Mud Mixing Plant from start of fabrication to
installation onboard MV Trinity Supporter
(Singapore) End client NIKO Indonesia
This was a capital sale project not a rental project
2250 bbl Tank
capacity with separate
250 bbl Brine mixing
tank
2 x 585Kw
Generators
1 x air conditioned
Circuit Breaker
Module
12 x mud guns
20 x 11Kw Agitators
3 x 8 x 6 x 14
Centrifugal Pumps
2 x Big Bag Mixer
2 x Hi - Ride Mixers
1 x CD 500 Centrifuge
2 x 9.2Kw Conveyors
1 x Mud Lab
1 x Storage Container
MV Trinity Supporter Deck during survey
Start of Fabrication after design acceptance
Day 1 start of installation at Loyang Offshore Base Singapore
Installation
Installation of CD 500 Centrifuge
Installed mixer pumps / Pipe work / Lighting / Electrics prior to commissioning phase
Utilities: Brine / Sea water / drill water / mixing pump transfer lines and
equalization upper and lower manifolds, conveyor for centrifuge solids
transfer to future cuttings box lay down area.
The top of tanks were designed to have a modular grated deck eliminating trip hazards
for the operators all valves shafts were extended so the operators had easy access
during operation, all agitator starters were mounted on easy reach stands directly next
to each agitator,
The centrifuge could take suction from any tank and discharge to any tank
Looking Forward to Aft with access stairs to Port and Starboard side of tanks and
Starboard Aft view of the Centrifuge package / mixing and equalization manifolds
pictures taken prior to commissioning and hand over to client the final commissioning
was carried out at Anchorage East Coast Bay Singapore.
Mud Mixing plant installed onboard Trinity Supporter for NIKO
Mud Mixing plant installed onboard Trinity Supporter for NIKO

Weitere ähnliche Inhalte

Was ist angesagt?

DeesideSeaways MPSS Presentation Ver 3
DeesideSeaways MPSS  Presentation Ver 3DeesideSeaways MPSS  Presentation Ver 3
DeesideSeaways MPSS Presentation Ver 3Craig Lang
 
ASL SHIPYARD - Company Profile
ASL SHIPYARD - Company ProfileASL SHIPYARD - Company Profile
ASL SHIPYARD - Company ProfileMitchell Mantiri
 
Asia Days 2013 - India Cochin Shipyard
Asia Days 2013 - India Cochin ShipyardAsia Days 2013 - India Cochin Shipyard
Asia Days 2013 - India Cochin ShipyardInnovation Norway
 
Atlascopco Presentation
Atlascopco PresentationAtlascopco Presentation
Atlascopco PresentationEko Purwanto
 
Gas entec ppt for_gis 2016_distribution
Gas entec ppt for_gis 2016_distributionGas entec ppt for_gis 2016_distribution
Gas entec ppt for_gis 2016_distributionBrandon Shin
 
Compatibility Study of FSRU Exemplar for STS Transfer with LNGC
Compatibility Study of FSRU Exemplar for STS Transfer with LNGCCompatibility Study of FSRU Exemplar for STS Transfer with LNGC
Compatibility Study of FSRU Exemplar for STS Transfer with LNGCAchmad Agung P
 
Fsru conference fsru dam 21 nov 12
Fsru conference fsru dam 21 nov 12Fsru conference fsru dam 21 nov 12
Fsru conference fsru dam 21 nov 12swoolway
 
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Association for Project Management
 
Sea Magic Fast Craft
Sea Magic Fast CraftSea Magic Fast Craft
Sea Magic Fast CraftValentineBond
 
Company Profile of C. Than and Associates Marine Design Firm
Company Profile of C. Than and Associates Marine Design FirmCompany Profile of C. Than and Associates Marine Design Firm
Company Profile of C. Than and Associates Marine Design FirmHtike Aung Kyaw
 
Cleveland Cascades DCI Sep14
Cleveland Cascades DCI Sep14Cleveland Cascades DCI Sep14
Cleveland Cascades DCI Sep14Brian Thirlwall
 
Shipyard Begej Company Profile
Shipyard Begej Company ProfileShipyard Begej Company Profile
Shipyard Begej Company ProfileShipyard Begej
 
Manitowoc press-presentation final
Manitowoc press-presentation finalManitowoc press-presentation final
Manitowoc press-presentation finalManitowocCompany
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webNora Kohlhase
 
Asia Days 2013 - Market opportunities for small LNG distribution
Asia Days 2013 - Market opportunities for small LNG distributionAsia Days 2013 - Market opportunities for small LNG distribution
Asia Days 2013 - Market opportunities for small LNG distributionInnovation Norway
 

Was ist angesagt? (20)

DeesideSeaways MPSS Presentation Ver 3
DeesideSeaways MPSS  Presentation Ver 3DeesideSeaways MPSS  Presentation Ver 3
DeesideSeaways MPSS Presentation Ver 3
 
ASL SHIPYARD - Company Profile
ASL SHIPYARD - Company ProfileASL SHIPYARD - Company Profile
ASL SHIPYARD - Company Profile
 
Asia Days 2013 - India Cochin Shipyard
Asia Days 2013 - India Cochin ShipyardAsia Days 2013 - India Cochin Shipyard
Asia Days 2013 - India Cochin Shipyard
 
Atlascopco Presentation
Atlascopco PresentationAtlascopco Presentation
Atlascopco Presentation
 
Gas entec ppt for_gis 2016_distribution
Gas entec ppt for_gis 2016_distributionGas entec ppt for_gis 2016_distribution
Gas entec ppt for_gis 2016_distribution
 
Spotlight 1Astander
Spotlight 1AstanderSpotlight 1Astander
Spotlight 1Astander
 
Compatibility Study of FSRU Exemplar for STS Transfer with LNGC
Compatibility Study of FSRU Exemplar for STS Transfer with LNGCCompatibility Study of FSRU Exemplar for STS Transfer with LNGC
Compatibility Study of FSRU Exemplar for STS Transfer with LNGC
 
Fsru conference fsru dam 21 nov 12
Fsru conference fsru dam 21 nov 12Fsru conference fsru dam 21 nov 12
Fsru conference fsru dam 21 nov 12
 
BMT Catamaran Development
BMT Catamaran DevelopmentBMT Catamaran Development
BMT Catamaran Development
 
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
 
Sea Magic Fast Craft
Sea Magic Fast CraftSea Magic Fast Craft
Sea Magic Fast Craft
 
Company Profile of C. Than and Associates Marine Design Firm
Company Profile of C. Than and Associates Marine Design FirmCompany Profile of C. Than and Associates Marine Design Firm
Company Profile of C. Than and Associates Marine Design Firm
 
Cleveland Cascades DCI Sep14
Cleveland Cascades DCI Sep14Cleveland Cascades DCI Sep14
Cleveland Cascades DCI Sep14
 
Shipyard Begej Company Profile
Shipyard Begej Company ProfileShipyard Begej Company Profile
Shipyard Begej Company Profile
 
Asl batam presentation 2015 v1
Asl batam   presentation 2015 v1Asl batam   presentation 2015 v1
Asl batam presentation 2015 v1
 
Manitowoc press-presentation final
Manitowoc press-presentation finalManitowoc press-presentation final
Manitowoc press-presentation final
 
NovaAlgoma
NovaAlgomaNovaAlgoma
NovaAlgoma
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
 
deep_orient
deep_orientdeep_orient
deep_orient
 
Asia Days 2013 - Market opportunities for small LNG distribution
Asia Days 2013 - Market opportunities for small LNG distributionAsia Days 2013 - Market opportunities for small LNG distribution
Asia Days 2013 - Market opportunities for small LNG distribution
 

Ähnlich wie Mud Mixing plant installed onboard Trinity Supporter for NIKO

Nidec asi marine electric propulsion deff
Nidec asi marine electric propulsion deffNidec asi marine electric propulsion deff
Nidec asi marine electric propulsion deffNidec Corporation
 
Rhino tanks presentation for stp & etp
Rhino tanks presentation for stp & etpRhino tanks presentation for stp & etp
Rhino tanks presentation for stp & etpMaxpromotion
 
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15Aaron Lian Kian Hoe
 
Coanda Power Systems - Elgin Equipment Group
Coanda Power Systems - Elgin Equipment GroupCoanda Power Systems - Elgin Equipment Group
Coanda Power Systems - Elgin Equipment GroupCookLegacyTraining
 
Presentation Waterways-Management
Presentation Waterways-ManagementPresentation Waterways-Management
Presentation Waterways-Managementmatproptech
 
Indonesia flow station lifted in simultaneous jacking operation - Offshore
Indonesia flow station lifted in simultaneous jacking operation - OffshoreIndonesia flow station lifted in simultaneous jacking operation - Offshore
Indonesia flow station lifted in simultaneous jacking operation - OffshoreNurdin .
 
Clay Bricks - Start up Road map
Clay Bricks - Start up Road mapClay Bricks - Start up Road map
Clay Bricks - Start up Road mapKannan V.K
 
WQD2011 - KAIZEN - EMAL - Modification of Dust Recycling Duct
WQD2011 - KAIZEN - EMAL - Modification of Dust Recycling DuctWQD2011 - KAIZEN - EMAL - Modification of Dust Recycling Duct
WQD2011 - KAIZEN - EMAL - Modification of Dust Recycling DuctDubai Quality Group
 
Tw Rcc Dams Display
Tw Rcc Dams DisplayTw Rcc Dams Display
Tw Rcc Dams DisplayTed Warren
 
Introduction to djuvik
Introduction to djuvikIntroduction to djuvik
Introduction to djuvikCem Sayar
 
Marine Market Applications & Innovations
Marine Market Applications & InnovationsMarine Market Applications & Innovations
Marine Market Applications & InnovationsAltra Industrial Motion
 
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaRV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaMichaelUberti
 

Ähnlich wie Mud Mixing plant installed onboard Trinity Supporter for NIKO (20)

New PPT
New PPT New PPT
New PPT
 
YH profile (E)
YH profile (E)YH profile (E)
YH profile (E)
 
Reflex notable projects
Reflex notable projectsReflex notable projects
Reflex notable projects
 
KPT_Pritam
KPT_PritamKPT_Pritam
KPT_Pritam
 
Nidec asi marine electric propulsion deff
Nidec asi marine electric propulsion deffNidec asi marine electric propulsion deff
Nidec asi marine electric propulsion deff
 
Vedam Designs: Solutions for Shallow Water maintenance Dredging
Vedam Designs: Solutions for Shallow Water maintenance DredgingVedam Designs: Solutions for Shallow Water maintenance Dredging
Vedam Designs: Solutions for Shallow Water maintenance Dredging
 
Rhino tanks presentation for stp & etp
Rhino tanks presentation for stp & etpRhino tanks presentation for stp & etp
Rhino tanks presentation for stp & etp
 
satish2014
satish2014satish2014
satish2014
 
SubseaServices
SubseaServicesSubseaServices
SubseaServices
 
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
 
Solar projects
Solar projectsSolar projects
Solar projects
 
Coanda Power Systems - Elgin Equipment Group
Coanda Power Systems - Elgin Equipment GroupCoanda Power Systems - Elgin Equipment Group
Coanda Power Systems - Elgin Equipment Group
 
Presentation Waterways-Management
Presentation Waterways-ManagementPresentation Waterways-Management
Presentation Waterways-Management
 
Indonesia flow station lifted in simultaneous jacking operation - Offshore
Indonesia flow station lifted in simultaneous jacking operation - OffshoreIndonesia flow station lifted in simultaneous jacking operation - Offshore
Indonesia flow station lifted in simultaneous jacking operation - Offshore
 
Clay Bricks - Start up Road map
Clay Bricks - Start up Road mapClay Bricks - Start up Road map
Clay Bricks - Start up Road map
 
WQD2011 - KAIZEN - EMAL - Modification of Dust Recycling Duct
WQD2011 - KAIZEN - EMAL - Modification of Dust Recycling DuctWQD2011 - KAIZEN - EMAL - Modification of Dust Recycling Duct
WQD2011 - KAIZEN - EMAL - Modification of Dust Recycling Duct
 
Tw Rcc Dams Display
Tw Rcc Dams DisplayTw Rcc Dams Display
Tw Rcc Dams Display
 
Introduction to djuvik
Introduction to djuvikIntroduction to djuvik
Introduction to djuvik
 
Marine Market Applications & Innovations
Marine Market Applications & InnovationsMarine Market Applications & Innovations
Marine Market Applications & Innovations
 
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaRV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey Australia
 

Mud Mixing plant installed onboard Trinity Supporter for NIKO

  • 1. Mud Mixing Plant from start of fabrication to installation onboard MV Trinity Supporter (Singapore) End client NIKO Indonesia This was a capital sale project not a rental project 2250 bbl Tank capacity with separate 250 bbl Brine mixing tank 2 x 585Kw Generators 1 x air conditioned Circuit Breaker Module 12 x mud guns 20 x 11Kw Agitators 3 x 8 x 6 x 14 Centrifugal Pumps 2 x Big Bag Mixer 2 x Hi - Ride Mixers 1 x CD 500 Centrifuge 2 x 9.2Kw Conveyors 1 x Mud Lab 1 x Storage Container
  • 2. MV Trinity Supporter Deck during survey
  • 3. Start of Fabrication after design acceptance
  • 4. Day 1 start of installation at Loyang Offshore Base Singapore
  • 6. Installation of CD 500 Centrifuge
  • 7. Installed mixer pumps / Pipe work / Lighting / Electrics prior to commissioning phase
  • 8. Utilities: Brine / Sea water / drill water / mixing pump transfer lines and equalization upper and lower manifolds, conveyor for centrifuge solids transfer to future cuttings box lay down area.
  • 9. The top of tanks were designed to have a modular grated deck eliminating trip hazards for the operators all valves shafts were extended so the operators had easy access during operation, all agitator starters were mounted on easy reach stands directly next to each agitator, The centrifuge could take suction from any tank and discharge to any tank
  • 10. Looking Forward to Aft with access stairs to Port and Starboard side of tanks and Starboard Aft view of the Centrifuge package / mixing and equalization manifolds pictures taken prior to commissioning and hand over to client the final commissioning was carried out at Anchorage East Coast Bay Singapore.

Hinweis der Redaktion

  1. The design acceptance phase was completed in a 4 week window with more than 1,500 detailed fabrication drawings generated 11 CAD engineers were involved for the 4 week period.
  2. The design acceptance phase was completed in a 4 week window with more than 1,500 detailed fabrication drawings generated 11 CAD engineers were involved for the 4 week period.
  3. The design acceptance phase was completed in a 4 week window with more than 1,500 detailed fabrication drawings generated 11 CAD engineers were involved for the 4 week period.
  4. The design acceptance phase was completed in a 4 week window with more than 1,500 detailed fabrication drawings generated 11 CAD engineers were involved for the 4 week period.
  5. The design acceptance phase was completed in a 4 week window with more than 1,500 detailed fabrication drawings generated 11 CAD engineers were involved for the 4 week period.
  6. The design acceptance phase was completed in a 4 week window with more than 1,500 detailed fabrication drawings generated 11 CAD engineers were involved for the 4 week period.
  7. The design acceptance phase was completed in a 4 week window with more than 1,500 detailed fabrication drawings generated 11 CAD engineers were involved for the 4 week period. From start of fabrication to commissioning and hand over to client was 14 weeks.
  8. The design acceptance phase was completed in a 4 week window with more than 1,500 detailed fabrication drawings generated 11 CAD engineers were involved for the 4 week period.
  9. The design acceptance phase was completed in a 4 week window with more than 1,500 detailed fabrication drawings generated 11 CAD engineers were involved for the 4 week period.
  10. The design acceptance phase was completed in a 4 week window with more than 1,500 detailed fabrication drawings generated 11 CAD engineers were involved for the 4 week period.