SlideShare a Scribd company logo
1 of 40
Download to read offline
CONCEPT OF URS,
DQ, IQ, OQ, PQ
Presented By-
ROHIT
R.K.S.D college of pharmacy,
Kaithal (Hry)
M.Pharma 1st year
(Pharmaceutics)
 Introduction.
 Validation
 User Requirement Specification.(URS)
 Phase of validation
 Design qualification (DQ)
 Installation Qualification (IQ)
 Operation Qualification (OQ)
 Performance Qualification (PQ)
 Maintenance Qualification (MQ)
 Component Qualification (CQ)
 Instrument Re-Qualification
 References.
 According to the Food and Drug Administration (FDA), the
goal of validation is to:
“Establish documented evidence which provides a high
degree of assurance that a specific process will consistently
produce a product meeting its predetermined specifications
and quality attributes.”
 It is a requirement for Good Manufacturing Practices and
other regulatory requirements.
 What does this mean?
An quantitative approach is needed to prove quality,
functionality, and performance of a
pharmaceutical/biotechnological manufacturing process.
This approach will be applied to individual pieces of
equipment as well as the manufacturing process as a whole.
Guidelines for validation are set by the FDA, but the
specifications of validation are determined by the
pharmaceutical/biotech company.
 User Requirements Specification (URS), is the most critical of
documents and yet, the most often bungled. Whether the
system is purely mechanical, or a mix of electro-mechanical,
or solely a software program, the successful compilation and
execution of the Installation Qualification (IQ) (for
installation), Operational Qualification (OQ) (for functionality)
and the Performance / Product Qualification (PQ) (for
operability), is dependent on an User Requirements
Specification (URS) containing clear, concise and testable
requirements.
Once the end user requirements specification is documented,
agreed and approved they form the basic URS Level-1 document.
The engineers (or vendor) can then commence the preliminary
design to establish exactly what functions are required for each of
the items specified in the user requirements specification, the
end user has listed. Once this functionality is documented and
approved it forms URS Level-2 document. This is the final level of
the URS unless software is used.
If software is to be used, the URS Level-2 document, is passed to
the code writers. As the code is written, lines, or groups of lines,
of code must be attributed to the individual functions that
necessitate their presence. The completion of this task results in
the completion of the URS Level-3 document
Developing the URS to this level is unique in most industries, but
is, standard practice in strictly regulated industries, as it is a
major building block in the creation of quality software. The URS
Level-3 document, contains all the traceability which is deemed
mandatory for software assessed to be critical to product quality,
in the pharmaceutical regulated industries.
The URS can contain a large number of requirements and
should therefore be structured in a way that will permit easy
access to information.
The requirement specification must be formally reviewed and
approved by the pharmaceutical manufacturer.
 The following guidelines should be followed during the
production of the URS :
1.Each requirement statement to be uniquely referenced,and
no longer than 250 words.
2.Requirement statements should not be duplicated nor
contradicted.
3. The URS should express requirements and not design solutions.
4. Each requirement should be testable.
5.The URS must be understood by both user and supplier;
ambiguity and jargon should be avoided.
6. The use of diagrams is often useful.
7.The scope for readers to make assumptions or misinterpret
should be minimized.
8.Wherever possible, the URS should distinguish between
mandatory/regulatory requirements and desirable features.
The URS for a GMP computer control system application will typically
address the following:
Scope of system supply
 Project objectives
 Regulatory requirements
 Process overview
 System boundaries
 Operational considerations
 Manufacturing design data
 Instrument application data
 Data records
 System functions
 System software
 System hardware and peripherals
System interfaces
Environmental conditions
Access security
Diagnostics
System availability
Safety
Test and calibration
Quality procedures
Software development life cycle
Documentation requirements
Training
Engineering/installation standards
Ongoing support
Warranty
Delivery/commercial requirements
Newly sanctioned systems will require compliance with
regulations for GMP electronic records and electronic signatures,
and definition of the functionality required will need to be
included.
The structure of the URS be used as the basis for the
presentation format of the FDS and hardware and software
design specifications; this helps ensure design decisions are
auditable back to the source requirement.
Once reviewed and approved internally, the URS is issued to
prospective suppliers as part of the tender document set so that
detailed quotations for the system application can be obtained.
URS provides the following key benefits for the validation
program:
1. Clarifies technical, quality, and documentation
requirements to the vendor( s).
2. Enables the pharmaceutical manufacturer to assess the
technical, regulatory, and commercial compliance (or
otherwise) of submitted bids against a formal specification.
3. Ensures the basis of a structured approach to the
presentation of information.
4. Provides a basis for testing and test acceptance criteria.
5. Provide a baseline for validation and verification..
 They must be comprehensive. Each and every requirement
relating to product safety, identity, strength, purity, and
quality must be identified. Hence, Quality Assurance (QA)
must have a significant role in reviewing and approving the
final set of requirements, and must be an approver of
changes to any requirement that can affect the above
product or process attributes (e.g., cGMP’s).
Given a comprehensive User Requirements Specification that
has been approved by QA and is under project change
management, the Design Qualification(DQ) process then can be
reduced to two key objectives:
Documented verification that the overall design appears to
address, by some means, each and every requirement affecting
the product and performance of the manufacturing process (or, in
the case of unknown product or multi-product manufacturing
facility, the required equipment/ system performance
capabilities).
Identification (and documentation) of the critical individual
physical components, attributes, and operational features that
directly support meeting each requirement.
 Validation is broken down into 5 main phases,
 Design qualification (DQ).
 Installation qualification (IQ).
 Operational qualification (OQ).
 Performance qualification (PQ).
 Maintenance Qualification (MQ)
 Component qualification (CQ).
Vendor’s Site Owner’s site
Before Purchase Before Use After Use
Structurall
y
Validated
Products
DQ
Functional Validation
Installation Operational
Performance Qualification Qualification
Qualification
Maintenance
OQ
PQIQ OQ PQ
System Suitability During Use
 Validation:
 Refers to the total life cycle of a product from development
through use and maintenance.
 Owners are responsible for Validating Their Processes (personnel,
equipment, methods, SOPs) to ensure compliance to cGMP/GLP
regulations.
 Qualification: (Inspection, functional testing and documentationreview)
 Is a part of the validation process which verifies module and
system functional performance prior to being placed on-line
and thereafter according to a standard operating procedure.
 It is a basic requirement of good analytical chemistry that
balances and other analytical instruments must be suitable
for the purpose for which they are used and that they must
be appropriately calibrated. As a consequence, Equipment
Qualification is gaining more and more importance in
ensuring the validity of results. Regulatory bodies also seem
to be turning their attention increasingly to this area, and
manufacturers of analytical equipment are forced to play a
significant role in the various steps of Equipment
Qualification.
Step 1: Design Qualification (DQ) defines the functional and operational
specifications of a balance or instrument.
Step 2 :Installation Qualification (IQ) ensures that a balance or instrument
is received as designed and specified. It documents the installation in the
selected user environment.
Step 3: Operational Qualification (OQ) demonstrates that a balance or
instrument will function according to its operational specification in the
selected environment.
Step 4: Performance Qualification (PQ) demonstrates that a balance or
instrument consistently performs according to a specification appropriate
to its routine use.
Step 5: Maintenance Qualification (MQ) describes and documents any
maintenance required on the equipment.
Design qualification (DQ) is the process of completing and
documenting design reviews to illustrate that all quality aspects
have been fully considered at the design stage. The purpose is to
ensure that all the requirements for the final systems have been
clearly defined at the start.
Design Qualification (DQ) defines the functional and operational
specifications of the instrument and details the conscious decisions
made in the selection of the supplier. DQ should ensure that
instruments have all the necessary functions and performance
criteria that will enable them to be successfully implemented for
the intended application and to meet user requirements.
The list below shows the recommended steps that should be
considered for inclusion in a Design Qualification.
- Description of the analysis problem
- Description of the intended use for the equipment
- Description of the intended environment
-Preliminary selection of the functional and performance
specifications (technical, environmental, safety)
- Preliminary selection of the supplier
- Final selection of the supplier and equipment
-Development and documentation of final functional and
operational specifications
 As part of the design qualification process, the vendor should
be qualified; the question is how should this be done? Is an
established and documented quality system enough (e.g. ISO
9001), or should there be a direct audit?
The answer is that there may be situations where a vendor
audit is recommended: for example, when complex computer
systems are being developed for a specific user. However, this
is rarely the case for balances and analytical instruments.
If equipment does not include a computer system, a good
reputation, one's own experience or good references from
other users - together with ISO 9001 certification - can be
sufficient.
Installation qualification (IQ) is the process of checking the
installation, to ensure that the components meet the approved
specification and are installed correctly, and to see how that
information is recorded. The purpose is to ensure that all
aspects (static attributes) of the facility or equipment are
installed correctly and comply with the original design.
all of the instrumentation components are identified and
checked against the manufacturer’s component listing.
The working environment conditions are documented and
checked to ensure that they are suitable for the operation of the
instrument.
Installation Qualification establishes that the instrument is
received as designed and specified, that it is properly installed in
the selected environment, and that this environment is suitable
for the operation and use of the instrument.
Before installation:
-Obtain manufacturer's recommendations for installation site
requirements.
-Check the site for the fulfillment of the manufacturer's
recommendations (utilities such as electricity, water and gases
plus environmental conditions such as humidity, temperature,
vibration level and dust).
-Allow sufficient shelf space for the equipment itself, related
SOPs, operating manuals, logbooks and software.
Operational qualification (OQ) is the process of testing to ensure
that the individual and combined systems function to meet
agreed performance criteria and to check how the result of
testing is recorded. The purpose is to ensure that all the dynamic
attributes comply with the original design. Each of the
instrument’s function are checked to ensure that they conform to
the manufacturer’s specifications.
This includes the use of certified, traceable electrical simulators
and standards to verify that the equipment is processing input
signals correctly.
Performance qualification (PQ), also called process qualification,
is the process of testing to ensure that the individual and
combined systems function to meet agreed performance criteria
on a consistent basis and to check how the result of testing is
recorded. The purpose is to ensure that the criteria specified can
be achieved on a reliable basis over a period of time.
The performance of the equipment for its routine analytical use
is checked to ensure that this complies with its specification.
The temperature sensor readings are compared with a certified
reference thermometer. After calibration, the conductivity sensor
readings are compared using certified, traceable control
standards.
Control Standards of similar values to the intended test samples
must be used for PQ.
Performance Qualification (PQ) is the process of demonstrating
that an instrument consistently performs according to a
specification appropriate to its routine use.
Important here is the word consistently. The test frequency is
much higher than for OQ. Another difference is that PQ should
always be performed under conditions that are similar to
routine sample analysis.
PQ should be performed on a daily (or at least a weekly) basis,
or whenever the instrument is used. The test frequency
depends not only on the stability of the equipment but also on
everything in the system that may contribute to the analysis
results.
1. Define the performance criteria and test procedures.
2. Select critical parameters.
3. Define the test intervals.
The MQ describes and documents any maintenance required
on the equipment. This includes routine servicing and any
repairs necessary. Details of any maintenance contracts are
also documented in this section, together with a list of
authorized service engineers. In addition, the MQ includes
the routine cleaning of the equipment and also its ultimate
disposal.
 Component qualification (CQ) – is a relatively new term
developed in 2005. This term refers to the manufacturing of
auxiliary components to ensure that they are manufactured
to the correct design criteria. This could include packaging
components such as folding cartons, shipping cases, labels or
even phase change material. All of these components must
have some type of random inspection to ensure that the third
party manufacturer's process is consistently producing
components that are used in the world of GMP at drug or
biologic manufacturer.
 Instrument Validation should not be viewed as a one-off
event – confidence in analytical results is required for the
whole of the instrument’s working life.
 To ensure that this confidence is retained, the instrument
validation process should be repeated at regular intervals
during the instruments operational life.
 The difference between Installation Validation and Re-
Qualification is that IQ is omitted for the Re-Qualification
 Re-Qualification should be performed at least annually and
should be performed more frequently for applications whose
test results have critical implications
CONCEPT OF URS, DQ, IQ, OQ, PQ

More Related Content

What's hot

Qualification of Dissolution Test Apparatus and Validation of Utility System
Qualification of Dissolution Test Apparatus and Validation of Utility SystemQualification of Dissolution Test Apparatus and Validation of Utility System
Qualification of Dissolution Test Apparatus and Validation of Utility SystemAkshay Trivedi , Maliba Pharmacy College
 
Documentation in pharmaceutical industry, by dr. umesh kumar sharma and anu m...
Documentation in pharmaceutical industry, by dr. umesh kumar sharma and anu m...Documentation in pharmaceutical industry, by dr. umesh kumar sharma and anu m...
Documentation in pharmaceutical industry, by dr. umesh kumar sharma and anu m...Dr. UMESH KUMAR SHARMA
 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validationVinay Jain
 
Documentation in pharmaceutical industry
Documentation in pharmaceutical industryDocumentation in pharmaceutical industry
Documentation in pharmaceutical industryDevipriya Viswambharan
 
Validation and calibration master plan
Validation and calibration master planValidation and calibration master plan
Validation and calibration master planBharatlal Sain
 
Pharmaceutical documentation
Pharmaceutical documentationPharmaceutical documentation
Pharmaceutical documentationK V NANDA KUMAR
 
Validation and calibration of master plan
Validation and calibration of master planValidation and calibration of master plan
Validation and calibration of master planPrinka Choudhary
 
Pilot plant scale up for parentrals
Pilot plant scale up for parentralsPilot plant scale up for parentrals
Pilot plant scale up for parentralsParag Behura
 
EQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxEQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxRamkumar906213
 
Pharmaceutical validation
Pharmaceutical validationPharmaceutical validation
Pharmaceutical validationMineeta Mahra
 
ICH & WHO GUIDELINES ON validation
ICH & WHO GUIDELINES ON validationICH & WHO GUIDELINES ON validation
ICH & WHO GUIDELINES ON validationSACHIN C P
 
Current Good Manufacturing Practices(cGMP) and industrial management
Current Good Manufacturing Practices(cGMP) and industrial managementCurrent Good Manufacturing Practices(cGMP) and industrial management
Current Good Manufacturing Practices(cGMP) and industrial managementMahewash Sana Pathan
 
Objectives and policies of c gmp, layout of building and services
Objectives and policies of c gmp, layout of building and servicesObjectives and policies of c gmp, layout of building and services
Objectives and policies of c gmp, layout of building and servicesSharwari Sapate
 
Validation of cone blender, mixer granulator and tablet compression machine.
Validation of cone blender, mixer granulator and tablet compression machine.Validation of cone blender, mixer granulator and tablet compression machine.
Validation of cone blender, mixer granulator and tablet compression machine.MayuriGhavate
 
Process validation and its types
Process validation and its typesProcess validation and its types
Process validation and its typesAnjali9410
 
Out of specification shravan
Out of specification shravanOut of specification shravan
Out of specification shravanshravan dubey
 
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptxPharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptxMariaSaifee
 

What's hot (20)

Qualification of Dissolution Test Apparatus and Validation of Utility System
Qualification of Dissolution Test Apparatus and Validation of Utility SystemQualification of Dissolution Test Apparatus and Validation of Utility System
Qualification of Dissolution Test Apparatus and Validation of Utility System
 
Documentation in pharmaceutical industry, by dr. umesh kumar sharma and anu m...
Documentation in pharmaceutical industry, by dr. umesh kumar sharma and anu m...Documentation in pharmaceutical industry, by dr. umesh kumar sharma and anu m...
Documentation in pharmaceutical industry, by dr. umesh kumar sharma and anu m...
 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validation
 
Validation master plan
Validation master planValidation master plan
Validation master plan
 
Documentation in pharmaceutical industry
Documentation in pharmaceutical industryDocumentation in pharmaceutical industry
Documentation in pharmaceutical industry
 
Validation and calibration master plan
Validation and calibration master planValidation and calibration master plan
Validation and calibration master plan
 
Pharmaceutical documentation
Pharmaceutical documentationPharmaceutical documentation
Pharmaceutical documentation
 
Validation and calibration of master plan
Validation and calibration of master planValidation and calibration of master plan
Validation and calibration of master plan
 
Pilot plant scale up for parentrals
Pilot plant scale up for parentralsPilot plant scale up for parentrals
Pilot plant scale up for parentrals
 
EQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxEQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptx
 
Pharmaceutical validation
Pharmaceutical validationPharmaceutical validation
Pharmaceutical validation
 
ICH & WHO GUIDELINES ON validation
ICH & WHO GUIDELINES ON validationICH & WHO GUIDELINES ON validation
ICH & WHO GUIDELINES ON validation
 
Master formula record
Master formula recordMaster formula record
Master formula record
 
Current Good Manufacturing Practices(cGMP) and industrial management
Current Good Manufacturing Practices(cGMP) and industrial managementCurrent Good Manufacturing Practices(cGMP) and industrial management
Current Good Manufacturing Practices(cGMP) and industrial management
 
Objectives and policies of c gmp, layout of building and services
Objectives and policies of c gmp, layout of building and servicesObjectives and policies of c gmp, layout of building and services
Objectives and policies of c gmp, layout of building and services
 
Validation of cone blender, mixer granulator and tablet compression machine.
Validation of cone blender, mixer granulator and tablet compression machine.Validation of cone blender, mixer granulator and tablet compression machine.
Validation of cone blender, mixer granulator and tablet compression machine.
 
Process validation and its types
Process validation and its typesProcess validation and its types
Process validation and its types
 
Out of specification shravan
Out of specification shravanOut of specification shravan
Out of specification shravan
 
Equipment Qualification
Equipment QualificationEquipment Qualification
Equipment Qualification
 
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptxPharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
 

Similar to CONCEPT OF URS, DQ, IQ, OQ, PQ

Concept of URS,DQ,IQ,OQ,PQ
Concept of URS,DQ,IQ,OQ,PQConcept of URS,DQ,IQ,OQ,PQ
Concept of URS,DQ,IQ,OQ,PQdhavalrock24
 
validation ppt.pptx
 validation ppt.pptx validation ppt.pptx
validation ppt.pptxPawanDhamala1
 
Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects Apoorva Bauskar
 
Equipment Qualification.pptx
Equipment Qualification.pptxEquipment Qualification.pptx
Equipment Qualification.pptxNeeraj Kumar Rai
 
Validation : Project Management
Validation : Project ManagementValidation : Project Management
Validation : Project ManagementDipen Shroff
 
Computerized System Validation.vinay (1).pptx
Computerized  System  Validation.vinay (1).pptxComputerized  System  Validation.vinay (1).pptx
Computerized System Validation.vinay (1).pptxKIET GROUP OF INSITITUTE
 
Qualification of Laboratory Equipments.pptx
Qualification of Laboratory Equipments.pptxQualification of Laboratory Equipments.pptx
Qualification of Laboratory Equipments.pptxHemlataMore3
 
validationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdfvalidationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdfabdo badr
 
Validation master plan
Validation master planValidation master plan
Validation master planDr. Amsavel A
 
Analytical instrument qualification
Analytical instrument qualificationAnalytical instrument qualification
Analytical instrument qualificationmanusb07
 
Unit II Software Testing and Quality Assurance
Unit II Software Testing and Quality AssuranceUnit II Software Testing and Quality Assurance
Unit II Software Testing and Quality AssuranceVinothkumaR Ramu
 
EQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxEQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxRamkumar906213
 

Similar to CONCEPT OF URS, DQ, IQ, OQ, PQ (20)

Vaidation ppt.pptx
Vaidation ppt.pptxVaidation ppt.pptx
Vaidation ppt.pptx
 
Concept of URS,DQ,IQ,OQ,PQ
Concept of URS,DQ,IQ,OQ,PQConcept of URS,DQ,IQ,OQ,PQ
Concept of URS,DQ,IQ,OQ,PQ
 
Qualification for validation
Qualification for validationQualification for validation
Qualification for validation
 
Validation master plan
Validation master planValidation master plan
Validation master plan
 
validation ppt.pptx
 validation ppt.pptx validation ppt.pptx
validation ppt.pptx
 
Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects
 
Equipment Qualification.pptx
Equipment Qualification.pptxEquipment Qualification.pptx
Equipment Qualification.pptx
 
Validation : Project Management
Validation : Project ManagementValidation : Project Management
Validation : Project Management
 
Qualification
QualificationQualification
Qualification
 
Computerized System Validation.vinay (1).pptx
Computerized  System  Validation.vinay (1).pptxComputerized  System  Validation.vinay (1).pptx
Computerized System Validation.vinay (1).pptx
 
Qualification of Laboratory Equipments.pptx
Qualification of Laboratory Equipments.pptxQualification of Laboratory Equipments.pptx
Qualification of Laboratory Equipments.pptx
 
validationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdfvalidationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdf
 
Validation master plan
Validation master planValidation master plan
Validation master plan
 
Validation qualification
Validation qualificationValidation qualification
Validation qualification
 
Validation
ValidationValidation
Validation
 
Analytical instrument qualification
Analytical instrument qualificationAnalytical instrument qualification
Analytical instrument qualification
 
Validation_Tutorial.ppt
Validation_Tutorial.pptValidation_Tutorial.ppt
Validation_Tutorial.ppt
 
Unit II Software Testing and Quality Assurance
Unit II Software Testing and Quality AssuranceUnit II Software Testing and Quality Assurance
Unit II Software Testing and Quality Assurance
 
validation ppt.pptx
validation ppt.pptxvalidation ppt.pptx
validation ppt.pptx
 
EQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxEQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptx
 

More from ROHIT

Life skills ppt
Life skills pptLife skills ppt
Life skills pptROHIT
 
Plant tissue culture & its application (PTC)
Plant tissue culture & its application (PTC)Plant tissue culture & its application (PTC)
Plant tissue culture & its application (PTC)ROHIT
 
Nutraceuticals (Nutrition + Pharmaceutical)
Nutraceuticals (Nutrition + Pharmaceutical)Nutraceuticals (Nutrition + Pharmaceutical)
Nutraceuticals (Nutrition + Pharmaceutical)ROHIT
 
Scale up post approval changes
Scale up post approval changesScale up post approval changes
Scale up post approval changesROHIT
 
Application of UV-Visible spectroscopy
Application of UV-Visible spectroscopyApplication of UV-Visible spectroscopy
Application of UV-Visible spectroscopyROHIT
 
Fluorimetry/ Fluoroscences
Fluorimetry/ FluoroscencesFluorimetry/ Fluoroscences
Fluorimetry/ FluoroscencesROHIT
 
UV- Visible Spectroscopy
UV- Visible SpectroscopyUV- Visible Spectroscopy
UV- Visible SpectroscopyROHIT
 
Pilot plant Scale up techniques
Pilot plant Scale up techniquesPilot plant Scale up techniques
Pilot plant Scale up techniquesROHIT
 
colon targetting
colon targettingcolon targetting
colon targettingROHIT
 
Niosomes (TARGETTEDDRUG DELIVERY SYSTEM)
Niosomes (TARGETTEDDRUG DELIVERY SYSTEM)Niosomes (TARGETTEDDRUG DELIVERY SYSTEM)
Niosomes (TARGETTEDDRUG DELIVERY SYSTEM)ROHIT
 
Nanoparticles AS AN TARGETTED DRUG DELIVERY SYSTEM
Nanoparticles AS AN TARGETTED DRUG DELIVERY SYSTEMNanoparticles AS AN TARGETTED DRUG DELIVERY SYSTEM
Nanoparticles AS AN TARGETTED DRUG DELIVERY SYSTEMROHIT
 
Microspheres USED AS DRUG DELIVERY SYSTEM
Microspheres USED AS DRUG DELIVERY SYSTEMMicrospheres USED AS DRUG DELIVERY SYSTEM
Microspheres USED AS DRUG DELIVERY SYSTEMROHIT
 
APTAMERS
APTAMERS APTAMERS
APTAMERS ROHIT
 
LIPOSOMES USED AS AN DRUG DELIVERY SYSTEMS
LIPOSOMES USED AS AN DRUG DELIVERY SYSTEMSLIPOSOMES USED AS AN DRUG DELIVERY SYSTEMS
LIPOSOMES USED AS AN DRUG DELIVERY SYSTEMSROHIT
 
Gastrointestinal absorption of drugs
Gastrointestinal absorption of drugsGastrointestinal absorption of drugs
Gastrointestinal absorption of drugsROHIT
 
DISSOLUTION PARAMETERS AND ITS APPARATUS
DISSOLUTION PARAMETERS AND ITS APPARATUSDISSOLUTION PARAMETERS AND ITS APPARATUS
DISSOLUTION PARAMETERS AND ITS APPARATUSROHIT
 
Cytochorme p450 enzyme
Cytochorme p450 enzymeCytochorme p450 enzyme
Cytochorme p450 enzymeROHIT
 
CTD AND ECTD
CTD AND ECTDCTD AND ECTD
CTD AND ECTDROHIT
 
Computer aided drug design
Computer aided drug designComputer aided drug design
Computer aided drug designROHIT
 
Brain specific drug deliverys
Brain specific drug deliverysBrain specific drug deliverys
Brain specific drug deliverysROHIT
 

More from ROHIT (20)

Life skills ppt
Life skills pptLife skills ppt
Life skills ppt
 
Plant tissue culture & its application (PTC)
Plant tissue culture & its application (PTC)Plant tissue culture & its application (PTC)
Plant tissue culture & its application (PTC)
 
Nutraceuticals (Nutrition + Pharmaceutical)
Nutraceuticals (Nutrition + Pharmaceutical)Nutraceuticals (Nutrition + Pharmaceutical)
Nutraceuticals (Nutrition + Pharmaceutical)
 
Scale up post approval changes
Scale up post approval changesScale up post approval changes
Scale up post approval changes
 
Application of UV-Visible spectroscopy
Application of UV-Visible spectroscopyApplication of UV-Visible spectroscopy
Application of UV-Visible spectroscopy
 
Fluorimetry/ Fluoroscences
Fluorimetry/ FluoroscencesFluorimetry/ Fluoroscences
Fluorimetry/ Fluoroscences
 
UV- Visible Spectroscopy
UV- Visible SpectroscopyUV- Visible Spectroscopy
UV- Visible Spectroscopy
 
Pilot plant Scale up techniques
Pilot plant Scale up techniquesPilot plant Scale up techniques
Pilot plant Scale up techniques
 
colon targetting
colon targettingcolon targetting
colon targetting
 
Niosomes (TARGETTEDDRUG DELIVERY SYSTEM)
Niosomes (TARGETTEDDRUG DELIVERY SYSTEM)Niosomes (TARGETTEDDRUG DELIVERY SYSTEM)
Niosomes (TARGETTEDDRUG DELIVERY SYSTEM)
 
Nanoparticles AS AN TARGETTED DRUG DELIVERY SYSTEM
Nanoparticles AS AN TARGETTED DRUG DELIVERY SYSTEMNanoparticles AS AN TARGETTED DRUG DELIVERY SYSTEM
Nanoparticles AS AN TARGETTED DRUG DELIVERY SYSTEM
 
Microspheres USED AS DRUG DELIVERY SYSTEM
Microspheres USED AS DRUG DELIVERY SYSTEMMicrospheres USED AS DRUG DELIVERY SYSTEM
Microspheres USED AS DRUG DELIVERY SYSTEM
 
APTAMERS
APTAMERS APTAMERS
APTAMERS
 
LIPOSOMES USED AS AN DRUG DELIVERY SYSTEMS
LIPOSOMES USED AS AN DRUG DELIVERY SYSTEMSLIPOSOMES USED AS AN DRUG DELIVERY SYSTEMS
LIPOSOMES USED AS AN DRUG DELIVERY SYSTEMS
 
Gastrointestinal absorption of drugs
Gastrointestinal absorption of drugsGastrointestinal absorption of drugs
Gastrointestinal absorption of drugs
 
DISSOLUTION PARAMETERS AND ITS APPARATUS
DISSOLUTION PARAMETERS AND ITS APPARATUSDISSOLUTION PARAMETERS AND ITS APPARATUS
DISSOLUTION PARAMETERS AND ITS APPARATUS
 
Cytochorme p450 enzyme
Cytochorme p450 enzymeCytochorme p450 enzyme
Cytochorme p450 enzyme
 
CTD AND ECTD
CTD AND ECTDCTD AND ECTD
CTD AND ECTD
 
Computer aided drug design
Computer aided drug designComputer aided drug design
Computer aided drug design
 
Brain specific drug deliverys
Brain specific drug deliverysBrain specific drug deliverys
Brain specific drug deliverys
 

Recently uploaded

Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...Osopher
 
How to Uninstall a Module in Odoo 17 Using Command Line
How to Uninstall a Module in Odoo 17 Using Command LineHow to Uninstall a Module in Odoo 17 Using Command Line
How to Uninstall a Module in Odoo 17 Using Command LineCeline George
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...Nguyen Thanh Tu Collection
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptxmary850239
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptshraddhaparab530
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...DhatriParmar
 
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvRicaMaeCastro1
 
4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptxmary850239
 
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...HetalPathak10
 
6 ways Samsung’s Interactive Display powered by Android changes the classroom
6 ways Samsung’s Interactive Display powered by Android changes the classroom6 ways Samsung’s Interactive Display powered by Android changes the classroom
6 ways Samsung’s Interactive Display powered by Android changes the classroomSamsung Business USA
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxAnupam32727
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationdeepaannamalai16
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxSayali Powar
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQuiz Club NITW
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdfMr Bounab Samir
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6Vanessa Camilleri
 
An Overview of the Calendar App in Odoo 17 ERP
An Overview of the Calendar App in Odoo 17 ERPAn Overview of the Calendar App in Odoo 17 ERP
An Overview of the Calendar App in Odoo 17 ERPCeline George
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
Objectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptxObjectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptxMadhavi Dharankar
 

Recently uploaded (20)

Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of EngineeringFaculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
 
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
 
How to Uninstall a Module in Odoo 17 Using Command Line
How to Uninstall a Module in Odoo 17 Using Command LineHow to Uninstall a Module in Odoo 17 Using Command Line
How to Uninstall a Module in Odoo 17 Using Command Line
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.ppt
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
 
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
 
4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx
 
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
 
6 ways Samsung’s Interactive Display powered by Android changes the classroom
6 ways Samsung’s Interactive Display powered by Android changes the classroom6 ways Samsung’s Interactive Display powered by Android changes the classroom
6 ways Samsung’s Interactive Display powered by Android changes the classroom
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentation
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdf
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6
 
An Overview of the Calendar App in Odoo 17 ERP
An Overview of the Calendar App in Odoo 17 ERPAn Overview of the Calendar App in Odoo 17 ERP
An Overview of the Calendar App in Odoo 17 ERP
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
Objectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptxObjectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptx
 

CONCEPT OF URS, DQ, IQ, OQ, PQ

  • 1. CONCEPT OF URS, DQ, IQ, OQ, PQ Presented By- ROHIT R.K.S.D college of pharmacy, Kaithal (Hry) M.Pharma 1st year (Pharmaceutics)
  • 2.  Introduction.  Validation  User Requirement Specification.(URS)  Phase of validation  Design qualification (DQ)  Installation Qualification (IQ)  Operation Qualification (OQ)  Performance Qualification (PQ)  Maintenance Qualification (MQ)  Component Qualification (CQ)  Instrument Re-Qualification  References.
  • 3.  According to the Food and Drug Administration (FDA), the goal of validation is to: “Establish documented evidence which provides a high degree of assurance that a specific process will consistently produce a product meeting its predetermined specifications and quality attributes.”  It is a requirement for Good Manufacturing Practices and other regulatory requirements.
  • 4.  What does this mean? An quantitative approach is needed to prove quality, functionality, and performance of a pharmaceutical/biotechnological manufacturing process. This approach will be applied to individual pieces of equipment as well as the manufacturing process as a whole. Guidelines for validation are set by the FDA, but the specifications of validation are determined by the pharmaceutical/biotech company.
  • 5.  User Requirements Specification (URS), is the most critical of documents and yet, the most often bungled. Whether the system is purely mechanical, or a mix of electro-mechanical, or solely a software program, the successful compilation and execution of the Installation Qualification (IQ) (for installation), Operational Qualification (OQ) (for functionality) and the Performance / Product Qualification (PQ) (for operability), is dependent on an User Requirements Specification (URS) containing clear, concise and testable requirements.
  • 6. Once the end user requirements specification is documented, agreed and approved they form the basic URS Level-1 document. The engineers (or vendor) can then commence the preliminary design to establish exactly what functions are required for each of the items specified in the user requirements specification, the end user has listed. Once this functionality is documented and approved it forms URS Level-2 document. This is the final level of the URS unless software is used. If software is to be used, the URS Level-2 document, is passed to the code writers. As the code is written, lines, or groups of lines, of code must be attributed to the individual functions that necessitate their presence. The completion of this task results in the completion of the URS Level-3 document
  • 7. Developing the URS to this level is unique in most industries, but is, standard practice in strictly regulated industries, as it is a major building block in the creation of quality software. The URS Level-3 document, contains all the traceability which is deemed mandatory for software assessed to be critical to product quality, in the pharmaceutical regulated industries.
  • 8. The URS can contain a large number of requirements and should therefore be structured in a way that will permit easy access to information. The requirement specification must be formally reviewed and approved by the pharmaceutical manufacturer.  The following guidelines should be followed during the production of the URS : 1.Each requirement statement to be uniquely referenced,and no longer than 250 words. 2.Requirement statements should not be duplicated nor contradicted.
  • 9. 3. The URS should express requirements and not design solutions. 4. Each requirement should be testable. 5.The URS must be understood by both user and supplier; ambiguity and jargon should be avoided. 6. The use of diagrams is often useful. 7.The scope for readers to make assumptions or misinterpret should be minimized. 8.Wherever possible, the URS should distinguish between mandatory/regulatory requirements and desirable features.
  • 10. The URS for a GMP computer control system application will typically address the following: Scope of system supply  Project objectives  Regulatory requirements  Process overview  System boundaries  Operational considerations  Manufacturing design data  Instrument application data  Data records  System functions  System software  System hardware and peripherals
  • 11. System interfaces Environmental conditions Access security Diagnostics System availability Safety Test and calibration Quality procedures Software development life cycle Documentation requirements Training Engineering/installation standards Ongoing support Warranty Delivery/commercial requirements
  • 12. Newly sanctioned systems will require compliance with regulations for GMP electronic records and electronic signatures, and definition of the functionality required will need to be included. The structure of the URS be used as the basis for the presentation format of the FDS and hardware and software design specifications; this helps ensure design decisions are auditable back to the source requirement. Once reviewed and approved internally, the URS is issued to prospective suppliers as part of the tender document set so that detailed quotations for the system application can be obtained.
  • 13. URS provides the following key benefits for the validation program: 1. Clarifies technical, quality, and documentation requirements to the vendor( s). 2. Enables the pharmaceutical manufacturer to assess the technical, regulatory, and commercial compliance (or otherwise) of submitted bids against a formal specification. 3. Ensures the basis of a structured approach to the presentation of information. 4. Provides a basis for testing and test acceptance criteria. 5. Provide a baseline for validation and verification..
  • 14.  They must be comprehensive. Each and every requirement relating to product safety, identity, strength, purity, and quality must be identified. Hence, Quality Assurance (QA) must have a significant role in reviewing and approving the final set of requirements, and must be an approver of changes to any requirement that can affect the above product or process attributes (e.g., cGMP’s).
  • 15. Given a comprehensive User Requirements Specification that has been approved by QA and is under project change management, the Design Qualification(DQ) process then can be reduced to two key objectives: Documented verification that the overall design appears to address, by some means, each and every requirement affecting the product and performance of the manufacturing process (or, in the case of unknown product or multi-product manufacturing facility, the required equipment/ system performance capabilities). Identification (and documentation) of the critical individual physical components, attributes, and operational features that directly support meeting each requirement.
  • 16.  Validation is broken down into 5 main phases,  Design qualification (DQ).  Installation qualification (IQ).  Operational qualification (OQ).  Performance qualification (PQ).  Maintenance Qualification (MQ)  Component qualification (CQ).
  • 17.
  • 18. Vendor’s Site Owner’s site Before Purchase Before Use After Use Structurall y Validated Products DQ Functional Validation Installation Operational Performance Qualification Qualification Qualification Maintenance OQ PQIQ OQ PQ System Suitability During Use
  • 19.  Validation:  Refers to the total life cycle of a product from development through use and maintenance.  Owners are responsible for Validating Their Processes (personnel, equipment, methods, SOPs) to ensure compliance to cGMP/GLP regulations.  Qualification: (Inspection, functional testing and documentationreview)  Is a part of the validation process which verifies module and system functional performance prior to being placed on-line and thereafter according to a standard operating procedure.
  • 20.
  • 21.  It is a basic requirement of good analytical chemistry that balances and other analytical instruments must be suitable for the purpose for which they are used and that they must be appropriately calibrated. As a consequence, Equipment Qualification is gaining more and more importance in ensuring the validity of results. Regulatory bodies also seem to be turning their attention increasingly to this area, and manufacturers of analytical equipment are forced to play a significant role in the various steps of Equipment Qualification.
  • 22. Step 1: Design Qualification (DQ) defines the functional and operational specifications of a balance or instrument. Step 2 :Installation Qualification (IQ) ensures that a balance or instrument is received as designed and specified. It documents the installation in the selected user environment. Step 3: Operational Qualification (OQ) demonstrates that a balance or instrument will function according to its operational specification in the selected environment. Step 4: Performance Qualification (PQ) demonstrates that a balance or instrument consistently performs according to a specification appropriate to its routine use. Step 5: Maintenance Qualification (MQ) describes and documents any maintenance required on the equipment.
  • 23.
  • 24. Design qualification (DQ) is the process of completing and documenting design reviews to illustrate that all quality aspects have been fully considered at the design stage. The purpose is to ensure that all the requirements for the final systems have been clearly defined at the start. Design Qualification (DQ) defines the functional and operational specifications of the instrument and details the conscious decisions made in the selection of the supplier. DQ should ensure that instruments have all the necessary functions and performance criteria that will enable them to be successfully implemented for the intended application and to meet user requirements.
  • 25. The list below shows the recommended steps that should be considered for inclusion in a Design Qualification. - Description of the analysis problem - Description of the intended use for the equipment - Description of the intended environment -Preliminary selection of the functional and performance specifications (technical, environmental, safety) - Preliminary selection of the supplier - Final selection of the supplier and equipment -Development and documentation of final functional and operational specifications
  • 26.  As part of the design qualification process, the vendor should be qualified; the question is how should this be done? Is an established and documented quality system enough (e.g. ISO 9001), or should there be a direct audit? The answer is that there may be situations where a vendor audit is recommended: for example, when complex computer systems are being developed for a specific user. However, this is rarely the case for balances and analytical instruments. If equipment does not include a computer system, a good reputation, one's own experience or good references from other users - together with ISO 9001 certification - can be sufficient.
  • 27.
  • 28. Installation qualification (IQ) is the process of checking the installation, to ensure that the components meet the approved specification and are installed correctly, and to see how that information is recorded. The purpose is to ensure that all aspects (static attributes) of the facility or equipment are installed correctly and comply with the original design. all of the instrumentation components are identified and checked against the manufacturer’s component listing. The working environment conditions are documented and checked to ensure that they are suitable for the operation of the instrument.
  • 29. Installation Qualification establishes that the instrument is received as designed and specified, that it is properly installed in the selected environment, and that this environment is suitable for the operation and use of the instrument. Before installation: -Obtain manufacturer's recommendations for installation site requirements. -Check the site for the fulfillment of the manufacturer's recommendations (utilities such as electricity, water and gases plus environmental conditions such as humidity, temperature, vibration level and dust). -Allow sufficient shelf space for the equipment itself, related SOPs, operating manuals, logbooks and software.
  • 30.
  • 31. Operational qualification (OQ) is the process of testing to ensure that the individual and combined systems function to meet agreed performance criteria and to check how the result of testing is recorded. The purpose is to ensure that all the dynamic attributes comply with the original design. Each of the instrument’s function are checked to ensure that they conform to the manufacturer’s specifications. This includes the use of certified, traceable electrical simulators and standards to verify that the equipment is processing input signals correctly.
  • 32.
  • 33. Performance qualification (PQ), also called process qualification, is the process of testing to ensure that the individual and combined systems function to meet agreed performance criteria on a consistent basis and to check how the result of testing is recorded. The purpose is to ensure that the criteria specified can be achieved on a reliable basis over a period of time. The performance of the equipment for its routine analytical use is checked to ensure that this complies with its specification. The temperature sensor readings are compared with a certified reference thermometer. After calibration, the conductivity sensor readings are compared using certified, traceable control standards.
  • 34. Control Standards of similar values to the intended test samples must be used for PQ. Performance Qualification (PQ) is the process of demonstrating that an instrument consistently performs according to a specification appropriate to its routine use. Important here is the word consistently. The test frequency is much higher than for OQ. Another difference is that PQ should always be performed under conditions that are similar to routine sample analysis.
  • 35. PQ should be performed on a daily (or at least a weekly) basis, or whenever the instrument is used. The test frequency depends not only on the stability of the equipment but also on everything in the system that may contribute to the analysis results. 1. Define the performance criteria and test procedures. 2. Select critical parameters. 3. Define the test intervals.
  • 36.
  • 37. The MQ describes and documents any maintenance required on the equipment. This includes routine servicing and any repairs necessary. Details of any maintenance contracts are also documented in this section, together with a list of authorized service engineers. In addition, the MQ includes the routine cleaning of the equipment and also its ultimate disposal.
  • 38.  Component qualification (CQ) – is a relatively new term developed in 2005. This term refers to the manufacturing of auxiliary components to ensure that they are manufactured to the correct design criteria. This could include packaging components such as folding cartons, shipping cases, labels or even phase change material. All of these components must have some type of random inspection to ensure that the third party manufacturer's process is consistently producing components that are used in the world of GMP at drug or biologic manufacturer.
  • 39.  Instrument Validation should not be viewed as a one-off event – confidence in analytical results is required for the whole of the instrument’s working life.  To ensure that this confidence is retained, the instrument validation process should be repeated at regular intervals during the instruments operational life.  The difference between Installation Validation and Re- Qualification is that IQ is omitted for the Re-Qualification  Re-Qualification should be performed at least annually and should be performed more frequently for applications whose test results have critical implications