SlideShare a Scribd company logo
1 of 52
Introduction
Site Engineering Solution For Mobilink
BY
Faran Ul Ghani/Du Erning
Purpose
• This ppt will describe in detail the site
engineering swap solutions from existing BTS
to new ZTE BTS/NodeB
Key Points
• Difference between Integrated Solution and
Distributed Solution.
• Original BTS swapped with ZTE BS8700
• BBU Installed in 8910A cabinet.
BTS Swap Scenarios
• Outdoor Macro Site swapped to Outdoor
distributed site (IDU Installed in BC Cab)
• Outdoor Macro Site swapped to Outdoor
distributed site (IDU Installed in Rectifier)
• Indoor Macro Site Swap to Outdoor
Distributed Site
• Indoor Macro Site Swap to Outdoor
Distributed Site (After New Rec Move ZTE BTS
Outdoor
Outdoor Scenario Before Swap
After Swap
Outdoor to Outdoor
Scenario -2
After Swap
Note: If IDU are less than 3, we will remain the IDU in REC
Indoor to Outdoor
Scenario -3
After Swap
Note: Pre Install recti and ZTE BTS to prop location, IDU will remain in shelter
Indoor to Outdoor
Scenario -4
After Swap-1
After Swap-2
Secondary Swap
Note: Secondary Swap need after new recti ready
Indoor to Indoor
Scenario -5
After Swap
RF System Swap Solution
There are 6 RF system scenarios during the Site Swap
RF Scenario
900M 1800M 1 Sector 2 or 3 Sectors
• Single band S1-S4 R8881 R8863
• Single band S5-S8 R8881 x2 R8863 x2
• S1~S4 S1~S4 R8881 x2 R8863 x2
• S1~S4 S5~S8 R8881 x3 R8863 x3
• S5~S8 S1~S4 R8881 x3 R8863 x3
• S5~S8 S5~S8 R8881 x4 R8863 x4
• Any sector has a configure which is more than 8 TRXs, R8881 will be used
for all the sectors.
Scenario-1
Single band 900M or 1800M sector
only.S1-S4
Scenario-2
Single band 900M or 1800M S5-S8
Scenario-3
Dual band 900M S1-S4 +1800M S1-S4
Scenario-4
Dual band 900M S1-S4, 1800M S5-S8
Scenario-5
Dual band 900M S5-8, 1800M S1-4
Scenario-5 CONT
Scenario-6
Dual band 900M S5-S8 , 1800M S5-S8
Scenario-6 CONT
Scenario-7
UMTS swap
This scenario is showing the 3G swap
• Distributed site: Original 3G RU is installed on
the tower.
During the swap, dismantle the original RRU and install ZTE R8881/R8863
in the old location. Connect the jumpers from RRU to the 2100M port of
the antenna.
• Macro site: Original 3G RU in the cabinet
For some sharing site, there is no space on the tower to install RRU, The RRUs will
be installed on the ground with a pole. During the swap, original feeders will be
reused, connect the jumpers from RRU to original feeders.
FS- RRU Relations
• R8881 connection
The connections between FS and R8881 should comply with the following rules:
• In case of using one FS board: The FS board is placed at slot3 of BBU, An additional
FS board will be configured at slot 4 when there are more than 6 sectors.
• Each sector takes one FS port. The secondary R8881 for the same sector will be
cascaded to the first R8881.
• The ports of FS board are numbered from 0 to 5 (from right to left).The RRU units
are connected to the FS ports in the following order from port No. 0 to port No. 5:
• Not more than 6 sectors:
GSM 900 R8881 in order of cells (lower at first) takes 0, 1, and 2
DCS1800 R8881 in order of cells (lower at first) takes 3, 4, and 5
R8881 connection CONT
• More than 6 sectors:
GSM 900 R8881 in order of cells (lower at first) takes 0, 1, 2, 3…..(FS board in slot3)
DCS1800 R8881 in order of cells (lower at first) takes 0, 1, 2, 3…..(FS board in slot4)
UMTS2100 R8881 in order of cells (lower at first) takes 3,4,5 ports of the FS board in
slot4.
R8863 connection
The connections between FS and R8863 should comply with the following rules:
• In case of using one FS board: The FS board is placed at slot3 of BBU.
• Each R8863 takes one FS port. The secondary R8863 will directly connect to the FS
board instead of cascading.
• The ports of FS board are numbered from 0 to 5 (from right to left).The RRU units
are connected to the FS ports in the following order from port No. 0 to port No. 5:
• An additional FS board will be added in the 3G site.
GSM 900 R8863 in order of cells (lower at first) takes 0, 1, and 2
DCS1800 R8863 in order of cells (lower at first) takes 3, 4, and 5
UMTS2100 R8863 in order of cells (lower at first) takes 0,1, and 2 of FS in slot4
RET connection
• R8881
The distance between RRU to Antenna is less
than 6m ,One standard AISG cable for each
sector.
R8881 CONT
The distance between RRU and Antenna is more than 6m ,NSBT and ASBT will be
configured for each sector, connect RRU and NSBT with a AISG special cable (DB15 to
AISG), and ASBT to the RCU with a AISG standard cable (AISG to AISG).
RET R8863
An AISG special cable connect the R8863 to the
RCU for sector A, then cascade the RCU for
sector B and C.
Power Supply Solution
All RRUs will be connected to the LLVD 25A breakers
on existing rectifier.
IF more than 6 RRUs are configured
• R8881: parallel connect two RRUs to one breaker.
• R8863: connect one RRU to one 25A breaker, add
additional breaker when there are more than 6
R8863.
DCPD7 will be used in the BC cabinet for the BBU&IDU power supply,
which is connected to the BLVD breaker of the existing rectifier.
DCPD7
New power system swap.
As Mobilink planned, the new Rectifier will be
installed.
Before new rectifier installed, an new ATS and DB
will be installed outdoor which will provide the
power to the new rectifier.
During the secondary swap, reconnect the power
cable of original rectifier to the new built ATS and
DB. After all equipments working normally,
dismantle the original ATS and DB.
New Power System Swap
New Power System Swap
Transmission solution
In the phase 2, Ericson is using IP for the BTS
transmission. All the phase 2 site will use an
Ethernet cable connecting from IDU to CC
board.
For the outdoor sites, a LPU will be configured
for the Lightning protection Unit (LPU). All the
signalling cables which is lying out of the BC
cabinet, should be connected to the LPU first
Transmission Solution
External Alarm Solution
For Outdoor Sites
PIN and Colour definition
SA board
Labels Guideline
The following items should be abided when fix labels:
• Labels shall be affixed facing the same direction, and the side that
indicates the cabling direction shall face upward or face the side of
operation and maintenance for ease of reading.
• Both ends of each cable (power cable, grounding cable,
transmission cable, jumper wire, and so on) shall be affixed with
labels.
• Labels shall be affixed in a neat and workmanlike manner.
• A label shall be affixed 200 mm from each end of a feeder, or 20
mm from each end of a power cable, network cable, signal cable or
fibre.
• Affix labels on the cables distributed vertically and horizontally in
the way shown in the following figure.
Feeder and Jumper Labels
Requirement
[Label Format]
Sector ID- ANT1/2
[Labelling Conditions]
• Sector ID: Ranges from S1 to S4
• ANT1 for TX/RX, ANT2 for RX
Optical Fibre Labels Requirement
[Label Format]
Sector ID- OPB/OPR
[Labelling Conditions]
• Sector ID: Ranges from S1 to S4
• OPB: Used on BBU side; OPR: Used on RRU
side
Optical Fibre Labels Requirement
CONT
When connect RRUs to BBU FS board with optical fibre, it’s very easy to make
mistake. So ZTE require all the partners use temporary labels on the fibre's
when lay them.
The temporary label for fibres requirements are as follows:
[Label Format]
Fiber-SystemID-SectorID-1/2
[Labelling Conditions]
• System ID:GSM900 DCS1800
• Sector ID: Ranges from S1 to S4
• 1/2 means the fiber quantity in one sector
[Labelling Conditions]
Label of Main DC Cable
[Label Format]
PWR
[Labelling Conditions]
• Main DC cable include DC power cable of
BS8800, ILP ,DCPD4 and so on.
Label of Outdoor LPB (OLP)
[Label Format]
Sector ID-PWR
[Labeling Conditions]
• Sector ID: Ranges from S1 to S4
• PWR means power.
Label of GPS feeder
Label of Alarm Cable
Label of MW IF Cable
[Label Format]
MU1-ODU1
[Labelling Conditions]
• If IDU more than one, A red remark used to
identify them
Label of Grounding Cable
THE END
Have a Good DAY

More Related Content

What's hot

Soft x3000 operation manual configuration guide
Soft x3000 operation manual configuration guideSoft x3000 operation manual configuration guide
Soft x3000 operation manual configuration guide
Tuhin Narayan
 
Ericsson BTS commisioning
Ericsson BTS commisioningEricsson BTS commisioning
Ericsson BTS commisioning
Shahid Rasool
 
dokumen.tips_ericsson-lte-throughput-troubleshooting-techniques_SUPERRRRRRR.ppt
dokumen.tips_ericsson-lte-throughput-troubleshooting-techniques_SUPERRRRRRR.pptdokumen.tips_ericsson-lte-throughput-troubleshooting-techniques_SUPERRRRRRR.ppt
dokumen.tips_ericsson-lte-throughput-troubleshooting-techniques_SUPERRRRRRR.ppt
LibaBali
 

What's hot (20)

Introduction to-zxsdr-products-gsm
Introduction to-zxsdr-products-gsmIntroduction to-zxsdr-products-gsm
Introduction to-zxsdr-products-gsm
 
Huawei XPIC Hardware Connection
Huawei XPIC Hardware ConnectionHuawei XPIC Hardware Connection
Huawei XPIC Hardware Connection
 
ZTE BTS Manual
ZTE BTS ManualZTE BTS Manual
ZTE BTS Manual
 
Handling Common Faults and Alarms for Huawei RTN Microwaves
Handling Common Faults and Alarms for Huawei RTN MicrowavesHandling Common Faults and Alarms for Huawei RTN Microwaves
Handling Common Faults and Alarms for Huawei RTN Microwaves
 
Huawei BTS 3900 Hardware Structure
Huawei BTS 3900 Hardware StructureHuawei BTS 3900 Hardware Structure
Huawei BTS 3900 Hardware Structure
 
Ericsson RBS 6000
Ericsson RBS 6000Ericsson RBS 6000
Ericsson RBS 6000
 
SGSN- serving gprs support node - Platform - HW, SW and CLI
SGSN- serving gprs support node  - Platform - HW, SW and CLI SGSN- serving gprs support node  - Platform - HW, SW and CLI
SGSN- serving gprs support node - Platform - HW, SW and CLI
 
Antenna Installation Engineering.
Antenna Installation Engineering.Antenna Installation Engineering.
Antenna Installation Engineering.
 
Soft x3000 operation manual configuration guide
Soft x3000 operation manual configuration guideSoft x3000 operation manual configuration guide
Soft x3000 operation manual configuration guide
 
Rtn
RtnRtn
Rtn
 
TDM Traffic Migration into IP Backhaul
TDM Traffic Migration into IP BackhaulTDM Traffic Migration into IP Backhaul
TDM Traffic Migration into IP Backhaul
 
Gsm basics
Gsm basicsGsm basics
Gsm basics
 
Ip ran v1.1
Ip ran v1.1Ip ran v1.1
Ip ran v1.1
 
Ericsson BTS commisioning
Ericsson BTS commisioningEricsson BTS commisioning
Ericsson BTS commisioning
 
CS-Core Mobile Network (General)
CS-Core Mobile Network (General)CS-Core Mobile Network (General)
CS-Core Mobile Network (General)
 
Nokia LTE IP Planning Guide
Nokia LTE IP Planning GuideNokia LTE IP Planning Guide
Nokia LTE IP Planning Guide
 
SRAN19 dimensioning.pdf
SRAN19 dimensioning.pdfSRAN19 dimensioning.pdf
SRAN19 dimensioning.pdf
 
Ericsson TN Cards in Details
Ericsson TN Cards in DetailsEricsson TN Cards in Details
Ericsson TN Cards in Details
 
dokumen.tips_ericsson-lte-throughput-troubleshooting-techniques_SUPERRRRRRR.ppt
dokumen.tips_ericsson-lte-throughput-troubleshooting-techniques_SUPERRRRRRR.pptdokumen.tips_ericsson-lte-throughput-troubleshooting-techniques_SUPERRRRRRR.ppt
dokumen.tips_ericsson-lte-throughput-troubleshooting-techniques_SUPERRRRRRR.ppt
 
Huawei DBS 3900 Hardware Structure
Huawei DBS 3900 Hardware StructureHuawei DBS 3900 Hardware Structure
Huawei DBS 3900 Hardware Structure
 

Similar to zte mobilink bts swap

toaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdf
toaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdftoaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdf
toaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdf
wafawafa52
 
Mobilink Project On Site Swap SOP V2_4
Mobilink Project On Site Swap SOP V2_4Mobilink Project On Site Swap SOP V2_4
Mobilink Project On Site Swap SOP V2_4
ij qkka
 

Similar to zte mobilink bts swap (20)

Rmu710 b 1-autres_fiches_en
Rmu710 b 1-autres_fiches_enRmu710 b 1-autres_fiches_en
Rmu710 b 1-autres_fiches_en
 
eNB Introduction and I&C.tejas networkpptx
eNB Introduction and I&C.tejas networkpptxeNB Introduction and I&C.tejas networkpptx
eNB Introduction and I&C.tejas networkpptx
 
American Fibertek MTX-91685C-SL User Manual
American Fibertek MTX-91685C-SL User ManualAmerican Fibertek MTX-91685C-SL User Manual
American Fibertek MTX-91685C-SL User Manual
 
45555555555-4G-Training .pptx
45555555555-4G-Training            .pptx45555555555-4G-Training            .pptx
45555555555-4G-Training .pptx
 
Rms705 b 1-autres_fiches_en
Rms705 b 1-autres_fiches_enRms705 b 1-autres_fiches_en
Rms705 b 1-autres_fiches_en
 
519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdf
519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdf519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdf
519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdf
 
toaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdf
toaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdftoaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdf
toaz.info-5g-solution-overview-pr_306866f43cebfb285586e3dd90989b89.pdf
 
American Fibertek MRX986UTP User Manual
American Fibertek MRX986UTP User ManualAmerican Fibertek MRX986UTP User Manual
American Fibertek MRX986UTP User Manual
 
Mobilink Project On Site Swap SOP V2_4
Mobilink Project On Site Swap SOP V2_4Mobilink Project On Site Swap SOP V2_4
Mobilink Project On Site Swap SOP V2_4
 
Drive Training - Copy.pptx
Drive Training - Copy.pptxDrive Training - Copy.pptx
Drive Training - Copy.pptx
 
IBS Training
IBS TrainingIBS Training
IBS Training
 
BlueOptics Bo31j15680dc 10gbase-zr xfp transceiver 1550nm 80km singlemode lc ...
BlueOptics Bo31j15680dc 10gbase-zr xfp transceiver 1550nm 80km singlemode lc ...BlueOptics Bo31j15680dc 10gbase-zr xfp transceiver 1550nm 80km singlemode lc ...
BlueOptics Bo31j15680dc 10gbase-zr xfp transceiver 1550nm 80km singlemode lc ...
 
SON Server Web KPI Portal 4G DT Analysis Cases Module.pptx
SON Server Web KPI Portal  4G DT Analysis Cases Module.pptxSON Server Web KPI Portal  4G DT Analysis Cases Module.pptx
SON Server Web KPI Portal 4G DT Analysis Cases Module.pptx
 
Ipmu ic procedure
Ipmu ic procedureIpmu ic procedure
Ipmu ic procedure
 
American Fibertek RR944C User Manual
American Fibertek RR944C User ManualAmerican Fibertek RR944C User Manual
American Fibertek RR944C User Manual
 
BlueOptics BO31J13610DC 10GBASE-LR XFP Transceiver 1310nm 10KM Singlemode LC ...
BlueOptics BO31J13610DC 10GBASE-LR XFP Transceiver 1310nm 10KM Singlemode LC ...BlueOptics BO31J13610DC 10GBASE-LR XFP Transceiver 1310nm 10KM Singlemode LC ...
BlueOptics BO31J13610DC 10GBASE-LR XFP Transceiver 1310nm 10KM Singlemode LC ...
 
Bts installation & commisioning.ppt
Bts installation & commisioning.pptBts installation & commisioning.ppt
Bts installation & commisioning.ppt
 
EtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptxEtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptx
 
10Gb/s DWDM SFP+ Transceiver Hot Pluggable, Duplex LC, +3.3V, 100GHz ITU Grid...
10Gb/s DWDM SFP+ Transceiver Hot Pluggable, Duplex LC, +3.3V, 100GHz ITU Grid...10Gb/s DWDM SFP+ Transceiver Hot Pluggable, Duplex LC, +3.3V, 100GHz ITU Grid...
10Gb/s DWDM SFP+ Transceiver Hot Pluggable, Duplex LC, +3.3V, 100GHz ITU Grid...
 
Gpon Network
Gpon NetworkGpon Network
Gpon Network
 

Recently uploaded

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 

Recently uploaded (20)

kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 

zte mobilink bts swap

  • 1. Introduction Site Engineering Solution For Mobilink BY Faran Ul Ghani/Du Erning
  • 2. Purpose • This ppt will describe in detail the site engineering swap solutions from existing BTS to new ZTE BTS/NodeB
  • 3. Key Points • Difference between Integrated Solution and Distributed Solution. • Original BTS swapped with ZTE BS8700 • BBU Installed in 8910A cabinet.
  • 4. BTS Swap Scenarios • Outdoor Macro Site swapped to Outdoor distributed site (IDU Installed in BC Cab) • Outdoor Macro Site swapped to Outdoor distributed site (IDU Installed in Rectifier) • Indoor Macro Site Swap to Outdoor Distributed Site • Indoor Macro Site Swap to Outdoor Distributed Site (After New Rec Move ZTE BTS Outdoor
  • 8. After Swap Note: If IDU are less than 3, we will remain the IDU in REC
  • 10. After Swap Note: Pre Install recti and ZTE BTS to prop location, IDU will remain in shelter
  • 13. After Swap-2 Secondary Swap Note: Secondary Swap need after new recti ready
  • 16. RF System Swap Solution There are 6 RF system scenarios during the Site Swap RF Scenario 900M 1800M 1 Sector 2 or 3 Sectors • Single band S1-S4 R8881 R8863 • Single band S5-S8 R8881 x2 R8863 x2 • S1~S4 S1~S4 R8881 x2 R8863 x2 • S1~S4 S5~S8 R8881 x3 R8863 x3 • S5~S8 S1~S4 R8881 x3 R8863 x3 • S5~S8 S5~S8 R8881 x4 R8863 x4 • Any sector has a configure which is more than 8 TRXs, R8881 will be used for all the sectors.
  • 17. Scenario-1 Single band 900M or 1800M sector only.S1-S4
  • 18. Scenario-2 Single band 900M or 1800M S5-S8
  • 19. Scenario-3 Dual band 900M S1-S4 +1800M S1-S4
  • 20. Scenario-4 Dual band 900M S1-S4, 1800M S5-S8
  • 21. Scenario-5 Dual band 900M S5-8, 1800M S1-4
  • 23. Scenario-6 Dual band 900M S5-S8 , 1800M S5-S8
  • 25. Scenario-7 UMTS swap This scenario is showing the 3G swap • Distributed site: Original 3G RU is installed on the tower. During the swap, dismantle the original RRU and install ZTE R8881/R8863 in the old location. Connect the jumpers from RRU to the 2100M port of the antenna. • Macro site: Original 3G RU in the cabinet For some sharing site, there is no space on the tower to install RRU, The RRUs will be installed on the ground with a pole. During the swap, original feeders will be reused, connect the jumpers from RRU to original feeders.
  • 26. FS- RRU Relations • R8881 connection The connections between FS and R8881 should comply with the following rules: • In case of using one FS board: The FS board is placed at slot3 of BBU, An additional FS board will be configured at slot 4 when there are more than 6 sectors. • Each sector takes one FS port. The secondary R8881 for the same sector will be cascaded to the first R8881. • The ports of FS board are numbered from 0 to 5 (from right to left).The RRU units are connected to the FS ports in the following order from port No. 0 to port No. 5: • Not more than 6 sectors: GSM 900 R8881 in order of cells (lower at first) takes 0, 1, and 2 DCS1800 R8881 in order of cells (lower at first) takes 3, 4, and 5
  • 27. R8881 connection CONT • More than 6 sectors: GSM 900 R8881 in order of cells (lower at first) takes 0, 1, 2, 3…..(FS board in slot3) DCS1800 R8881 in order of cells (lower at first) takes 0, 1, 2, 3…..(FS board in slot4) UMTS2100 R8881 in order of cells (lower at first) takes 3,4,5 ports of the FS board in slot4.
  • 28. R8863 connection The connections between FS and R8863 should comply with the following rules: • In case of using one FS board: The FS board is placed at slot3 of BBU. • Each R8863 takes one FS port. The secondary R8863 will directly connect to the FS board instead of cascading. • The ports of FS board are numbered from 0 to 5 (from right to left).The RRU units are connected to the FS ports in the following order from port No. 0 to port No. 5: • An additional FS board will be added in the 3G site. GSM 900 R8863 in order of cells (lower at first) takes 0, 1, and 2 DCS1800 R8863 in order of cells (lower at first) takes 3, 4, and 5 UMTS2100 R8863 in order of cells (lower at first) takes 0,1, and 2 of FS in slot4
  • 29. RET connection • R8881 The distance between RRU to Antenna is less than 6m ,One standard AISG cable for each sector.
  • 30. R8881 CONT The distance between RRU and Antenna is more than 6m ,NSBT and ASBT will be configured for each sector, connect RRU and NSBT with a AISG special cable (DB15 to AISG), and ASBT to the RCU with a AISG standard cable (AISG to AISG).
  • 31. RET R8863 An AISG special cable connect the R8863 to the RCU for sector A, then cascade the RCU for sector B and C.
  • 32. Power Supply Solution All RRUs will be connected to the LLVD 25A breakers on existing rectifier. IF more than 6 RRUs are configured • R8881: parallel connect two RRUs to one breaker. • R8863: connect one RRU to one 25A breaker, add additional breaker when there are more than 6 R8863. DCPD7 will be used in the BC cabinet for the BBU&IDU power supply, which is connected to the BLVD breaker of the existing rectifier.
  • 33. DCPD7
  • 34. New power system swap. As Mobilink planned, the new Rectifier will be installed. Before new rectifier installed, an new ATS and DB will be installed outdoor which will provide the power to the new rectifier. During the secondary swap, reconnect the power cable of original rectifier to the new built ATS and DB. After all equipments working normally, dismantle the original ATS and DB.
  • 37. Transmission solution In the phase 2, Ericson is using IP for the BTS transmission. All the phase 2 site will use an Ethernet cable connecting from IDU to CC board. For the outdoor sites, a LPU will be configured for the Lightning protection Unit (LPU). All the signalling cables which is lying out of the BC cabinet, should be connected to the LPU first
  • 41. PIN and Colour definition SA board
  • 42. Labels Guideline The following items should be abided when fix labels: • Labels shall be affixed facing the same direction, and the side that indicates the cabling direction shall face upward or face the side of operation and maintenance for ease of reading. • Both ends of each cable (power cable, grounding cable, transmission cable, jumper wire, and so on) shall be affixed with labels. • Labels shall be affixed in a neat and workmanlike manner. • A label shall be affixed 200 mm from each end of a feeder, or 20 mm from each end of a power cable, network cable, signal cable or fibre. • Affix labels on the cables distributed vertically and horizontally in the way shown in the following figure.
  • 43. Feeder and Jumper Labels Requirement [Label Format] Sector ID- ANT1/2 [Labelling Conditions] • Sector ID: Ranges from S1 to S4 • ANT1 for TX/RX, ANT2 for RX
  • 44. Optical Fibre Labels Requirement [Label Format] Sector ID- OPB/OPR [Labelling Conditions] • Sector ID: Ranges from S1 to S4 • OPB: Used on BBU side; OPR: Used on RRU side
  • 45. Optical Fibre Labels Requirement CONT When connect RRUs to BBU FS board with optical fibre, it’s very easy to make mistake. So ZTE require all the partners use temporary labels on the fibre's when lay them. The temporary label for fibres requirements are as follows: [Label Format] Fiber-SystemID-SectorID-1/2 [Labelling Conditions] • System ID:GSM900 DCS1800 • Sector ID: Ranges from S1 to S4 • 1/2 means the fiber quantity in one sector [Labelling Conditions]
  • 46. Label of Main DC Cable [Label Format] PWR [Labelling Conditions] • Main DC cable include DC power cable of BS8800, ILP ,DCPD4 and so on.
  • 47. Label of Outdoor LPB (OLP) [Label Format] Sector ID-PWR [Labeling Conditions] • Sector ID: Ranges from S1 to S4 • PWR means power.
  • 48. Label of GPS feeder
  • 49. Label of Alarm Cable
  • 50. Label of MW IF Cable [Label Format] MU1-ODU1 [Labelling Conditions] • If IDU more than one, A red remark used to identify them
  • 52. THE END Have a Good DAY