The Blend MX08 mixer was designed for use on the Monte Ceneri Tunnel project in Switzerland, which will reduce travel time between Milan and Zurich by over an hour once completed in 2020. The Monte Ceneri tunnel requires two 15.4 km tunnels to be constructed, and six Blend MX08 mixers will be used to cast the concrete. The first test of the Blend MX08 was conducted on April 28, 2017, and it will begin working inside the tunnel for concrete placement starting in July 2017.