Robert’s Projects at
Adams Building Contractors
ETHANOL
FACILIT Y




T h i s p r o j ec t
i nv o l v e d t h e
a d d i t io n o f a
105 foot
d i a m ete r s te e l
bin.
RAMMED
ETHANOL FACILITY       AGGREGATE
                        PIERS – SOIL
                        MODIFCATION
                         This project
                Auger    utilized rammed
                         aggregate piers
                Rig      to improve the
                         existing soils
                         bearing capacity
                         for a new 105
     Tamping             foot diameter
                         bin.
     Rig
                         The auger at the
                         right drills a 20
                         inch diameter
                         hole
                         approximately 25
                         feet deep. The
                         ramming rig on
                         the left compacts
                         aggregate in lif ts
                         of approximately
                         18 inches.

                         This densifies the
                         existing soils and
                         improves the
                         b e a r i n g c a p a c i t y.
SOIL
ETHANOL FACILITY   IMPROVEMENT
                    FOR 105 FOOT
                    DIAMETER BIN

                    L o a d te s t i n g o f
                    the rammed
                    a g g r e g a te
                    Geopiers
105 FOOT
ETHANOL FACILITY   DIAMETER
                    BIN
                    FOUNDATION


                    Bin ring wall
                    footing
                    r e i n fo r c in g i s
                    r e - r o ute d
                    around the
                    b o o t p i t to
                    maintain
                    c o n t i n ui t y.
105 FOOT
ETHANOL FACILITY              DIAMETER
                               BIN
                               FOUNDATION


                               R i n g f o o t i ng
                               and tunnel mat
                               h av e b e e n
                               poured.
                               S et t i n g
                               f o r mwo r k f o r
                               ring wall.




              2’-0” x 10’-0”
              Ring Footing
105 FOOT
ETHANOL FACILITY   DIAMETER
                    BIN
                    FOUNDATION


                    R i n g f o o t i ng
                    and boot pit
                    h av e b e e n
                    poured.
105 FOOT
ETHANOL FACILITY                DIAMETER
                                 BIN
                                 FOUNDATION


                                 Back filling
                                 operations in
                                 t h e i n te r i o r o f
                                 the bin ring
                                 wall and
         Ring                    reclaim tunnel.
         Wall                    B a c k f i ll
                                 c o n s i s te d o f
                                 c r u sh e d
                                 l i m e s to n e
                       Reclaim   m a te r i al s .
                       Tunnel

                Crushed stone
                backfill
105 FOOT
ETHANOL FACILITY                      DIAMETER
                                       BIN
                                       FOUNDATION


                                       T h i s p h o to
                                       shows the bin
                                       ring wall and
                                       f o u n d a t io n w i t h
                                       the reclaim
                                       tunnel running
                                       down the
                                       c e n te r o f t h e
                                       bin foundation.
                      Reclaim Tunnel


                         Bin
                         Anchor
          Ring Wall      Bolts
NEW
ETHANOL FACILITY                BOOT
                                 PIT

       Tower                     T h i s p h o to
                                 shows the
       Anchor                    construction of
       Bolts                     the new boot pit
                                 a d j a c e n t to t h e
                                 reclaim tunnel
                                 below the bin.

                                 The reclaim
                                 c o nv eyo r w i l l
                                 feed the new
                                 b u c ke t e l e v a to r
                                 which will sit in
                                 the boot pit.
                                 B u c ke t e l e v a to r
                                 capacity is
                                 15,000 bushel
                                 p e r h o u r.




                Boot Pit Walls
105 FOOT
ETHANOL FACILITY   DIAMETER
                    BIN
                    FOUNDATION


                    V i ew l o o k i n g
                    down the
                    reclaim tunnel
                    to wa r d s t h e
                    ex i s t i n g b i n .
105 FOOT
ETHANOL FACILITY   DIAMETER
                    BIN
                    FOUNDATION
  W18x86

                    Fo r mwo rk a n d
                    s te e l b e a m
                    header at
                    tunnel opening
                    in ring wall
                    f o u n d a t io n .

                    T h e s te e l b e a m
                    carries uniform
                    wall loads from
                    the bin of
                    a p p r ox i m a tel y
                    50 kips per
                    foot over the
                    tunnel opening
                    in the ring wall.
RECLAIM
ETHANOL FACILITY          TUNNEL

                           T h i s p h o to
                           shows the
                           c o m p l ete d
                           reclaim tunnel
  Slide                    b e l ow t h e b i n
                           f l o o r. T h e s l i d e
  Gate                     g a te s h av e
                    Boot   been installed
                           at the floor
                    Pit    s u m p l o c a t i o ns .
                           Re c l a i m
                           c o nv eyo r h a s
                           not been
                           installed.
RECLAIM
ETHANOL FACILITY   TUNNEL
                    This
                    p h o to g r a p h
                    shows the
                    installed
                    reclaim
                    c o nv eyo r
                    c o n n e c te d to
                    t h e s l i d e g a te
  Slide             with spouting.
  Gate
          Spout




     Reclaim
     conveyor
ETHANOL FACILITY                          BUCKET
                                           ELEVATOR
                    Bucket Elevator Legs   BOOT PIT



                                           This
                                           p h o to g r a p h i s
                                           i n t h e b u c ket
                                           e l ev a to r b o o t
                                           pit.




   Reclaim
   Conveyor
ETHANOL FACILITY   105 FOOT
                    DIAMETER
                    STEEL BIN

                    Tw o h o r i z o n t al
                    wall rings and
                    roof framing
                    h av e b e e n
                    c o n s t r uc te d .

                    The bin is
                    a l m o s t r e a d y to
                    b e j a c ke d u p to
                    it’s full height.
ETHANOL FACILITY   105 FOOT
                    DIAMETER
                    STEEL BIN
                    T h i s p h o to g r a p h
                    illustrated the
                    roof
                    construction for
                    a s te e l s to r a g e
                    bin.

                    T h e f i r s t t wo
                    wa l l r i n g s a r e
                    set and then the
                    roof framing is
                    built. After the
                    roof is
                    constructed,
                    t h ey j a c k t h e
                    entire bin up
                    a n d i n s e r t wa l l
                    rings a section
                    at a time. This
                    sequence
                    continues until
                    the bin reaches
                    i t ’ s f i n a l e av e
                    height.
ETHANOL FACILITY   750,000
                    BUSHEL
                    BIN
                    CAPACIT Y

                    Tw o h o r i z o n t al
                    rings are
                    c o m p l ete a n d
                    the roof is
                    s h e ete d . T h e
                    bin is now
                    ready for
                    j a c k i ng to b u i l d
                    up it’s full
                    height.
ETHANOL FACILITY   750,000
                    BUSHEL
                    CAPACIT Y
                    BIN

                    T h i s p h o to
                    s h o w s t h e n ew
                    105 foot
                    d i a m ete r s te e l
                    bin under
                    c o n s t r uc t i o n .
                    The bin is just
                    over the half
                    w ay m a r k o f
                    it’s final 88
                    f o o t e av e
                    height.
750,000
ETHANOL FACILITY   BUSHEL
                    CAPACIT Y
                    STEEL BIN


                    T h e c o m p l ete d
                    bin at it’s 88
                    f o o t e av e
                    height.
AERATION
ETHANOL FACILITY      FANS

                       T h i s p h o to
                       shows the
                       aeration fans
                       installed at the
                       aeration
                       trenches on the
                       bin foundation.
                       In the
                       b a c k g r o un d i s
                       t h e s te e l to w e r
                       which supports
                       the fill
                       c o nv eyo r
                       above.


    New     Aeration
    Boot    Fan
    Pit
750,000
ETHANOL FACILITY     BUSHEL
                      STEEL
                      STORAGE
                      BIN

                      The existing bin
                      is on the left
                      a n d t h e n e w 10 5
            New       foot diameter
                      bin is on the
            Towers    right.
            Erected
                      T h i s p h o to g r a p h
                      s h ow s t h e
                      erection of the
                      t wo to we r s
                      which will
                      support a new
                      c a t wa l k t r u s s
                      a n d f i l l c o nv eyo r
                      to f e e d t h e n e w
                      bin.
TOWERS
ETHANOL FACILITY               AND
                                TRUSSES


            New Catwalk Truss
                                Bin erection
                                has been
                                c o m p l ete d .
                                To w e r a n d
                                c a t wa l k t r u s s
                                a r e e r e c te d .
    New
    Tower                       T h e n ex t s te p
                                will be
                                i n s t a l l in g t h e
                                f i l l c o nv eyo r o n
                                the catwalk
                                truss.
TOWERS
ETHANOL FACILITY                                  AND
                                                   CAT WALK
                                                   TRUSS


                                                   T h i s p h o to
              New catwalk truss, conveyor,         shows the
              and towers                           c o m p l ete d
                                                   to w e r s a n d
                                                   c a t wa l k t r u s s e s
                                                   in place.
                                                   E x i s t in g b i n i s
                                                   on the left and
                                                   t h e n ew b i n i s
                                             New   on the right.
   Existing                                  Bin
   Bin
105 FOOT
ETHANOL FACILITY         DIAMETER
                          BIN

                          T h e c o m p l ete d
                          project.




                    New
                    Bin
105 FOOT
ETHANOL FACILITY   DIAMETER
                    BIN



                    C o m p lete d 1 0 5
                    f o o t d i a m ete r
                    b i n s t r u c t ur e .
135 FOOT DIAMETER BIN   135 FOOT
                        DIAMETER
FOUNDATION              STORAGE
                        BIN
135 FOOT
BIN FOUNDATION   DIAMETER
                  BIN
                  FOUNDATION


                  Aerial view of
                  one quarter of
                  the bin
                  foundation.
                  Slab concrete
                  has been poured
                  and block outs
                  a r e i n p l a c e to
                  form the future
                  aeration
                  trenches.
                  A d d i t i o n a l l y, t h e
                  reclaim tunnel
                  roof slab has
                  been poured and
                  sump inserts
                  h av e b e e n s e t .
135 FOOT
BIN FOUNDATION   DIAMETER
                  BIN
                  FOUNDATION


                  A e r i a l v i ew o f
                  the 135 foot
                  d i a m ete r b i n
                  f o u n d a t io n .
                  Slab is being
                  poured with
                  block outs for
                  the aeration
                  trenches.
135 FOOT
BIN FOUNDATION   DIAMETER
                  BIN
                  FOUNDATION

                  A e r i a l v i ew o f
                  the nearly
                  c o m pl ete b i n
                  f o u n d a t io n .
                  M et a l a e r a t i o n
                  trench covers
                  are almost
                  c o m p l ete .

                  S te e l to w e r i n
                  t h e f o r e g r o un d
                  will support the
                  c a t wa l k t r u s s
                  that carries the
                  f i l l c o nv eyo r.
135 FOOT
BIN FOUNDATION   DIAMETER
                  STORAGE
                  BIN


                  E r e c t in g t h e
                  last section of
                  c a t wa l k t r u s s
                  for the fill
                  c o nv eyo r.
GRAIN
FACILIT Y




T h i s p r o j ec t
i nv o l v e d t h e
a d d i t io n o f a
n ew 9 0 f o o t
d i a m ete r b i n
a n d t h e to w e r s ,
c a t wa l k
trusses,
c o nv eyo r, et c .
to f e e d t h e b i n .
GRAIN FACILITY UPGRADE     90 FOOT
                            DIAMETER
                            STEEL
                            STORAGE
                            BIN
                            O v e r s aw t h e
                            bin foundation
                            design provided
                            by an outside
                New         c o n s ul t a n t .
                90 foot ϕ   Designed
                Bin         f o u n d a t io n s f o r
                            t h e v a r i o us
                            s te e l to w e r.
GRAIN FACILITY UPGRADE   TOWERS
                          AND
                          TRUSSES



                          E r e c t in g t h e
                          c a t wa l k t r u s s e s
                          o n to p o f t h e
                          s te e l to w e r s .

                          T h e to w e r s a n d
                          trusses were
                          supplied by an
                          o u t s i d e v e n d o r.
GRAIN FACILITY UPGRADE   CAT WALK
                          TRUSS AND
                          FILL
                          CONVEYOR

                          V i ew f r o m t h e
                          c a t wa l k t r u s s
                          l o o ki n g d o w n
                          the length of
                          t h e n ew
                          c o nv eyo r b a c k
                          to wa r d s t h e
                          b u c ket
                          e l ev a to r s.
STEEL
GRAIN FACILITY UPGRADE   TOWER AND
                          FOUNDATION



                          To w e r
                          f o u n d a t io n
                          a d j a c e n t to a n
                          ex i s t i n g
                          building
                          f o u n d a t io n .
GRAIN FACILITY UPGRADE   CAT WALK
                          TRUSS
                          ERECTION



                          E r e c t in g
                          sections of the
                          f i l l c o nv eyo r
                          inside the
                          c a t wa l k t r u s s .
NEW
GREENFIELD GRAIN FACILITY   GREENFIELD
                             GRAIN
                             FACILIT Y


                             Provided in-
                             house
                             s t r uc t ur a l
                             engineering
                             ser vices for
                             m i s c e l l a n e o us
                             ser vice
                             p l a t fo r m s , m a n
                             l i f t , et c .
MANLIFT
GREENFIELD GRAIN FACILITY   HEADHOUSE

                             This is the
                             headhouse
                             portion of the
                             m a n l i f t o n to p
                             of the silos.

                             The knee
      Lift                   braced
      Machine                p l a t fo r m a l l o w s
      Room                   a c c e s s to t h e
                             m a c hi n e r o o m
                             for the man
                             lift.
      Manlift
                             Below the silo
                             roof, the man
                             lift rides within
                             a slip formed
                             c o n c r ete s h a f t
                             inside the silo.
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y –
                             SOUTH
                             DAKOTA

                             Provided in-
                             house structural
                             engineering
                             ser vices for
                             miscellaneous
                             ser vice
                             platforms, desig
                             n o f t h e 10 0
                             f o o t t a l l s te e l
                             to we r, a n d
                             coordination
                             with an outside
                             engineering
                             consultant who
                             designed the
                             silos.
SOUTH
GREENFIELD GRAIN FACILITY   DAKOTA


                             S l i p fo r m in g o f
                             the eight 36
                             f o o t d i a m ete r
                             silos.

                             T h e t w o 76 f o o t
                             d i a m ete r s i l o s
                             were slip
                             formed in one
                             operation. The
                             second slip
                             forming
                             operation
                             shown here
                             i n c l ud e s t h e
                             eight 36 foot
                             d i a m ete r s i l o
                             g r o up .
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y

                             The second slip
                             formed group
                             of eight 36 foot
                             d i a m ete r s i l o s
                             nearing the
                             to p p in g o u t
                             e l ev a t i o n o f
                             1 4 0 f e et a b o v e
                             grade.

    2 - 76’ Ø
    Silos       8 – 36’ Ø
                Silo Group
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y



                             C o nv eyo r
                             i n s t a l l a t io n o n
                             the silo group
                             roof deck.
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y
                             This
                             p h o to g r a p h
                             shows the two
                             76 f o o t
                             d i a m ete r s i l o s
                             in the
                             b a c k g r o un d
                             and the 8-36
                             f o o t d i a m ete r
                             silo group in
                             t h e f o r e g r o un d .
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y



                             Silo group
                             to p p e d o u t a n d
                             starting
                             c o nv eyo r
                             i n s t a l l a t io n o n
                             the roof deck.
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y



                             C o nv eyo r
                             i n s t a l l a t io n o n
                             the roof deck.
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y

                             I n s t a l l in g
                             c o nv eyo r
                             support frames
                             on the roof.
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y

                             B u c ket e l ev a to r
                             i n s t a l l a t io n
                             p a s s i n g t h e to p
                             of the silo roof
                             deck.

                             This is the area
                             w h e r e t h e s te e l
                             b u c ket e l ev a to r
                             to w e r w i l l s i t .



                 Manlift
                 Shaft
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y

                             The first section
                             o f s te e l to we r
                             b e i n g e r e c te d .

                             T h e s te e l towe r
                             w i l l e x te n d 10 0
                             feet above the
                             to p o f t h e g r a i n
                             silos.

                             T h e s te e l to we r
                             provides suppor t
                             f o r t h e b u c ke t
                             e l e v a to r s , s c r e e
                             ners, and
                             distributors that
                             channel the
                             g r a i n to t h e
                             various
                             c o nv eyo r s a n d
                             silos.
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y



                             C r a n e p i c ki n g
                             the first
                             s e c t i o n o f s te e l
                             b u c ket e l ev a to r
                             to w e r.
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y



                             E r e c t io n o f t h e
                             first section of
                             b u c ket e l ev a to r
                             to w e r.
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y



                             C r a n e p i c ki n g a
                             section of the
                             s te e l b u c ket
                             e l ev a to r to w e r.
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y



                             S te e l e r e c t i o n
                             o f b u c ket
                             e l ev a to r to w e r
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y



                             E r e c t io n o f a
                             f u l l y f a b r i c a te d
                             c o nv eyo r
                             ser vice
                             p l a t fo r m .
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y



                             C o nv eyo r
                             ser vice
                             p l a t fo r m .
GREENFIELD
GREENFIELD GRAIN FACILITY               GRAIN
                                         FACILIT Y
                                         T h e s te e l b u c ke t
                                         e l e v a to r to we r
              Steel                      r i s e s 10 0 f e e t
              Bucket                     a b o v e t h e to p o f
                                         the silo roof
              Elevator                   deck which is
                                         14 0 f e e t a b o v e
              Tower                      grade.
              (Galvanized)
                                         T h i s p h o to g r a p h
                                         s h o w s t h e to we r
                                         at
                                         approximately
  Grain                                  t h e h a l f way
  Dryer                      Truck       point.
  (1 of 2)                   Receiving
                             Building
GREENFIELD
GREENFIELD GRAIN FACILITY        GRAIN
                                  FACILIT Y

                    Bucket
                    Elevator
                    Tower         E r e c t io n o f t h e
                                  b u c ket e l ev a to r
                                  to w e r.




                         Grain
                         Dryer

                      Truck
                      Receiving
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y

 W27x84
                             This
 Transfer                    p h o to g r a p h
 Girder                      s h o w s t h e W 27
                             transfer girder
                             spanning
                             across the u
                             shaped opening
                             in the silo
                             g r o up . T h e
                             m i d d l e c o l um n
                             o f t h e to w e r
                             sits on the
                             t r a n s f e r g i r d e r.
GREENFIELD
GREENFIELD GRAIN FACILITY          GRAIN
                                    FACILIT Y



                   Grain Dryer #1
                                    This
                                    p h o to g r a p h
                                    shows the
                                    second grain
                                    d r ye r r e a d y to
                                    b e j a c ke d u p to
                   Grain Dryer #2   it’s full height
                                    s i m i l a r to d r ye r
                                    #1.
GREENFIELD
GREENFIELD GRAIN FACILITY          GRAIN
                                    FACILIT Y
                  Bucket
                  Elevator
                  Tower
                                    V i ew o f t h e
                                    n e a r l y to p p e d
                                    o u t b u c ket
                                    e l ev a to r to w e r
                                    o n to p o f t h e
Conveyor                            silo group.
                         Grain
                         Screener
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y

                  Conveyor
                  Service
                  Platform   C o nv eyo r
                             ser vice
                             p l a t fo r m o n to p
                             of the silo roof
                             deck.
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y



                             S te e l e r e c t i o n
                             o n t h e b u c ket
                             e l ev a to r to w e r.
GREENFIELD
 GREENDFIELD GRAIN FACILITY   GRAIN
                               FACILIT Y



                               Grain
                               d i s t r i b uto r s
                               installed.
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y



                             V i ew l o o k i n g u p
                             at the grain
                             d i s t r i b uto r
                             i n s t a l l a t io n .
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y



                             View looking up
                             at the grain
                             distributors.
                             The square
                             holes are where
                             the spouting will
                             connect.

                             T h e d i s t r i b u to r s
                             allow the grain
                             fl ow to b e
                             d i r e c te d to t h e
                             various
                             c o nv eyo r s w h i c h
                             will then carr y
                             t h e g r a i n to f i l l
                             the silos.
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y



                             This
                             p h o to g r a p h
                             shows the
                             n e a r l y to p p e d
                             o u t b u c ket
                             e l ev a to r to w e r.

                             The piece of
                             e q u i pm e n t i n
                             the lower right
                             hand corner is
                             a grain
                             s c r e e n e r.
SOUTH
GREENFIELD GRAIN FACILITY   DAKOTA




                             B u c ke t e l e v a to r
                             leg installation
                             is continuing on
                             the left side of
                             t h e p h o to g r a p h .

                             The right side of
                             t h e p h o to g r a p h
                             shows the
                             completed head
                             section of a
                             b u c ke t e l e v a to r
                             l e g a t a l o we r
                             level.
SOUTH
GREENFIELD GRAIN FACILITY   DAKOTA
                             This
                             p h o to g r a p h i s
                             of the last
                             section of
                             to w e r to b e
                             e r e c te d . N o te
                             that all
                             s t r uc t ur a l s te e l
                             f o r t h e b u c ket
                             e l ev a to r to w e r
                             was galvanized.
SOUTH
GREENFIELD GRAIN FACILITY   DAKOTA
                             Picking the last
                             section of
                             b u c ket e l ev a to r
                             to w e r.
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y



                             Picking the last
                             s e c t i o n o f s te e l
                             b u c ket e l ev a to r
                             to w e r.
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y



                             S et t i n g t h e l a s t
                             s e c t i o n o f s te e l
                             b u c ket e l ev a to r
                             to w e r.

                             T h e to w e r to p s
                             out at
                             a p p r ox i m a tel y
                             24 0 f e et a b o v e
                             grade.
GREENFIELD
GREENFIELD GRAIN FACILITY           GRAIN
                                     FACILIT Y

                          Bucket
               Bucket     Elevator
               Elevator   Leg        I n s t a l l a t io n o f
                                     floor bar
               Leg                   grating around
                                     t h e b u c ket
                                     e l ev a to r l e g s .
                                     All grating is
                                     g a l v a ni z e d .
GREENFIELD
                           Cross over
                           bridge       GRAIN
                                        FACILIT Y –
                                        SOUTH
                                        DAKOTA

                                        The manlift
                                        to w e r e n c l o s e d
                                        with siding.
                                        Tw o c r o s s o v e r
         Manlift tower                  bridges span
                                        o v e r to t h e
                                        m a i n b u c ket
                                        e l ev a to r to w e r.

110’ Above silo roof
     deck

              Cross over
              bridge
Cross over
                                             GREENFIELD
           bridge                            GRAIN
                                             FACILIT Y –
                                             SOUTH
                         Manlift tower       DAKOTA
Grain
screener                                     C o m p lete d
                                             m a i n b u c ket
                                             e l ev a to r to w e r
                                             with siding
                                             enclosing the
                                             m a n l i f t . N o te
                                             the two cross
                                             over bridges
                                             from the
                        Cross over           m a n l i f t s h a f t to
                        bridge               t h e m a i n to w e r.

conveyor

                        HSS bracing struts
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y -
                             ILLINOIS

                             This
                             p h o to g r a p h
                             shows the main
                             b u c ket e l ev a to r
                             to w e r. T h i s
                             to w e r s i t s o n
                             two W36
                             beams that
                             span 60
                             b et w e e n s i l o
                             g r o up s . A l l t h e
                             s t r uc t ur a l s te e l
                             and bar grating
                             was galvanized.
ILLINOIS
GREENFIELD GRAIN FACILITY


                             Wet g r a i n
                             b u c ket e l ev a to r
                             to w e r. T h i s
                             to w e r c o n t a i n s
                             a p l a t fo r m t h a t
                             is knee braced
                             o u t 1 4 f e et
                             b eyo n d t h e e n d
                             of the silo
                             g r o up .
GREENFIELD GRAIN FACILITY   ILLINOIS




                             V i ew f r o m m a i n
                             to w e r l o o k i n g
                             down on the
                             silo roof deck
                             showing three
                             enclosed
                             c o nv eyo r
                             s y s te m s o n t h e
                             roof slab.
GREENFIELD GRAIN FACILITY    ILLINOIS




                              View of the main
                              b u c ke t e l e v a to r
                              to we r b e t w e e n
                              silo groups. The
                              e l e v a to r l e g s a r e
                              braced at 20
                 76’ Ø        f o o t i n te r v a l s .
                 Silo Group   Building under
                              construction in
                              the foreground
                              is the grain
                              truck receiving
                              building.
GREENFIELD GRAIN FACILITY   ILLINOIS



 Bulk
 Weigh                       This
 Equipment                   p h o to g r a p h
                             shows the bulk
                             w e i g h s t r u c t ur e
                             and bulk
                             w e i g h er. A f te r
                             the grain is
                             weighed it is
                             l o a d e d i n to r a i l
                             cars for
                             shipping.
GREENFIELD GRAIN FACILITY   ILLINOIS




                             Bulk weigh
                             s t r uc t ur e a n d
                             t w o s to r y M C C
                             building. Rigid
                             frames are
                             b e i n g s et f o r
                             the rail load
                             o u t b u i l d in g .
GREENFIELD GRAIN FACILITY   ILLINOIS




                             V i ew o f w et
                             g r a i n b u c ket
                             e l ev a to r s g o i n g
                             u p . G r a i n d r ye r
                             is in the
                             f o r e g ro un d .



                  38’ Ø
                  Silo
      Grain
      Dryer
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y



                             O v e r a l l v i ew o f
                             t h e n ew g r a i n
                             f a c i l i t y.
GREENFIELD GRAIN FACILITY   ILLINOIS
                             A e r i a l v i ew o f
                             t h e n ew g r o u n d
                             pile for
                             a d d i t io n a l
                             g r a i n s to r a g e .
GREENFIELD GRAIN FACILITY       ILLINOIS

                                 T h i s p h o to
   Wet Grain                     s h o w s t h e w et
                                 g r a i n b u c ket
   Bucket Elevators              e l ev a to r s a n d
                                 t h e d r ye r.




                         38’
                      Diameter
                        Silos
          Grain
          Dryer
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y -
                             ILLINOIS


                             O v e r a l l v i ew o f
                             t h e p r o j ec t .



                76’ Ø
                Silos

        38’ Ø
        Silos
GREENFIELD GRAIN FACILIT Y - ILLINOIS




                      4-76’ Ø
                      Silos
            2-38’ Ø
   Dryer    Silos
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y -
                             ILLINOIS


                             Wet g r a i n
                             b u c ket
                             e l ev a to r s .
GREENFIELD GRAIN FACILITY   ILLINOIS
                              V i ew o f t h e
Conveyor                      c o nv eyo r b r i d g e
                              that feeds the
Bridge Feeding
                              g r o un d p i l e .
Ground Pile
GREENFIELD GRAIN FACILITY   ILLINOIS
                             V i ew o f t h e
              Bulk           bulk weigher
             Weigh           e q u i pm e n t t h a t
             Equip.          feeds the rail
                             cars in the load
                             o u t b u i l d in g .



   Fall
Protection
 System        Rail
             Load Out
             Building
GREENFIELD GRAIN FACILITY   ILLINOIS
                             O v e r a l l v i ew o f
               Bulk
  Future                     the bulk
              Weigh          weigher
  Conveyor
              Equip.         equipment.
  Support




               Rail
             Load Out
             Building
GREENFIELD GRAIN FACILITY       ILLINOIS
                                 P h o to o f t h e
                      Grain      rail car load
                      Screener   o u t b u i l din g
                                 and the bulk
                                 weigher
                                 equipment.




           Rail
           Load Out
GREENFIELD GRAIN FACILITY      ILLINOIS

                                P h o to o f t h e
                                t r uc k r e c e i v i n g
                                building (2
                                pits) and the
            Fines               fines hopper
            Bin                 tank.
Truck       Hopper
Receiving   Tank
Building
                     Silo
                     Aeration
                     Fans
GREENFIELD GRAIN FACILITY                 ILLINOIS
                                           Overall project
                  Main Bucket              v i ew.
                  Elevator Tower
      Wet Grain
      Elevator
      Tower


                                   76’ ϕ
                                   Silos
GREENFIELD GRAIN FACILITY   ILLINOIS
                             P h o to l o o k i n g
                             down at the
                             grain screener
                             and a portion
                             of the ground
                             pile.




                Grain
               Screener
GREENFIELD GRAIN FACILITY                    ILLINOIS

                                              P h o to o f t h e
                                              m a i n b u c ket
        Main Bucket                           e l ev a to r to w e r.
        Elevator Tower
                         Monorail
                         Hoist Beam


                            Bucket Elevator
                            Head Section
                            Conveyor
GREENFIELD
                Manlift   GRAIN
                Hoist     FACILIT Y

                          V i ew o f t h e
                          m a n l i f t to w e r
                          a d j a c e n t to t h e
                          m a i n b u c ket
Bucket                    e l ev a to r to w e r.
Elevator        Manlift
Head            Tower
Section




     Conveyor
GREENFIELD
GRAIIN
FACILIT Y -
ILLINOIS


P h o to g r a p h o f
the manlift
to w e r a n d h o i s t
visible in the
m a c hi n e r o o m .
GREENFIELD
GREENFIELD GRAIN FACILITY   GRAIN
                             FACILIT Y -
                             ILLINOIS


                             N ew g r o u n d
                             pile for
                             a d d i t io n a l
                             g r a i n s to r a g e .




            Ground
              Pile
             Grain
            Storage
GREENFIELD
GREENFIELD GRAIN FACILITY          GRAIN
                                    FACILIT Y
                                    Wet g r a i n
                                    b u c ket
                                    e l ev a to r s .



                        Wet Grain
                        Bucket
                        Elevator
                        Tower




                    Conveyor
ILLINOIS
GREENFIELD GRAIN FACILITY
                                  V i ew o f t h e
   Fines    Screener              bulk weigh
                                  equipment
   Conveyor
                                  s u p p o r te d
                                  above the rail
                                  l o a d - o ut
                                  b u i l di n g .




               Upper
               Garner


            Bulk
            Weigher




         Rail Load-out Building
GREENFIELD GRAIN FACILITY             ILLINOIS
                                       This
                                       p h o to g r a p h
                                       s h o w s a s te e l
                                       bridge beam
                                       supporting the
                                       fines bin above
                                       and
                                       t r a n s f e r r in g t h e
                                       load over an
                                       ex i s t i n g t u n n e l
                                       b e l ow.




                   W24x104
                   Bridge Beam
                   Over Tunnel Below
GREENFIELD GRAIN FACILITY          ILLINOIS
                                    Bearing
                                    s t i f fe n e r u n d e r
                                    the bin support
                                    c o l um n .




                          W24x104
              Bearing
              Stiffener
Thank you for Viewing
      My Project Profile
             at
  Adams Building Contractors

Robert S. Downey, PE, LEED® AP
     22180 Cape Cod Way
   Farmington Hills, MI 48336
        r-downey@att.net
     Mobile: 248.687.4711

Weitere ähnliche Inhalte

Kürzlich hochgeladen

Kelly Wang 王薇盈_數位轉型、生成式AI、設計思考、客戶體驗優化、敏捷管理、SEO
Kelly Wang 王薇盈_數位轉型、生成式AI、設計思考、客戶體驗優化、敏捷管理、SEOKelly Wang 王薇盈_數位轉型、生成式AI、設計思考、客戶體驗優化、敏捷管理、SEO
Kelly Wang 王薇盈_數位轉型、生成式AI、設計思考、客戶體驗優化、敏捷管理、SEOKelly Wang
 
Get to know about Raquel Thompson Barbados.pdf
Get to know about Raquel Thompson Barbados.pdfGet to know about Raquel Thompson Barbados.pdf
Get to know about Raquel Thompson Barbados.pdfRaquel Thompson Barbados
 
John Steven McRae Resume Generated April 2024
John Steven McRae Resume Generated April 2024John Steven McRae Resume Generated April 2024
John Steven McRae Resume Generated April 2024jsmcrae2016
 
How To Land Your Next PM Dream Job - PMISSC Meeting - April 2024
How To Land Your Next PM Dream Job - PMISSC Meeting - April 2024How To Land Your Next PM Dream Job - PMISSC Meeting - April 2024
How To Land Your Next PM Dream Job - PMISSC Meeting - April 2024Hector Del Castillo, CPM, CPMM
 
Thomas Calculus 12th Edition Textbook and helping material
Thomas Calculus 12th Edition Textbook and helping materialThomas Calculus 12th Edition Textbook and helping material
Thomas Calculus 12th Edition Textbook and helping materialsafdarhussainbhutta4
 
Bobby singh - Digital Marketing Service
Bobby singh -  Digital Marketing ServiceBobby singh -  Digital Marketing Service
Bobby singh - Digital Marketing ServiceBobby singh
 
Complete Benefits of career counseling in India
Complete Benefits of career counseling in IndiaComplete Benefits of career counseling in India
Complete Benefits of career counseling in IndiaMere Mentor
 
401799841-Increasing-Crimes-and-Suicides-Among-Youth.pptx
401799841-Increasing-Crimes-and-Suicides-Among-Youth.pptx401799841-Increasing-Crimes-and-Suicides-Among-Youth.pptx
401799841-Increasing-Crimes-and-Suicides-Among-Youth.pptxwaghmare9860lavin
 
Banged Dubai Call Girls O525547819 Call Girls Dubai
Banged Dubai Call Girls O525547819 Call Girls DubaiBanged Dubai Call Girls O525547819 Call Girls Dubai
Banged Dubai Call Girls O525547819 Call Girls Dubaikojalkojal131
 
What is the career path of a VFX artist?
What is the career path of a VFX artist?What is the career path of a VFX artist?
What is the career path of a VFX artist?santoshjadhav126
 
About Kelly Wang: Generative AI, SEO, PR
About Kelly Wang: Generative AI, SEO, PRAbout Kelly Wang: Generative AI, SEO, PR
About Kelly Wang: Generative AI, SEO, PRKelly Wang
 
Design, Desire and Demand Presentation.pptx
Design, Desire and Demand Presentation.pptxDesign, Desire and Demand Presentation.pptx
Design, Desire and Demand Presentation.pptxaaronbasko1
 
Training for Deaconess, biblical qualifications.ppt
Training for Deaconess, biblical qualifications.pptTraining for Deaconess, biblical qualifications.ppt
Training for Deaconess, biblical qualifications.pptVidalMendoza5
 
How to make career in advance 3d animation
How to make career in advance 3d animationHow to make career in advance 3d animation
How to make career in advance 3d animationsantoshjadhav126
 
Abanoub Ghobrial, Planning Team Leader.pdf
Abanoub Ghobrial, Planning Team Leader.pdfAbanoub Ghobrial, Planning Team Leader.pdf
Abanoub Ghobrial, Planning Team Leader.pdfAbanoubGhobrial1
 
Network to Success - Using Social Media in Job Search
Network to Success - Using Social Media in Job SearchNetwork to Success - Using Social Media in Job Search
Network to Success - Using Social Media in Job SearchBruce Bennett
 
FACILITATING LEARNER-CENTERED TEACHING pptx
FACILITATING LEARNER-CENTERED TEACHING pptxFACILITATING LEARNER-CENTERED TEACHING pptx
FACILITATING LEARNER-CENTERED TEACHING pptxJAMESPARAQUINAN
 
The Next Things To Immediately Do About Mating Press
The Next Things To Immediately Do About Mating PressThe Next Things To Immediately Do About Mating Press
The Next Things To Immediately Do About Mating Pressmatingpress170
 
Youth Career and Employment Insights and informative Charts
Youth Career and Employment Insights and informative ChartsYouth Career and Employment Insights and informative Charts
Youth Career and Employment Insights and informative ChartsYouthLab
 
APSC Motor Vechile Inspector 18 Posts.pdf
APSC Motor Vechile Inspector 18 Posts.pdfAPSC Motor Vechile Inspector 18 Posts.pdf
APSC Motor Vechile Inspector 18 Posts.pdfsoumita869
 

Kürzlich hochgeladen (20)

Kelly Wang 王薇盈_數位轉型、生成式AI、設計思考、客戶體驗優化、敏捷管理、SEO
Kelly Wang 王薇盈_數位轉型、生成式AI、設計思考、客戶體驗優化、敏捷管理、SEOKelly Wang 王薇盈_數位轉型、生成式AI、設計思考、客戶體驗優化、敏捷管理、SEO
Kelly Wang 王薇盈_數位轉型、生成式AI、設計思考、客戶體驗優化、敏捷管理、SEO
 
Get to know about Raquel Thompson Barbados.pdf
Get to know about Raquel Thompson Barbados.pdfGet to know about Raquel Thompson Barbados.pdf
Get to know about Raquel Thompson Barbados.pdf
 
John Steven McRae Resume Generated April 2024
John Steven McRae Resume Generated April 2024John Steven McRae Resume Generated April 2024
John Steven McRae Resume Generated April 2024
 
How To Land Your Next PM Dream Job - PMISSC Meeting - April 2024
How To Land Your Next PM Dream Job - PMISSC Meeting - April 2024How To Land Your Next PM Dream Job - PMISSC Meeting - April 2024
How To Land Your Next PM Dream Job - PMISSC Meeting - April 2024
 
Thomas Calculus 12th Edition Textbook and helping material
Thomas Calculus 12th Edition Textbook and helping materialThomas Calculus 12th Edition Textbook and helping material
Thomas Calculus 12th Edition Textbook and helping material
 
Bobby singh - Digital Marketing Service
Bobby singh -  Digital Marketing ServiceBobby singh -  Digital Marketing Service
Bobby singh - Digital Marketing Service
 
Complete Benefits of career counseling in India
Complete Benefits of career counseling in IndiaComplete Benefits of career counseling in India
Complete Benefits of career counseling in India
 
401799841-Increasing-Crimes-and-Suicides-Among-Youth.pptx
401799841-Increasing-Crimes-and-Suicides-Among-Youth.pptx401799841-Increasing-Crimes-and-Suicides-Among-Youth.pptx
401799841-Increasing-Crimes-and-Suicides-Among-Youth.pptx
 
Banged Dubai Call Girls O525547819 Call Girls Dubai
Banged Dubai Call Girls O525547819 Call Girls DubaiBanged Dubai Call Girls O525547819 Call Girls Dubai
Banged Dubai Call Girls O525547819 Call Girls Dubai
 
What is the career path of a VFX artist?
What is the career path of a VFX artist?What is the career path of a VFX artist?
What is the career path of a VFX artist?
 
About Kelly Wang: Generative AI, SEO, PR
About Kelly Wang: Generative AI, SEO, PRAbout Kelly Wang: Generative AI, SEO, PR
About Kelly Wang: Generative AI, SEO, PR
 
Design, Desire and Demand Presentation.pptx
Design, Desire and Demand Presentation.pptxDesign, Desire and Demand Presentation.pptx
Design, Desire and Demand Presentation.pptx
 
Training for Deaconess, biblical qualifications.ppt
Training for Deaconess, biblical qualifications.pptTraining for Deaconess, biblical qualifications.ppt
Training for Deaconess, biblical qualifications.ppt
 
How to make career in advance 3d animation
How to make career in advance 3d animationHow to make career in advance 3d animation
How to make career in advance 3d animation
 
Abanoub Ghobrial, Planning Team Leader.pdf
Abanoub Ghobrial, Planning Team Leader.pdfAbanoub Ghobrial, Planning Team Leader.pdf
Abanoub Ghobrial, Planning Team Leader.pdf
 
Network to Success - Using Social Media in Job Search
Network to Success - Using Social Media in Job SearchNetwork to Success - Using Social Media in Job Search
Network to Success - Using Social Media in Job Search
 
FACILITATING LEARNER-CENTERED TEACHING pptx
FACILITATING LEARNER-CENTERED TEACHING pptxFACILITATING LEARNER-CENTERED TEACHING pptx
FACILITATING LEARNER-CENTERED TEACHING pptx
 
The Next Things To Immediately Do About Mating Press
The Next Things To Immediately Do About Mating PressThe Next Things To Immediately Do About Mating Press
The Next Things To Immediately Do About Mating Press
 
Youth Career and Employment Insights and informative Charts
Youth Career and Employment Insights and informative ChartsYouth Career and Employment Insights and informative Charts
Youth Career and Employment Insights and informative Charts
 
APSC Motor Vechile Inspector 18 Posts.pdf
APSC Motor Vechile Inspector 18 Posts.pdfAPSC Motor Vechile Inspector 18 Posts.pdf
APSC Motor Vechile Inspector 18 Posts.pdf
 

Robert’s Projects at Adams Building Contractors

  • 1. Robert’s Projects at Adams Building Contractors
  • 2. ETHANOL FACILIT Y T h i s p r o j ec t i nv o l v e d t h e a d d i t io n o f a 105 foot d i a m ete r s te e l bin.
  • 3. RAMMED ETHANOL FACILITY AGGREGATE PIERS – SOIL MODIFCATION This project Auger utilized rammed aggregate piers Rig to improve the existing soils bearing capacity for a new 105 Tamping foot diameter bin. Rig The auger at the right drills a 20 inch diameter hole approximately 25 feet deep. The ramming rig on the left compacts aggregate in lif ts of approximately 18 inches. This densifies the existing soils and improves the b e a r i n g c a p a c i t y.
  • 4. SOIL ETHANOL FACILITY IMPROVEMENT FOR 105 FOOT DIAMETER BIN L o a d te s t i n g o f the rammed a g g r e g a te Geopiers
  • 5. 105 FOOT ETHANOL FACILITY DIAMETER BIN FOUNDATION Bin ring wall footing r e i n fo r c in g i s r e - r o ute d around the b o o t p i t to maintain c o n t i n ui t y.
  • 6. 105 FOOT ETHANOL FACILITY DIAMETER BIN FOUNDATION R i n g f o o t i ng and tunnel mat h av e b e e n poured. S et t i n g f o r mwo r k f o r ring wall. 2’-0” x 10’-0” Ring Footing
  • 7. 105 FOOT ETHANOL FACILITY DIAMETER BIN FOUNDATION R i n g f o o t i ng and boot pit h av e b e e n poured.
  • 8. 105 FOOT ETHANOL FACILITY DIAMETER BIN FOUNDATION Back filling operations in t h e i n te r i o r o f the bin ring wall and Ring reclaim tunnel. Wall B a c k f i ll c o n s i s te d o f c r u sh e d l i m e s to n e Reclaim m a te r i al s . Tunnel Crushed stone backfill
  • 9. 105 FOOT ETHANOL FACILITY DIAMETER BIN FOUNDATION T h i s p h o to shows the bin ring wall and f o u n d a t io n w i t h the reclaim tunnel running down the c e n te r o f t h e bin foundation. Reclaim Tunnel Bin Anchor Ring Wall Bolts
  • 10. NEW ETHANOL FACILITY BOOT PIT Tower T h i s p h o to shows the Anchor construction of Bolts the new boot pit a d j a c e n t to t h e reclaim tunnel below the bin. The reclaim c o nv eyo r w i l l feed the new b u c ke t e l e v a to r which will sit in the boot pit. B u c ke t e l e v a to r capacity is 15,000 bushel p e r h o u r. Boot Pit Walls
  • 11. 105 FOOT ETHANOL FACILITY DIAMETER BIN FOUNDATION V i ew l o o k i n g down the reclaim tunnel to wa r d s t h e ex i s t i n g b i n .
  • 12. 105 FOOT ETHANOL FACILITY DIAMETER BIN FOUNDATION W18x86 Fo r mwo rk a n d s te e l b e a m header at tunnel opening in ring wall f o u n d a t io n . T h e s te e l b e a m carries uniform wall loads from the bin of a p p r ox i m a tel y 50 kips per foot over the tunnel opening in the ring wall.
  • 13. RECLAIM ETHANOL FACILITY TUNNEL T h i s p h o to shows the c o m p l ete d reclaim tunnel Slide b e l ow t h e b i n f l o o r. T h e s l i d e Gate g a te s h av e Boot been installed at the floor Pit s u m p l o c a t i o ns . Re c l a i m c o nv eyo r h a s not been installed.
  • 14. RECLAIM ETHANOL FACILITY TUNNEL This p h o to g r a p h shows the installed reclaim c o nv eyo r c o n n e c te d to t h e s l i d e g a te Slide with spouting. Gate Spout Reclaim conveyor
  • 15. ETHANOL FACILITY BUCKET ELEVATOR Bucket Elevator Legs BOOT PIT This p h o to g r a p h i s i n t h e b u c ket e l ev a to r b o o t pit. Reclaim Conveyor
  • 16. ETHANOL FACILITY 105 FOOT DIAMETER STEEL BIN Tw o h o r i z o n t al wall rings and roof framing h av e b e e n c o n s t r uc te d . The bin is a l m o s t r e a d y to b e j a c ke d u p to it’s full height.
  • 17. ETHANOL FACILITY 105 FOOT DIAMETER STEEL BIN T h i s p h o to g r a p h illustrated the roof construction for a s te e l s to r a g e bin. T h e f i r s t t wo wa l l r i n g s a r e set and then the roof framing is built. After the roof is constructed, t h ey j a c k t h e entire bin up a n d i n s e r t wa l l rings a section at a time. This sequence continues until the bin reaches i t ’ s f i n a l e av e height.
  • 18. ETHANOL FACILITY 750,000 BUSHEL BIN CAPACIT Y Tw o h o r i z o n t al rings are c o m p l ete a n d the roof is s h e ete d . T h e bin is now ready for j a c k i ng to b u i l d up it’s full height.
  • 19. ETHANOL FACILITY 750,000 BUSHEL CAPACIT Y BIN T h i s p h o to s h o w s t h e n ew 105 foot d i a m ete r s te e l bin under c o n s t r uc t i o n . The bin is just over the half w ay m a r k o f it’s final 88 f o o t e av e height.
  • 20. 750,000 ETHANOL FACILITY BUSHEL CAPACIT Y STEEL BIN T h e c o m p l ete d bin at it’s 88 f o o t e av e height.
  • 21. AERATION ETHANOL FACILITY FANS T h i s p h o to shows the aeration fans installed at the aeration trenches on the bin foundation. In the b a c k g r o un d i s t h e s te e l to w e r which supports the fill c o nv eyo r above. New Aeration Boot Fan Pit
  • 22. 750,000 ETHANOL FACILITY BUSHEL STEEL STORAGE BIN The existing bin is on the left a n d t h e n e w 10 5 New foot diameter bin is on the Towers right. Erected T h i s p h o to g r a p h s h ow s t h e erection of the t wo to we r s which will support a new c a t wa l k t r u s s a n d f i l l c o nv eyo r to f e e d t h e n e w bin.
  • 23. TOWERS ETHANOL FACILITY AND TRUSSES New Catwalk Truss Bin erection has been c o m p l ete d . To w e r a n d c a t wa l k t r u s s a r e e r e c te d . New Tower T h e n ex t s te p will be i n s t a l l in g t h e f i l l c o nv eyo r o n the catwalk truss.
  • 24. TOWERS ETHANOL FACILITY AND CAT WALK TRUSS T h i s p h o to New catwalk truss, conveyor, shows the and towers c o m p l ete d to w e r s a n d c a t wa l k t r u s s e s in place. E x i s t in g b i n i s on the left and t h e n ew b i n i s New on the right. Existing Bin Bin
  • 25. 105 FOOT ETHANOL FACILITY DIAMETER BIN T h e c o m p l ete d project. New Bin
  • 26. 105 FOOT ETHANOL FACILITY DIAMETER BIN C o m p lete d 1 0 5 f o o t d i a m ete r b i n s t r u c t ur e .
  • 27. 135 FOOT DIAMETER BIN 135 FOOT DIAMETER FOUNDATION STORAGE BIN
  • 28. 135 FOOT BIN FOUNDATION DIAMETER BIN FOUNDATION Aerial view of one quarter of the bin foundation. Slab concrete has been poured and block outs a r e i n p l a c e to form the future aeration trenches. A d d i t i o n a l l y, t h e reclaim tunnel roof slab has been poured and sump inserts h av e b e e n s e t .
  • 29. 135 FOOT BIN FOUNDATION DIAMETER BIN FOUNDATION A e r i a l v i ew o f the 135 foot d i a m ete r b i n f o u n d a t io n . Slab is being poured with block outs for the aeration trenches.
  • 30. 135 FOOT BIN FOUNDATION DIAMETER BIN FOUNDATION A e r i a l v i ew o f the nearly c o m pl ete b i n f o u n d a t io n . M et a l a e r a t i o n trench covers are almost c o m p l ete . S te e l to w e r i n t h e f o r e g r o un d will support the c a t wa l k t r u s s that carries the f i l l c o nv eyo r.
  • 31. 135 FOOT BIN FOUNDATION DIAMETER STORAGE BIN E r e c t in g t h e last section of c a t wa l k t r u s s for the fill c o nv eyo r.
  • 32. GRAIN FACILIT Y T h i s p r o j ec t i nv o l v e d t h e a d d i t io n o f a n ew 9 0 f o o t d i a m ete r b i n a n d t h e to w e r s , c a t wa l k trusses, c o nv eyo r, et c . to f e e d t h e b i n .
  • 33. GRAIN FACILITY UPGRADE 90 FOOT DIAMETER STEEL STORAGE BIN O v e r s aw t h e bin foundation design provided by an outside New c o n s ul t a n t . 90 foot ϕ Designed Bin f o u n d a t io n s f o r t h e v a r i o us s te e l to w e r.
  • 34. GRAIN FACILITY UPGRADE TOWERS AND TRUSSES E r e c t in g t h e c a t wa l k t r u s s e s o n to p o f t h e s te e l to w e r s . T h e to w e r s a n d trusses were supplied by an o u t s i d e v e n d o r.
  • 35. GRAIN FACILITY UPGRADE CAT WALK TRUSS AND FILL CONVEYOR V i ew f r o m t h e c a t wa l k t r u s s l o o ki n g d o w n the length of t h e n ew c o nv eyo r b a c k to wa r d s t h e b u c ket e l ev a to r s.
  • 36. STEEL GRAIN FACILITY UPGRADE TOWER AND FOUNDATION To w e r f o u n d a t io n a d j a c e n t to a n ex i s t i n g building f o u n d a t io n .
  • 37. GRAIN FACILITY UPGRADE CAT WALK TRUSS ERECTION E r e c t in g sections of the f i l l c o nv eyo r inside the c a t wa l k t r u s s .
  • 38. NEW GREENFIELD GRAIN FACILITY GREENFIELD GRAIN FACILIT Y Provided in- house s t r uc t ur a l engineering ser vices for m i s c e l l a n e o us ser vice p l a t fo r m s , m a n l i f t , et c .
  • 39. MANLIFT GREENFIELD GRAIN FACILITY HEADHOUSE This is the headhouse portion of the m a n l i f t o n to p of the silos. The knee Lift braced Machine p l a t fo r m a l l o w s Room a c c e s s to t h e m a c hi n e r o o m for the man lift. Manlift Below the silo roof, the man lift rides within a slip formed c o n c r ete s h a f t inside the silo.
  • 40. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y – SOUTH DAKOTA Provided in- house structural engineering ser vices for miscellaneous ser vice platforms, desig n o f t h e 10 0 f o o t t a l l s te e l to we r, a n d coordination with an outside engineering consultant who designed the silos.
  • 41. SOUTH GREENFIELD GRAIN FACILITY DAKOTA S l i p fo r m in g o f the eight 36 f o o t d i a m ete r silos. T h e t w o 76 f o o t d i a m ete r s i l o s were slip formed in one operation. The second slip forming operation shown here i n c l ud e s t h e eight 36 foot d i a m ete r s i l o g r o up .
  • 42. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y The second slip formed group of eight 36 foot d i a m ete r s i l o s nearing the to p p in g o u t e l ev a t i o n o f 1 4 0 f e et a b o v e grade. 2 - 76’ Ø Silos 8 – 36’ Ø Silo Group
  • 43. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y C o nv eyo r i n s t a l l a t io n o n the silo group roof deck.
  • 44. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y This p h o to g r a p h shows the two 76 f o o t d i a m ete r s i l o s in the b a c k g r o un d and the 8-36 f o o t d i a m ete r silo group in t h e f o r e g r o un d .
  • 45. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y Silo group to p p e d o u t a n d starting c o nv eyo r i n s t a l l a t io n o n the roof deck.
  • 46. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y C o nv eyo r i n s t a l l a t io n o n the roof deck.
  • 47. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y I n s t a l l in g c o nv eyo r support frames on the roof.
  • 48. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y B u c ket e l ev a to r i n s t a l l a t io n p a s s i n g t h e to p of the silo roof deck. This is the area w h e r e t h e s te e l b u c ket e l ev a to r to w e r w i l l s i t . Manlift Shaft
  • 49. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y The first section o f s te e l to we r b e i n g e r e c te d . T h e s te e l towe r w i l l e x te n d 10 0 feet above the to p o f t h e g r a i n silos. T h e s te e l to we r provides suppor t f o r t h e b u c ke t e l e v a to r s , s c r e e ners, and distributors that channel the g r a i n to t h e various c o nv eyo r s a n d silos.
  • 50. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y C r a n e p i c ki n g the first s e c t i o n o f s te e l b u c ket e l ev a to r to w e r.
  • 51. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y E r e c t io n o f t h e first section of b u c ket e l ev a to r to w e r.
  • 52. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y C r a n e p i c ki n g a section of the s te e l b u c ket e l ev a to r to w e r.
  • 53. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y S te e l e r e c t i o n o f b u c ket e l ev a to r to w e r
  • 54. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y E r e c t io n o f a f u l l y f a b r i c a te d c o nv eyo r ser vice p l a t fo r m .
  • 55. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y C o nv eyo r ser vice p l a t fo r m .
  • 56. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y T h e s te e l b u c ke t e l e v a to r to we r Steel r i s e s 10 0 f e e t Bucket a b o v e t h e to p o f the silo roof Elevator deck which is 14 0 f e e t a b o v e Tower grade. (Galvanized) T h i s p h o to g r a p h s h o w s t h e to we r at approximately Grain t h e h a l f way Dryer Truck point. (1 of 2) Receiving Building
  • 57. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y Bucket Elevator Tower E r e c t io n o f t h e b u c ket e l ev a to r to w e r. Grain Dryer Truck Receiving
  • 58. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y W27x84 This Transfer p h o to g r a p h Girder s h o w s t h e W 27 transfer girder spanning across the u shaped opening in the silo g r o up . T h e m i d d l e c o l um n o f t h e to w e r sits on the t r a n s f e r g i r d e r.
  • 59. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y Grain Dryer #1 This p h o to g r a p h shows the second grain d r ye r r e a d y to b e j a c ke d u p to Grain Dryer #2 it’s full height s i m i l a r to d r ye r #1.
  • 60. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y Bucket Elevator Tower V i ew o f t h e n e a r l y to p p e d o u t b u c ket e l ev a to r to w e r o n to p o f t h e Conveyor silo group. Grain Screener
  • 61. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y Conveyor Service Platform C o nv eyo r ser vice p l a t fo r m o n to p of the silo roof deck.
  • 62. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y S te e l e r e c t i o n o n t h e b u c ket e l ev a to r to w e r.
  • 63. GREENFIELD  GREENDFIELD GRAIN FACILITY GRAIN FACILIT Y Grain d i s t r i b uto r s installed.
  • 64. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y V i ew l o o k i n g u p at the grain d i s t r i b uto r i n s t a l l a t io n .
  • 65. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y View looking up at the grain distributors. The square holes are where the spouting will connect. T h e d i s t r i b u to r s allow the grain fl ow to b e d i r e c te d to t h e various c o nv eyo r s w h i c h will then carr y t h e g r a i n to f i l l the silos.
  • 66. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y This p h o to g r a p h shows the n e a r l y to p p e d o u t b u c ket e l ev a to r to w e r. The piece of e q u i pm e n t i n the lower right hand corner is a grain s c r e e n e r.
  • 67. SOUTH GREENFIELD GRAIN FACILITY DAKOTA B u c ke t e l e v a to r leg installation is continuing on the left side of t h e p h o to g r a p h . The right side of t h e p h o to g r a p h shows the completed head section of a b u c ke t e l e v a to r l e g a t a l o we r level.
  • 68. SOUTH GREENFIELD GRAIN FACILITY DAKOTA This p h o to g r a p h i s of the last section of to w e r to b e e r e c te d . N o te that all s t r uc t ur a l s te e l f o r t h e b u c ket e l ev a to r to w e r was galvanized.
  • 69. SOUTH GREENFIELD GRAIN FACILITY DAKOTA Picking the last section of b u c ket e l ev a to r to w e r.
  • 70. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y Picking the last s e c t i o n o f s te e l b u c ket e l ev a to r to w e r.
  • 71. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y S et t i n g t h e l a s t s e c t i o n o f s te e l b u c ket e l ev a to r to w e r. T h e to w e r to p s out at a p p r ox i m a tel y 24 0 f e et a b o v e grade.
  • 72. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y Bucket Bucket Elevator Elevator Leg I n s t a l l a t io n o f floor bar Leg grating around t h e b u c ket e l ev a to r l e g s . All grating is g a l v a ni z e d .
  • 73. GREENFIELD Cross over bridge GRAIN FACILIT Y – SOUTH DAKOTA The manlift to w e r e n c l o s e d with siding. Tw o c r o s s o v e r Manlift tower bridges span o v e r to t h e m a i n b u c ket e l ev a to r to w e r. 110’ Above silo roof deck Cross over bridge
  • 74. Cross over GREENFIELD bridge GRAIN FACILIT Y – SOUTH Manlift tower DAKOTA Grain screener C o m p lete d m a i n b u c ket e l ev a to r to w e r with siding enclosing the m a n l i f t . N o te the two cross over bridges from the Cross over m a n l i f t s h a f t to bridge t h e m a i n to w e r. conveyor HSS bracing struts
  • 75. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y - ILLINOIS This p h o to g r a p h shows the main b u c ket e l ev a to r to w e r. T h i s to w e r s i t s o n two W36 beams that span 60 b et w e e n s i l o g r o up s . A l l t h e s t r uc t ur a l s te e l and bar grating was galvanized.
  • 76. ILLINOIS GREENFIELD GRAIN FACILITY Wet g r a i n b u c ket e l ev a to r to w e r. T h i s to w e r c o n t a i n s a p l a t fo r m t h a t is knee braced o u t 1 4 f e et b eyo n d t h e e n d of the silo g r o up .
  • 77. GREENFIELD GRAIN FACILITY ILLINOIS V i ew f r o m m a i n to w e r l o o k i n g down on the silo roof deck showing three enclosed c o nv eyo r s y s te m s o n t h e roof slab.
  • 78. GREENFIELD GRAIN FACILITY ILLINOIS View of the main b u c ke t e l e v a to r to we r b e t w e e n silo groups. The e l e v a to r l e g s a r e braced at 20 76’ Ø f o o t i n te r v a l s . Silo Group Building under construction in the foreground is the grain truck receiving building.
  • 79. GREENFIELD GRAIN FACILITY ILLINOIS Bulk Weigh This Equipment p h o to g r a p h shows the bulk w e i g h s t r u c t ur e and bulk w e i g h er. A f te r the grain is weighed it is l o a d e d i n to r a i l cars for shipping.
  • 80. GREENFIELD GRAIN FACILITY ILLINOIS Bulk weigh s t r uc t ur e a n d t w o s to r y M C C building. Rigid frames are b e i n g s et f o r the rail load o u t b u i l d in g .
  • 81. GREENFIELD GRAIN FACILITY ILLINOIS V i ew o f w et g r a i n b u c ket e l ev a to r s g o i n g u p . G r a i n d r ye r is in the f o r e g ro un d . 38’ Ø Silo Grain Dryer
  • 82. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y O v e r a l l v i ew o f t h e n ew g r a i n f a c i l i t y.
  • 83. GREENFIELD GRAIN FACILITY ILLINOIS A e r i a l v i ew o f t h e n ew g r o u n d pile for a d d i t io n a l g r a i n s to r a g e .
  • 84. GREENFIELD GRAIN FACILITY ILLINOIS T h i s p h o to Wet Grain s h o w s t h e w et g r a i n b u c ket Bucket Elevators e l ev a to r s a n d t h e d r ye r. 38’ Diameter Silos Grain Dryer
  • 85. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y - ILLINOIS O v e r a l l v i ew o f t h e p r o j ec t . 76’ Ø Silos 38’ Ø Silos
  • 86. GREENFIELD GRAIN FACILIT Y - ILLINOIS 4-76’ Ø Silos 2-38’ Ø Dryer Silos
  • 87. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y - ILLINOIS Wet g r a i n b u c ket e l ev a to r s .
  • 88. GREENFIELD GRAIN FACILITY ILLINOIS V i ew o f t h e Conveyor c o nv eyo r b r i d g e that feeds the Bridge Feeding g r o un d p i l e . Ground Pile
  • 89. GREENFIELD GRAIN FACILITY ILLINOIS V i ew o f t h e Bulk bulk weigher Weigh e q u i pm e n t t h a t Equip. feeds the rail cars in the load o u t b u i l d in g . Fall Protection System Rail Load Out Building
  • 90. GREENFIELD GRAIN FACILITY ILLINOIS O v e r a l l v i ew o f Bulk Future the bulk Weigh weigher Conveyor Equip. equipment. Support Rail Load Out Building
  • 91. GREENFIELD GRAIN FACILITY ILLINOIS P h o to o f t h e Grain rail car load Screener o u t b u i l din g and the bulk weigher equipment. Rail Load Out
  • 92. GREENFIELD GRAIN FACILITY ILLINOIS P h o to o f t h e t r uc k r e c e i v i n g building (2 pits) and the Fines fines hopper Bin tank. Truck Hopper Receiving Tank Building Silo Aeration Fans
  • 93. GREENFIELD GRAIN FACILITY ILLINOIS Overall project Main Bucket v i ew. Elevator Tower Wet Grain Elevator Tower 76’ ϕ Silos
  • 94. GREENFIELD GRAIN FACILITY ILLINOIS P h o to l o o k i n g down at the grain screener and a portion of the ground pile. Grain Screener
  • 95. GREENFIELD GRAIN FACILITY ILLINOIS P h o to o f t h e m a i n b u c ket Main Bucket e l ev a to r to w e r. Elevator Tower Monorail Hoist Beam Bucket Elevator Head Section Conveyor
  • 96. GREENFIELD Manlift GRAIN Hoist FACILIT Y V i ew o f t h e m a n l i f t to w e r a d j a c e n t to t h e m a i n b u c ket Bucket e l ev a to r to w e r. Elevator Manlift Head Tower Section Conveyor
  • 97. GREENFIELD GRAIIN FACILIT Y - ILLINOIS P h o to g r a p h o f the manlift to w e r a n d h o i s t visible in the m a c hi n e r o o m .
  • 98. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y - ILLINOIS N ew g r o u n d pile for a d d i t io n a l g r a i n s to r a g e . Ground Pile Grain Storage
  • 99. GREENFIELD GREENFIELD GRAIN FACILITY GRAIN FACILIT Y Wet g r a i n b u c ket e l ev a to r s . Wet Grain Bucket Elevator Tower Conveyor
  • 100. ILLINOIS GREENFIELD GRAIN FACILITY V i ew o f t h e Fines Screener bulk weigh equipment Conveyor s u p p o r te d above the rail l o a d - o ut b u i l di n g . Upper Garner Bulk Weigher Rail Load-out Building
  • 101. GREENFIELD GRAIN FACILITY ILLINOIS This p h o to g r a p h s h o w s a s te e l bridge beam supporting the fines bin above and t r a n s f e r r in g t h e load over an ex i s t i n g t u n n e l b e l ow. W24x104 Bridge Beam Over Tunnel Below
  • 102. GREENFIELD GRAIN FACILITY ILLINOIS Bearing s t i f fe n e r u n d e r the bin support c o l um n . W24x104 Bearing Stiffener
  • 103. Thank you for Viewing My Project Profile at Adams Building Contractors Robert S. Downey, PE, LEED® AP 22180 Cape Cod Way Farmington Hills, MI 48336 r-downey@att.net Mobile: 248.687.4711