SlideShare a Scribd company logo
1 of 3
Richard J. Weire
1403 South Pheasant
Gilbert, Arizona 85296
480-292-1981
rwiere@cox.net
Career Objective
ProjectSuperintendentwithoverfifteenyearsof experience inplanning,organizing, building,
renovatingexistingandnewhospital centersseekingchallengingrole forlarge scale buildingprojects,
structures,andsupervisionof laborerswhere inmyskillsare utilizedin anefficientcosteffectivebenefit
to an employer.
Goals:
 DevelopandTrainfuture superintendents.
 Learn anddevelop newmethodstoconstruction.I’mafirmbelieverinLEAN construction.I
believethere isawayto make it useful andalsomake iteasyto understandforall the workers
inthe field.
 Keepupwithand learnthe newschedulingsoftware andanyothertechnologythatcanbe used.
EmploymentExperience – employedwithKitchell Contractors 1707 East Highland,Phoenix,Arizona
85016 June 1998 to present:
Highlightsof Qualifications
Ak-ChinIndian community|Maricopa Arizona|$3,000,000.
Buildingnewconference/Banquetroomwithexteriordining.Buildoutnew space inanexisting shelled
building.Thisprojecthadachallengingschedulewithnon-typical procurementsandleadtime forthe
building.
Mercy GilbertMedical Center,a DignityHealth Member,NewHybrid Operating Room. |GilbertAZ|
2,000,000.
Renovate existingcorridorsandstorage roomsintoa new HybridOperatingroomina workingsurgical
suite.Includednew upgradeandAirbalance onthe existingPhoenixvalvesthatcontrol (7) other
Operatingrooms
Mercy GilbertMedical Center,a DignityHealth Member,16 Bed ObservationUnit.|GilbertAZ
|1,200,000.
BuildoutnewOBS Unitin shelledspace onthe existinglevel4,Includesnew medical gasvalvesonthe
existingsystem,newupgradedSanitarypipingbelow floorinforDialysisuse.
ChandlerRegional Medical Center,A Dignity Health Member,BedTower Expansion | Chandler,AZ |
$79,000,000
180,000 SFnewconstruction;21,000 SFremodel;five-storypatienttower;32 new ICU beds;64 medical
and surgerytelemetrybeds;six operating rooms;new 50,000 SF ED (double the size of the previousED);
CT and general radiologyroom;newon-groundhelipadandcentral plantanddockexpansion
PhoenixChildren’sHospital | Phoenix,AZ| $356,000,000
The projectincluded:31,000 SF remote central plantandloadingdockwithtunnel accesstothe new
patienttower;two parkinggarages - one 750-car and two500-car garages;760,000 SFnew patient
towerfor 399 bedswithclinical space;53,000 SF renovationof existingmedical office space;123,000 SF
renovationof existinghospital space and1.45M SF concrete.
Cardon’s Children’sMedical Centerat Banner DesertMedical Center| Mesa,AZ | $254,000,000
Newseven-story206-bedfacilityincludesanexpandedneonatalintensive care unit,six pediatricrooms
featuring25 private,child-friendly pre- andpost-opareas;anexpandedpediatricemergency
department;anoutpatienttreatmentcenter;adedicatedpediatricradiologydepartment;rehabilitation
unit;cancer and blooddisorderunit;andpediatricICUandexpansion/renovationof central plantand
1,250-stall parkingstructure.
Banner Desert Medical Center| Mesa,AZ | Multiple Projects
• Complete Re-Skinof the existingExterior.AppliednewEIFSandcaulkingoverthe existingstucco
system
• NICU phase 1- Thisprojectwasan additiontothe existingNICUdepartment.The projectwas
locatedonthe existingroof.Complete new constructionwhichincludedtie intothe existingNICUand
alsoa renovationof anexistingNurse station
• Lab phase 2- Installed(4) newTube stationssystemsandpipingabove the ceiling.Thisproject
had to be completedinalab thatis inoperation24 hours
• Five storyparkinggarage/Pedestrianbridge- Assistinthe constructionof anew 5 story 1200
space parkinggarage.Constructeda new pedestrianbridgefromthe Level 4of the new parking garage
to the existinglevel3of the building.
• WIS Level 1 - Complete demolitionof the existingpatientroomsandnew constructionona 16
bedWIS (womeninfantservices) level 1
John C. LincolnHospital North Mountain | Phoenix,AZ| $38,232,154
EmergencyDepartmentexpansionconstitutedmore than57,000 SF of the projectandallowedforstate-
of-the artimprovementstobe instituted.The projectcreated30 private examroomsincluding:seven
newFast Track roomsto tendto patientswith lesserinjuries,fourmajortraumarooms,three minor
resuscitationroomsandtwotriage rooms.
John C. LincolnHospital Deer Valley| Phoenix, AZ $49,000,000
Four-story,155,000 SFtoweradditiononthe southside of the existinghospital.The project includesa
29,000 SF expansionof the hospital’semergencydepartment,a30,000 SF ICU expansion,a17,000 SF
basementand56,000 SFof shell space forfuture expansion.The expandedemergencydepartmentcan
accommodate upto 80,000 patientsperyearand features32 private examinationroomsandthree
resuscitationrooms.The IntensiveCare Unitholds32 private treatmentrooms.
Personnel Management
Manage,direct,and coordinate avarietyof up to tendifferentsubcontractors onjobsite.Manage upto
seventyworkers
Supervise uptofifteen Kitchell employeesandapprove time forjuniorcarpenterlaborers
Additional Skills
Develop,assess, andmaintainInfectionControlRiskAssessment(ICRA)usingmatrix of precautionsfor
constructionandrenovation,includingnon-invasiveactivities,dustrequirements,demolition, all types
of constructionandnon-invasiveactivates.
Construct,communicate, andmaintainsafe workingenvironmentsbyusingsite specificdaily
documentations,addressingsafetyconcerns,analysis,and timelinestointernal andexternal usersat
site.
Developandmaintainconstructionschedule tosupportprojectsubcontractorsandtrack documentsin
relationtoprojectusingGantt charts and vendorinvoices
Education
Certifications
CurrentOccupational SafetyHealthAdministration(OSHA) 10hour and30 hour certifications
PermitholderRule 310 – Maricopa CountyAirQuality– Site Superintendent
CarpenterApprenticeship Local #408
QualityImprovement Process

More Related Content

Viewers also liked

Presentación
PresentaciónPresentación
PresentaciónLisa Tai
 
Svetlana Kuyumdzhieva presentation - build up 14-15 luglio 2016
Svetlana Kuyumdzhieva presentation - build up 14-15 luglio 2016Svetlana Kuyumdzhieva presentation - build up 14-15 luglio 2016
Svetlana Kuyumdzhieva presentation - build up 14-15 luglio 2016Fondazione Matera-Basilicata 2019
 
Using scatter gather
Using scatter gatherUsing scatter gather
Using scatter gatherRahul Kumar
 
[GuzmánDiego] Informe Práctica 9 - Alcoholes, obtención y propiedades
[GuzmánDiego] Informe Práctica 9 - Alcoholes, obtención y propiedades[GuzmánDiego] Informe Práctica 9 - Alcoholes, obtención y propiedades
[GuzmánDiego] Informe Práctica 9 - Alcoholes, obtención y propiedadesDiego Guzmán
 
Informe de laboratorio mechero de Bunsen
Informe de laboratorio mechero de Bunsen Informe de laboratorio mechero de Bunsen
Informe de laboratorio mechero de Bunsen William Matamoros
 

Viewers also liked (9)

Presentación
PresentaciónPresentación
Presentación
 
Sergio Dogliani presentation - build up 14-15 luglio 2016
Sergio Dogliani presentation - build up 14-15 luglio 2016Sergio Dogliani presentation - build up 14-15 luglio 2016
Sergio Dogliani presentation - build up 14-15 luglio 2016
 
Svetlana Kuyumdzhieva presentation - build up 14-15 luglio 2016
Svetlana Kuyumdzhieva presentation - build up 14-15 luglio 2016Svetlana Kuyumdzhieva presentation - build up 14-15 luglio 2016
Svetlana Kuyumdzhieva presentation - build up 14-15 luglio 2016
 
Chris Torch presentation - build up 28-29 giugno 2016
Chris Torch presentation - build up 28-29 giugno 2016Chris Torch presentation - build up 28-29 giugno 2016
Chris Torch presentation - build up 28-29 giugno 2016
 
Presentación
PresentaciónPresentación
Presentación
 
Using scatter gather
Using scatter gatherUsing scatter gather
Using scatter gather
 
[GuzmánDiego] Informe Práctica 9 - Alcoholes, obtención y propiedades
[GuzmánDiego] Informe Práctica 9 - Alcoholes, obtención y propiedades[GuzmánDiego] Informe Práctica 9 - Alcoholes, obtención y propiedades
[GuzmánDiego] Informe Práctica 9 - Alcoholes, obtención y propiedades
 
Informe de laboratorio mechero de Bunsen
Informe de laboratorio mechero de Bunsen Informe de laboratorio mechero de Bunsen
Informe de laboratorio mechero de Bunsen
 
Uso de la_balanza[1]
Uso de la_balanza[1]Uso de la_balanza[1]
Uso de la_balanza[1]
 

Similar to Richard J. Weire Resume

John Flynn Private Hospital
John Flynn Private Hospital John Flynn Private Hospital
John Flynn Private Hospital Od Solutions
 
The Canberra Hospital Building 1, Level 5
The Canberra Hospital Building 1, Level 5 The Canberra Hospital Building 1, Level 5
The Canberra Hospital Building 1, Level 5 Od Solutions
 
Dc cv 2016_may_with sample projects
Dc cv 2016_may_with sample projectsDc cv 2016_may_with sample projects
Dc cv 2016_may_with sample projectsDave Colville
 
Mark Olson Current Resume
Mark Olson Current ResumeMark Olson Current Resume
Mark Olson Current ResumeMark Olson
 
Kris anderson 2016 resume docx
Kris anderson 2016 resume docxKris anderson 2016 resume docx
Kris anderson 2016 resume docxKris Anderson
 
Mike Haller - Professional Resume
Mike Haller - Professional ResumeMike Haller - Professional Resume
Mike Haller - Professional ResumeMichael Haller
 
Project Experience Rachel Byrne
Project Experience Rachel ByrneProject Experience Rachel Byrne
Project Experience Rachel ByrneRachel Byrne
 
101014 Melton Jennifer Project List
101014 Melton Jennifer Project List101014 Melton Jennifer Project List
101014 Melton Jennifer Project Listjenmelt10
 
Duncan Merritt CV Oct 2015
Duncan Merritt CV Oct 2015Duncan Merritt CV Oct 2015
Duncan Merritt CV Oct 2015Duncan Merritt
 
Braithwaite Case Study Fit Out
Braithwaite Case Study Fit OutBraithwaite Case Study Fit Out
Braithwaite Case Study Fit Outlukebraithwaite
 
BioTechnique LLC, Madison, WI USA 53719
BioTechnique LLC, Madison, WI USA 53719BioTechnique LLC, Madison, WI USA 53719
BioTechnique LLC, Madison, WI USA 53719John Clapham, RAC
 
Rick Russell Resume 150406
Rick Russell Resume 150406Rick Russell Resume 150406
Rick Russell Resume 150406Rick Russell
 
Dave Yeap Resume Nov 2016
Dave Yeap Resume Nov 2016Dave Yeap Resume Nov 2016
Dave Yeap Resume Nov 2016Dave Yeap
 

Similar to Richard J. Weire Resume (20)

John Flynn Private Hospital
John Flynn Private Hospital John Flynn Private Hospital
John Flynn Private Hospital
 
!dRA Project List
!dRA Project List!dRA Project List
!dRA Project List
 
The Canberra Hospital Building 1, Level 5
The Canberra Hospital Building 1, Level 5 The Canberra Hospital Building 1, Level 5
The Canberra Hospital Building 1, Level 5
 
Colin Nixon CV
Colin Nixon CVColin Nixon CV
Colin Nixon CV
 
Garst Jim 2015-Update
Garst Jim 2015-UpdateGarst Jim 2015-Update
Garst Jim 2015-Update
 
Res414
Res414Res414
Res414
 
Dc cv 2016_may_with sample projects
Dc cv 2016_may_with sample projectsDc cv 2016_may_with sample projects
Dc cv 2016_may_with sample projects
 
Mark Olson Current Resume
Mark Olson Current ResumeMark Olson Current Resume
Mark Olson Current Resume
 
Kris anderson 2016 resume docx
Kris anderson 2016 resume docxKris anderson 2016 resume docx
Kris anderson 2016 resume docx
 
Mike Haller - Professional Resume
Mike Haller - Professional ResumeMike Haller - Professional Resume
Mike Haller - Professional Resume
 
project resume
project resumeproject resume
project resume
 
Project Experience Rachel Byrne
Project Experience Rachel ByrneProject Experience Rachel Byrne
Project Experience Rachel Byrne
 
101014 Melton Jennifer Project List
101014 Melton Jennifer Project List101014 Melton Jennifer Project List
101014 Melton Jennifer Project List
 
Duncan Merritt CV Oct 2015
Duncan Merritt CV Oct 2015Duncan Merritt CV Oct 2015
Duncan Merritt CV Oct 2015
 
Braithwaite Case Study Fit Out
Braithwaite Case Study Fit OutBraithwaite Case Study Fit Out
Braithwaite Case Study Fit Out
 
BioTechnique LLC, Madison, WI USA 53719
BioTechnique LLC, Madison, WI USA 53719BioTechnique LLC, Madison, WI USA 53719
BioTechnique LLC, Madison, WI USA 53719
 
Rick Russell Resume 150406
Rick Russell Resume 150406Rick Russell Resume 150406
Rick Russell Resume 150406
 
Chris Spencer icv3f
Chris Spencer icv3fChris Spencer icv3f
Chris Spencer icv3f
 
Dave Yeap Resume Nov 2016
Dave Yeap Resume Nov 2016Dave Yeap Resume Nov 2016
Dave Yeap Resume Nov 2016
 
Francisco Quintana Resume
Francisco Quintana Resume Francisco Quintana Resume
Francisco Quintana Resume
 

Richard J. Weire Resume

  • 1. Richard J. Weire 1403 South Pheasant Gilbert, Arizona 85296 480-292-1981 rwiere@cox.net Career Objective ProjectSuperintendentwithoverfifteenyearsof experience inplanning,organizing, building, renovatingexistingandnewhospital centersseekingchallengingrole forlarge scale buildingprojects, structures,andsupervisionof laborerswhere inmyskillsare utilizedin anefficientcosteffectivebenefit to an employer. Goals:  DevelopandTrainfuture superintendents.  Learn anddevelop newmethodstoconstruction.I’mafirmbelieverinLEAN construction.I believethere isawayto make it useful andalsomake iteasyto understandforall the workers inthe field.  Keepupwithand learnthe newschedulingsoftware andanyothertechnologythatcanbe used. EmploymentExperience – employedwithKitchell Contractors 1707 East Highland,Phoenix,Arizona 85016 June 1998 to present: Highlightsof Qualifications Ak-ChinIndian community|Maricopa Arizona|$3,000,000. Buildingnewconference/Banquetroomwithexteriordining.Buildoutnew space inanexisting shelled building.Thisprojecthadachallengingschedulewithnon-typical procurementsandleadtime forthe building. Mercy GilbertMedical Center,a DignityHealth Member,NewHybrid Operating Room. |GilbertAZ| 2,000,000. Renovate existingcorridorsandstorage roomsintoa new HybridOperatingroomina workingsurgical suite.Includednew upgradeandAirbalance onthe existingPhoenixvalvesthatcontrol (7) other Operatingrooms Mercy GilbertMedical Center,a DignityHealth Member,16 Bed ObservationUnit.|GilbertAZ |1,200,000. BuildoutnewOBS Unitin shelledspace onthe existinglevel4,Includesnew medical gasvalvesonthe existingsystem,newupgradedSanitarypipingbelow floorinforDialysisuse. ChandlerRegional Medical Center,A Dignity Health Member,BedTower Expansion | Chandler,AZ | $79,000,000
  • 2. 180,000 SFnewconstruction;21,000 SFremodel;five-storypatienttower;32 new ICU beds;64 medical and surgerytelemetrybeds;six operating rooms;new 50,000 SF ED (double the size of the previousED); CT and general radiologyroom;newon-groundhelipadandcentral plantanddockexpansion PhoenixChildren’sHospital | Phoenix,AZ| $356,000,000 The projectincluded:31,000 SF remote central plantandloadingdockwithtunnel accesstothe new patienttower;two parkinggarages - one 750-car and two500-car garages;760,000 SFnew patient towerfor 399 bedswithclinical space;53,000 SF renovationof existingmedical office space;123,000 SF renovationof existinghospital space and1.45M SF concrete. Cardon’s Children’sMedical Centerat Banner DesertMedical Center| Mesa,AZ | $254,000,000 Newseven-story206-bedfacilityincludesanexpandedneonatalintensive care unit,six pediatricrooms featuring25 private,child-friendly pre- andpost-opareas;anexpandedpediatricemergency department;anoutpatienttreatmentcenter;adedicatedpediatricradiologydepartment;rehabilitation unit;cancer and blooddisorderunit;andpediatricICUandexpansion/renovationof central plantand 1,250-stall parkingstructure. Banner Desert Medical Center| Mesa,AZ | Multiple Projects • Complete Re-Skinof the existingExterior.AppliednewEIFSandcaulkingoverthe existingstucco system • NICU phase 1- Thisprojectwasan additiontothe existingNICUdepartment.The projectwas locatedonthe existingroof.Complete new constructionwhichincludedtie intothe existingNICUand alsoa renovationof anexistingNurse station • Lab phase 2- Installed(4) newTube stationssystemsandpipingabove the ceiling.Thisproject had to be completedinalab thatis inoperation24 hours • Five storyparkinggarage/Pedestrianbridge- Assistinthe constructionof anew 5 story 1200 space parkinggarage.Constructeda new pedestrianbridgefromthe Level 4of the new parking garage to the existinglevel3of the building. • WIS Level 1 - Complete demolitionof the existingpatientroomsandnew constructionona 16 bedWIS (womeninfantservices) level 1 John C. LincolnHospital North Mountain | Phoenix,AZ| $38,232,154 EmergencyDepartmentexpansionconstitutedmore than57,000 SF of the projectandallowedforstate- of-the artimprovementstobe instituted.The projectcreated30 private examroomsincluding:seven newFast Track roomsto tendto patientswith lesserinjuries,fourmajortraumarooms,three minor resuscitationroomsandtwotriage rooms. John C. LincolnHospital Deer Valley| Phoenix, AZ $49,000,000 Four-story,155,000 SFtoweradditiononthe southside of the existinghospital.The project includesa 29,000 SF expansionof the hospital’semergencydepartment,a30,000 SF ICU expansion,a17,000 SF basementand56,000 SFof shell space forfuture expansion.The expandedemergencydepartmentcan accommodate upto 80,000 patientsperyearand features32 private examinationroomsandthree resuscitationrooms.The IntensiveCare Unitholds32 private treatmentrooms.
  • 3. Personnel Management Manage,direct,and coordinate avarietyof up to tendifferentsubcontractors onjobsite.Manage upto seventyworkers Supervise uptofifteen Kitchell employeesandapprove time forjuniorcarpenterlaborers Additional Skills Develop,assess, andmaintainInfectionControlRiskAssessment(ICRA)usingmatrix of precautionsfor constructionandrenovation,includingnon-invasiveactivities,dustrequirements,demolition, all types of constructionandnon-invasiveactivates. Construct,communicate, andmaintainsafe workingenvironmentsbyusingsite specificdaily documentations,addressingsafetyconcerns,analysis,and timelinestointernal andexternal usersat site. Developandmaintainconstructionschedule tosupportprojectsubcontractorsandtrack documentsin relationtoprojectusingGantt charts and vendorinvoices Education Certifications CurrentOccupational SafetyHealthAdministration(OSHA) 10hour and30 hour certifications PermitholderRule 310 – Maricopa CountyAirQuality– Site Superintendent CarpenterApprenticeship Local #408 QualityImprovement Process