1. CURRICULUM
VITAE
NAME : RICHARD JOK @ NGAU JOCK.
I/C NO. : 690325-13-6135
DATE OF
BIRTH : 25th
March 1969
NATIONALITY : MALAYSIAN (SARAWAK)
NOS. OF
CHILDREN : 3
CONTACT NO : Mobile Phone +60198256938
HOBBY
LANGUAGE
EXPERIENCE
:
:
:
Watching TV, Fishing, Travelling & site seeing.
BAHASA MALAYSIA,ENGLISH AND OTHER.
SARAWAK( 1993-1995,2001 – 2003,2007-2008,2012-PRESENT ), West Malaysia(1996-
2000,2008-2011)
CONTACT
ADDRESS
: NO: 42, Long Laput Baram, Sarawak Malaysia.
EDUCATION
LEVEL
: SECONDARY SCHOOL ( MALAYSIAN CERTIFICATE OF EDUCATION ) 1986.
EMAIL : ngaurichardjok@yahoo.com
COMPUTER : MICROSOFT WORD/EXCEL
POSITION : As Qc, Site /Mechanical/Piping and Tanks Supervisor, Piping superintendent for various
project and maintenance job include coordination of subcontractors daily activities,
reporting directly to engineer or manager in charge. Liaise with client / owner to ensure
the safety, progress and standard of work done is according to procedures and schedule.
EXPERIENCE.
More than 20 years experiences in oil and gas and petrochemicalindustries. Familiar with
Isometrics Drawing , P&I.D, General Arrangement ,Standard Support, Daily Work Permit ,
Work/Lifting Procedures , JMS , JSA/JHA etc. Have work at MLNG Satu , Dua , Tiga ,
PP(M)SB , PP(T)SB , MCOT , SHELL (PD) , Ethylene and Polyethylene , TITAN , IDEMITSU,
PETRONAS Chemical, SMDS and etc.
2. April 2015
Onward till
Present
January 2014
to March2015.
Ranex (M) Sdn. Bhd.
Overall AE/Supervisor/Planner
SMDS Bintulu, Sarawak. Manpower supply for mechanicalmaintenance work for Oil & Wax
plant, including U8600 Wax Processing Plant and Fire Station. (Manpower Supply)
Ranex (M) Sdn. Bhd
As Area Engineer
SMDS Bintulu, Sarawak.Integrated Service Contractor mechanical maintenance work for
Oil & Wax plant on a 3 years contract.
August2013-
December2103
NAIM ENGINEERING SDN. BHD
As Mechanical & Piping Supervisor
PETRONAS LNG TRAIN 9 PROJECT, BINTULU SARAWAK.
May2013-
August2013.
INGRESS FABRICATORS SDN BHD
As Piping Superintendent
SABAH AMMONIA UREA(SAMUR) PROJECT, PETRONAS CHEMICAL SDN. BHD.
SIPITANG SABAH.
Shop fabrication and field erection of piping and support works for P-3 utility and offsite
area.
January 2013–
May 2013
NEWWIN ENGINEERING (M) SDN. BHD
As site coordinator/supervisor
MLNG Dua Plant Bintulu for Module 6 Total Shutdown June/July 2013
November
2012-December
2012
EESB (Seconded to Chiyoda Sarawak Sdn. Bhd.)
As site supervisor
Tokuyama Polysilicon Sdn. Bhd. New plant Project at Samalaju Industrial Area ,Bintulu
Sarawak,piping and equipment pre-comm and commissioning.
April 2012-
August 2012
NEWWIN Engineering (M) SDN BHD.
As Site Supervisor
MLNG Dua Plant Bintulu for Module 5 Total Shutdown June/July 2012.
April 2011-
December 2011
KWH Technologies Sdn Bhd.
As site supervisor
TITAN PetrochemicalSdn. Bhd Pasir Gudang total shutdown 2011.
3. March 2010-
March 2011
AnakBanyok General Contractor under Endaya Construction Sdn. Bhd. / JKR at Miri
Sarawak.
As Site Supervisor.
Mechanical and civil construction works.
May 2008-
February 2010
WARGA HIKMAT KEJ.S/B
As Tank Erection Supervisor
APCST PROJECT MELAKA PSR 2.
Additional PSR-2 crude oil storage tanks project.
Tank erection and fire fighting piping and equipment installation.
2 nos: 76m Diameter Tank X 22mH,
May 2007-April
2008
Rekayasa Industries (M)Sdn. Bhd.
As Mechanical/Piping Supervisor
MiriCrude Oil Terminal (MCOT) Rejuvenation Project Phase 2.
Structural, Piping and equipment installation works.
May 2007 Attend Sea Survival Course at SMTC, Miri Sarawak.
September
2003-April 2007
Doing own business.
January 2001-
August 2003
WARGA HIKMAT KEJURUTERAAN SDN. BHD
As Piping Supervisor /Tie-In Coordinator
MLNG Tiga Plant Project, Mechanical Works-Existing Area(MC2), structure erection,
piping, equipment installation, painting, insulation and fire proofing works.
September
2000-November
2000
WARGA HIKMAT KEJURUTERAAN SDN. BHD
As Mechanical/Piping Supervisor
PetronasPenapisan Melaka,major turnaround work of Hydro Craker Unit (U-30 & U-31) and
installation of 1 Unit 75 Ton Breech Lock Heat Exchanger.
May 2000-
August 2000
WARGA HIKMAT KEJURUTERAAN SDN. BHD
As Site/Piping Supervisor
PetronasPenapisan Melaka, shop fabrication and field installation, testing, pre-comm and
commissioning of Dolezal System for Boiler F5101/02 & F51201/202/203 and its associated
piping.
April 2000 WARGA HIKMAT KEJURUTERAAN SDN. BHD
As Mechanical Supervisor
Idemitsu Petrochemical(M) Sdn. BhdPasirGudang Johor, major turnaround work
(including piping modification).
4. March 2000 WARGA HIKMAT KEJURUTERAAN SDN. BHD
As Mechanical Supervisor
Polythelene and Ethylene (M) Sdn. BhdKertih Facilities Terengganu, major turnaround
work.
February 2000-
March 2000
WARGA HIKMAT KEJURUTERAAN SDN. BHD
As Site/Piping Supervisor
PetronasPenapisan Melaka,Condensate Filtration package modification work.
May 1999-
November1999
WARGA HIKMAT KEJURUTERAAN SDN. BHD
As Site/Piping Supervisor
PetronasPenapisan Melaka,shop fabrication and field installation and testing
SuperheaterII Tube for Boiler F5101/02 & F51201/202/203 and its associatedpiping.
June 1998-April
1999
WARGA HIKMAT KEJURUTERAAN SDN. BHD
As Piping Supervisor
Shell Refinery Port Dickson, LRCC-Project-Piping work, shop fabrication and field
installation and testing.
March1997-May
1998
WARGA HIKMAT KEJURUTERAAN SDN. BHD
As Piping Supervisor
PetronasPenapisan Melaka,PSR-2 Project Stage 1-Piping work Area C, shop fabrication
and field installation and testing.
November
1996-March
1997
WARGA HIKMAT KEJURUTERAAN SDN. BHD
As Installation Supervisor
KLIA Satelite and Main Terminal building, structural works.
December
1995-October
1996
WARGA HIKMAT KEJURUTERAAN SDN. BHD
As Site Supervisor
Idemitsu SM (Malaysia) Sdn. Bhd,Ethylbenzene/Styrene Monomer Plant Project- Tanks
construction works (19 nos).
July 1995-
November 1995
WARGA HIKMAT KEJURUTERAAN SDN. BHD
As QC Inspector
Shell Refinery Port Dickson-CDU-2 Revamp Project, shop fabrication and field erection
cone roof Tanks (2nos).
August 1993-
June 1995
WARGA HIKMAT KEJURUTERAAN SDN. BHD
As QC Inspector/Supervisor
MLNG DUA PLANT Project (existing complex)- Mechanical, piping, painting, insulation,
civil and structural works.
August 1993 Joint WARGA HIKMAT KEJURUTERAAN SDN. BHD
May 1992-May
1993
As mechanic for timber company in Baram Sarawak.
5. 1990- 1991 As maintenance assistant for seismic survey work at Baram Delta.
Refference:Mr.John Chiok.
SeniorProject Manager
019-6616128
Mr. Adrian Thomas Perera
Director(Ranex(M) Sdn. Bhd)
019-6223668