Presentation from Per Ahl, Vice President, Head of Commercial, Civil Security and Traffic Management, Market Area Europe & Greater Middle East at Farnborough 2014.
Read more about Saab's Remote Tower solutions here: http://www.saabgroup.com/Civil-security/Air-Transportation-and-Airport-Security/Air-Traffic-Management-Solutions/Remote-Tower-Pre/
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Remote Tower Press Briefing Farnborough 2014
1. Remotely Operated Tower
- Breaking the thought barrier-
Per Ahl
Vice President
Head of CommercialAerostructure, Civil Security, and Traffic Management
Market Area Europe and Greater Middle East
8. 2006 2007 2008 2009 2010 2011 2012 2013
Saab ATM - long time r-TWR experience
r-TWR proof
of concept
project start
ART project
start
r-TWR
installed at
Ängelholm
airport
Shadow
mode
validations
at Sturup
ATC Global
2009 & r-TWR
rollout
ART
validations
at Sturup
Start of
SESAR r-TWR
projects
The second
remote tower
symposium
SESAR
validation 1
single
SESAR
validation 2
single
Delivery of 1st
operational
r-TWR system
SESAR
validation AFIS
Værøy - Bodø
Delivery of
r-TWR test
system to
Airservices
Delivery of
SESAR r-TWR
prototype
Værøy - Bodø
Start of
operational
certification
in Sweden
11. SWEDEN
Contract rewarded in January 2011
Two airports Sundsvall and Örnsköldsvik
The RTC will be located in Sundsvall
Delivered December 2013
Final Validation report February, 2014
Operation - Q3 2014 – first in the world !!!
12.
13.
14. AUSTRALIA
Contract signed with Airservices Australia, AsA, June 2011
Remotely control Alice Springs airport from Adelaide (1500 km)
Based on the Swedish implementation + visual tracking
Installed Q4 2013
Validation finished June, 2014
15. NORWAY
Contract signed 2012
Værøy heliport, RTC in Bodø
Based on the Swedish
implementation + IR camera
SESAR Trials in Dec 2012
Röst airport installed December
2013 – RTC in Bodø
18. A module that feeds ordinary r-TWR CWP position(s) with
all necessary data for 1-N airports
1-M pilot positions
r-TWR Training & Simulation
19.
20. Survival opportunity for smaller airports with low traffic density
More efficient and cost effective TWR service
• Large scale operation
• Difficult to recruit to distant airports
• Ability to sequenced control of small airports
• Multi airport control
• Possible shared use of the APP-resources
Increase ATC operation by utilizing the staff in a more cost
effective way
• Lack of educated or trained people when expanding the
operation
• Multi airport control – one controller will be able to control up to 3
airports
The ability to have 7/24 SAR operation
• Flexibility to open up airfields
Alternatives to new construction or refurbishment of the tower
> 30 customers in queue…..
SUMMARY:
Driving forces for Remote TWR
21. TIME FOR A NEW BUSINESS MODEL ???
- ATC ON DEMAND –