Curriculum Vitae for Mechanical Engineer with Power Plant Experience
1. Curriculum Vitae
Fikret AKSU
Personal data
Date of birth: 20 January 1968
Nationality: Turkey
Marital status: married, two children
Mobile Phone:0543-3064626
E-Mail Adress:fikretaksu968@gmail.com
EDUCATİON:
AYDIN ENDÜSTRİ MESLEK LİSESİ- MOTOR BÖLÜMÜ -1985
ATATÜRK ÜNİVERSİTESİ- ERZİNCAN MESLEK YÜKSEKOKULU-MOTOR BÖLÜMÜ -1988
(75/100-Finish Second in)
DİLKO ENGLİSH COURSE -Upper İntermediate Level (İNGİLİZCE KURSU)-2007-2009
DYNET İNGİLİZCE COURSE- Distance Learning ( 280 Hours )- 2013-2014
SKODA 85 MW Condensing Steam Turbine MTD 40 –Operation Traning
DCS ZAT SYSTEM
GE Gas Turbine Frame 6B and 6 FA And Generatör Training
SİEMENS Gas Turbine 8000H- Steam Turbine SST 5000 And Generatör Training 600
MW (SİNGLE SHAFT)
MITSUBİSHİ M701 F 305 MW Gas Turbine –Mıtsubishi 330 MW Steam Turbine And
Generatör Training
SİEMENS NK 50 Condensing Steam Turbine 22,5 MW
ARİEL GAS COMPRESSÖR-20-50 BAR –Erection-Comissioning and Operation Training
Sulzer Pump --KSB Pump—Torishma Pump-Kirloskar Pump-- Maintenance –Operation
Training
Water Treatment Maintenance and Operation Training
2. Fısher Valve—CCI valve--Flow Serve Valve-Klinger Valve –Auma Valve Maintenance-
Operation Training
TMMOB Fire İnduıstrial Boiler Operation Certficated
GENERAL POWER PLANT TRAİNİNG -- AEE /MITSUBISHİ KONSORYUM
SAP -Training
Aqumach Water Treatment Desalination and Demiralize Water
Cris Tepro Demiralize Water Treatment Training (2 Days)
DESA-OTAK HRSG Operating and Maintenance Training (5 Days)
STANDART FASSEL HRSG Operating and Maintenance Training (7 Days)
NOOTER ERİKSEN HRSG Operating and Maintenance Training (7 Days)
CLAYTON Auxlairy Boiler Operation and Maintenance Traning (3 Days)
METSO DCS OPERATÖR TRAİNİNG
SKF Roller Bearing Training
JOHN CRANE Mechanicial Seal Training (2 Days)
HY-TORK User Training (1 Days)
TMMOB CRANE User Training (1 Days)
KONECRANES CRANE Maintenance and User Traning (2 Days)
ATLAS COPCO SCREW AND GAS COMPRESSOR TRAİNİNG
Rigger Lifting Device Equipment Training
TMMOB Forklift Drive License ( 3 Days)
HİDROLİK AND PNEUMATİC COURSE ---KOSGEB ---İZMİR/TURKEY (10 Days)
TEİAŞ SOMA EĞİTİM MERKEZİ POWER PLANT OPERATİON TRAİNİNG -2002- (45 Days)
BOYS- Maintenance Training (5 Days)
SİEMENS PCS 7-- Operatör Training
İSO 9001 Environmental Management System Training
NASH Vacum Pumps.
PROFESSİONAL CAREER :
Since 25 September-2015: ÇALIK ENERJİ. --Mechanicial Operation Advısor Control
Room – 230 MW NATURAL GAS COMBİNE CYCLE POWER PLANT
GARDABANİ /GEORGİA
230 MW Gürcistan-Gardabani Combine Cycle Power Plant :2*75 MW GE -6FA Gas
Turbine -85 MW SKODA-DOOSAN -Steam Turbine 2*NOOTER ERİKSEN HRSG-
Honeywell and ZAT DCS system—Commercial Operation
2009-2015--ENERJİSA ENERJİ ÜRETİM A.Ş Mechanicial Maintenance and Operation
Technician
930 MW NATURAL GAS COMBİNE CYCLE POWER PLANT BANDIRMA/ TURKEY
2*300 MW Mıtsubıshi Gas Turbine and 330 MW Mıtsubıshi Steam Turbine -Comissioning
and Commercial Operation METSO DCS system
930 MW NG Combined Cycle Power Plant Project; following all Mechanical activities
such as erection of Gas Turbines and NOOTER ERİKSEN HRSGs, Steam Turbine and
YUBA CONDENSER, all BOP activities including piping and insulation. At the end of the
erection, systems were commissioned and Commercial Operation Generator Hydrojen
Cooling –SEA WATER MAİN COOLİNG Ball Cleaning and Priming Unit System
2*300 MW MITSUBISHİİ Gas Turbine – 330 MW Steam Turbine -Minor and Major
Maintenance
MITSUBISHİ STEAM TURBİNE Steam Valves Maintenance Activities
MITSUBISHİ Gas Turbine Rotor Removal İnspection Major Maintenance -2015- (56 Days)
3. MITSUBISHİ Gas Turbine CI And TI İnspection Maintenance -2012–(22 Days)
MITSUBISHİ Gas Turbine Combustion Chamber İnspection 2011--(15 Days)
2002-2009---ENERJİSA ENERJİ ÜRETİM A.Ş-Mechanicial Maintenance and Operation
Technician
60 MW NATURAL GAS COMBİNE CYCLE POWER PLANT - ÇANAKKALE /TURKEY
1*40 MW GE Frame 6 B Gas Turbine and 22,5 MW Siemens NK-50 Steam Turbine and
Condenser –Water Treatment Rewerse Osmozis Mix Bed –Softening Unit –EDİ Unit
Cooling Tower all BOP including Piping At the end of the erection, systems were
commissioned and Commercial Operation
MAİNTENANCE ACTİVİTİES
Gas Turbine Steam Turbine- Minor and Major maintenance
GE –Frame 6 B Gas Turbine Major Maintenance –Rotor Removal - 2013-( 33 Days)
SİEMENS NK 50 Steam Turbine Major Maintenance –Rotor Removal - 2013- (35 Days)
GE Gas Turbine Frame 6 B –Hot Gas Path İnspection- ÇANAKKALE - 2009- (22 Days)
GE Gas Turbine Frame 6 B-Major İnpection –Rotor Removal –İZMİT - 2007- (33 Days)
SİEMENS Steam Turbine Minor Maintenance --ADANA- 2007- (15 Days)
SİEMENS NK 50 Steam Turbine Minor Maintenance - ÇANAKKALE- 2006 (15 Days)
GE Gas Turbine Frame 6 B –Hot Gas Path İnspection İZMİT - 2005-(20 Days )
1997-2002--- DESA ENERJİ ELEK- ÜRETİM AŞ-Mechanicial Maintenance -Operation
Technician
10 MW-Lıgud Fuel (Nafta-Dizel)KOJENERASYON POWER PLANT
2*5 MW Taurus 60 gas Turbine and 1 MW –KKK Back Pressure Steam Turbine
Complete Erection- Coommissioning and Commmercial Operation
PLANT OPERATIONS AND MAINTENANCE TECHNİCİAN(Including:Gas Turbines
(2x5MW Turbo Mach-Taurus 60)--1 MW KKK Back Pressure Steam Turbine –DESA
HRSG,Steam and Closed Circuit Hot Water System,Auxiliary Conventional Boiler,Water
Treatment System (Reverse Osmosıs-Mix bed),Chemical Treatment of
Boilers,Compressed Air Process, Pumps,Hydraulic ,pneumatıc and Valves
I have been working Desa Enerji Elektrik A.ş During Erection,start-up and Commercial
Operation I worked as a Mechanicial Maintenance Technician
1992-1997---Habaş Sanayii ve Tıbbı Gazlar Endüstri A..Ş ALİAĞA/ İZMİR
I worked as a Mechanicial Maintenance Technician in İron and Steel Factory
Maintenance of Rolling Bench Pneumatic and Hidrolik Valves