1. Richard J. Weire
1403 South Pheasant
Gilbert, Arizona 85296
480-292-1981
rwiere@cox.net
Career Objective
ProjectSuperintendentwithoverfifteenyearsof experience inplanning,organizing, building,
renovatingexistingandnewhospital centersseekingchallengingrole forlarge scale buildingprojects,
structures,andsupervisionof laborerswhere inmyskillsare utilizedin anefficientcosteffectivebenefit
to an employer.
Goals:
DevelopandTrainfuture superintendents.
Learn anddevelop newmethodstoconstruction.I’mafirmbelieverinLEAN construction.I
believethere isawayto make it useful andalsomake iteasyto understandforall the workers
inthe field.
Keepupwithand learnthe newschedulingsoftware andanyothertechnologythatcanbe used.
EmploymentExperience – employedwithKitchell Contractors 1707 East Highland,Phoenix,Arizona
85016 June 1998 to present:
Highlightsof Qualifications
Ak-ChinIndian community|Maricopa Arizona|$3,000,000.
Buildingnewconference/Banquetroomwithexteriordining.Buildoutnew space inanexisting shelled
building.Thisprojecthadachallengingschedulewithnon-typical procurementsandleadtime forthe
building.
Mercy GilbertMedical Center,a DignityHealth Member,NewHybrid Operating Room. |GilbertAZ|
2,000,000.
Renovate existingcorridorsandstorage roomsintoa new HybridOperatingroomina workingsurgical
suite.Includednew upgradeandAirbalance onthe existingPhoenixvalvesthatcontrol (7) other
Operatingrooms
Mercy GilbertMedical Center,a DignityHealth Member,16 Bed ObservationUnit.|GilbertAZ
|1,200,000.
BuildoutnewOBS Unitin shelledspace onthe existinglevel4,Includesnew medical gasvalvesonthe
existingsystem,newupgradedSanitarypipingbelow floorinforDialysisuse.
ChandlerRegional Medical Center,A Dignity Health Member,BedTower Expansion | Chandler,AZ |
$79,000,000
2. 180,000 SFnewconstruction;21,000 SFremodel;five-storypatienttower;32 new ICU beds;64 medical
and surgerytelemetrybeds;six operating rooms;new 50,000 SF ED (double the size of the previousED);
CT and general radiologyroom;newon-groundhelipadandcentral plantanddockexpansion
PhoenixChildren’sHospital | Phoenix,AZ| $356,000,000
The projectincluded:31,000 SF remote central plantandloadingdockwithtunnel accesstothe new
patienttower;two parkinggarages - one 750-car and two500-car garages;760,000 SFnew patient
towerfor 399 bedswithclinical space;53,000 SF renovationof existingmedical office space;123,000 SF
renovationof existinghospital space and1.45M SF concrete.
Cardon’s Children’sMedical Centerat Banner DesertMedical Center| Mesa,AZ | $254,000,000
Newseven-story206-bedfacilityincludesanexpandedneonatalintensive care unit,six pediatricrooms
featuring25 private,child-friendly pre- andpost-opareas;anexpandedpediatricemergency
department;anoutpatienttreatmentcenter;adedicatedpediatricradiologydepartment;rehabilitation
unit;cancer and blooddisorderunit;andpediatricICUandexpansion/renovationof central plantand
1,250-stall parkingstructure.
Banner Desert Medical Center| Mesa,AZ | Multiple Projects
• Complete Re-Skinof the existingExterior.AppliednewEIFSandcaulkingoverthe existingstucco
system
• NICU phase 1- Thisprojectwasan additiontothe existingNICUdepartment.The projectwas
locatedonthe existingroof.Complete new constructionwhichincludedtie intothe existingNICUand
alsoa renovationof anexistingNurse station
• Lab phase 2- Installed(4) newTube stationssystemsandpipingabove the ceiling.Thisproject
had to be completedinalab thatis inoperation24 hours
• Five storyparkinggarage/Pedestrianbridge- Assistinthe constructionof anew 5 story 1200
space parkinggarage.Constructeda new pedestrianbridgefromthe Level 4of the new parking garage
to the existinglevel3of the building.
• WIS Level 1 - Complete demolitionof the existingpatientroomsandnew constructionona 16
bedWIS (womeninfantservices) level 1
John C. LincolnHospital North Mountain | Phoenix,AZ| $38,232,154
EmergencyDepartmentexpansionconstitutedmore than57,000 SF of the projectandallowedforstate-
of-the artimprovementstobe instituted.The projectcreated30 private examroomsincluding:seven
newFast Track roomsto tendto patientswith lesserinjuries,fourmajortraumarooms,three minor
resuscitationroomsandtwotriage rooms.
John C. LincolnHospital Deer Valley| Phoenix, AZ $49,000,000
Four-story,155,000 SFtoweradditiononthe southside of the existinghospital.The project includesa
29,000 SF expansionof the hospital’semergencydepartment,a30,000 SF ICU expansion,a17,000 SF
basementand56,000 SFof shell space forfuture expansion.The expandedemergencydepartmentcan
accommodate upto 80,000 patientsperyearand features32 private examinationroomsandthree
resuscitationrooms.The IntensiveCare Unitholds32 private treatmentrooms.
3. Personnel Management
Manage,direct,and coordinate avarietyof up to tendifferentsubcontractors onjobsite.Manage upto
seventyworkers
Supervise uptofifteen Kitchell employeesandapprove time forjuniorcarpenterlaborers
Additional Skills
Develop,assess, andmaintainInfectionControlRiskAssessment(ICRA)usingmatrix of precautionsfor
constructionandrenovation,includingnon-invasiveactivities,dustrequirements,demolition, all types
of constructionandnon-invasiveactivates.
Construct,communicate, andmaintainsafe workingenvironmentsbyusingsite specificdaily
documentations,addressingsafetyconcerns,analysis,and timelinestointernal andexternal usersat
site.
Developandmaintainconstructionschedule tosupportprojectsubcontractorsandtrack documentsin
relationtoprojectusingGantt charts and vendorinvoices
Education
Certifications
CurrentOccupational SafetyHealthAdministration(OSHA) 10hour and30 hour certifications
PermitholderRule 310 – Maricopa CountyAirQuality– Site Superintendent
CarpenterApprenticeship Local #408
QualityImprovement Process