NAJMUL SAQIB MANIAR 
C – 100, Block – A, North Nazimabad, Karachi 
Mobile #: (+92) 322-2201257, Tel. #: (+92) 36636564, 
Email: saqibmaniar@gmail.com; Skype: saqib.maniar1 
PROFESSIONAL EXPERIENCES 
DAWLANCE GROUP OF COMPANIES (July 2005 – Till Now) 
PROJECT MANAGER ( July 2009 – Till Now): 
Dawlance is largest home appliances concern in Pakistan, annual production exceeding 
1 million units. Country wide network of after-sales services with 03 manufacturing 
facilities. Accountable for delivering large scale projects to achieve business objectives. 
1 – H.C.F.C. Phase- out Implementation Project 
(July 2009 – December 2013): 
UNIDO funded project to save ozone layer and promoting green environment. As part of 
Montreal Protocol, foaming plants using HCFC converted to HC gases, which are highly 
inflammable. Stake holders involved were UNIDO, Cannon, TUV, ICI, BASF, ONSITE & 
GOP. Cost of project was USD 6 million. 
• Phase wise budget & capex plans, consisting UNIDO funding & group contribution 
• Compliance report as per international T.O.R. 
•Prepare project approval documents, feasibility analysis, pre-qualification notices, 
tender & L.O.I. documents for local & international contractors / suppliers 
•Keep strong check over all tasks, cost and resources associated with each phase using 
MS-Project. Share progress reports to management via SharePoint app 
•Weekly site and monthly PMO meetings to monitor progress against master schedule 
and resolve issues and conflicts 
• Promote & provide LWT through mentorship 
• Keep eye on changing project features across globe & incorporating latest 
developments to ensure max. productivity with cost benefits 
• Co-author of environment of care (EOC) procedures, safety bindings sheets & 
H.I.R.A. with local (EFU) & international (TUV) certification bodies 
• Prepare HRM plan for managing enormous and multi-task workforce of 195 direct 
and 556 indirect workers 
• Create project KPI’s of all team members 
• Prepare risk management plan to identify, analyze and prioritize project risks & 
define risk response hierarchy for proper and on-time resolution of issues 
• Layout changes to incorporate 24nos. double speed ventilation fans 
• Facility development for 06 nos. HC based foaming plants 
• Hire an Iranian MEP firm for retrofitting of 86 nos. foaming fixtures 
• Construction of RCC structures to incorporate UG tanks and foaming plants 
• Install fire hydrant system, foam units and gas sensors for LEL & UEL monitoring 
• Handle conflict management & motivate team for parallel working 
• Erection of nitrogen plants, water chillers & jacketed day tanks 
• Erection of lightening arrestors to cover all critical and hazardous installations 
• Attend O&M training in Italy & then gave in-house trainings to all team members 
• Project documentation including piping, ducting, BOQ’s, P&ID’s, pressure testing 
certificates, soil testing, radiographic reports & project handover forms 
PROFESSIONAL OBJECTIVE 
To contribute my creative, multi-tasking & 
administrative qualities for efficiently and 
effectively managing large scale projects & 
providing clear guidance with leadership 
to project team, for achieving maximum 
results in accordance with organizational 
objectives 
QUALIFICATIONS 
• M.B.A., from SZABIST with 3.25 CGPA 
in 2008 
• B.E. (Ind & Mfg), from NED University, 
with 73% in 2004 
• H.S.S.C., from ADAMJEE Science College, 
Karachi, with 77% in 2000 
• S.S.C., from PROGRAMMER Secondary 
School, Karachi, with 86% in 1998 
INTERNATIONAL TRAININGS 
• Extrusion plants in Verese, Italy 
• Safeties for cyclopentane in Milan, Italy 
• Storage and disposals of cyclopentane in 
Hefei, China 
• Latest manufacturing techniques in 
refrigerator assembling in Guangzhou, China 
• Foaming chemicals & hazards in Shanghai, 
China 
• Productivity tools & kaizen management 
with N.P.O., G.O.P. 
• ISO 9000 & 14000 course with NPO, GOP 
• Workshop on PMP with P.I.M.’s, Khi 
• F.M.E.A. (Failure Mode & Effects Analysis) 
• Factory Management with TORA 
• Conflict Management with 13 dimensions
2 – Facility Development for Chest Freezer & DFD 
(January 2008 –September 2010): 
First time incorporation of 5 door refrigerator series in existing product mix. Leading this 
most technical & innovative project from concept till completion, having project cost of 
USD 4 million. Key aspects of project were: 
• Identify and document high-level risks & design complexities based on environment, 
historical data of product and judgment 
• Project feasibility presentation comprising business objectives, project scope, execution 
strategies & major milestones to B.O.D.’s for subsequent project approvals 
• Assessed project requirements and timelines with all stakeholders, in order to establish 
a detailed project master schedule with level 0, I, II and III provisions 
• Continuous brainstorming & team building sessions, to encourage project team for 
parallel workings 
• Creating and maintaining close relationship with international supplier & consultants 
including leading names KINTE, PARCO & JWELL 
• Major modifications in factory layouts with provision of on-line material supplies 
• Dismantling, rigging, shifting and installation of 108 nos. machines from KHI to HYD 
manufacturing units 
• First time introducing concept & benefits of In-transit & health insurances 
• Shifting of 1250 KVA gensets and synchronized with existing installation 
• Construction of noise proof room for compressor and DFD noise level monitoring 
• Erection of 3 layers JWELL extrusion plant and block molding set-up to cater new 
product design features 
• Reducing civil construction timelines and cost by shifting to P.E.B. 
• Incorporate skylights to save electricity in daytime 
3 – EPS Plant Erection 
(December 2009 – October 2011): 
Responsible for completion of a very challenging & critical project with extreme 
environment conditions.. Cost of project was USD 1.8 million. Some challenging projects 
tasks were: 
• Dismantling, shifting, overhauling and re-installation of steam boilers, steam pre-expanders, 
block molding plant & silo distribution network, all are almost 15 yrs old and 
in extreme rusted condition 
• Laying of complex & extensive network of all utilities 
• Construction of UG tanks and fire retardant wire cutting zones 
• Innovative solution for reducing cost of cooling tower operations by making open 
trenches for exhaust steam instead of closed loop piping 
• Separation of pasting processes with punching processes by enhancing process layout 
and modifications in material distribution route 
• Install waste recovery system & save cost of PKR 3.5 million / yr 
• Procurement of EPS plants from Turkey & erection in minimal time 
• Save 13% cost against allocated budget through resource optimization 
• Installation of ES-4 synchronization module for air compressors and save cost upto 20% 
with prioritizing & load management 
• Installation of laser beam detectors 
• Hand over project with 30% improved MOP 
AREAS OF EXPERTISE 
• Project planning & reporting 
• Resource & Contract management 
• Risk management 
• Process optimization 
• Change management 
• MS-Project & ORACLE 11i 
• MS-Office 2012 & Auto Cad 
ACADEMIC PROJECTS 
• Manufacturing processes used in 
refrigeration 
• Supply chain analysis & optimization for 
Agriautos Pvt. Ltd. 
• Brand audit of corolla for I.M.C. (Indus 
motor company) 
• Strategic analysis consisting of B.A.P.’s & 
S.A.P.’s on caterpillar generators for Allied 
Engineering 
• Market survey & research report on 
Telecommunication Industry in Pakistan 
• VRF systems design & installations 
PERSONALITY FEATURES 
• Analyzing, Planning, Organizing and 
Team Management Abilities 
• Hard Worker, Good Negotiator and 
Strong Communication Skills 
• Creative and Work Loving 
• Candor, Openness and Decision Maker
SENIOR DEPUTY MANAGER – PLANT ENGINEERING ( Jan 2008 – June 2009): 
4 – ERP Implementation 
(March 2006 – June 2008): 
Involved in ERP (Oracle) implementation project with a view to achieve business 
objectives and ensure optimum utilization of available data & resources. Also nominated 
as Super User- Oracle. Some project tasks were: 
• Detail study with analysis of all manufacturing processes and making flow diagrams of 
each operation 
• Prepare F.D.’s to represent the processes and functions involved & identify gaps 
• Develop procedures and methodology for item codes, routings, cost centers and BOM’s 
•Analyze target cost with W.I.P. moving avg. cost and update higher management on 
monthly basis 
• Document user expectations& develop training manuals 
• Responsible to establish a channel of communication b/w users & consultant 
ASSISTANT MANAGER – PLANT ENGINEERING ( July 2005 – Dec 2007): 
5 – Productivity Enhancement Project 
(July 2005 – June 2006): 
• Implement MOST techniques & increased MOP of various production departments 
• Calculate & enhanced Cpk & OEE and established continuous monitoring checks in 
ohbeya & councils 
• Re-layouting of machines for improved material flow and better utilization of space 
• Prepare M.P.M.P. and make plans to improve m/c output 
• Prepare W.I.’s, D.P.’s (Departmental Procedures) and M.P.C.P.’s 
• Permanent member of QCT, 7-S , R.I.A.P .& I.P.D.P. teams 
FUTEHALLY CHEMICALS LIMITED (3P – UNILEVER) 
(December 2004 – June 2005): 
Performed responsibilities as Production Engineer in surf excel manufacturing plant. 
Responsible for daily operations of packaging line. Also, took in-house trainings and 
implement 5-S 
GLAXO SMITHKLINE PAKISTAN LIMITED: 
As an Internee, worked in quality department of liquid filling section 
EXTRA CURRICULAR ACTIVITIES 
• Music 
• Cricket 
• Driving 
• Net Surfing 
PERSONAL INFORMATION 
• Father’s Name: Mohammad Yaqoob 
Maniar 
• Marital Status: Married 
• Religion: Islam 
• N.I.C. No: 42101-0593141-7 
• Passport No.: AQ0791412 
• Nationality: Pakistani 
• Languages: English and Urdu

Weitere ähnliche Inhalte

Was ist angesagt?

Resume jaseem
Resume jaseemResume jaseem
Resume jaseemjaseem
 
Skills development for the new Oil & Gas industry
Skills development for the new Oil & Gas industrySkills development for the new Oil & Gas industry
Skills development for the new Oil & Gas industryAdvisian
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon
 
Koch Modular's CURT (Construction Users Round Table) Presentation
Koch Modular's CURT (Construction Users Round Table) PresentationKoch Modular's CURT (Construction Users Round Table) Presentation
Koch Modular's CURT (Construction Users Round Table) PresentationKoch Modular Process Systems, LLC.
 
JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02Jamal Jamil
 
Mohammad Rehan Akbar Khan 2- CV
Mohammad Rehan Akbar Khan 2- CVMohammad Rehan Akbar Khan 2- CV
Mohammad Rehan Akbar Khan 2- CVRehan Khan
 
main resume milind naukri
main resume milind naukrimain resume milind naukri
main resume milind naukrimilind phadke
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assetsAdvisian
 
2015 03 31 cv giovanni koolman.docx lattes update jan 2016
2015 03 31 cv giovanni koolman.docx lattes update jan 20162015 03 31 cv giovanni koolman.docx lattes update jan 2016
2015 03 31 cv giovanni koolman.docx lattes update jan 2016Giovanni Silvio Koolman
 
Resume Feroz Habid
Resume Feroz HabidResume Feroz Habid
Resume Feroz HabidFeroz Habid
 
Resume dennis r. barrick 3-18-2018
Resume   dennis r. barrick 3-18-2018Resume   dennis r. barrick 3-18-2018
Resume dennis r. barrick 3-18-2018Dennis Barrick
 

Was ist angesagt? (20)

Resume jaseem
Resume jaseemResume jaseem
Resume jaseem
 
SHREYAS__SABNIS CV
SHREYAS__SABNIS CVSHREYAS__SABNIS CV
SHREYAS__SABNIS CV
 
Richard clark cv
Richard clark cvRichard clark cv
Richard clark cv
 
Skills development for the new Oil & Gas industry
Skills development for the new Oil & Gas industrySkills development for the new Oil & Gas industry
Skills development for the new Oil & Gas industry
 
Allwyn-PE-CV
Allwyn-PE-CVAllwyn-PE-CV
Allwyn-PE-CV
 
Allwyn Leo CV
Allwyn Leo CVAllwyn Leo CV
Allwyn Leo CV
 
Moh.Ramadan-CV
Moh.Ramadan-CVMoh.Ramadan-CV
Moh.Ramadan-CV
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
 
Case Study - A Modular Approach to Bio-Based Plastic
Case Study - A Modular Approach to Bio-Based PlasticCase Study - A Modular Approach to Bio-Based Plastic
Case Study - A Modular Approach to Bio-Based Plastic
 
Koch Modular's CURT (Construction Users Round Table) Presentation
Koch Modular's CURT (Construction Users Round Table) PresentationKoch Modular's CURT (Construction Users Round Table) Presentation
Koch Modular's CURT (Construction Users Round Table) Presentation
 
Mohammed vasil k.
Mohammed vasil k.Mohammed vasil k.
Mohammed vasil k.
 
JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02
 
Mohammad Rehan Akbar Khan 2- CV
Mohammad Rehan Akbar Khan 2- CVMohammad Rehan Akbar Khan 2- CV
Mohammad Rehan Akbar Khan 2- CV
 
main resume milind naukri
main resume milind naukrimain resume milind naukri
main resume milind naukri
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assets
 
2015 03 31 cv giovanni koolman.docx lattes update jan 2016
2015 03 31 cv giovanni koolman.docx lattes update jan 20162015 03 31 cv giovanni koolman.docx lattes update jan 2016
2015 03 31 cv giovanni koolman.docx lattes update jan 2016
 
resume-6
resume-6resume-6
resume-6
 
Resume Feroz Habid
Resume Feroz HabidResume Feroz Habid
Resume Feroz Habid
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
Resume dennis r. barrick 3-18-2018
Resume   dennis r. barrick 3-18-2018Resume   dennis r. barrick 3-18-2018
Resume dennis r. barrick 3-18-2018
 

Ähnlich wie RESUME - NAJMUL SAQIB MANIAR (20)

Resume-Thomas Mathew
Resume-Thomas MathewResume-Thomas Mathew
Resume-Thomas Mathew
 
Interaction sharing my experience
Interaction   sharing my experienceInteraction   sharing my experience
Interaction sharing my experience
 
CV_2016_rev_4_RW
CV_2016_rev_4_RWCV_2016_rev_4_RW
CV_2016_rev_4_RW
 
Resume
ResumeResume
Resume
 
Mohammed Islam's Resume-05-20-15
Mohammed Islam's Resume-05-20-15Mohammed Islam's Resume-05-20-15
Mohammed Islam's Resume-05-20-15
 
AESP_Spring
AESP_SpringAESP_Spring
AESP_Spring
 
TCM presentation May 2013
TCM presentation May 2013TCM presentation May 2013
TCM presentation May 2013
 
ISPE updated
ISPE updatedISPE updated
ISPE updated
 
Gopa 16 Aug 2016
Gopa 16 Aug 2016Gopa 16 Aug 2016
Gopa 16 Aug 2016
 
Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_
 
dipankar bandyopadhyay_6787_GR_A
dipankar bandyopadhyay_6787_GR_Adipankar bandyopadhyay_6787_GR_A
dipankar bandyopadhyay_6787_GR_A
 
Resume 2016 nadeem siddiqui
Resume   2016 nadeem siddiquiResume   2016 nadeem siddiqui
Resume 2016 nadeem siddiqui
 
John P Chan II
John P Chan IIJohn P Chan II
John P Chan II
 
Test centre mongstad presentation may 2013
Test centre mongstad presentation may 2013Test centre mongstad presentation may 2013
Test centre mongstad presentation may 2013
 
Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16
 
Derek Berry - IACMI/Wind Technology Area
Derek Berry - IACMI/Wind Technology AreaDerek Berry - IACMI/Wind Technology Area
Derek Berry - IACMI/Wind Technology Area
 
Wellington Shumba CV projects
Wellington Shumba CV projectsWellington Shumba CV projects
Wellington Shumba CV projects
 
SumitGaur_Resume
SumitGaur_ResumeSumitGaur_Resume
SumitGaur_Resume
 
Dhanaji suravase resume
Dhanaji suravase resumeDhanaji suravase resume
Dhanaji suravase resume
 
Steve James Resume
Steve James   ResumeSteve James   Resume
Steve James Resume
 

RESUME - NAJMUL SAQIB MANIAR

  • 1. NAJMUL SAQIB MANIAR C – 100, Block – A, North Nazimabad, Karachi Mobile #: (+92) 322-2201257, Tel. #: (+92) 36636564, Email: saqibmaniar@gmail.com; Skype: saqib.maniar1 PROFESSIONAL EXPERIENCES DAWLANCE GROUP OF COMPANIES (July 2005 – Till Now) PROJECT MANAGER ( July 2009 – Till Now): Dawlance is largest home appliances concern in Pakistan, annual production exceeding 1 million units. Country wide network of after-sales services with 03 manufacturing facilities. Accountable for delivering large scale projects to achieve business objectives. 1 – H.C.F.C. Phase- out Implementation Project (July 2009 – December 2013): UNIDO funded project to save ozone layer and promoting green environment. As part of Montreal Protocol, foaming plants using HCFC converted to HC gases, which are highly inflammable. Stake holders involved were UNIDO, Cannon, TUV, ICI, BASF, ONSITE & GOP. Cost of project was USD 6 million. • Phase wise budget & capex plans, consisting UNIDO funding & group contribution • Compliance report as per international T.O.R. •Prepare project approval documents, feasibility analysis, pre-qualification notices, tender & L.O.I. documents for local & international contractors / suppliers •Keep strong check over all tasks, cost and resources associated with each phase using MS-Project. Share progress reports to management via SharePoint app •Weekly site and monthly PMO meetings to monitor progress against master schedule and resolve issues and conflicts • Promote & provide LWT through mentorship • Keep eye on changing project features across globe & incorporating latest developments to ensure max. productivity with cost benefits • Co-author of environment of care (EOC) procedures, safety bindings sheets & H.I.R.A. with local (EFU) & international (TUV) certification bodies • Prepare HRM plan for managing enormous and multi-task workforce of 195 direct and 556 indirect workers • Create project KPI’s of all team members • Prepare risk management plan to identify, analyze and prioritize project risks & define risk response hierarchy for proper and on-time resolution of issues • Layout changes to incorporate 24nos. double speed ventilation fans • Facility development for 06 nos. HC based foaming plants • Hire an Iranian MEP firm for retrofitting of 86 nos. foaming fixtures • Construction of RCC structures to incorporate UG tanks and foaming plants • Install fire hydrant system, foam units and gas sensors for LEL & UEL monitoring • Handle conflict management & motivate team for parallel working • Erection of nitrogen plants, water chillers & jacketed day tanks • Erection of lightening arrestors to cover all critical and hazardous installations • Attend O&M training in Italy & then gave in-house trainings to all team members • Project documentation including piping, ducting, BOQ’s, P&ID’s, pressure testing certificates, soil testing, radiographic reports & project handover forms PROFESSIONAL OBJECTIVE To contribute my creative, multi-tasking & administrative qualities for efficiently and effectively managing large scale projects & providing clear guidance with leadership to project team, for achieving maximum results in accordance with organizational objectives QUALIFICATIONS • M.B.A., from SZABIST with 3.25 CGPA in 2008 • B.E. (Ind & Mfg), from NED University, with 73% in 2004 • H.S.S.C., from ADAMJEE Science College, Karachi, with 77% in 2000 • S.S.C., from PROGRAMMER Secondary School, Karachi, with 86% in 1998 INTERNATIONAL TRAININGS • Extrusion plants in Verese, Italy • Safeties for cyclopentane in Milan, Italy • Storage and disposals of cyclopentane in Hefei, China • Latest manufacturing techniques in refrigerator assembling in Guangzhou, China • Foaming chemicals & hazards in Shanghai, China • Productivity tools & kaizen management with N.P.O., G.O.P. • ISO 9000 & 14000 course with NPO, GOP • Workshop on PMP with P.I.M.’s, Khi • F.M.E.A. (Failure Mode & Effects Analysis) • Factory Management with TORA • Conflict Management with 13 dimensions
  • 2. 2 – Facility Development for Chest Freezer & DFD (January 2008 –September 2010): First time incorporation of 5 door refrigerator series in existing product mix. Leading this most technical & innovative project from concept till completion, having project cost of USD 4 million. Key aspects of project were: • Identify and document high-level risks & design complexities based on environment, historical data of product and judgment • Project feasibility presentation comprising business objectives, project scope, execution strategies & major milestones to B.O.D.’s for subsequent project approvals • Assessed project requirements and timelines with all stakeholders, in order to establish a detailed project master schedule with level 0, I, II and III provisions • Continuous brainstorming & team building sessions, to encourage project team for parallel workings • Creating and maintaining close relationship with international supplier & consultants including leading names KINTE, PARCO & JWELL • Major modifications in factory layouts with provision of on-line material supplies • Dismantling, rigging, shifting and installation of 108 nos. machines from KHI to HYD manufacturing units • First time introducing concept & benefits of In-transit & health insurances • Shifting of 1250 KVA gensets and synchronized with existing installation • Construction of noise proof room for compressor and DFD noise level monitoring • Erection of 3 layers JWELL extrusion plant and block molding set-up to cater new product design features • Reducing civil construction timelines and cost by shifting to P.E.B. • Incorporate skylights to save electricity in daytime 3 – EPS Plant Erection (December 2009 – October 2011): Responsible for completion of a very challenging & critical project with extreme environment conditions.. Cost of project was USD 1.8 million. Some challenging projects tasks were: • Dismantling, shifting, overhauling and re-installation of steam boilers, steam pre-expanders, block molding plant & silo distribution network, all are almost 15 yrs old and in extreme rusted condition • Laying of complex & extensive network of all utilities • Construction of UG tanks and fire retardant wire cutting zones • Innovative solution for reducing cost of cooling tower operations by making open trenches for exhaust steam instead of closed loop piping • Separation of pasting processes with punching processes by enhancing process layout and modifications in material distribution route • Install waste recovery system & save cost of PKR 3.5 million / yr • Procurement of EPS plants from Turkey & erection in minimal time • Save 13% cost against allocated budget through resource optimization • Installation of ES-4 synchronization module for air compressors and save cost upto 20% with prioritizing & load management • Installation of laser beam detectors • Hand over project with 30% improved MOP AREAS OF EXPERTISE • Project planning & reporting • Resource & Contract management • Risk management • Process optimization • Change management • MS-Project & ORACLE 11i • MS-Office 2012 & Auto Cad ACADEMIC PROJECTS • Manufacturing processes used in refrigeration • Supply chain analysis & optimization for Agriautos Pvt. Ltd. • Brand audit of corolla for I.M.C. (Indus motor company) • Strategic analysis consisting of B.A.P.’s & S.A.P.’s on caterpillar generators for Allied Engineering • Market survey & research report on Telecommunication Industry in Pakistan • VRF systems design & installations PERSONALITY FEATURES • Analyzing, Planning, Organizing and Team Management Abilities • Hard Worker, Good Negotiator and Strong Communication Skills • Creative and Work Loving • Candor, Openness and Decision Maker
  • 3. SENIOR DEPUTY MANAGER – PLANT ENGINEERING ( Jan 2008 – June 2009): 4 – ERP Implementation (March 2006 – June 2008): Involved in ERP (Oracle) implementation project with a view to achieve business objectives and ensure optimum utilization of available data & resources. Also nominated as Super User- Oracle. Some project tasks were: • Detail study with analysis of all manufacturing processes and making flow diagrams of each operation • Prepare F.D.’s to represent the processes and functions involved & identify gaps • Develop procedures and methodology for item codes, routings, cost centers and BOM’s •Analyze target cost with W.I.P. moving avg. cost and update higher management on monthly basis • Document user expectations& develop training manuals • Responsible to establish a channel of communication b/w users & consultant ASSISTANT MANAGER – PLANT ENGINEERING ( July 2005 – Dec 2007): 5 – Productivity Enhancement Project (July 2005 – June 2006): • Implement MOST techniques & increased MOP of various production departments • Calculate & enhanced Cpk & OEE and established continuous monitoring checks in ohbeya & councils • Re-layouting of machines for improved material flow and better utilization of space • Prepare M.P.M.P. and make plans to improve m/c output • Prepare W.I.’s, D.P.’s (Departmental Procedures) and M.P.C.P.’s • Permanent member of QCT, 7-S , R.I.A.P .& I.P.D.P. teams FUTEHALLY CHEMICALS LIMITED (3P – UNILEVER) (December 2004 – June 2005): Performed responsibilities as Production Engineer in surf excel manufacturing plant. Responsible for daily operations of packaging line. Also, took in-house trainings and implement 5-S GLAXO SMITHKLINE PAKISTAN LIMITED: As an Internee, worked in quality department of liquid filling section EXTRA CURRICULAR ACTIVITIES • Music • Cricket • Driving • Net Surfing PERSONAL INFORMATION • Father’s Name: Mohammad Yaqoob Maniar • Marital Status: Married • Religion: Islam • N.I.C. No: 42101-0593141-7 • Passport No.: AQ0791412 • Nationality: Pakistani • Languages: English and Urdu