mochten auch (9)

U13 Innovation
U13   InnovationU13   Innovation
U13 Innovation
 
Meet Tyler Hunsberger
Meet Tyler HunsbergerMeet Tyler Hunsberger
Meet Tyler Hunsberger
 
1-2-1Utilities
1-2-1Utilities1-2-1Utilities
1-2-1Utilities
 
Wyndham Hotels & Resorts
Wyndham Hotels & ResortsWyndham Hotels & Resorts
Wyndham Hotels & Resorts
 
Ait 1 1 group 3 berkeley unix
Ait 1 1 group 3 berkeley unixAit 1 1 group 3 berkeley unix
Ait 1 1 group 3 berkeley unix
 
Assistant Manager at Procon Engineering
Assistant Manager at Procon Engineering Assistant Manager at Procon Engineering
Assistant Manager at Procon Engineering
 
U13 Innovation
U13   InnovationU13   Innovation
U13 Innovation
 
experience certificates.PDF
experience  certificates.PDFexperience  certificates.PDF
experience certificates.PDF
 
Succession “Losers”: What Happens to Executives Passed Over for the CEO Job?
Succession “Losers”: What Happens to Executives Passed Over for the CEO Job? Succession “Losers”: What Happens to Executives Passed Over for the CEO Job?
Succession “Losers”: What Happens to Executives Passed Over for the CEO Job?
 

Ähnlich wie Procon Engineering Private Limited

Quality management and quality planning
Quality management and quality planningQuality management and quality planning
Quality management and quality planningAmartya Talukdar
 
Six Sigma Implementation to reduce rejection rate of Pump Casings at local Ma...
Six Sigma Implementation to reduce rejection rate of Pump Casings at local Ma...Six Sigma Implementation to reduce rejection rate of Pump Casings at local Ma...
Six Sigma Implementation to reduce rejection rate of Pump Casings at local Ma...IOSR Journals
 
QM-026-Quality Management
QM-026-Quality ManagementQM-026-Quality Management
QM-026-Quality Managementhandbook
 
Quality Management
Quality ManagementQuality Management
Quality ManagementJoanmaines
 
As9100 c 2009-standard
As9100 c 2009-standardAs9100 c 2009-standard
As9100 c 2009-standardSunil Arora
 
IOP Conference Series Materials Science and EngineeringPA.docx
IOP Conference Series Materials Science and EngineeringPA.docxIOP Conference Series Materials Science and EngineeringPA.docx
IOP Conference Series Materials Science and EngineeringPA.docxvrickens
 
Managing quality ppt @ bec doms
Managing quality ppt @ bec domsManaging quality ppt @ bec doms
Managing quality ppt @ bec domsBabasab Patil
 
Ajay_Training_Report[1]
Ajay_Training_Report[1]Ajay_Training_Report[1]
Ajay_Training_Report[1]AJAY KUMAR
 
Measuring and Improving MP1.ppt
Measuring and Improving MP1.pptMeasuring and Improving MP1.ppt
Measuring and Improving MP1.pptssuserf2880f
 
Comissioning & qualification vol.5 (2nd eddition)
Comissioning & qualification vol.5 (2nd eddition)Comissioning & qualification vol.5 (2nd eddition)
Comissioning & qualification vol.5 (2nd eddition)Ravindra Kushwaha
 
Quality Introduction Quiz - Series 1 By Maya.
Quality Introduction Quiz - Series 1 By Maya.Quality Introduction Quiz - Series 1 By Maya.
Quality Introduction Quiz - Series 1 By Maya.johnsqms
 
Coml Psg Automation Approach
Coml Psg Automation ApproachComl Psg Automation Approach
Coml Psg Automation Approachroopavani
 

Ähnlich wie Procon Engineering Private Limited (20)

Ch8 total+qlty+mgt
Ch8 total+qlty+mgtCh8 total+qlty+mgt
Ch8 total+qlty+mgt
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
Quality management and quality planning
Quality management and quality planningQuality management and quality planning
Quality management and quality planning
 
C v a.madrigal ingles
C v a.madrigal inglesC v a.madrigal ingles
C v a.madrigal ingles
 
Apqp fundamentals
Apqp fundamentalsApqp fundamentals
Apqp fundamentals
 
Six Sigma Implementation to reduce rejection rate of Pump Casings at local Ma...
Six Sigma Implementation to reduce rejection rate of Pump Casings at local Ma...Six Sigma Implementation to reduce rejection rate of Pump Casings at local Ma...
Six Sigma Implementation to reduce rejection rate of Pump Casings at local Ma...
 
QM-026-Quality Management
QM-026-Quality ManagementQM-026-Quality Management
QM-026-Quality Management
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
yellow belt training
yellow belt trainingyellow belt training
yellow belt training
 
Waste Elimination
Waste EliminationWaste Elimination
Waste Elimination
 
As9100 c 2009-standard
As9100 c 2009-standardAs9100 c 2009-standard
As9100 c 2009-standard
 
IOP Conference Series Materials Science and EngineeringPA.docx
IOP Conference Series Materials Science and EngineeringPA.docxIOP Conference Series Materials Science and EngineeringPA.docx
IOP Conference Series Materials Science and EngineeringPA.docx
 
Managing quality ppt @ bec doms
Managing quality ppt @ bec domsManaging quality ppt @ bec doms
Managing quality ppt @ bec doms
 
Ajay_Training_Report[1]
Ajay_Training_Report[1]Ajay_Training_Report[1]
Ajay_Training_Report[1]
 
Measuring and Improving MP1.ppt
Measuring and Improving MP1.pptMeasuring and Improving MP1.ppt
Measuring and Improving MP1.ppt
 
Analisis iso 25010
Analisis iso 25010Analisis iso 25010
Analisis iso 25010
 
Comissioning & qualification vol.5 (2nd eddition)
Comissioning & qualification vol.5 (2nd eddition)Comissioning & qualification vol.5 (2nd eddition)
Comissioning & qualification vol.5 (2nd eddition)
 
Quality Introduction Quiz - Series 1 By Maya.
Quality Introduction Quiz - Series 1 By Maya.Quality Introduction Quiz - Series 1 By Maya.
Quality Introduction Quiz - Series 1 By Maya.
 
Coml Psg Automation Approach
Coml Psg Automation ApproachComl Psg Automation Approach
Coml Psg Automation Approach
 
Agile testing approach
Agile testing approachAgile testing approach
Agile testing approach
 

Mehr von Saad_Sarfraz

Environmental asessement of switching to renewable energy sources
Environmental asessement of switching to renewable energy sourcesEnvironmental asessement of switching to renewable energy sources
Environmental asessement of switching to renewable energy sourcesSaad_Sarfraz
 
Analysis of gap between incidence of corruption and Corruption Perception Ind...
Analysis of gap between incidence of corruption and Corruption Perception Ind...Analysis of gap between incidence of corruption and Corruption Perception Ind...
Analysis of gap between incidence of corruption and Corruption Perception Ind...Saad_Sarfraz
 
Petroleum policy needs a paradigm shift
Petroleum policy needs a paradigm shiftPetroleum policy needs a paradigm shift
Petroleum policy needs a paradigm shiftSaad_Sarfraz
 
AQRON Private Limited
AQRON Private LimitedAQRON Private Limited
AQRON Private LimitedSaad_Sarfraz
 
Analysis of select Internal Controls
Analysis of select Internal ControlsAnalysis of select Internal Controls
Analysis of select Internal ControlsSaad_Sarfraz
 
Corporate Governance in financial sector of Pakistan
Corporate Governance in financial sector of PakistanCorporate Governance in financial sector of Pakistan
Corporate Governance in financial sector of PakistanSaad_Sarfraz
 
Foreign Currency Accounts Freeze 1998
Foreign Currency Accounts Freeze 1998Foreign Currency Accounts Freeze 1998
Foreign Currency Accounts Freeze 1998Saad_Sarfraz
 
AQRON Private Limited
AQRON Private LimitedAQRON Private Limited
AQRON Private LimitedSaad_Sarfraz
 

Mehr von Saad_Sarfraz (9)

Environmental asessement of switching to renewable energy sources
Environmental asessement of switching to renewable energy sourcesEnvironmental asessement of switching to renewable energy sources
Environmental asessement of switching to renewable energy sources
 
Analysis of gap between incidence of corruption and Corruption Perception Ind...
Analysis of gap between incidence of corruption and Corruption Perception Ind...Analysis of gap between incidence of corruption and Corruption Perception Ind...
Analysis of gap between incidence of corruption and Corruption Perception Ind...
 
Entrepreneurship
EntrepreneurshipEntrepreneurship
Entrepreneurship
 
Petroleum policy needs a paradigm shift
Petroleum policy needs a paradigm shiftPetroleum policy needs a paradigm shift
Petroleum policy needs a paradigm shift
 
AQRON Private Limited
AQRON Private LimitedAQRON Private Limited
AQRON Private Limited
 
Analysis of select Internal Controls
Analysis of select Internal ControlsAnalysis of select Internal Controls
Analysis of select Internal Controls
 
Corporate Governance in financial sector of Pakistan
Corporate Governance in financial sector of PakistanCorporate Governance in financial sector of Pakistan
Corporate Governance in financial sector of Pakistan
 
Foreign Currency Accounts Freeze 1998
Foreign Currency Accounts Freeze 1998Foreign Currency Accounts Freeze 1998
Foreign Currency Accounts Freeze 1998
 
AQRON Private Limited
AQRON Private LimitedAQRON Private Limited
AQRON Private Limited
 

Procon Engineering Private Limited

  • 1. procon Engineering private limited____________ A Statistical Quality Management Review The Statistical quality review was conducted by SaadSarfraz
  • 2. Company Profile Master Group of Industries Establishment Manufacturing Facility Standards ISO 9002 Certification QS 9000 Series Certification
  • 3.
  • 4. Sports car seats for export
  • 19. Honda
  • 24. Hino
  • 26. Volvo
  • 30. Statistical Quality Control Systems Categories Descriptive Statistics Statistical Process Control (SPC) Acceptance Sampling PROCON SQCS Failure Mode and Effect Analysis (FMEA) Checks Sheets Control Plans Process Flow Charts Process Quality Control Tables Cause and Effect Diagram Pareto Charts Kaizen
  • 31. Application of Management Strategies Total Quality Management (TQM) Problem History Charts Scrap and Rework Log Quality vs. Price HACPL Quarterly Presentations Operational Manuals Diagrams Team Work Encouraged vs. Fear of Management Kaizen Target Monitoring Ergonomics
  • 32.
  • 38. Aesthetics  Style, color, shape, tactile characteristics
  • 39.
  • 40. Stem and Leaf Display
  • 43. Magnificent Seven (Statistical Process Control) Major Tools Histogram or stem-and-leaf diagram Check sheet-- Pareto chart Cause-and-effect diagram Defect concentration diagram Scatter diagram Control chart
  • 44.
  • 45. Chance and Assignable Causes of Variation Definition Impact/Implication on Quality Identification Failure Modes and Effects Analysis (FMEA)
  • 46. Control Charts for Variables Definition Purpose and Usefulness X-Bar Chart and R-Chart
  • 47.
  • 48. Control Chart for Attributes Definition Purpose and Usefulness P- Chart and C- Chart
  • 49.
  • 50. Process and Measurement System Capability Analysis Process capability involves evaluating process variability relative to preset product specifications in order to determine whether the process is capable of producing an acceptable product To produce an acceptable product, the process must be capable and in control before production begins
  • 51. Process and Measurement System Capability Analysis The Indices of Process Capability The processes and measurement systems considered Evaluation Criteria Results
  • 52.
  • 53.
  • 54.
  • 55.
  • 56. Acceptance Sampling for Attributes and Variables Acceptance sampling refers to the process of randomly inspecting a certain number of items from a lot or batch in order to decide whether to accept or reject the entire batch A sampling plan is required for acceptance sampling that precisely specifies the parameters of the sampling process and the acceptance/rejection criteria
  • 57. Acceptance Sampling for Attributes and Variables Sampling plan for attributes Lot size (N) = 100,000 Inspection level = Normal Acceptance quality level (AQL) = 2% Sample size code letter = N Sample size (n) = 500 Acceptance number (c) = 18
  • 58. Acceptance Sampling for Attributes and Variables Sampling plan for variables Lot size (N) = 100,000 Inspection level = Normal Acceptance quality level (AQL) = 2% Sample size code letter = O Sample size (n) = 100 Acceptance number (k) = 1.765
  • 59.
  • 60.
  • 61.
  • 62. ISO Standardization ISO develops international standards of quality for all industrial standards ISO has gained popularity and recognition because of the facts that it controls quality, it saves money, customers expect it and competitors use it ISO 9000 and ISO 14000
  • 63. ISO Standardization PROCON strictly follows the ISO standards of quality and its QMS is based entirely on the ISO 9000 family The compatible standard that applies to PROCON is ISO T/S 16949 quality specification for automotive industry supplier
  • 64. Application of Six Sigma Approach Six Sigma Quality is defined as a high level of quality associated with approximately 3.4 defective parts per million Six Sigma simply means a measure of quality that strives for near perfection A Six Sigma defect is defined as anything outside of customer specifications
  • 65. Application of Six Sigma Approach There are two aspects to implementing the Six Sigma concept: DMAIC and DMADV The first is the use of technical tools to identify and eliminate causes of quality problems The second aspect of Six Sigma implementation is people involvement
  • 66. Critique of the Quality Control System The objective is to study, evaluate and critically analyze the quality control system of the company The quality control measures for the most part conform to the standard operating procedure One drawback of the quality control system of PROCON is its cost Overall, the quality control system is highly efficient and effective at establishing and maintaining quality

Hinweis der Redaktion

  1. Overall, the quality control system is highly efficient and effective at establishing and maintaining quality