SlideShare a Scribd company logo
1 of 20
Download to read offline
[RUBÉNURCOLAPELÁEZ]
ARCHITECTUREPORTFOLIO
RUBÉNURCOLAPELÁEZ
“I am a highly responsible architect, creative and initiative. I have more than 3 years
experience working in diferent countries and offices which have allowed me to see the
architecture from different points of views. My Master Degree of Architecture gave me
strong background in all facets of building desing. I have improved my skills in Design
during my profesional experience in Spain and UAE. I consider myself a proactive,
responsible and reliable person who can work well individually and in a team. I also
work well under pressure and to deadline. I have good ability in problem solving and
excellent organizational skills. I have great ability to adapt to different circumstances,
love new challenges and commit myself to what I do and the desire to learn.”
Email		 rubenurcolapelaez@gmail.com		
Telephone	+971553152195		
Website 	 www.rubenurcolapelaez.wix.com/portfolio-urcola
Linkedin 	 www.linkedin.com/in/rubenurcola			
[WORK EXPERIENCE]
June 2014 - Present			 [15 months]
Senior BIM Architect Itech Management Consultancy 		 (Abu Dhabi / Dubai, UAE)
September 2013 - May 2014		 [9 months]
Design Trainee at LPA, Lab of Planning and Architecture 	 (Canary Island, Spain)
February 2013 - July 2013		 [6 months]
Internship at the Construction Department ULPGC 		 (Canary Island, Spain)
September 2012 - October 2012 	 [2 months]
Internship at Dirsur, Urban Planning and Engineering 		 (Cantabria, Spain)
February 2012 - July 2012 		 [6 months]
Junior Site Architect at Laugero Construction and Promotion 	 (Mendoza, Argentina)
[EDUCATION]
September 2006 - June 2013
Master Degree of Architecture at the ULPGC (Spain). Mark: 8 / 10
February 2012 - July 2012
Eibes Programme, Mendoza University (Argentina)
September 2010 - June 2011
Erasmus Exchange Programme, Cracow University of Technology (Poland)
[COMPUTER SKILLS]
BIM /3D / CAD		 Structural Design			 Other
	 Revit			 CypeCad, Advance Certificate		 Lider, Calener and CE3+
	Autocad		Metal 3D				Adobe CS6 [Ps,Id,Ai]
	 Rhinoceros		 Tricalc					 Microsoft Office
	 SketchUp Pro	 Render
	 Archicad	 	 Cinema 4D + VRay		 Operating System
	Microstation		Lumion					Mac
	Navisworks		3DS Max				Windows
[LANGUAGES SKILLS]
Spanish	 English		 French 		 Chinese	 			
Native		 Advance	 Intermediate	 Basic. HSK2	
[PUBLICATIONS]
Project Presentation at Red PHI. 2013
Renewal and Restoration of the Old Library “Simon Benitez Padilla”. 2013
Architecture Biennial of Lanzarote, lanzART. 2012
Architecture Biennial of the Canaries, El Confital. 2008
[COURSES]
Energy Control Sustem course. Energy Efficiency Certificate at ULPGC. 45 hours. 2013
Preservation and Revaluation of Monuments at CUT. 50 hours. 2011
Photoshop CS6. Advance. 200 hours. 2013
Autodesk Revit. Advance. 150 hours. 2013
WORKEXPERIENCE
				June 2014 - Present		[15 months]
Senior BIM Architect at Itech Management Consultancy (Dubai, UAE)
Assist the BIM Manager as a project team member, interacting with project
owners, architects, engineers, contractors and subcontractors to develop and
analyze the virtual construction process in order to maximize construction
efficiency, job cost savings, as well as enhance project documentation &
delivery. As part of the Virtual Construction Organization, the Senior BIM
Architect represents one or more discipline (Architecture/Structure/MEP) and is
responsible to coordinate the RFI process.
[ Working at ADPi office - Dubai ]
Tiara United Towers (Dubai, UAE)
Create and maintain BIM Models for project specific requirements. Develop
schematic and detailed level models including modeling structure architectural
elements and MEP systems. Identify conflicts, incomplete or ambiguous design
information. Coordinate with BIM service providers and Subcontractors. Create
new library components. Responsible as “Model Administrator” for assigned
projects. Produce quantity reports as per client requirement. Assisting full
coordination of BIM project Set-Up the project. Delivery documents for the
Concept Desing, Schematic Design and Municipal Drawings. Modeling
structural and architectural elements for the two towers, two carpark towers
and basement. Create and organize ghost and central files. Coordinate Sheet
file for Concept Design and Municipal Drawings. Rhino model for the facade
study. Responsible for the submission and final presentation.
Bahrain International Airport
BIM modeling. Modeling of the PreBoarding Bridges, Facade and Roof of the
Main Building. Modeling interior partitions for the Duty Free. Model organization.
Create new library components
Al Maktoum International Airport
Rhino Modeling + Render Production + Post Production.
[ Working at AWW office - Dubai ]
PlaySpaces, Secret Garden + Area 52 (Dubai, UAE)
BIM modeling. Set-Up the Project. Creation of Architectural and structural
models, as well as parametrical families. Creation of System Family file with
all the details of the materials. Co-Ordination between the architectural and
structural files. Update modifications for the models according to design
changes. Naviswork Renders. Manage Sketchup files and 3DS files. Creation
of Shop Drawings for both projects.
				 September 2013 - May 2014	 [9 months]
Design Trainee at LPA, Lab of Planning and Architecture (Spain)
Part of the design team on different projects and phases, from concept de-
sign to tender drawings. Meeting with clients, proposed diverse ideas, learning
eco-design tips.
Design Proposal (Full Design) sixteen Luxury Villas in Gran Canaria, Spain
Design Proposal (Concept Design) of Tourist Resort in Girona, Spain
Analyze Azca with Breeam Urbanism metodology. BREEAM Collabaration
Design Proposal (Concept Design) of an Office in Madrid, Spain
Content preparation for the corporate web of LPA
				 March 2012 - July 2012	 [6 months]
Junior Site Architect at Construction and Promotion at Laugero (Argentina)
Assistan of the Manager Site. Developing control of “Le Parc Center”
REMARKABLEPROJECTS
Master Thesis
Group of Housing
Family Housing
Tourist Hotel in Ski Resort
Collective Housing
Al Maktoum International Airport
Eco-Resort
PGA Golf Extension
Bahrein International Airport
Tiara United Towers
TIARAUNITEDTOWERS
This project has an important location in Dubai. It will be one of the landmarks and should follow the skyline
of the city. The design, selection of materials, layouts and sustainability of the project are the main roles .
The project consists in four independent buildings. The main buildings are two towers of fifty levels, facing
Sheikh Zayed Rd. Both Towers were previously designed as a Hotel and Office, nowadays due to the Client
requirements, the towers will be redesigned as a Residential Towers and Retailers in lower levels.
The new design for the towers includes a completely new façade and several changes in the existing
structure (already built cores until level 18 and metal bracing until level 14).
Location	 Dubai - UAE
Year		 2015
Status		 Concept Design, Schematic Design, Draft Detail
Area 		 200.000 sqm
The master plan responds to the ambition of building the world’s largest airport.
Upon completion, it will offer 6 runways, an ‘Atlanta’ type terminal for handling 120 million passengers, a
cargo zone with a capacity of 12 million tons, and all the related functions. Around the airport itself will be
located a logistics site, a high-tech area, a business centre, residential areas, a golf course, and exposition
zones
Location	 Dubai - UAE
Year		 2014
Status		 Concept Design
Area 		 140 km²
AlMaktoumInternationalAirport
Within the scope of the Passenger Terminal extension project at the Bahrain International Airport, ADPI has
proposed a phased solution designed to triple the air terminals existing surface area.
The concept proposed by ADPI offers a modern and innovative image while maintaining Bahrain’s warm and
welcoming spirit. The building’s shape is inspired by aerodynamic design of race cars, a subtle reference
to the Bahrain Formula 1 Grand Prix, a major attraction in the region. With this concept, ADPI was able to
solve the customer’s capacity-related problems: in phase 1, 10 million passengers and 14 terminal gates, in
phase 2, 12 million passengers and 16 terminal gates, as well as the possibility of long-term development to
accommodate more than 15 million passengers.
Location	Bahrein
Year		 2014
Status		 Tender Drawings
Area 		 300.000 sqm
BAHREININT.AIRPORT
The existing ecological assets and their dynamics structure the land-use strategy.
This plan develops the spatial organization principles and the location’s specific uses for the new extension
of PGA Catalunya Golf. It includes a new brand hotel, 83 residential units and several leisure/sport facilities to
complement the existing two golf courses. The plan follows two strategies. The first one bets for maintaining
the site’s farming productive nature, mixing it with in the new development, including the real estate. The
second strategy consists in the restoration of the site’s ecological dynamics, that were deteriorated by its
intensive agriculture activity. The plan proposes overlapping the ecological dynamics within the mobility
strategy the functional and the leisure one. The resulting system will structure the uses’ locations and the
landscape’s identity for the whole development.
Location	 Girona - Spain
Year		 2014
Status		 Concept Design
Area 		 70 Ha
PGA-CATALUNYAGOLF
NUEVANORUEGAECO-RESORT
A strategy of minimum footprint and its compensation through green roofs drives the resulting massing.
This housing complex of sixteen touristic villas is organized by a combination of two types of “living-bars”:
one housing unit contains a kitchen, a living room and a balcony and the other one accommodates two extra
bedrooms and bathroom. Each apartment is the result of the aggregation of two or more bars placed at
different levels that are completed by an “eco-box”, that articulates the vertical connexions between the bars,
making possible a permanent natural ventilation and illumination of the whole unit, even when the owner is on
leave. The open space around the housing complex, accommodates two types of landscapes and a natural
(chemical-free) swimming pool.
Location	 Canary Island - Spain
Year		 2013
Status		 Concept Design, Schematic Design, Full Design
Area 		 5.000 sqm
The residential area limits are disappearing because of the location in a conflicted zone. Therefore to increase
the value of this area, it has selected an emblematic group of buildings, where many years ago people from
the neighborhood made traditional oil. It’s located in an strategic place of this district, being a link of the
different sectors.
Also, this proposal is related with the social infrastructures of the district and with elements nearby. The
public spaces generates an important role solving the principal problem of the district. Strengthening the
outdoor spaces as a link between the different parts of the city. To solve the problem of the aging population
and architectonic of La Isleta, appears a new concept of building, a place where live the handicap people.
It’s created as a solution for the inhabitants of the district that wants to live in but improving their conditions.
Location	 Canary Island, Spain
Year		 2013
Status		 Final Thesis Presentation
OILFACTORYREACTIVATION
COMPOUNDFORWRITERS
The project involves five houses, social facilities and open spaces. The place where the writer lives it is a link
between the private life and the creative process.
The idea is to link this with a multiple features of the houses, unified in the public spaces and creating an
interesting courtyard. The houses are modules visually connected to each other and to their environment,
lining the street to the social facilities to act as a meeting point between the neighbours and the writers.
Location	 Mendoza, Argentina
Year		 2012
Status		 Design Proposal
FAMILYHOUSINGFORARTIST
The first idea of this project is the integration of the building with the houses on the block. The movements on
the facades point out the part of the houses that connects to the neighbourhood, which in this case would be
the studio for the artist, whereas the other part is the residential area for the family.
The house is also divided into two spaces: Indoor - Outdoor. The exterior links the different spaces within the
building as well as unifies the different personalities of the inhabitants. The areas are also connected on the
second floor, so the courtyards serve as unifying points for the family.
Location	 Mendoza, Argentina
Year		 2012
Status		 Design Proposal
TOURISTHOTELINSKIRESORT
The project is located at the top of a ski resort. This is a very nice place with stunning views of the landscape
and the city, Cracow. As the area is full of trees, the idea is to integrate nature into the building and not to
make an impact in the area, arise two different volumes connected by an organic courtyard.
This area and the outdoor square would be the new public spaces used by skiers as well as guests staying at
the hotel. These are spaces oriented towards the south, which means they can be enjoyed both in winter and
summer. It has a roof garden, so there’s a continuity between the building and the landscape. The windows
are very wide and link rooms with the landscape. Sloping roofs on the final design with different angles to
facilitate drainage of water out of the building. Most spaces have windows facing south as it is better for
inside comfort.
Location	 Crawow, Poland
Year		 2011
Status		 Design Proposal
COLLECTIVEHOUSING
The project starts generating two volumes with different geometry but trying to find the same meaning.
The volume of the smallest building is broken in order to create a connection between indoor and outdoor
spaces. The other building has the same intentions, created by breaking the floor and creating viewpoints
throughout the house to admire the city from different perspectives. On the first floor this connection is made
by facilities which is linked to the public spaces.
Location	 Canary Island, Spain
Year		 2010
Status		 Design Proposal

More Related Content

What's hot

Dalia Mokhtar (Design Manager_ Urban Planning and Landscape Design Engineer)_CV
Dalia Mokhtar (Design Manager_ Urban Planning and Landscape Design Engineer)_CVDalia Mokhtar (Design Manager_ Urban Planning and Landscape Design Engineer)_CV
Dalia Mokhtar (Design Manager_ Urban Planning and Landscape Design Engineer)_CVDalia Mokhtar
 
Mohamed Hammad Architectural Portfolio
Mohamed Hammad Architectural Portfolio Mohamed Hammad Architectural Portfolio
Mohamed Hammad Architectural Portfolio Mohamed Hammad
 
Francisco Farias_CV 2016
Francisco Farias_CV 2016Francisco Farias_CV 2016
Francisco Farias_CV 2016Francisco Far
 
Mohammad Anchassi - Major Projects 1
Mohammad Anchassi - Major Projects 1Mohammad Anchassi - Major Projects 1
Mohammad Anchassi - Major Projects 1Mohamad Anchassi
 
CV-Carlo Muniz-T_AR
CV-Carlo Muniz-T_ARCV-Carlo Muniz-T_AR
CV-Carlo Muniz-T_ARCarlo Mu
 
Reda shosha CV 1st oct 2014 rev 1 - Copy
Reda shosha CV  1st oct 2014 rev 1 - CopyReda shosha CV  1st oct 2014 rev 1 - Copy
Reda shosha CV 1st oct 2014 rev 1 - CopyReda Shosha
 
Portfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيلي
Portfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيليPortfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيلي
Portfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيليTasamim Online
 
Architect mohamed el-tarabily
Architect mohamed el-tarabilyArchitect mohamed el-tarabily
Architect mohamed el-tarabilyTasamim Online
 
Dina J. architectural and interior work samples-2019
Dina J. architectural and interior work samples-2019Dina J. architectural and interior work samples-2019
Dina J. architectural and interior work samples-2019Dina j. soliman
 
Yahia Ragab, updated C.V - December 2015
Yahia Ragab, updated C.V - December 2015Yahia Ragab, updated C.V - December 2015
Yahia Ragab, updated C.V - December 2015Yehia Ragab
 
Architectural Portfolio-Bharathwaj Iyengar
Architectural Portfolio-Bharathwaj IyengarArchitectural Portfolio-Bharathwaj Iyengar
Architectural Portfolio-Bharathwaj IyengarBharathwaj Iyengar
 
Luca Tentellini Architecture * Interior Design * Project Management * Constru...
Luca Tentellini Architecture * Interior Design * Project Management * Constru...Luca Tentellini Architecture * Interior Design * Project Management * Constru...
Luca Tentellini Architecture * Interior Design * Project Management * Constru...Luca Tentellini
 
Luca_Tentellini_Portfolio_27_03_22.pdf
Luca_Tentellini_Portfolio_27_03_22.pdfLuca_Tentellini_Portfolio_27_03_22.pdf
Luca_Tentellini_Portfolio_27_03_22.pdfLuca Tentellini
 
Cv giulia papa 2019
Cv giulia papa  2019Cv giulia papa  2019
Cv giulia papa 2019Giu Lia
 

What's hot (20)

Dalia Mokhtar (Design Manager_ Urban Planning and Landscape Design Engineer)_CV
Dalia Mokhtar (Design Manager_ Urban Planning and Landscape Design Engineer)_CVDalia Mokhtar (Design Manager_ Urban Planning and Landscape Design Engineer)_CV
Dalia Mokhtar (Design Manager_ Urban Planning and Landscape Design Engineer)_CV
 
Architectural_Portfolio
Architectural_PortfolioArchitectural_Portfolio
Architectural_Portfolio
 
Mohamed Hammad Architectural Portfolio
Mohamed Hammad Architectural Portfolio Mohamed Hammad Architectural Portfolio
Mohamed Hammad Architectural Portfolio
 
Ibrahim al kishki -cv
Ibrahim al kishki -cvIbrahim al kishki -cv
Ibrahim al kishki -cv
 
Francisco Farias_CV 2016
Francisco Farias_CV 2016Francisco Farias_CV 2016
Francisco Farias_CV 2016
 
Mohammad Anchassi - Major Projects 1
Mohammad Anchassi - Major Projects 1Mohammad Anchassi - Major Projects 1
Mohammad Anchassi - Major Projects 1
 
CV-Carlo Muniz-T_AR
CV-Carlo Muniz-T_ARCV-Carlo Muniz-T_AR
CV-Carlo Muniz-T_AR
 
Reda shosha CV 1st oct 2014 rev 1 - Copy
Reda shosha CV  1st oct 2014 rev 1 - CopyReda shosha CV  1st oct 2014 rev 1 - Copy
Reda shosha CV 1st oct 2014 rev 1 - Copy
 
Portfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيلي
Portfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيليPortfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيلي
Portfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيلي
 
Architect mohamed el-tarabily
Architect mohamed el-tarabilyArchitect mohamed el-tarabily
Architect mohamed el-tarabily
 
Dina J. architectural and interior work samples-2019
Dina J. architectural and interior work samples-2019Dina J. architectural and interior work samples-2019
Dina J. architectural and interior work samples-2019
 
Amr Moneim CV March 2016
Amr Moneim CV March 2016Amr Moneim CV March 2016
Amr Moneim CV March 2016
 
Yahia Ragab, updated C.V - December 2015
Yahia Ragab, updated C.V - December 2015Yahia Ragab, updated C.V - December 2015
Yahia Ragab, updated C.V - December 2015
 
Portfolio
PortfolioPortfolio
Portfolio
 
Mahmoud-portfolio
Mahmoud-portfolioMahmoud-portfolio
Mahmoud-portfolio
 
Architectural Portfolio-Bharathwaj Iyengar
Architectural Portfolio-Bharathwaj IyengarArchitectural Portfolio-Bharathwaj Iyengar
Architectural Portfolio-Bharathwaj Iyengar
 
Luca Tentellini Architecture * Interior Design * Project Management * Constru...
Luca Tentellini Architecture * Interior Design * Project Management * Constru...Luca Tentellini Architecture * Interior Design * Project Management * Constru...
Luca Tentellini Architecture * Interior Design * Project Management * Constru...
 
Luca_Tentellini_Portfolio_27_03_22.pdf
Luca_Tentellini_Portfolio_27_03_22.pdfLuca_Tentellini_Portfolio_27_03_22.pdf
Luca_Tentellini_Portfolio_27_03_22.pdf
 
Cv giulia papa 2019
Cv giulia papa  2019Cv giulia papa  2019
Cv giulia papa 2019
 
Resume_Alejandro Weiss M
Resume_Alejandro Weiss MResume_Alejandro Weiss M
Resume_Alejandro Weiss M
 

Viewers also liked

Beeldmateriaal Drechterland Draait Door deel 2
Beeldmateriaal Drechterland Draait Door deel 2Beeldmateriaal Drechterland Draait Door deel 2
Beeldmateriaal Drechterland Draait Door deel 2Loft25
 
Ppppppppppppppppp
PppppppppppppppppPpppppppppppppppp
Ppppppppppppppppppraduma
 
Production and Operations management - assignment 1 - defining a system
Production and Operations management - assignment 1 - defining a systemProduction and Operations management - assignment 1 - defining a system
Production and Operations management - assignment 1 - defining a systemKerrie Noble
 
Bsf kna (2)
Bsf kna (2)Bsf kna (2)
Bsf kna (2)praduma
 
Critical Success Factors of QRM
Critical Success Factors of QRMCritical Success Factors of QRM
Critical Success Factors of QRMKerrie Noble
 
Police check guide | Tutor Hero
Police check guide | Tutor HeroPolice check guide | Tutor Hero
Police check guide | Tutor HeroCE
 
Rod Swanson resume
Rod Swanson resumeRod Swanson resume
Rod Swanson resumeRod Swanson
 
A Multicore Parallelization of Continuous Skyline Queries on Data Streams
A Multicore Parallelization of Continuous Skyline Queries on Data StreamsA Multicore Parallelization of Continuous Skyline Queries on Data Streams
A Multicore Parallelization of Continuous Skyline Queries on Data StreamsTiziano De Matteis
 
Literacies of Bilingual Youth: A profile of Txt, Social, and Bilingual Literacy
Literacies of Bilingual Youth: A profile of Txt, Social, and Bilingual LiteracyLiteracies of Bilingual Youth: A profile of Txt, Social, and Bilingual Literacy
Literacies of Bilingual Youth: A profile of Txt, Social, and Bilingual LiteracyMichelle_JM
 
140814 Karenhills Brochure LR
140814 Karenhills Brochure LR140814 Karenhills Brochure LR
140814 Karenhills Brochure LRAndrew Salmon
 
Formatted materials assignment (2)
Formatted materials assignment (2)Formatted materials assignment (2)
Formatted materials assignment (2)Kerrie Noble
 
Product Development - presentation 1
Product Development - presentation 1Product Development - presentation 1
Product Development - presentation 1Kerrie Noble
 

Viewers also liked (20)

Vipin_Pandey
Vipin_PandeyVipin_Pandey
Vipin_Pandey
 
Поведение в интернет
Поведение в интернетПоведение в интернет
Поведение в интернет
 
RMH ACAD CV 04.04.15
RMH ACAD CV 04.04.15RMH ACAD CV 04.04.15
RMH ACAD CV 04.04.15
 
CCF PRESENTATION-FINAL
CCF PRESENTATION-FINALCCF PRESENTATION-FINAL
CCF PRESENTATION-FINAL
 
Beeldmateriaal Drechterland Draait Door deel 2
Beeldmateriaal Drechterland Draait Door deel 2Beeldmateriaal Drechterland Draait Door deel 2
Beeldmateriaal Drechterland Draait Door deel 2
 
Ppppppppppppppppp
PppppppppppppppppPpppppppppppppppp
Ppppppppppppppppp
 
Production and Operations management - assignment 1 - defining a system
Production and Operations management - assignment 1 - defining a systemProduction and Operations management - assignment 1 - defining a system
Production and Operations management - assignment 1 - defining a system
 
project report
project reportproject report
project report
 
Bsf kna (2)
Bsf kna (2)Bsf kna (2)
Bsf kna (2)
 
Critical Success Factors of QRM
Critical Success Factors of QRMCritical Success Factors of QRM
Critical Success Factors of QRM
 
Police check guide | Tutor Hero
Police check guide | Tutor HeroPolice check guide | Tutor Hero
Police check guide | Tutor Hero
 
DISSERTATION
DISSERTATIONDISSERTATION
DISSERTATION
 
SIK
SIKSIK
SIK
 
Rod Swanson resume
Rod Swanson resumeRod Swanson resume
Rod Swanson resume
 
A Multicore Parallelization of Continuous Skyline Queries on Data Streams
A Multicore Parallelization of Continuous Skyline Queries on Data StreamsA Multicore Parallelization of Continuous Skyline Queries on Data Streams
A Multicore Parallelization of Continuous Skyline Queries on Data Streams
 
Literacies of Bilingual Youth: A profile of Txt, Social, and Bilingual Literacy
Literacies of Bilingual Youth: A profile of Txt, Social, and Bilingual LiteracyLiteracies of Bilingual Youth: A profile of Txt, Social, and Bilingual Literacy
Literacies of Bilingual Youth: A profile of Txt, Social, and Bilingual Literacy
 
Stage 2 Report
Stage 2 ReportStage 2 Report
Stage 2 Report
 
140814 Karenhills Brochure LR
140814 Karenhills Brochure LR140814 Karenhills Brochure LR
140814 Karenhills Brochure LR
 
Formatted materials assignment (2)
Formatted materials assignment (2)Formatted materials assignment (2)
Formatted materials assignment (2)
 
Product Development - presentation 1
Product Development - presentation 1Product Development - presentation 1
Product Development - presentation 1
 

Similar to 201508_Portfolio Ruben Urcola

CV Efstathios Kanios 2017
CV Efstathios Kanios 2017CV Efstathios Kanios 2017
CV Efstathios Kanios 2017Stathis Kanios
 
BIM Portfolio Daniel Almenares
BIM Portfolio Daniel AlmenaresBIM Portfolio Daniel Almenares
BIM Portfolio Daniel AlmenaresDaniel Almenares
 
Faisal Kazi CV & Portfolio
Faisal Kazi CV & PortfolioFaisal Kazi CV & Portfolio
Faisal Kazi CV & PortfolioFaisalKazi10
 
Rolando alvarez cv for site architect 2
Rolando alvarez cv for site architect  2Rolando alvarez cv for site architect  2
Rolando alvarez cv for site architect 2Rolando Alvarez
 
Rolando alvarez cv for site architect 2
Rolando alvarez cv for site architect  2Rolando alvarez cv for site architect  2
Rolando alvarez cv for site architect 2Rolando Alvarez
 
110429 pgi cv_hotels_english_redux
110429 pgi cv_hotels_english_redux110429 pgi cv_hotels_english_redux
110429 pgi cv_hotels_english_reduxPGI ENGINEERING
 
Metwally - BIM ShowroomV1.0
Metwally - BIM ShowroomV1.0Metwally - BIM ShowroomV1.0
Metwally - BIM ShowroomV1.0Mohammed Salah
 
Metwally - BIM Portfolio
Metwally - BIM PortfolioMetwally - BIM Portfolio
Metwally - BIM PortfolioMohammed Salah
 
Profesional portafolio 05 2017
Profesional portafolio 05 2017Profesional portafolio 05 2017
Profesional portafolio 05 2017Daniel Almenares
 
Personal Profile April 2015
Personal Profile April 2015Personal Profile April 2015
Personal Profile April 2015Khaled Elagroudy
 
Tutorial archi cad 7.0
Tutorial archi cad 7.0Tutorial archi cad 7.0
Tutorial archi cad 7.0imaduddin91
 

Similar to 201508_Portfolio Ruben Urcola (20)

CV Efstathios Kanios 2017
CV Efstathios Kanios 2017CV Efstathios Kanios 2017
CV Efstathios Kanios 2017
 
BIM Portfolio Daniel Almenares
BIM Portfolio Daniel AlmenaresBIM Portfolio Daniel Almenares
BIM Portfolio Daniel Almenares
 
2018 DCPEREZ CV
2018 DCPEREZ CV2018 DCPEREZ CV
2018 DCPEREZ CV
 
Dina jamal resume
Dina jamal resumeDina jamal resume
Dina jamal resume
 
SuchadaRamakul-Resume-Portfolio-2014-12-08-Rev-A
SuchadaRamakul-Resume-Portfolio-2014-12-08-Rev-ASuchadaRamakul-Resume-Portfolio-2014-12-08-Rev-A
SuchadaRamakul-Resume-Portfolio-2014-12-08-Rev-A
 
Faisal Kazi CV & Portfolio
Faisal Kazi CV & PortfolioFaisal Kazi CV & Portfolio
Faisal Kazi CV & Portfolio
 
Rolando alvarez cv for site architect 2
Rolando alvarez cv for site architect  2Rolando alvarez cv for site architect  2
Rolando alvarez cv for site architect 2
 
Rolando alvarez cv for site architect 2
Rolando alvarez cv for site architect  2Rolando alvarez cv for site architect  2
Rolando alvarez cv for site architect 2
 
Portfolio
PortfolioPortfolio
Portfolio
 
110429 pgi cv_hotels_english_redux
110429 pgi cv_hotels_english_redux110429 pgi cv_hotels_english_redux
110429 pgi cv_hotels_english_redux
 
Hagar EL Ebiari_CV
Hagar EL Ebiari_CVHagar EL Ebiari_CV
Hagar EL Ebiari_CV
 
Mc cv updated 2017
Mc cv   updated 2017Mc cv   updated 2017
Mc cv updated 2017
 
Metwally - BIM ShowroomV1.0
Metwally - BIM ShowroomV1.0Metwally - BIM ShowroomV1.0
Metwally - BIM ShowroomV1.0
 
Metwally - BIM Portfolio
Metwally - BIM PortfolioMetwally - BIM Portfolio
Metwally - BIM Portfolio
 
Profesional portafolio 05 2017
Profesional portafolio 05 2017Profesional portafolio 05 2017
Profesional portafolio 05 2017
 
Raj Cv
Raj CvRaj Cv
Raj Cv
 
Personal Profile April 2015
Personal Profile April 2015Personal Profile April 2015
Personal Profile April 2015
 
Cv rs architect_2016_li
Cv rs architect_2016_liCv rs architect_2016_li
Cv rs architect_2016_li
 
Tutorial archi cad 7.0
Tutorial archi cad 7.0Tutorial archi cad 7.0
Tutorial archi cad 7.0
 
Corgan
CorganCorgan
Corgan
 

201508_Portfolio Ruben Urcola

  • 2. RUBÉNURCOLAPELÁEZ “I am a highly responsible architect, creative and initiative. I have more than 3 years experience working in diferent countries and offices which have allowed me to see the architecture from different points of views. My Master Degree of Architecture gave me strong background in all facets of building desing. I have improved my skills in Design during my profesional experience in Spain and UAE. I consider myself a proactive, responsible and reliable person who can work well individually and in a team. I also work well under pressure and to deadline. I have good ability in problem solving and excellent organizational skills. I have great ability to adapt to different circumstances, love new challenges and commit myself to what I do and the desire to learn.” Email rubenurcolapelaez@gmail.com Telephone +971553152195 Website www.rubenurcolapelaez.wix.com/portfolio-urcola Linkedin www.linkedin.com/in/rubenurcola [WORK EXPERIENCE] June 2014 - Present [15 months] Senior BIM Architect Itech Management Consultancy (Abu Dhabi / Dubai, UAE) September 2013 - May 2014 [9 months] Design Trainee at LPA, Lab of Planning and Architecture (Canary Island, Spain) February 2013 - July 2013 [6 months] Internship at the Construction Department ULPGC (Canary Island, Spain) September 2012 - October 2012 [2 months] Internship at Dirsur, Urban Planning and Engineering (Cantabria, Spain) February 2012 - July 2012 [6 months] Junior Site Architect at Laugero Construction and Promotion (Mendoza, Argentina) [EDUCATION] September 2006 - June 2013 Master Degree of Architecture at the ULPGC (Spain). Mark: 8 / 10 February 2012 - July 2012 Eibes Programme, Mendoza University (Argentina) September 2010 - June 2011 Erasmus Exchange Programme, Cracow University of Technology (Poland) [COMPUTER SKILLS] BIM /3D / CAD Structural Design Other Revit CypeCad, Advance Certificate Lider, Calener and CE3+ Autocad Metal 3D Adobe CS6 [Ps,Id,Ai] Rhinoceros Tricalc Microsoft Office SketchUp Pro Render Archicad Cinema 4D + VRay Operating System Microstation Lumion Mac Navisworks 3DS Max Windows [LANGUAGES SKILLS] Spanish English French Chinese Native Advance Intermediate Basic. HSK2 [PUBLICATIONS] Project Presentation at Red PHI. 2013 Renewal and Restoration of the Old Library “Simon Benitez Padilla”. 2013 Architecture Biennial of Lanzarote, lanzART. 2012 Architecture Biennial of the Canaries, El Confital. 2008 [COURSES] Energy Control Sustem course. Energy Efficiency Certificate at ULPGC. 45 hours. 2013 Preservation and Revaluation of Monuments at CUT. 50 hours. 2011 Photoshop CS6. Advance. 200 hours. 2013 Autodesk Revit. Advance. 150 hours. 2013
  • 3. WORKEXPERIENCE June 2014 - Present [15 months] Senior BIM Architect at Itech Management Consultancy (Dubai, UAE) Assist the BIM Manager as a project team member, interacting with project owners, architects, engineers, contractors and subcontractors to develop and analyze the virtual construction process in order to maximize construction efficiency, job cost savings, as well as enhance project documentation & delivery. As part of the Virtual Construction Organization, the Senior BIM Architect represents one or more discipline (Architecture/Structure/MEP) and is responsible to coordinate the RFI process. [ Working at ADPi office - Dubai ] Tiara United Towers (Dubai, UAE) Create and maintain BIM Models for project specific requirements. Develop schematic and detailed level models including modeling structure architectural elements and MEP systems. Identify conflicts, incomplete or ambiguous design information. Coordinate with BIM service providers and Subcontractors. Create new library components. Responsible as “Model Administrator” for assigned projects. Produce quantity reports as per client requirement. Assisting full coordination of BIM project Set-Up the project. Delivery documents for the Concept Desing, Schematic Design and Municipal Drawings. Modeling structural and architectural elements for the two towers, two carpark towers and basement. Create and organize ghost and central files. Coordinate Sheet file for Concept Design and Municipal Drawings. Rhino model for the facade study. Responsible for the submission and final presentation. Bahrain International Airport BIM modeling. Modeling of the PreBoarding Bridges, Facade and Roof of the Main Building. Modeling interior partitions for the Duty Free. Model organization. Create new library components Al Maktoum International Airport Rhino Modeling + Render Production + Post Production. [ Working at AWW office - Dubai ] PlaySpaces, Secret Garden + Area 52 (Dubai, UAE) BIM modeling. Set-Up the Project. Creation of Architectural and structural models, as well as parametrical families. Creation of System Family file with all the details of the materials. Co-Ordination between the architectural and structural files. Update modifications for the models according to design changes. Naviswork Renders. Manage Sketchup files and 3DS files. Creation of Shop Drawings for both projects. September 2013 - May 2014 [9 months] Design Trainee at LPA, Lab of Planning and Architecture (Spain) Part of the design team on different projects and phases, from concept de- sign to tender drawings. Meeting with clients, proposed diverse ideas, learning eco-design tips. Design Proposal (Full Design) sixteen Luxury Villas in Gran Canaria, Spain Design Proposal (Concept Design) of Tourist Resort in Girona, Spain Analyze Azca with Breeam Urbanism metodology. BREEAM Collabaration Design Proposal (Concept Design) of an Office in Madrid, Spain Content preparation for the corporate web of LPA March 2012 - July 2012 [6 months] Junior Site Architect at Construction and Promotion at Laugero (Argentina) Assistan of the Manager Site. Developing control of “Le Parc Center”
  • 4. REMARKABLEPROJECTS Master Thesis Group of Housing Family Housing Tourist Hotel in Ski Resort Collective Housing Al Maktoum International Airport Eco-Resort PGA Golf Extension Bahrein International Airport Tiara United Towers
  • 5. TIARAUNITEDTOWERS This project has an important location in Dubai. It will be one of the landmarks and should follow the skyline of the city. The design, selection of materials, layouts and sustainability of the project are the main roles . The project consists in four independent buildings. The main buildings are two towers of fifty levels, facing Sheikh Zayed Rd. Both Towers were previously designed as a Hotel and Office, nowadays due to the Client requirements, the towers will be redesigned as a Residential Towers and Retailers in lower levels. The new design for the towers includes a completely new façade and several changes in the existing structure (already built cores until level 18 and metal bracing until level 14). Location Dubai - UAE Year 2015 Status Concept Design, Schematic Design, Draft Detail Area 200.000 sqm
  • 6.
  • 7. The master plan responds to the ambition of building the world’s largest airport. Upon completion, it will offer 6 runways, an ‘Atlanta’ type terminal for handling 120 million passengers, a cargo zone with a capacity of 12 million tons, and all the related functions. Around the airport itself will be located a logistics site, a high-tech area, a business centre, residential areas, a golf course, and exposition zones Location Dubai - UAE Year 2014 Status Concept Design Area 140 km² AlMaktoumInternationalAirport
  • 8.
  • 9. Within the scope of the Passenger Terminal extension project at the Bahrain International Airport, ADPI has proposed a phased solution designed to triple the air terminals existing surface area. The concept proposed by ADPI offers a modern and innovative image while maintaining Bahrain’s warm and welcoming spirit. The building’s shape is inspired by aerodynamic design of race cars, a subtle reference to the Bahrain Formula 1 Grand Prix, a major attraction in the region. With this concept, ADPI was able to solve the customer’s capacity-related problems: in phase 1, 10 million passengers and 14 terminal gates, in phase 2, 12 million passengers and 16 terminal gates, as well as the possibility of long-term development to accommodate more than 15 million passengers. Location Bahrein Year 2014 Status Tender Drawings Area 300.000 sqm BAHREININT.AIRPORT
  • 10.
  • 11. The existing ecological assets and their dynamics structure the land-use strategy. This plan develops the spatial organization principles and the location’s specific uses for the new extension of PGA Catalunya Golf. It includes a new brand hotel, 83 residential units and several leisure/sport facilities to complement the existing two golf courses. The plan follows two strategies. The first one bets for maintaining the site’s farming productive nature, mixing it with in the new development, including the real estate. The second strategy consists in the restoration of the site’s ecological dynamics, that were deteriorated by its intensive agriculture activity. The plan proposes overlapping the ecological dynamics within the mobility strategy the functional and the leisure one. The resulting system will structure the uses’ locations and the landscape’s identity for the whole development. Location Girona - Spain Year 2014 Status Concept Design Area 70 Ha PGA-CATALUNYAGOLF
  • 12.
  • 13. NUEVANORUEGAECO-RESORT A strategy of minimum footprint and its compensation through green roofs drives the resulting massing. This housing complex of sixteen touristic villas is organized by a combination of two types of “living-bars”: one housing unit contains a kitchen, a living room and a balcony and the other one accommodates two extra bedrooms and bathroom. Each apartment is the result of the aggregation of two or more bars placed at different levels that are completed by an “eco-box”, that articulates the vertical connexions between the bars, making possible a permanent natural ventilation and illumination of the whole unit, even when the owner is on leave. The open space around the housing complex, accommodates two types of landscapes and a natural (chemical-free) swimming pool. Location Canary Island - Spain Year 2013 Status Concept Design, Schematic Design, Full Design Area 5.000 sqm
  • 14.
  • 15. The residential area limits are disappearing because of the location in a conflicted zone. Therefore to increase the value of this area, it has selected an emblematic group of buildings, where many years ago people from the neighborhood made traditional oil. It’s located in an strategic place of this district, being a link of the different sectors. Also, this proposal is related with the social infrastructures of the district and with elements nearby. The public spaces generates an important role solving the principal problem of the district. Strengthening the outdoor spaces as a link between the different parts of the city. To solve the problem of the aging population and architectonic of La Isleta, appears a new concept of building, a place where live the handicap people. It’s created as a solution for the inhabitants of the district that wants to live in but improving their conditions. Location Canary Island, Spain Year 2013 Status Final Thesis Presentation OILFACTORYREACTIVATION
  • 16.
  • 17. COMPOUNDFORWRITERS The project involves five houses, social facilities and open spaces. The place where the writer lives it is a link between the private life and the creative process. The idea is to link this with a multiple features of the houses, unified in the public spaces and creating an interesting courtyard. The houses are modules visually connected to each other and to their environment, lining the street to the social facilities to act as a meeting point between the neighbours and the writers. Location Mendoza, Argentina Year 2012 Status Design Proposal
  • 18. FAMILYHOUSINGFORARTIST The first idea of this project is the integration of the building with the houses on the block. The movements on the facades point out the part of the houses that connects to the neighbourhood, which in this case would be the studio for the artist, whereas the other part is the residential area for the family. The house is also divided into two spaces: Indoor - Outdoor. The exterior links the different spaces within the building as well as unifies the different personalities of the inhabitants. The areas are also connected on the second floor, so the courtyards serve as unifying points for the family. Location Mendoza, Argentina Year 2012 Status Design Proposal
  • 19. TOURISTHOTELINSKIRESORT The project is located at the top of a ski resort. This is a very nice place with stunning views of the landscape and the city, Cracow. As the area is full of trees, the idea is to integrate nature into the building and not to make an impact in the area, arise two different volumes connected by an organic courtyard. This area and the outdoor square would be the new public spaces used by skiers as well as guests staying at the hotel. These are spaces oriented towards the south, which means they can be enjoyed both in winter and summer. It has a roof garden, so there’s a continuity between the building and the landscape. The windows are very wide and link rooms with the landscape. Sloping roofs on the final design with different angles to facilitate drainage of water out of the building. Most spaces have windows facing south as it is better for inside comfort. Location Crawow, Poland Year 2011 Status Design Proposal
  • 20. COLLECTIVEHOUSING The project starts generating two volumes with different geometry but trying to find the same meaning. The volume of the smallest building is broken in order to create a connection between indoor and outdoor spaces. The other building has the same intentions, created by breaking the floor and creating viewpoints throughout the house to admire the city from different perspectives. On the first floor this connection is made by facilities which is linked to the public spaces. Location Canary Island, Spain Year 2010 Status Design Proposal