PORTFOLIO AS QUANTITY SURVEYOR AND ESTIMATOR
*HERE IS COLLECTED A BRIEF DESCRIPTION OF ALL THE PROJECTS THAT I STUDIED AS
QUANTITY SURVEYOR AND ESTIMATOR DURING MY STAY IN SERINCO. JUST INCLUDED
THE PROJECT WHERE I WAS THE MAIN QUANTITY SURVEYOR.
* ALL THE BUDGETS ARE A DIRECT CURRENCY EXCHANGE. CONSIDER THAT THE
CHILEAN CONSTRUCTION MARKET IS NOT THE BRITISH.
50 APARTMENTS
TOTAL SURFACE: 8,200 m2
TOTAL BUDGET: £ 5,555,504
14 FLOORS
GROUND FLOOR
2 UNDERGROUND FLOORS
CONCRETE STRUCTURE
GYM
SWIMMING POOL
EVENT ROOM
59 PARKING SPACES
59 STORE ROOMS
LOCATION: VIÑA DEL MAR, VALPARAISO, CHILE
BUDGET SUMMARY
7 APARTMENT MODELS
108 APARTMENTS
TOTAL SURFACE: 6,900 m2
TOTAL BUDGET: £ 5,055,709
10 FLOORS
2 UNDERGROUND FLOORS
CONCRETE STRUCTURE
GYM
SWIMMING POOL
2 EVENT ROOMS
BARBECUE AND GREEN AREA
LOCATION: LAS CONDES, SANTIAGO DE CHILE, CHILE
BUDGET SUMMARY
REFURBISHMENT "NAVY COMMAND
TALCAHUANO"
After the earthquake that took place in Concepción in February 2010. The
main facade of this building was seriously damaged. The project proposed the
removal of all the elements to be conserved, propping up of the structure,
demolition of all the structural elements damaged, rebuilding, restoration and
reinstatement of all the elements conserved.
BUDGET SUMMARY
SECOND PHASE (W2)
66m2apa a 304m2
APARTMENTS FROM 166 m2 to 304 m2
8 BUILDINGS
23 APARTMENTS
TOTAL BUDGET: £ 6,482,756
CONCRETE STRUCTURE
URBANIZATION AND GARDENS
SWIMMING POOL
BARBECUE AREA
LOCATION: CACHAGUA, VALPARAISO, CHILE
BUDGET SUMMARY
THIRD PHASE (W3)
APARTMENTS FROM 166 m2 to 304 m2
8 BUILDINGS
23 APARTMENTS
TOTAL BUDGET: £ 6,480,762
CONCRETE STRUCTURE
URBANIZATION AND GARDENS
LOCATION: CACHAGUA, VALPARAISO, CHILE
BUDGET SUMMARY

More Related Content

What's hot

Eca presentation-compile
Eca presentation-compileEca presentation-compile
Eca presentation-compile
Timun Loh
 

What's hot (20)

Elemental Cost Analysis
Elemental Cost AnalysisElemental Cost Analysis
Elemental Cost Analysis
 
BQ
BQBQ
BQ
 
Measurement 4 Tender Document
Measurement 4 Tender Document Measurement 4 Tender Document
Measurement 4 Tender Document
 
5.1 quantity take-off
5.1 quantity take-off5.1 quantity take-off
5.1 quantity take-off
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
 
QUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazineQUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazine
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Civil Engineering Measurment
Civil Engineering MeasurmentCivil Engineering Measurment
Civil Engineering Measurment
 
BOQ GUDANG MOBIL.pdf
BOQ GUDANG MOBIL.pdfBOQ GUDANG MOBIL.pdf
BOQ GUDANG MOBIL.pdf
 
Assignment - Final Account
Assignment - Final AccountAssignment - Final Account
Assignment - Final Account
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
 
Elemental cost analysis
Elemental cost analysisElemental cost analysis
Elemental cost analysis
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
PP2 - Assignment
PP2 - Assignment PP2 - Assignment
PP2 - Assignment
 
Eca presentation-compile
Eca presentation-compileEca presentation-compile
Eca presentation-compile
 
Quantity Surveyor presentation
Quantity Surveyor presentationQuantity Surveyor presentation
Quantity Surveyor presentation
 
SLF - Sertifikat Laik Fungsi & Pengkaji Teknis
SLF - Sertifikat Laik Fungsi & Pengkaji TeknisSLF - Sertifikat Laik Fungsi & Pengkaji Teknis
SLF - Sertifikat Laik Fungsi & Pengkaji Teknis
 
Quantity surveying course
Quantity surveying courseQuantity surveying course
Quantity surveying course
 

PORTFOLIO AS QUANTITY SURVEYOR AND ESTIMATOR

  • 1. PORTFOLIO AS QUANTITY SURVEYOR AND ESTIMATOR *HERE IS COLLECTED A BRIEF DESCRIPTION OF ALL THE PROJECTS THAT I STUDIED AS QUANTITY SURVEYOR AND ESTIMATOR DURING MY STAY IN SERINCO. JUST INCLUDED THE PROJECT WHERE I WAS THE MAIN QUANTITY SURVEYOR. * ALL THE BUDGETS ARE A DIRECT CURRENCY EXCHANGE. CONSIDER THAT THE CHILEAN CONSTRUCTION MARKET IS NOT THE BRITISH.
  • 2. 50 APARTMENTS TOTAL SURFACE: 8,200 m2 TOTAL BUDGET: £ 5,555,504 14 FLOORS GROUND FLOOR 2 UNDERGROUND FLOORS CONCRETE STRUCTURE GYM SWIMMING POOL EVENT ROOM 59 PARKING SPACES 59 STORE ROOMS LOCATION: VIÑA DEL MAR, VALPARAISO, CHILE
  • 4. 7 APARTMENT MODELS 108 APARTMENTS TOTAL SURFACE: 6,900 m2 TOTAL BUDGET: £ 5,055,709 10 FLOORS 2 UNDERGROUND FLOORS CONCRETE STRUCTURE GYM SWIMMING POOL 2 EVENT ROOMS BARBECUE AND GREEN AREA LOCATION: LAS CONDES, SANTIAGO DE CHILE, CHILE
  • 6. REFURBISHMENT "NAVY COMMAND TALCAHUANO" After the earthquake that took place in Concepción in February 2010. The main facade of this building was seriously damaged. The project proposed the removal of all the elements to be conserved, propping up of the structure, demolition of all the structural elements damaged, rebuilding, restoration and reinstatement of all the elements conserved.
  • 8. SECOND PHASE (W2) 66m2apa a 304m2 APARTMENTS FROM 166 m2 to 304 m2 8 BUILDINGS 23 APARTMENTS TOTAL BUDGET: £ 6,482,756 CONCRETE STRUCTURE URBANIZATION AND GARDENS SWIMMING POOL BARBECUE AREA LOCATION: CACHAGUA, VALPARAISO, CHILE
  • 9. BUDGET SUMMARY THIRD PHASE (W3) APARTMENTS FROM 166 m2 to 304 m2 8 BUILDINGS 23 APARTMENTS TOTAL BUDGET: £ 6,480,762 CONCRETE STRUCTURE URBANIZATION AND GARDENS LOCATION: CACHAGUA, VALPARAISO, CHILE