PREPARED BY
Er. Kashmir Dass
M.E. (Hons.) Civil
Sr. Lecturer in Civil Engineering,
Govt. Polytechnic College, Badbar
ANALYSIS OF RATES
• To determine the rate of a particular item
of work from a quantities of materials and
labours required and their costs
• The rates of materials and labour are
changing from place to place, therefore the
rates o different items of work also
changes from place to place
ANALYSIS OF RATES
• Every Estimate should be accompanied
by the analysis of rates of the items
provided in it .
• Analysis of rates comprises of
1. Cost of Material
2. Cost of Labour
3. T and P , and Sundries
4. Carriage
5. Contractor’s Profit
ANALYSIS OF RATES
• Tools and Plants ( T & P ) = 2.5 to 3 % of
the labour cost
• Transportation cost more than 8 km is
considered
• Water charges = 1.5 to 2 % 0f total cost
• Contractor ‘ s profit = 10 %
ANALYSIS OF RATES
• Rates of Materials and Labours :
• 1st class bricks = Rs 4500 per 1000 Nos.
• 2nd class bricks = Rs 4000 per 1000
Nos.
• Brick Ballast = Rs 800 per cum
• Coarse sand = Rs 800 per cum
• Cement 50 kg bag = Rs 270 per bag
• Twisted bars = Rs 5000 per Quintel
• Bitumen = Rs 10 per kg
ANALYSIS OF RATES
• Mason = Rs 450 per day
• Plaster = Rs 400 per day
• Carpenter = Rs 400 per day
• Bhishti = Rs 250 per day
• Mazdoor = Rs 250 per day
• Painter = Rs 300 per day
ANALYSIS OF RATES
• Earth work in excavation: Mazdoor = 33
(% cum) Mason = 1.5
• Earth work in Filling : Mazdoor = 18
(% cum) Mason = 0.5
• Cement concrete : Mazdoor = 15
in foundation Mason =1.5
Bhishti = 2
ANALYSIS OF RATES
• Cement concrete : Mazdoor = 15
Mason = 1
Bhishti = 2.5
• R. Cement concrete : Mazdoor = 40
(10 cum ) Mason = 2.5
Bhishti = 5
Blacksmith = 4
Carpenter = 4
ANALYSIS OF RATES
• DPC : Mazdoor = 2.5
(10 cum ) Mason = 1.5
Bhishti = 0.5
• 1st class brick work : Mazdoor = 15
Mason = 8
Bhishti = 2
ANALYSIS OF RATES
• Plastering work : Mazdoor = 10
( 100 sqm) Mason = 10
Bhishti = 2
• Distempering/painting/white washing :
Mazdoor = 5
( 100 sqm) Painter = 4
ANALYSIS OF RATES
Example 1. Find out dry materials required
for 1 cu m. C. concrete 1:4:8 in foundation.
Solution.
Ratio = 1:4:8 (cement,sand and aggregate)
Sum = 1+4+8=13
cont..
Total dry mortar for 1 cu m cement concrete
=1.54 cu m
Therefore the following materials are
required:
Cement = (1*1.54*28.8)/13
= 3.41 bags
Sand = (4*1.54)/13
= 0.47 cu m
cont..
Aggregate (Brick ballast) = (8*1.57)/13
= 0.94 cu m
so materials for 1 cu m cement concrete
1:4:8.
Cement 3.41 bags
Sand 0.47 cu m Ans.
Brick ballast 0.94 cu m
Example 2. Find out dry materials for 1
cu m lime concrete.
Solution:
Ratio = 1:2 (lime,surkhi)
Sum = 1+2
= 3
Total dry mortar for 1 cu m lime concrete
= 0.40 (lime, surkhi mortar)
Therefore the following materials are
required.
Lime = (1*0.40)/3
= 0.13 cu m
Surkhi = (2*0.40)/3
= 0.27 cu m
Aggregate (brick ballast) = 1.00 cu m
Materials required for1 cu m lime cocrete 1:2
Lime 0.13 cu m
Surkhi 0.27 cu m Ans.
Brick ballast 1.00 cu m
ANALYSIS OF RATES OF
DIFFERENT ITEMS OF WORK.
1. Excavation for foundation: payment
% cu m
(a)Materials at the site for % cu m nil
No material is required Rs. P.
(b)labour for % cu m
Mazdoor 33 nos.@ 250.00/day = 8250.00
Mason 1 no. @ 450.00 = 450.00
Sundries and Tand P 3%
on labour = 261.00
Total = 8961.00
(c)Add 10% contractor’s profit = 896.10
grand total =9857.10
say Rs. = 9857.00
Rate per % cu m = Rs. 9857.00
2.Earth filling under floors payment % cu m
(a)Materials at site for %cu m Rs.P.
No material is required nil
(b) Labour for % cu m
Majdoor18nos.@250.00/day =4500.00
Bhishti 1/2no.@250.00/day = 125.00
Sundries and Tand P3% on
labour 465.00 = 123.75
total = 4748.75
Add 10% contractor’s profit = 474.87
G.Total= 5223.62 say Rs.=5224.00
Rate per % cu m = Rs. 5224.00
3. Cement concrete 1:4:8 in foundations
(a) Materials at site for 1 cu m payment
per cu m
Cement 3.41 bags @270 bag = 929.70
Sand 0.47 cu m @800.00 per cu m=376.00
Brick ballast 0.94 cu m @ 800.00
= 752.00
Cost of labour for 10 cu m = 7520.00
(b)Labour for 10 cu m Rs. P
Mason 1@ 400.00/ day = 400.00
Mazdoors 15@ 250.00/ day = 3750.00
Bhishti 2@ 250.oo/ day = 500.00
Sundries and Tand P @ 3%
on labour = 139.50
• Cost of for 10 cu m = 12309.50
• Cost of for 1 cu m =12309.50/10
• =1230.95
• PROBLEM: Conglomerate floor 4 cm thick
of cement concrete 1:2:4 over 10 cm thick
cement concrete 1:6:18 over 10 cm sand
filling.
calculation of material for 10 sq m
(1) Wet mortar for cement concrete
1:2:4= 10 sq m*4cm
= 10*4/100
=0.40cu m
Dry mortar = 0.40*1.54=0.616+0.62 cu m
Ratio = 1:2:4 Sum =1+2+4=7
Cement = 1*0.62*28.8/7 =2.55 bags
Sand = 2*0.62/7 = 0.18 cu m
Crusher = 4*0.62/7=0.36 cu m
(2)Wet mortar for cement concrete 1:6:18
= 10 sq m*10 cm
=10*10/100
=1 cu m
Dry mortar 1*1.54 =1.54cu m
Ratio =1:6:18=1+6+18
= 25
Cement = 1*1.54*28.8/25
= 1.78 bags
Sand =6*1.54/25
= 0.37 cu m
Brick ballast = 18*1.54/2
= 1.11 cu m
(3) Sand for 10 sq m = 10 sq m* 10 cm
= 10*10/10
= 1 cu m
Total dry mortar for 10 sq m conglomerate
flooring.
Cement = 2.55+1.78
Sand = 0.18+0.37+1.00
Crusher = 0.46
(a) Materials at site for 10 sq m Rs.P
Cement 4.33 bags @ 270.00/bag = 1170.00
sand 1.55 cum@ 800.00 per cu m = 1240.00
Crusher 0.36 cu m @1200 /cu m = 432.00
Brick ballast 1.11 cu m@ 800 / cu m = 888.00
Cost of material for 10 sq m =3730.00
(b) Labour for 10 sq m Rs. P
Mason 2@ 400.00/ day = 900.00
Mazdoor 3@ 250.00/day = 750.00
Bhishti 1@ 250.00 / day = 250.00
Sundries T and P 3% on labour
= 57.00
Cost of labour for 10 sq m = 1957.00
Cost of material and labour for 10 sq m
=5687.00
Add 10% contractor’s profit =
568.70
and total = 6255.70
Rate for 10 sq m = Rs.6256.00
Rate per sq m = Rs.625.60

Weitere ähnliche Inhalte

Ähnlich wie ANALYSIS_OF_RATES.ppt

2170610_PPV_GTU_Study_Material_Presentations_Unit-4_31072020050116AM.ppt
2170610_PPV_GTU_Study_Material_Presentations_Unit-4_31072020050116AM.ppt2170610_PPV_GTU_Study_Material_Presentations_Unit-4_31072020050116AM.ppt
2170610_PPV_GTU_Study_Material_Presentations_Unit-4_31072020050116AM.pptHimani762003
 
Eqs unit 3 final
Eqs unit 3 finalEqs unit 3 final
Eqs unit 3 finaldhanapal143
 
estimating and costing (1).pdf
estimating and costing (1).pdfestimating and costing (1).pdf
estimating and costing (1).pdfRoshani Shahi
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfAvin Kharel
 
Bill of Quantity Tabulation
Bill of Quantity TabulationBill of Quantity Tabulation
Bill of Quantity TabulationLamaJassim1
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Amit pandit presentaion gautambuddha university
Amit pandit presentaion gautambuddha universityAmit pandit presentaion gautambuddha university
Amit pandit presentaion gautambuddha universityAman Jain
 
QUANTITY SURVEYING PORTFOLIO.pptx
QUANTITY SURVEYING PORTFOLIO.pptxQUANTITY SURVEYING PORTFOLIO.pptx
QUANTITY SURVEYING PORTFOLIO.pptxRajnishKumar916873
 
Fundamentals of Estimating and Costing
 Fundamentals of Estimating and Costing Fundamentals of Estimating and Costing
Fundamentals of Estimating and CostingGanesh Tatikonda
 
chapter1-210122051628.pdf
chapter1-210122051628.pdfchapter1-210122051628.pdf
chapter1-210122051628.pdfDeepak37004
 
Quantity notes by engineer saqib imran
Quantity notes by engineer saqib imranQuantity notes by engineer saqib imran
Quantity notes by engineer saqib imranSaqib Imran
 
Quantity notes by engineer saqb imran
Quantity notes by engineer saqb imranQuantity notes by engineer saqb imran
Quantity notes by engineer saqb imranSaqib Imran
 
potential use of red mud
potential use of red mud potential use of red mud
potential use of red mud murali mohan
 
Concrete design mix (ss)
Concrete design mix (ss)Concrete design mix (ss)
Concrete design mix (ss)Kezar Ali. Shah
 
Rate Analysis Site Meeting
Rate Analysis   Site MeetingRate Analysis   Site Meeting
Rate Analysis Site MeetingSanjay Patnaik
 

Ähnlich wie ANALYSIS_OF_RATES.ppt (20)

2170610_PPV_GTU_Study_Material_Presentations_Unit-4_31072020050116AM.ppt
2170610_PPV_GTU_Study_Material_Presentations_Unit-4_31072020050116AM.ppt2170610_PPV_GTU_Study_Material_Presentations_Unit-4_31072020050116AM.ppt
2170610_PPV_GTU_Study_Material_Presentations_Unit-4_31072020050116AM.ppt
 
Eqs unit 3 final
Eqs unit 3 finalEqs unit 3 final
Eqs unit 3 final
 
estimating and costing (1).pdf
estimating and costing (1).pdfestimating and costing (1).pdf
estimating and costing (1).pdf
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
 
Bill of Quantity Tabulation
Bill of Quantity TabulationBill of Quantity Tabulation
Bill of Quantity Tabulation
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
2 review
2 review2 review
2 review
 
Amit pandit presentaion gautambuddha university
Amit pandit presentaion gautambuddha universityAmit pandit presentaion gautambuddha university
Amit pandit presentaion gautambuddha university
 
QUANTITY SURVEYING PORTFOLIO.pptx
QUANTITY SURVEYING PORTFOLIO.pptxQUANTITY SURVEYING PORTFOLIO.pptx
QUANTITY SURVEYING PORTFOLIO.pptx
 
Fundamentals of Estimating and Costing
 Fundamentals of Estimating and Costing Fundamentals of Estimating and Costing
Fundamentals of Estimating and Costing
 
chapter1-210122051628.pdf
chapter1-210122051628.pdfchapter1-210122051628.pdf
chapter1-210122051628.pdf
 
Quantity notes by engineer saqib imran
Quantity notes by engineer saqib imranQuantity notes by engineer saqib imran
Quantity notes by engineer saqib imran
 
Quantity notes by engineer saqb imran
Quantity notes by engineer saqb imranQuantity notes by engineer saqb imran
Quantity notes by engineer saqb imran
 
Section 6
Section 6Section 6
Section 6
 
potential use of red mud
potential use of red mud potential use of red mud
potential use of red mud
 
ppt.pptx
ppt.pptxppt.pptx
ppt.pptx
 
Concrete design mix (ss)
Concrete design mix (ss)Concrete design mix (ss)
Concrete design mix (ss)
 
Rate Analysis Site Meeting
Rate Analysis   Site MeetingRate Analysis   Site Meeting
Rate Analysis Site Meeting
 

Mehr von RijuDasgupta

26901321007_SAPTADEEP DASGUPTA_CIVIL ENGINEERING (2).pdf
26901321007_SAPTADEEP DASGUPTA_CIVIL ENGINEERING (2).pdf26901321007_SAPTADEEP DASGUPTA_CIVIL ENGINEERING (2).pdf
26901321007_SAPTADEEP DASGUPTA_CIVIL ENGINEERING (2).pdfRijuDasgupta
 
26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdfRijuDasgupta
 
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdfRijuDasgupta
 
swpiracyslideshare-180302131348.pdf
swpiracyslideshare-180302131348.pdfswpiracyslideshare-180302131348.pdf
swpiracyslideshare-180302131348.pdfRijuDasgupta
 
L16_17_Shell structures.pdf
L16_17_Shell structures.pdfL16_17_Shell structures.pdf
L16_17_Shell structures.pdfRijuDasgupta
 
5-180501044424.pdf
5-180501044424.pdf5-180501044424.pdf
5-180501044424.pdfRijuDasgupta
 
6_2022_11_09!10_18_35_PM.ppt
6_2022_11_09!10_18_35_PM.ppt6_2022_11_09!10_18_35_PM.ppt
6_2022_11_09!10_18_35_PM.pptRijuDasgupta
 
rivetedjoints-130404054301-phpapp02 (1).pdf
rivetedjoints-130404054301-phpapp02 (1).pdfrivetedjoints-130404054301-phpapp02 (1).pdf
rivetedjoints-130404054301-phpapp02 (1).pdfRijuDasgupta
 
Compression_members1.ppt
Compression_members1.pptCompression_members1.ppt
Compression_members1.pptRijuDasgupta
 
2415536_Unit-ISIGHTDISTNCE.pptx
2415536_Unit-ISIGHTDISTNCE.pptx2415536_Unit-ISIGHTDISTNCE.pptx
2415536_Unit-ISIGHTDISTNCE.pptxRijuDasgupta
 
presentation47-190318045824 (1).pdf
presentation47-190318045824 (1).pdfpresentation47-190318045824 (1).pdf
presentation47-190318045824 (1).pdfRijuDasgupta
 
presentation_propertiesofcement_1513407631_244125.pptx
presentation_propertiesofcement_1513407631_244125.pptxpresentation_propertiesofcement_1513407631_244125.pptx
presentation_propertiesofcement_1513407631_244125.pptxRijuDasgupta
 
populationforecasting-200810153117 (1).pdf
populationforecasting-200810153117 (1).pdfpopulationforecasting-200810153117 (1).pdf
populationforecasting-200810153117 (1).pdfRijuDasgupta
 
AGGREGATES_AND_OTHERS.pptx
AGGREGATES_AND_OTHERS.pptxAGGREGATES_AND_OTHERS.pptx
AGGREGATES_AND_OTHERS.pptxRijuDasgupta
 

Mehr von RijuDasgupta (16)

26901321007_SAPTADEEP DASGUPTA_CIVIL ENGINEERING (2).pdf
26901321007_SAPTADEEP DASGUPTA_CIVIL ENGINEERING (2).pdf26901321007_SAPTADEEP DASGUPTA_CIVIL ENGINEERING (2).pdf
26901321007_SAPTADEEP DASGUPTA_CIVIL ENGINEERING (2).pdf
 
26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf
 
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
 
swpiracyslideshare-180302131348.pdf
swpiracyslideshare-180302131348.pdfswpiracyslideshare-180302131348.pdf
swpiracyslideshare-180302131348.pdf
 
L16_17_Shell structures.pdf
L16_17_Shell structures.pdfL16_17_Shell structures.pdf
L16_17_Shell structures.pdf
 
5-180501044424.pdf
5-180501044424.pdf5-180501044424.pdf
5-180501044424.pdf
 
6_2022_11_09!10_18_35_PM.ppt
6_2022_11_09!10_18_35_PM.ppt6_2022_11_09!10_18_35_PM.ppt
6_2022_11_09!10_18_35_PM.ppt
 
rivetedjoints-130404054301-phpapp02 (1).pdf
rivetedjoints-130404054301-phpapp02 (1).pdfrivetedjoints-130404054301-phpapp02 (1).pdf
rivetedjoints-130404054301-phpapp02 (1).pdf
 
Compression_members1.ppt
Compression_members1.pptCompression_members1.ppt
Compression_members1.ppt
 
beamanalysis.ppt
beamanalysis.pptbeamanalysis.ppt
beamanalysis.ppt
 
2415536_Unit-ISIGHTDISTNCE.pptx
2415536_Unit-ISIGHTDISTNCE.pptx2415536_Unit-ISIGHTDISTNCE.pptx
2415536_Unit-ISIGHTDISTNCE.pptx
 
forecast.ppt
forecast.pptforecast.ppt
forecast.ppt
 
presentation47-190318045824 (1).pdf
presentation47-190318045824 (1).pdfpresentation47-190318045824 (1).pdf
presentation47-190318045824 (1).pdf
 
presentation_propertiesofcement_1513407631_244125.pptx
presentation_propertiesofcement_1513407631_244125.pptxpresentation_propertiesofcement_1513407631_244125.pptx
presentation_propertiesofcement_1513407631_244125.pptx
 
populationforecasting-200810153117 (1).pdf
populationforecasting-200810153117 (1).pdfpopulationforecasting-200810153117 (1).pdf
populationforecasting-200810153117 (1).pdf
 
AGGREGATES_AND_OTHERS.pptx
AGGREGATES_AND_OTHERS.pptxAGGREGATES_AND_OTHERS.pptx
AGGREGATES_AND_OTHERS.pptx
 

ANALYSIS_OF_RATES.ppt

  • 1. PREPARED BY Er. Kashmir Dass M.E. (Hons.) Civil Sr. Lecturer in Civil Engineering, Govt. Polytechnic College, Badbar
  • 2. ANALYSIS OF RATES • To determine the rate of a particular item of work from a quantities of materials and labours required and their costs • The rates of materials and labour are changing from place to place, therefore the rates o different items of work also changes from place to place
  • 3. ANALYSIS OF RATES • Every Estimate should be accompanied by the analysis of rates of the items provided in it . • Analysis of rates comprises of 1. Cost of Material 2. Cost of Labour 3. T and P , and Sundries 4. Carriage 5. Contractor’s Profit
  • 4. ANALYSIS OF RATES • Tools and Plants ( T & P ) = 2.5 to 3 % of the labour cost • Transportation cost more than 8 km is considered • Water charges = 1.5 to 2 % 0f total cost • Contractor ‘ s profit = 10 %
  • 5. ANALYSIS OF RATES • Rates of Materials and Labours : • 1st class bricks = Rs 4500 per 1000 Nos. • 2nd class bricks = Rs 4000 per 1000 Nos. • Brick Ballast = Rs 800 per cum • Coarse sand = Rs 800 per cum • Cement 50 kg bag = Rs 270 per bag • Twisted bars = Rs 5000 per Quintel • Bitumen = Rs 10 per kg
  • 6. ANALYSIS OF RATES • Mason = Rs 450 per day • Plaster = Rs 400 per day • Carpenter = Rs 400 per day • Bhishti = Rs 250 per day • Mazdoor = Rs 250 per day • Painter = Rs 300 per day
  • 7. ANALYSIS OF RATES • Earth work in excavation: Mazdoor = 33 (% cum) Mason = 1.5 • Earth work in Filling : Mazdoor = 18 (% cum) Mason = 0.5 • Cement concrete : Mazdoor = 15 in foundation Mason =1.5 Bhishti = 2
  • 8. ANALYSIS OF RATES • Cement concrete : Mazdoor = 15 Mason = 1 Bhishti = 2.5 • R. Cement concrete : Mazdoor = 40 (10 cum ) Mason = 2.5 Bhishti = 5 Blacksmith = 4 Carpenter = 4
  • 9. ANALYSIS OF RATES • DPC : Mazdoor = 2.5 (10 cum ) Mason = 1.5 Bhishti = 0.5 • 1st class brick work : Mazdoor = 15 Mason = 8 Bhishti = 2
  • 10. ANALYSIS OF RATES • Plastering work : Mazdoor = 10 ( 100 sqm) Mason = 10 Bhishti = 2 • Distempering/painting/white washing : Mazdoor = 5 ( 100 sqm) Painter = 4
  • 11. ANALYSIS OF RATES Example 1. Find out dry materials required for 1 cu m. C. concrete 1:4:8 in foundation. Solution. Ratio = 1:4:8 (cement,sand and aggregate) Sum = 1+4+8=13 cont..
  • 12. Total dry mortar for 1 cu m cement concrete =1.54 cu m Therefore the following materials are required: Cement = (1*1.54*28.8)/13 = 3.41 bags Sand = (4*1.54)/13 = 0.47 cu m cont..
  • 13. Aggregate (Brick ballast) = (8*1.57)/13 = 0.94 cu m so materials for 1 cu m cement concrete 1:4:8. Cement 3.41 bags Sand 0.47 cu m Ans. Brick ballast 0.94 cu m
  • 14. Example 2. Find out dry materials for 1 cu m lime concrete. Solution: Ratio = 1:2 (lime,surkhi) Sum = 1+2 = 3 Total dry mortar for 1 cu m lime concrete = 0.40 (lime, surkhi mortar)
  • 15. Therefore the following materials are required. Lime = (1*0.40)/3 = 0.13 cu m Surkhi = (2*0.40)/3 = 0.27 cu m Aggregate (brick ballast) = 1.00 cu m
  • 16. Materials required for1 cu m lime cocrete 1:2 Lime 0.13 cu m Surkhi 0.27 cu m Ans. Brick ballast 1.00 cu m
  • 17. ANALYSIS OF RATES OF DIFFERENT ITEMS OF WORK. 1. Excavation for foundation: payment % cu m (a)Materials at the site for % cu m nil No material is required Rs. P. (b)labour for % cu m Mazdoor 33 nos.@ 250.00/day = 8250.00
  • 18. Mason 1 no. @ 450.00 = 450.00 Sundries and Tand P 3% on labour = 261.00 Total = 8961.00 (c)Add 10% contractor’s profit = 896.10 grand total =9857.10 say Rs. = 9857.00 Rate per % cu m = Rs. 9857.00
  • 19. 2.Earth filling under floors payment % cu m (a)Materials at site for %cu m Rs.P. No material is required nil (b) Labour for % cu m Majdoor18nos.@250.00/day =4500.00 Bhishti 1/2no.@250.00/day = 125.00 Sundries and Tand P3% on labour 465.00 = 123.75 total = 4748.75 Add 10% contractor’s profit = 474.87
  • 20. G.Total= 5223.62 say Rs.=5224.00 Rate per % cu m = Rs. 5224.00 3. Cement concrete 1:4:8 in foundations (a) Materials at site for 1 cu m payment per cu m Cement 3.41 bags @270 bag = 929.70 Sand 0.47 cu m @800.00 per cu m=376.00
  • 21. Brick ballast 0.94 cu m @ 800.00 = 752.00 Cost of labour for 10 cu m = 7520.00 (b)Labour for 10 cu m Rs. P Mason 1@ 400.00/ day = 400.00 Mazdoors 15@ 250.00/ day = 3750.00 Bhishti 2@ 250.oo/ day = 500.00 Sundries and Tand P @ 3% on labour = 139.50
  • 22. • Cost of for 10 cu m = 12309.50 • Cost of for 1 cu m =12309.50/10 • =1230.95 • PROBLEM: Conglomerate floor 4 cm thick of cement concrete 1:2:4 over 10 cm thick cement concrete 1:6:18 over 10 cm sand filling.
  • 23. calculation of material for 10 sq m (1) Wet mortar for cement concrete 1:2:4= 10 sq m*4cm = 10*4/100 =0.40cu m
  • 24. Dry mortar = 0.40*1.54=0.616+0.62 cu m Ratio = 1:2:4 Sum =1+2+4=7 Cement = 1*0.62*28.8/7 =2.55 bags Sand = 2*0.62/7 = 0.18 cu m
  • 25. Crusher = 4*0.62/7=0.36 cu m (2)Wet mortar for cement concrete 1:6:18 = 10 sq m*10 cm =10*10/100 =1 cu m
  • 26. Dry mortar 1*1.54 =1.54cu m Ratio =1:6:18=1+6+18 = 25 Cement = 1*1.54*28.8/25 = 1.78 bags
  • 27. Sand =6*1.54/25 = 0.37 cu m Brick ballast = 18*1.54/2 = 1.11 cu m (3) Sand for 10 sq m = 10 sq m* 10 cm = 10*10/10
  • 28. = 1 cu m Total dry mortar for 10 sq m conglomerate flooring. Cement = 2.55+1.78 Sand = 0.18+0.37+1.00 Crusher = 0.46
  • 29. (a) Materials at site for 10 sq m Rs.P Cement 4.33 bags @ 270.00/bag = 1170.00 sand 1.55 cum@ 800.00 per cu m = 1240.00 Crusher 0.36 cu m @1200 /cu m = 432.00 Brick ballast 1.11 cu m@ 800 / cu m = 888.00
  • 30. Cost of material for 10 sq m =3730.00 (b) Labour for 10 sq m Rs. P Mason 2@ 400.00/ day = 900.00 Mazdoor 3@ 250.00/day = 750.00 Bhishti 1@ 250.00 / day = 250.00
  • 31. Sundries T and P 3% on labour = 57.00 Cost of labour for 10 sq m = 1957.00 Cost of material and labour for 10 sq m =5687.00
  • 32. Add 10% contractor’s profit = 568.70 and total = 6255.70 Rate for 10 sq m = Rs.6256.00 Rate per sq m = Rs.625.60