SlideShare ist ein Scribd-Unternehmen logo
1 von 6
Downloaden Sie, um offline zu lesen
Curriculum Vitae
Rhod Mayers
0401 850 939
Nominated Position
General Superintendent Mechanical
Mechanical / Piping / Structural
Education/Qualifications and Professional Associations
• Automotive Engineer
• Mechanical Fitter TAFE
• NZ Army REME
Training
• Senior First Aider
• CPR Trained
• Certified WHSO (Construction)
• EHS 9 Modules GMR (global minimum requirements)
• EWP
• International Life & Rescue Confine Space
Areas of Expertise
• Project Management of Operations
• Oil and Gas Piping and Separation Systems installation
• Construction Management
• Water and Wastewater Mechanical/Piping Installation
• Treatment Plant Mechanical Installation
• Power Station Construction Mechanical/Piping installation
Profile Summary;
Rhod has a high degree of technical skill in everything mechanical. He looks for solutions rather than dwelling on
problems and this shines through in his project time management skills. His excellent leadership provides a highly
effective and safe work place. Rhod is known to be a very fast learner and has excellent interpersonal and people
management skills. He is a profound leader who enjoys directing people and delivering on project goals.
Recognised for his ability to quickly build professional rapport with Clients. Rhod has had exposure as an integral
leader in such roles; as Project/Site Manager:
• Townsville Water upgrade Programme - $188M
• Tarbet and Limestone Creek Gas Train, Block Oil Satellite Upgrades - $45M
• Illawarra Wastewater Treatment Plant Upgrade Programme - $ 450M
• Tallawarra GT26 (435MW) Combined Cycle Gas Turbine - $560M
• Millmerran Power Station QLD Silo & Conveyor Construction $6M
• Mackay Base Hospital MBH – $450M
• Australian Institute Of Marine Science AIMS - $35M
• Monreagh CSG Irrigation Pump Station - $20M
• HPX3 Hay point Offshore Mech/Elec expansion $100M
Curriculum Vitae: Rhod Mayers
Page 2 of 6
Project Experience;
HPX3 HAYPOINT COAL TERMINAL EXPANSION PROJECT - McCONNELL DOWELL
Role; Mechanical/Piping Supervisor.
Project Description:
Connect and align conveyors and chutes, Install SS Fire process piping systems offshore, install booster pumps,
hydrants and ancillary equipment. HDPE piping for potable water systems and sewage systems.
Tasks on the Project:
• Set up offshore storage containers for tooling and consumables
• Supervise a Group of tradesman in caring out tasks to meet programme requirements.
• Regular interface meetings on performance and schedule targets.
• Ensuring all relevant permits, SWMS are up to date and relevant to tasks.
• Constant Safety reviews of all works and associated KPI’s are met.
• Set up Sub Contractors for fabrication of SS pipework and carried out QC during fabrication.
• Carry out performance reviews on Craft under my control.
• Achieved handover to Pre commissioning with no outstanding punch list items.
MONREAGH CSG IRRIGATION PUMP STATION – McCONNELL DOWELL
Role; Mechanical Superintendent:
Project Description:
Construction of Irrigation Pumping station Chinchilla QLD
Tasks on the Project:
• Involved from tender acceptance
• Site mobilization and set up
• Client interface from beginning and throughout Project
• Ensure all required Safety and Environmental requirements were in place
• Manage Supervision and crews through Civils, Structural and Mechanical/Piping phases
• Oversee piping packages with Fabricators thru to delivery and install
• Plan and coordinate Civils for all excavations and materials for building pads and access roads
• Regular client meetings on schedule and project milestones
• Complete all activities through to commissioning and handover.
• Complete site De mobilization.
Curriculum Vitae: Rhod Mayers
Page 3 of 6
AUSTRALIAN INSTITUTE OF MARINE SCIENCE (AIMS) – BAULDERSTONE
Role; Mechanical Superintendent:
Project Description:
Construction of a new Marine Science research facility;
Tasks on the Project:
• Manage sub trades through construction stages leading into commissioning.
• Perform inspections during construction activities as well as provide technical assistance.
• Ensure Environment and Safety procedures are adhered to in accordance to safe work practices.
• Attend regular Site and Client meetings to gauge programme progress and deal with any arising issues.
MACKAY BASE HOSPITAL (MBH) – BAULDERSTONE
Role: Mechanical Superintendent:
Project Description:
Construction of new Hospital and Demolition of Existing Unit;
Tasks on the Project:
• Coordinating contractors in completion of defects.
• Witness testing and signing off ITP & ITC’s.
• Manage sub trades through construction stages leading into commissioning.
• Commissioning of Services.
TOWNSVILLE WASTEWATER UPGRADE PROJECT – BAULDERSTONE
Role: Mechanical Superintendent:
Project Description:
Construction of a 108EP – 160EP Waste Water Treatment Plant Installation of all Mechanical equipment, dosing
systems, Metal works, and provide assistance for Pre-Commissioning and Commissioning.
Implementation and delivery of best practice asset management systems and processes
Tasks on the Project:
• Rhod was directing and coordinating the activities involved at the current Wastewater Upgrade Project
in Townsville. Using his vast previous experience he effectively directs the various onsite trade groups
to ensure they collaboratively work towards the common goal of completion. Rhod provides highly
proficient leadership skills and working knowledge of his craft in all aspects of his role.
• Monitor the work sequences of sub-contractors to ensure compliance with safety requirements,
specifications, and schedules.
• Perform inspections during construction activities as well as provide technical assistance for
monitoring process conditions and identifying process improvement opportunities.
• Nurture a culture of OHSE participation and lead by example in demonstrating OHSE behaviours that
reflect the Project expectations
• Liaise and assist in providing key information for the purpose reporting on progress, schedule and
conformance and OHSE.
Curriculum Vitae: Rhod Mayers
Page 4 of 6
MILLMERRAN DRY ASH CONVEYOR SYSTEM- SITE MANAGER - TENIX
Role: Site Manager
Project Description:
Installation of two Dry Ash Conveyor and Silo Systems
Managing trades and planning of all mechanical installation
Interfacing with operations on key issues during shut downs.
Commissioning of new system and tie in to existing plant
Tasks on the Project:
Rhod had the primary responsibility to liaise with the project clients on constructability issues and its units. His
personal planning of the schedule works in conjunction with client delivery schemes and shutdown dates put the
project in position to finish on time and to budget. Rhod also set the milestones throughout the project to ensure
completion while maintaining all aspects of safety required during construction.
COMBINED CYCLE GAS TURBINE (NSW) - TENIX
Role: Mechanical Superintendent
Project Description:
Installation of all Mechanical Equipment and Pipe, Turbines, Generators Installation of Cooling Water systems,
Screens and Penstocks. Pre-Commissioning and Commissioning of new GT26 435MW Dual Cycle Power station
• Managing trades and planning of all mechanical installations
• Interfacing with Client on key issues during construction.
• Interface with Client on Scheduling/Planning issues
• Pre-Commissioning and Commissioning of new systems.
Tasks on the Project:
The correlation of all task involved with mechanical installation of plant and equipment was allocated to Rhod.
Rhod once again set specific milestones to ensure completion of the project on time. He was required to
consistently liaise with planners, clients and supervisors to confirm target achievements and progress
requirements.
OLYMPIC DAM- BHP Billiton Copper / Uranium Mine/ Gold-Silver SA
Curriculum Vitae: Rhod Mayers
Page 5 of 6
UNITED GROUP LOGISTICS
ROLE: Mechanical Supervisor:
Project Description:
• Site Maintenance/Upgrades
• Supervising trades and planning of all mechanical installations
Tasks on Project:
• Set up work packs with all relevant documentation- Scope of Works ,Drawings ,Risk
Assessments , Safety Plans etc. prior to execution of Maintenance Works or Shut Downs
• Generate SWMS with work team
• Liaise with planners /schedulers to ensure delivery of field works will be carried out in a timely
and cost effective manner
• Carry out site supervision on refurbishment of Hydro met CCD Thickener Tanks, replace with
new rakes, cage and gearboxes
• Coordinate rubber lining repairs with contractors
• Inspect underflow and overflow pumps and valves on Flocculants lines carry out repairs or
replace where required
• Maintenance and repairs on Tails Leach tanks and Clarifiers
• Shutdown repairs on De slime tanks
• Carry out safety audits
• Daily reporting to Superintendent on progress of work.
MOOMBA - OIL AND GAS SOULUTIONS (UNITED GROUP)
ROLE: Mechanical Area Coordinator:
Project Description:
• Upgrade storage and process facilities for expansion to remote Oil and Gas Satellites, Tarbet and
Limestone Creek. Major maintenance Shutdown on LNG plant at Moomba and ongoing plant
maintenance.
Tasks on Project:
• Plan and coordinate daily activities for site works
• Generate SWMS with work team
• Liaise with planners /schedulers to ensure delivery of field works will be carried out in a timely and
cost effective manner
• Set up and plan activities for remote site upgrades with back to back colleagues and Schedulers
• Managing trades and planning of all mechanical installations
• Interfacing with operations on key issues during shut downs.
• Ensure all required documentation was completed and handed over to QA and relevant Managers
• Regular Safety Audits on works and procedures.
Curriculum Vitae: Rhod Mayers
Page 6 of 6
SYDNEY WATER TREATMENT PLANT (NSW) – ILLAWARRA ENGINEERING/TOTAL PROCESS SERVICES
Role: Mechanical Supervisor
Project Description:
Construction of Waste Water Treatment Plant Wollongong NSW.
• Managing trades and planning of all mechanical installations
• Interfacing with Client on key issues during construction.
• Interface with Client on Scheduling/Planning issues
• Pre-Commissioning and Commissioning of new systems.
Tasks on the Project:
Rhod’s position included management of project operations to ensure performance in accordance with the project
management team. This involved consistent communication with senior management, clients and leading
supervisors. Rhod also coordinated all hydrostatic testing of equipment and plant. The installation process involved
pumps, diffusers, valves, conveyors, submersible pumps and micro-filtration.
Referees;
• Colin Wynn, Project Manager, Mechanical Commissioning Manager- 0459 801 395
• Tony Holmes, Construction Manager McConnell Dowell– 0400 998 005
• Fred Tubaru, Safety Manager – 0412 421 330
• Tai Lawrence, Safety Advisor – 0407 276 362
• Michael Schroers, General Superintendent – 07 3206 8238
• Gary Butler, QLD Regional Manager Lend Lease– 0418 834 971
• Ross Farrell Lead Field Engineer Bechtel 0477 700 003
• Drew Allen Area Manager Bechtel
• Chris Johnston Downers 0459 806 045
Working at Heights attainment.pdf construction code compliance.pdf Confine Space attainment.pdf
Management system Induction.pdf Construction Card RM 001.pdf
construction code compliance training programme.pdf Passport rbm 001.pdf DLIC RM001.pdf
MSIC 001.pdf RAC 4WD certificate 001.pdf Cert2 in Conservation & Land Management 001.pdf

Weitere ähnliche Inhalte

Was ist angesagt?

Completion & integrity engineer achievements
Completion & integrity engineer achievementsCompletion & integrity engineer achievements
Completion & integrity engineer achievementsJoseph Bracic
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Robert Dimanawa
 
BABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTILBABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTILBabu K
 
Tom resume' updated june 2016 pm
Tom resume' updated june 2016 pmTom resume' updated june 2016 pm
Tom resume' updated june 2016 pmTom Hinton
 
Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)Efren Molina
 
John Keenan - Resume
John Keenan - ResumeJohn Keenan - Resume
John Keenan - ResumeJohn Keenan
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSrinivas Sirigineedi
 
Chris_Perry_Resume_2016(1)
Chris_Perry_Resume_2016(1)Chris_Perry_Resume_2016(1)
Chris_Perry_Resume_2016(1)Chris Perry
 

Was ist angesagt? (20)

Completion & integrity engineer achievements
Completion & integrity engineer achievementsCompletion & integrity engineer achievements
Completion & integrity engineer achievements
 
Topside
TopsideTopside
Topside
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
redacvEPT
redacvEPTredacvEPT
redacvEPT
 
Resume
Resume Resume
Resume
 
BABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTILBABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTIL
 
Tom resume' updated june 2016 pm
Tom resume' updated june 2016 pmTom resume' updated june 2016 pm
Tom resume' updated june 2016 pm
 
Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)
 
John Keenan - Resume
John Keenan - ResumeJohn Keenan - Resume
John Keenan - Resume
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
NY_ CV
NY_ CVNY_ CV
NY_ CV
 
Jordan Cv
Jordan CvJordan Cv
Jordan Cv
 
Nadeem kumar cv
Nadeem kumar cvNadeem kumar cv
Nadeem kumar cv
 
RajeevCV2016
RajeevCV2016RajeevCV2016
RajeevCV2016
 
Moh.Ramadan-CV
Moh.Ramadan-CVMoh.Ramadan-CV
Moh.Ramadan-CV
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction Superintendent
 
Chris_Perry_Resume_2016(1)
Chris_Perry_Resume_2016(1)Chris_Perry_Resume_2016(1)
Chris_Perry_Resume_2016(1)
 
CV 3
CV 3CV 3
CV 3
 
SUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CVSUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CV
 
uanraju inst cv 9 sep 2015
uanraju inst cv 9 sep 2015uanraju inst cv 9 sep 2015
uanraju inst cv 9 sep 2015
 

Ähnlich wie R mayers_CV 2302 (20)

CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)
CV- Piping Engineer (EPC)
 
dean resume (1)
dean resume (1)dean resume (1)
dean resume (1)
 
Wellington Shumba CV projects
Wellington Shumba CV projectsWellington Shumba CV projects
Wellington Shumba CV projects
 
Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'
 
Royster menezes - Mechanical Engineer
Royster menezes - Mechanical EngineerRoyster menezes - Mechanical Engineer
Royster menezes - Mechanical Engineer
 
Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams CV Feb 2017
Ron Williams CV Feb 2017
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
 
Waqar Hussain Mechanical Engineer
Waqar Hussain Mechanical EngineerWaqar Hussain Mechanical Engineer
Waqar Hussain Mechanical Engineer
 
YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG
 
Lory Francis Navor - CV
Lory Francis Navor - CVLory Francis Navor - CV
Lory Francis Navor - CV
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2
 
Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012
 
Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012
 
Jared Langham Resume 4
Jared Langham Resume 4Jared Langham Resume 4
Jared Langham Resume 4
 
Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015
 
Venkatesh narasimhan
Venkatesh narasimhan Venkatesh narasimhan
Venkatesh narasimhan
 
Saqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad CV updated
Saqib Shahzad CV updated
 
Amir QC
Amir QCAmir QC
Amir QC
 
C V
C VC V
C V
 
CV Elect
CV ElectCV Elect
CV Elect
 

R mayers_CV 2302

  • 1. Curriculum Vitae Rhod Mayers 0401 850 939 Nominated Position General Superintendent Mechanical Mechanical / Piping / Structural Education/Qualifications and Professional Associations • Automotive Engineer • Mechanical Fitter TAFE • NZ Army REME Training • Senior First Aider • CPR Trained • Certified WHSO (Construction) • EHS 9 Modules GMR (global minimum requirements) • EWP • International Life & Rescue Confine Space Areas of Expertise • Project Management of Operations • Oil and Gas Piping and Separation Systems installation • Construction Management • Water and Wastewater Mechanical/Piping Installation • Treatment Plant Mechanical Installation • Power Station Construction Mechanical/Piping installation Profile Summary; Rhod has a high degree of technical skill in everything mechanical. He looks for solutions rather than dwelling on problems and this shines through in his project time management skills. His excellent leadership provides a highly effective and safe work place. Rhod is known to be a very fast learner and has excellent interpersonal and people management skills. He is a profound leader who enjoys directing people and delivering on project goals. Recognised for his ability to quickly build professional rapport with Clients. Rhod has had exposure as an integral leader in such roles; as Project/Site Manager: • Townsville Water upgrade Programme - $188M • Tarbet and Limestone Creek Gas Train, Block Oil Satellite Upgrades - $45M • Illawarra Wastewater Treatment Plant Upgrade Programme - $ 450M • Tallawarra GT26 (435MW) Combined Cycle Gas Turbine - $560M • Millmerran Power Station QLD Silo & Conveyor Construction $6M • Mackay Base Hospital MBH – $450M • Australian Institute Of Marine Science AIMS - $35M • Monreagh CSG Irrigation Pump Station - $20M • HPX3 Hay point Offshore Mech/Elec expansion $100M
  • 2. Curriculum Vitae: Rhod Mayers Page 2 of 6 Project Experience; HPX3 HAYPOINT COAL TERMINAL EXPANSION PROJECT - McCONNELL DOWELL Role; Mechanical/Piping Supervisor. Project Description: Connect and align conveyors and chutes, Install SS Fire process piping systems offshore, install booster pumps, hydrants and ancillary equipment. HDPE piping for potable water systems and sewage systems. Tasks on the Project: • Set up offshore storage containers for tooling and consumables • Supervise a Group of tradesman in caring out tasks to meet programme requirements. • Regular interface meetings on performance and schedule targets. • Ensuring all relevant permits, SWMS are up to date and relevant to tasks. • Constant Safety reviews of all works and associated KPI’s are met. • Set up Sub Contractors for fabrication of SS pipework and carried out QC during fabrication. • Carry out performance reviews on Craft under my control. • Achieved handover to Pre commissioning with no outstanding punch list items. MONREAGH CSG IRRIGATION PUMP STATION – McCONNELL DOWELL Role; Mechanical Superintendent: Project Description: Construction of Irrigation Pumping station Chinchilla QLD Tasks on the Project: • Involved from tender acceptance • Site mobilization and set up • Client interface from beginning and throughout Project • Ensure all required Safety and Environmental requirements were in place • Manage Supervision and crews through Civils, Structural and Mechanical/Piping phases • Oversee piping packages with Fabricators thru to delivery and install • Plan and coordinate Civils for all excavations and materials for building pads and access roads • Regular client meetings on schedule and project milestones • Complete all activities through to commissioning and handover. • Complete site De mobilization.
  • 3. Curriculum Vitae: Rhod Mayers Page 3 of 6 AUSTRALIAN INSTITUTE OF MARINE SCIENCE (AIMS) – BAULDERSTONE Role; Mechanical Superintendent: Project Description: Construction of a new Marine Science research facility; Tasks on the Project: • Manage sub trades through construction stages leading into commissioning. • Perform inspections during construction activities as well as provide technical assistance. • Ensure Environment and Safety procedures are adhered to in accordance to safe work practices. • Attend regular Site and Client meetings to gauge programme progress and deal with any arising issues. MACKAY BASE HOSPITAL (MBH) – BAULDERSTONE Role: Mechanical Superintendent: Project Description: Construction of new Hospital and Demolition of Existing Unit; Tasks on the Project: • Coordinating contractors in completion of defects. • Witness testing and signing off ITP & ITC’s. • Manage sub trades through construction stages leading into commissioning. • Commissioning of Services. TOWNSVILLE WASTEWATER UPGRADE PROJECT – BAULDERSTONE Role: Mechanical Superintendent: Project Description: Construction of a 108EP – 160EP Waste Water Treatment Plant Installation of all Mechanical equipment, dosing systems, Metal works, and provide assistance for Pre-Commissioning and Commissioning. Implementation and delivery of best practice asset management systems and processes Tasks on the Project: • Rhod was directing and coordinating the activities involved at the current Wastewater Upgrade Project in Townsville. Using his vast previous experience he effectively directs the various onsite trade groups to ensure they collaboratively work towards the common goal of completion. Rhod provides highly proficient leadership skills and working knowledge of his craft in all aspects of his role. • Monitor the work sequences of sub-contractors to ensure compliance with safety requirements, specifications, and schedules. • Perform inspections during construction activities as well as provide technical assistance for monitoring process conditions and identifying process improvement opportunities. • Nurture a culture of OHSE participation and lead by example in demonstrating OHSE behaviours that reflect the Project expectations • Liaise and assist in providing key information for the purpose reporting on progress, schedule and conformance and OHSE.
  • 4. Curriculum Vitae: Rhod Mayers Page 4 of 6 MILLMERRAN DRY ASH CONVEYOR SYSTEM- SITE MANAGER - TENIX Role: Site Manager Project Description: Installation of two Dry Ash Conveyor and Silo Systems Managing trades and planning of all mechanical installation Interfacing with operations on key issues during shut downs. Commissioning of new system and tie in to existing plant Tasks on the Project: Rhod had the primary responsibility to liaise with the project clients on constructability issues and its units. His personal planning of the schedule works in conjunction with client delivery schemes and shutdown dates put the project in position to finish on time and to budget. Rhod also set the milestones throughout the project to ensure completion while maintaining all aspects of safety required during construction. COMBINED CYCLE GAS TURBINE (NSW) - TENIX Role: Mechanical Superintendent Project Description: Installation of all Mechanical Equipment and Pipe, Turbines, Generators Installation of Cooling Water systems, Screens and Penstocks. Pre-Commissioning and Commissioning of new GT26 435MW Dual Cycle Power station • Managing trades and planning of all mechanical installations • Interfacing with Client on key issues during construction. • Interface with Client on Scheduling/Planning issues • Pre-Commissioning and Commissioning of new systems. Tasks on the Project: The correlation of all task involved with mechanical installation of plant and equipment was allocated to Rhod. Rhod once again set specific milestones to ensure completion of the project on time. He was required to consistently liaise with planners, clients and supervisors to confirm target achievements and progress requirements. OLYMPIC DAM- BHP Billiton Copper / Uranium Mine/ Gold-Silver SA
  • 5. Curriculum Vitae: Rhod Mayers Page 5 of 6 UNITED GROUP LOGISTICS ROLE: Mechanical Supervisor: Project Description: • Site Maintenance/Upgrades • Supervising trades and planning of all mechanical installations Tasks on Project: • Set up work packs with all relevant documentation- Scope of Works ,Drawings ,Risk Assessments , Safety Plans etc. prior to execution of Maintenance Works or Shut Downs • Generate SWMS with work team • Liaise with planners /schedulers to ensure delivery of field works will be carried out in a timely and cost effective manner • Carry out site supervision on refurbishment of Hydro met CCD Thickener Tanks, replace with new rakes, cage and gearboxes • Coordinate rubber lining repairs with contractors • Inspect underflow and overflow pumps and valves on Flocculants lines carry out repairs or replace where required • Maintenance and repairs on Tails Leach tanks and Clarifiers • Shutdown repairs on De slime tanks • Carry out safety audits • Daily reporting to Superintendent on progress of work. MOOMBA - OIL AND GAS SOULUTIONS (UNITED GROUP) ROLE: Mechanical Area Coordinator: Project Description: • Upgrade storage and process facilities for expansion to remote Oil and Gas Satellites, Tarbet and Limestone Creek. Major maintenance Shutdown on LNG plant at Moomba and ongoing plant maintenance. Tasks on Project: • Plan and coordinate daily activities for site works • Generate SWMS with work team • Liaise with planners /schedulers to ensure delivery of field works will be carried out in a timely and cost effective manner • Set up and plan activities for remote site upgrades with back to back colleagues and Schedulers • Managing trades and planning of all mechanical installations • Interfacing with operations on key issues during shut downs. • Ensure all required documentation was completed and handed over to QA and relevant Managers • Regular Safety Audits on works and procedures.
  • 6. Curriculum Vitae: Rhod Mayers Page 6 of 6 SYDNEY WATER TREATMENT PLANT (NSW) – ILLAWARRA ENGINEERING/TOTAL PROCESS SERVICES Role: Mechanical Supervisor Project Description: Construction of Waste Water Treatment Plant Wollongong NSW. • Managing trades and planning of all mechanical installations • Interfacing with Client on key issues during construction. • Interface with Client on Scheduling/Planning issues • Pre-Commissioning and Commissioning of new systems. Tasks on the Project: Rhod’s position included management of project operations to ensure performance in accordance with the project management team. This involved consistent communication with senior management, clients and leading supervisors. Rhod also coordinated all hydrostatic testing of equipment and plant. The installation process involved pumps, diffusers, valves, conveyors, submersible pumps and micro-filtration. Referees; • Colin Wynn, Project Manager, Mechanical Commissioning Manager- 0459 801 395 • Tony Holmes, Construction Manager McConnell Dowell– 0400 998 005 • Fred Tubaru, Safety Manager – 0412 421 330 • Tai Lawrence, Safety Advisor – 0407 276 362 • Michael Schroers, General Superintendent – 07 3206 8238 • Gary Butler, QLD Regional Manager Lend Lease– 0418 834 971 • Ross Farrell Lead Field Engineer Bechtel 0477 700 003 • Drew Allen Area Manager Bechtel • Chris Johnston Downers 0459 806 045 Working at Heights attainment.pdf construction code compliance.pdf Confine Space attainment.pdf Management system Induction.pdf Construction Card RM 001.pdf construction code compliance training programme.pdf Passport rbm 001.pdf DLIC RM001.pdf MSIC 001.pdf RAC 4WD certificate 001.pdf Cert2 in Conservation & Land Management 001.pdf