SlideShare a Scribd company logo
1 of 22
PROPOSAL AN ENGINEERING SOLUTIONS FOR FISH
MIGRATION UPSTREAM AND DOWNSTREAM OVER ONE
DISCHARGE SILL LOCATED ON THE BISTRA MĂRULUI RIVER
Răzvan G.VOICU,
National Institute of Hydrology and Water
Management
Laboratory of Eco-Hydrology and Water
Protection Quality Bucharest,România
Lee Jason BAUMGARTNER
Charles Stuart University, Institute for Land,Water and Society,
Albury, New South Wales Australia
Fish passage conference,
December 10 -14, 2018, Albury,
Australia
Dr. River Restoration Engineer
Freshwater Fish EcologistDr.
The fish migration over dams or
discharge sills(downstream and upstream)
is a challenge for an environment engineer,
a professional liability for a biologist and
debt of honor for a lawyer.
Răzvan Voicu
Fish passage conference, December 10 -14, 2018, Albury, Australia
Hydrologic connectivity is globally
recognized as a fundamental requirement of
all healthy ecosystems and sustainability of
fisheries.
Is fish migration an important thing?
For lotic ecosystems biodiversity, yes.
For most of people mentality, no.
For water quality, yes.
Fish passage conference, December 10 -14, 2018, Albury, Australia
România has a lot of experience it
comes about dams construction, are lots
of built dams built by România experts all
around the world, but in terms of building
passable migration systems for fish
upstream-downstream, it can be
considered a beginner.
Fish passage conference, December 10 -14, 2018, Albury, Australia
Fish passage conference, December 10 -14, 2018, Albury, Australia
Vidraru Dam
The dam's height is 166 metres, the arch length 305 meters and it can store 465
million cubic metres of water. The reservoir has a total shoreline (perimeter) length of 28km.
www.baraje.ro/baraje, http://en.wikipedia.org/wiki/Vidraru_Dam
Măneciu dam
The dam's height 75 metres –length
crowning 750 metres.
http://www.baraje.ro/baraje/pam/maneciu.htm
Fish passage conference, December 10 -14, 2018, Albury, Australia
Bicaz dam
The dam's height 127 metres –length
crowning 430 metres.
http://www.hidroconstructia.com/dy
n/2pub/proiecte_det.php?id=27&pg=
12
Porțile de Fier I dam
The dam's height 60 metres –length
crowning 1278 metres.
http://www.baraje.ro/bara
je/grepam/stanca2.htm
Fish passage conference, December 10 -14, 2018, Albury, Australia
Râușor dam
The dam's height 120 metres – length
crowning 380 metres.
http://www.baraje.ro/baraje/anroc/rausor.htm
Saveh dam (Iran)-arch dam
128 m height
Orantes (Liban); Rositos (Bolivia)
(http://mmediu.ro/vechi/departame
nt_ape/baraje/baraje.htm)
Fish passage conference, December 10 -14, 2018, Albury, Australia
Caraș River Azuga River
Ialomița River Source:Răzvan VoicuBistra Mărului River
WEIRS IN
ROMÂNIA
Functional fish passages in România
River Someșul Mic - Mănăstirea Dam source:
Administrația Bazinală de Apă Someș-Tisa
River Cobăşel - source:
Administratia Bazinală de Apă
Someș-Tisa
Functional fish passages in România Făgăraș Mountains
Source: AQUA-INVEST
Fish passage conference, December 10 -14, 2018, Albury, Australia
Unfunctional fish passages in România
Source:AQUA-INVEST
Făgăraș Mountains
Fish passage conference, December 10 -14, 2018, Albury, Australia
Fish passage conference, December 10 -14, 2018, Albury, Australia
There are many dams and weirs(discharge sills) that can not
be removed because they are useful to people (water supplies, flood
defenses for populations, civil constructions, roads and bridges, etc.).
Floods affect these hydro-technical constructions as well as
fish passage (generally frontal) fixed on these weirs.
There are many cases when these fish migration systems are
partially or totally destroyed at the first flood(generally in the
mountainous area but not only). In mountain areas, the existence of
upstream and downstream migration systems still remains a
complicated problem.
Given the extreme conditions often, classical frontal systems
have suffered each time during the winter and floods often very strong.
Can we repair or change them every year? Definitely not.
What can we do?
To invent and build systems for fish crossing upstream /
downstream to weirs which are protected by the consequences of
floods.
PROPOSAL AN ENGINEERING SOLUTIONS FOR FISH MIGRATION
UPSTREAM AND DOWNSTREAM OVER ONE DISCHARGE SILL
LOCATED ON THE BISTRA MĂRULUI RIVER
Fish passage conference, December 10 -14, 2018, Albury, Australia
Discharge sills(weirs) on the Bistra Mărului River (photos: Răzvan Voicu)
The River Bistra River is a stream with an average of about 5 m³/s, a
tributary of the Bistra River in Caras-Severin County. The velocity in this is about
0.8 m/s and the slope in the area is about 14 ‰. The study area has many discharge
sills because there are many floods in the area, especially spring and autumn. In
this river there are fish that are blocked to reach the springs by the discharge
sills(weirs).
The species of migratory fish are: Salmo trutta fario, Cottus gobio, Gobio uranoscopus,
Barbus meridionalis etc.
The weir where I propose the solution has a height of 1.6 meters (water fall),
a thickness of 1m and a length of 20m.
The discharge sill(weir) in the study
area(source: Răzvan Voicu)
Fish passage conference, December 10-14, 2018, Albury, Australia
Fish passage conference, December 10 -14, 2018, Albury, Australia
thftjfhjf
sdfs
rectangular concrete basin with a
semicircular surface
the common slope of the
drilled channel through the
spillway and the river
channel drilled inside the discharge sill
discharge sill
river bad
Bistra Mărului River
concrete platform
the slope of the river
The position of the concrete basin - cross section - the indicative scheme
A rectangular parallelepiped
basin upstream of the weir
must be constructed!!!
A rectangular channel
must be built through the
discharge sill(weir) that
will has the same slope
with the river !!!
Fish passage conference, December 10 -14, 2018, Albury, Australiafhfh
gkgg
channels for fish migration
concrete platform
discharge sill
concrete basin (semicircular surface)
Positioning of the semicircular
surface of the concrete basin -
indicative scheme
Fish passage conference, December 10 -14, 2018, Albury, Australia
Positioning of the fish migration channel in the discharge sill and in the
concrete platform - indicative scheme
water velocity (fig. 4).
fgd
channel for fish migration
concrete platform
concrete basin Bistra Mărului Riverdischarge sill
Bistra Mărului River
The channel will pass
through the concrete
platform.
The channel will
expand on each side
about 10cm after
leaving the weir.
Rectangular channels
can have about height
of 45 cm and a width of
42cm.
In our case the concrete
platform is about 30cm.
Fish passage conference, December 10 -14, 2018, Albury, Australia
Inside the canal located in the
discharge sill(weir), sheet piles of
resistant rubber will be fixed to reduce
the water velocity.
fhdfh
xfbxb
concrete platform
channel for fish migration
discharge sillsheet piles of resistant rubber
river stone
Inside the channel, river
stones will also be fixed to reduce
water velocity and to create rest
areas for fish.dhf
dhd
river stones
sheet pile of resistant rubber
discharge sill
Bistra Mărului River
channel for fish migration
Cross section of the fish migration channel
inside to the discharge sill(weir) - indicative
scheme
Positioning of river stones and
sheet piles inside the fish migration
channel - the indicative scheme
Fish passage conference, December 10 -14, 2018, Albury, Australia
system can be achieved.
gtyiti
concrete basin (semicircularsurface)
discharge sill
concrete platform
channel for fish migration
metal grill
vertical sliding metal
weirsmetal hinge
security system (close)
module 1
module 2
sheet piles of resistant rubber
General scheme of fish migration system - indicative scheme
These modules are fixed to the fish
migration channel with the help of the
metal hinges on one side and on the other
side of the secured systems .
Metal grill that defends the fish of
poaching and the channel of logs that
can be thrown over the discharge sill by
the floods.
The metal grids are fixed to the modules.
Fish passage conference, December 10 -14, 2018, Albury, Australia
The design of this system has been
achieved to be robust and functional
especially in mountain areas and not only.
The proposed solution does not in
any way diminish the structure and
functionality of the weir.
Where there are no concrete
platforms, new concrete platforms
with the heights and (as a foundation)
larger (about 40cm on both sides) can
be built than the fish migration
channels.
If fish migrate along side a shore, one of
the fish migration channels may be
downstream of that shore.
This system can be adaptable depending on
the characteristics and location of the
discharge sill(weir).
CONCLUSIONS
Why are you so sad?
I am so sad when I see a weir or dam
you know…
Why are you so optimistic?
BECAUSE THERE ARE
PEOPLE WHO WANT TO HELP US
!!!! SEE THE FISH PASSAGE
CONFERENCE, DECEMBER 10-14,
2018, ALBURY, AUSTRALIA !
Yes you are right, we never
cross the dam!
nou-nascuti.ro
scrigroup.com
mami.ro
1.
2.
3.
4.
5.
getiiliberi@gmail.com
Fish passage conference, December 10 -14, 2018, Albury, Australia
THANK YOU!
rzvnvoicu@yahoo.com
lbaumgartner@csu.edu.au

More Related Content

Similar to PROPOSAL AN ENGINEERING SOLUTIONS FOR FISH MIGRATION UPSTREAM AND DOWNSTREAM OVER ONE DISCHARGE SILL LOCATED ON THE BISTRA MĂRULUI RIVER

2016 Vianna et al. Indicators of fishing mortality in Palau_Authors copy
2016 Vianna et al. Indicators of fishing mortality in Palau_Authors copy2016 Vianna et al. Indicators of fishing mortality in Palau_Authors copy
2016 Vianna et al. Indicators of fishing mortality in Palau_Authors copy
Gabriel Maciel de Souza Vianna
 
Water Ways Presentation
Water Ways PresentationWater Ways Presentation
Water Ways Presentation
Tipperary
 

Similar to PROPOSAL AN ENGINEERING SOLUTIONS FOR FISH MIGRATION UPSTREAM AND DOWNSTREAM OVER ONE DISCHARGE SILL LOCATED ON THE BISTRA MĂRULUI RIVER (20)

Fish passage presentation 1 Madison conference!
 Fish passage presentation 1 Madison conference! Fish passage presentation 1 Madison conference!
Fish passage presentation 1 Madison conference!
 
CARAŞ RIVER GORGE ASPECTS OF SALMONIDS’ COMMUNITIES MANAGEMENT – TECHNICAL SO...
CARAŞ RIVER GORGE ASPECTS OF SALMONIDS’ COMMUNITIES MANAGEMENT – TECHNICAL SO...CARAŞ RIVER GORGE ASPECTS OF SALMONIDS’ COMMUNITIES MANAGEMENT – TECHNICAL SO...
CARAŞ RIVER GORGE ASPECTS OF SALMONIDS’ COMMUNITIES MANAGEMENT – TECHNICAL SO...
 
Msd10.2478 volume10 issue-2_01paper
Msd10.2478  volume10 issue-2_01paperMsd10.2478  volume10 issue-2_01paper
Msd10.2478 volume10 issue-2_01paper
 
Fish passage design on DŁUBNIA RIVER IN KRAKOW
Fish passage design on DŁUBNIA RIVER IN KRAKOWFish passage design on DŁUBNIA RIVER IN KRAKOW
Fish passage design on DŁUBNIA RIVER IN KRAKOW
 
Estuaries and barrier islands
Estuaries and barrier islandsEstuaries and barrier islands
Estuaries and barrier islands
 
Ecology of reservoirs in india
Ecology of reservoirs in indiaEcology of reservoirs in india
Ecology of reservoirs in india
 
Fish passage system!
Fish passage system!Fish passage system!
Fish passage system!
 
Challenges for Fish Pass Solutions in the Mekong River
Challenges for Fish Pass Solutions in the Mekong RiverChallenges for Fish Pass Solutions in the Mekong River
Challenges for Fish Pass Solutions in the Mekong River
 
Pacific Spirit Park Society (PSPS) Environmental Health and Safety Survey
 Pacific Spirit Park Society (PSPS) Environmental Health and Safety Survey Pacific Spirit Park Society (PSPS) Environmental Health and Safety Survey
Pacific Spirit Park Society (PSPS) Environmental Health and Safety Survey
 
201610204
201610204201610204
201610204
 
Sediment flow changes induced by dams in pamba river
Sediment flow changes induced by dams in pamba riverSediment flow changes induced by dams in pamba river
Sediment flow changes induced by dams in pamba river
 
Tawatina River Presentation
Tawatina River PresentationTawatina River Presentation
Tawatina River Presentation
 
Conservation Efforts in Ash Creek 2022.pdf
Conservation Efforts in Ash Creek 2022.pdfConservation Efforts in Ash Creek 2022.pdf
Conservation Efforts in Ash Creek 2022.pdf
 
Georgeann keersm
Georgeann keersmGeorgeann keersm
Georgeann keersm
 
2016 Vianna et al. Indicators of fishing mortality in Palau_Authors copy
2016 Vianna et al. Indicators of fishing mortality in Palau_Authors copy2016 Vianna et al. Indicators of fishing mortality in Palau_Authors copy
2016 Vianna et al. Indicators of fishing mortality in Palau_Authors copy
 
Ballast water :impact and management
Ballast water :impact and managementBallast water :impact and management
Ballast water :impact and management
 
FISH MIGRATION SYSTEM OVER A WOODEN DISCHARGE SILL LOCATED ON THE BISTRA MĂRU...
FISH MIGRATION SYSTEM OVER A WOODEN DISCHARGE SILL LOCATED ON THE BISTRA MĂRU...FISH MIGRATION SYSTEM OVER A WOODEN DISCHARGE SILL LOCATED ON THE BISTRA MĂRU...
FISH MIGRATION SYSTEM OVER A WOODEN DISCHARGE SILL LOCATED ON THE BISTRA MĂRU...
 
Water Ways Presentation
Water Ways PresentationWater Ways Presentation
Water Ways Presentation
 
Dam of thisavros
Dam of thisavrosDam of thisavros
Dam of thisavros
 
Fragma
FragmaFragma
Fragma
 

More from Răzvan Voicu

Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...
  Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...  Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...
Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...
Răzvan Voicu
 

More from Răzvan Voicu (20)

IMPROVEMENT OF LATERAL CONNECTIVITY IN A SECTOR OF RIVER HÂRTIBACIU (OLT/DANU...
IMPROVEMENT OF LATERAL CONNECTIVITY IN A SECTOR OF RIVER HÂRTIBACIU (OLT/DANU...IMPROVEMENT OF LATERAL CONNECTIVITY IN A SECTOR OF RIVER HÂRTIBACIU (OLT/DANU...
IMPROVEMENT OF LATERAL CONNECTIVITY IN A SECTOR OF RIVER HÂRTIBACIU (OLT/DANU...
 
Fish passage system on Ialomița River!Lawrence G. Dominguez!
Fish passage system on Ialomița River!Lawrence G. Dominguez!Fish passage system on Ialomița River!Lawrence G. Dominguez!
Fish passage system on Ialomița River!Lawrence G. Dominguez!
 
Wetland restoration and fish passage solutions near Retiș Dam!
Wetland restoration and fish passage solutions near Retiș Dam!Wetland restoration and fish passage solutions near Retiș Dam!
Wetland restoration and fish passage solutions near Retiș Dam!
 
Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...
  Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...  Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...
Bio-Engineering Solutions for Restoring the PeŃa Creek, on the water sector...
 
THE PROPOSAL OF POTENTIAL SOLUTIONS IN ORDER TO RESTORE THE BÂRZEŞTI –BRĂHĂŞO...
THE PROPOSAL OF POTENTIAL SOLUTIONS IN ORDER TO RESTORE THE BÂRZEŞTI –BRĂHĂŞO...THE PROPOSAL OF POTENTIAL SOLUTIONS IN ORDER TO RESTORE THE BÂRZEŞTI –BRĂHĂŞO...
THE PROPOSAL OF POTENTIAL SOLUTIONS IN ORDER TO RESTORE THE BÂRZEŞTI –BRĂHĂŞO...
 
Rivers and streams restoration - brochure 2010!
Rivers and streams restoration - brochure 2010!Rivers and streams restoration - brochure 2010!
Rivers and streams restoration - brochure 2010!
 
Razvan voicu fish passage 2015 - agnita and manastur ii+iii
Razvan voicu  fish passage 2015 - agnita and manastur ii+iiiRazvan voicu  fish passage 2015 - agnita and manastur ii+iii
Razvan voicu fish passage 2015 - agnita and manastur ii+iii
 
SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS...
SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS...SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS...
SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS...
 
Fish passage solution for Mănăştur dam!
Fish passage solution for Mănăştur dam!Fish passage solution for Mănăştur dam!
Fish passage solution for Mănăştur dam!
 
Modern technologies for ichthyofauna migration over the discharge sills!
Modern technologies for ichthyofauna migration over the discharge sills!Modern technologies for ichthyofauna migration over the discharge sills!
Modern technologies for ichthyofauna migration over the discharge sills!
 
Ecologie!
Ecologie!Ecologie!
Ecologie!
 
Socializarea prin raportul banilor 2.2 - 2011!
Socializarea prin raportul banilor 2.2   - 2011!Socializarea prin raportul banilor 2.2   - 2011!
Socializarea prin raportul banilor 2.2 - 2011!
 
Erosion of riverbanks and slopes! Răzvan Voicu
Erosion of riverbanks and slopes! Răzvan VoicuErosion of riverbanks and slopes! Răzvan Voicu
Erosion of riverbanks and slopes! Răzvan Voicu
 
The ecotechnical solution IV Răzvan Voicu,2012
The ecotechnical solution IV   Răzvan Voicu,2012The ecotechnical solution IV   Răzvan Voicu,2012
The ecotechnical solution IV Răzvan Voicu,2012
 
Removing the swanton dam on the missisquoi river
Removing the swanton dam on the missisquoi riverRemoving the swanton dam on the missisquoi river
Removing the swanton dam on the missisquoi river
 
Dâmboviţa river restoration 2!
Dâmboviţa river restoration 2!Dâmboviţa river restoration 2!
Dâmboviţa river restoration 2!
 
Răzvan Voicu - Measures of ecological reconstruction of Baseul Vechi and Base...
Răzvan Voicu - Measures of ecological reconstruction of Baseul Vechi and Base...Răzvan Voicu - Measures of ecological reconstruction of Baseul Vechi and Base...
Răzvan Voicu - Measures of ecological reconstruction of Baseul Vechi and Base...
 
General solutions to ensure fish fauna passage upstream – downstream of disch...
General solutions to ensure fish fauna passage upstream – downstream of disch...General solutions to ensure fish fauna passage upstream – downstream of disch...
General solutions to ensure fish fauna passage upstream – downstream of disch...
 
LUPTA PENTRU PĂSTRAREA IDENTITĂŢII NAŢIONALE!
LUPTA PENTRU PĂSTRAREA IDENTITĂŢII NAŢIONALE!LUPTA PENTRU PĂSTRAREA IDENTITĂŢII NAŢIONALE!
LUPTA PENTRU PĂSTRAREA IDENTITĂŢII NAŢIONALE!
 
Hydraulic and bioengineering solutions for rivers! 2
Hydraulic and bioengineering solutions for rivers! 2Hydraulic and bioengineering solutions for rivers! 2
Hydraulic and bioengineering solutions for rivers! 2
 

Recently uploaded

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 

Recently uploaded (20)

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 

PROPOSAL AN ENGINEERING SOLUTIONS FOR FISH MIGRATION UPSTREAM AND DOWNSTREAM OVER ONE DISCHARGE SILL LOCATED ON THE BISTRA MĂRULUI RIVER

  • 1. PROPOSAL AN ENGINEERING SOLUTIONS FOR FISH MIGRATION UPSTREAM AND DOWNSTREAM OVER ONE DISCHARGE SILL LOCATED ON THE BISTRA MĂRULUI RIVER Răzvan G.VOICU, National Institute of Hydrology and Water Management Laboratory of Eco-Hydrology and Water Protection Quality Bucharest,România Lee Jason BAUMGARTNER Charles Stuart University, Institute for Land,Water and Society, Albury, New South Wales Australia Fish passage conference, December 10 -14, 2018, Albury, Australia Dr. River Restoration Engineer Freshwater Fish EcologistDr.
  • 2. The fish migration over dams or discharge sills(downstream and upstream) is a challenge for an environment engineer, a professional liability for a biologist and debt of honor for a lawyer. Răzvan Voicu Fish passage conference, December 10 -14, 2018, Albury, Australia
  • 3. Hydrologic connectivity is globally recognized as a fundamental requirement of all healthy ecosystems and sustainability of fisheries. Is fish migration an important thing? For lotic ecosystems biodiversity, yes. For most of people mentality, no. For water quality, yes. Fish passage conference, December 10 -14, 2018, Albury, Australia
  • 4. România has a lot of experience it comes about dams construction, are lots of built dams built by România experts all around the world, but in terms of building passable migration systems for fish upstream-downstream, it can be considered a beginner. Fish passage conference, December 10 -14, 2018, Albury, Australia
  • 5. Fish passage conference, December 10 -14, 2018, Albury, Australia Vidraru Dam The dam's height is 166 metres, the arch length 305 meters and it can store 465 million cubic metres of water. The reservoir has a total shoreline (perimeter) length of 28km. www.baraje.ro/baraje, http://en.wikipedia.org/wiki/Vidraru_Dam Măneciu dam The dam's height 75 metres –length crowning 750 metres. http://www.baraje.ro/baraje/pam/maneciu.htm
  • 6. Fish passage conference, December 10 -14, 2018, Albury, Australia Bicaz dam The dam's height 127 metres –length crowning 430 metres. http://www.hidroconstructia.com/dy n/2pub/proiecte_det.php?id=27&pg= 12 Porțile de Fier I dam The dam's height 60 metres –length crowning 1278 metres. http://www.baraje.ro/bara je/grepam/stanca2.htm
  • 7. Fish passage conference, December 10 -14, 2018, Albury, Australia Râușor dam The dam's height 120 metres – length crowning 380 metres. http://www.baraje.ro/baraje/anroc/rausor.htm Saveh dam (Iran)-arch dam 128 m height Orantes (Liban); Rositos (Bolivia) (http://mmediu.ro/vechi/departame nt_ape/baraje/baraje.htm)
  • 8. Fish passage conference, December 10 -14, 2018, Albury, Australia Caraș River Azuga River Ialomița River Source:Răzvan VoicuBistra Mărului River WEIRS IN ROMÂNIA
  • 9. Functional fish passages in România River Someșul Mic - Mănăstirea Dam source: Administrația Bazinală de Apă Someș-Tisa River Cobăşel - source: Administratia Bazinală de Apă Someș-Tisa
  • 10. Functional fish passages in România Făgăraș Mountains Source: AQUA-INVEST Fish passage conference, December 10 -14, 2018, Albury, Australia
  • 11. Unfunctional fish passages in România Source:AQUA-INVEST Făgăraș Mountains Fish passage conference, December 10 -14, 2018, Albury, Australia
  • 12. Fish passage conference, December 10 -14, 2018, Albury, Australia There are many dams and weirs(discharge sills) that can not be removed because they are useful to people (water supplies, flood defenses for populations, civil constructions, roads and bridges, etc.). Floods affect these hydro-technical constructions as well as fish passage (generally frontal) fixed on these weirs. There are many cases when these fish migration systems are partially or totally destroyed at the first flood(generally in the mountainous area but not only). In mountain areas, the existence of upstream and downstream migration systems still remains a complicated problem. Given the extreme conditions often, classical frontal systems have suffered each time during the winter and floods often very strong. Can we repair or change them every year? Definitely not. What can we do? To invent and build systems for fish crossing upstream / downstream to weirs which are protected by the consequences of floods.
  • 13. PROPOSAL AN ENGINEERING SOLUTIONS FOR FISH MIGRATION UPSTREAM AND DOWNSTREAM OVER ONE DISCHARGE SILL LOCATED ON THE BISTRA MĂRULUI RIVER Fish passage conference, December 10 -14, 2018, Albury, Australia Discharge sills(weirs) on the Bistra Mărului River (photos: Răzvan Voicu) The River Bistra River is a stream with an average of about 5 m³/s, a tributary of the Bistra River in Caras-Severin County. The velocity in this is about 0.8 m/s and the slope in the area is about 14 ‰. The study area has many discharge sills because there are many floods in the area, especially spring and autumn. In this river there are fish that are blocked to reach the springs by the discharge sills(weirs). The species of migratory fish are: Salmo trutta fario, Cottus gobio, Gobio uranoscopus, Barbus meridionalis etc.
  • 14. The weir where I propose the solution has a height of 1.6 meters (water fall), a thickness of 1m and a length of 20m. The discharge sill(weir) in the study area(source: Răzvan Voicu) Fish passage conference, December 10-14, 2018, Albury, Australia
  • 15. Fish passage conference, December 10 -14, 2018, Albury, Australia thftjfhjf sdfs rectangular concrete basin with a semicircular surface the common slope of the drilled channel through the spillway and the river channel drilled inside the discharge sill discharge sill river bad Bistra Mărului River concrete platform the slope of the river The position of the concrete basin - cross section - the indicative scheme A rectangular parallelepiped basin upstream of the weir must be constructed!!! A rectangular channel must be built through the discharge sill(weir) that will has the same slope with the river !!!
  • 16. Fish passage conference, December 10 -14, 2018, Albury, Australiafhfh gkgg channels for fish migration concrete platform discharge sill concrete basin (semicircular surface) Positioning of the semicircular surface of the concrete basin - indicative scheme
  • 17. Fish passage conference, December 10 -14, 2018, Albury, Australia Positioning of the fish migration channel in the discharge sill and in the concrete platform - indicative scheme water velocity (fig. 4). fgd channel for fish migration concrete platform concrete basin Bistra Mărului Riverdischarge sill Bistra Mărului River The channel will pass through the concrete platform. The channel will expand on each side about 10cm after leaving the weir. Rectangular channels can have about height of 45 cm and a width of 42cm. In our case the concrete platform is about 30cm.
  • 18. Fish passage conference, December 10 -14, 2018, Albury, Australia Inside the canal located in the discharge sill(weir), sheet piles of resistant rubber will be fixed to reduce the water velocity. fhdfh xfbxb concrete platform channel for fish migration discharge sillsheet piles of resistant rubber river stone Inside the channel, river stones will also be fixed to reduce water velocity and to create rest areas for fish.dhf dhd river stones sheet pile of resistant rubber discharge sill Bistra Mărului River channel for fish migration Cross section of the fish migration channel inside to the discharge sill(weir) - indicative scheme Positioning of river stones and sheet piles inside the fish migration channel - the indicative scheme
  • 19. Fish passage conference, December 10 -14, 2018, Albury, Australia system can be achieved. gtyiti concrete basin (semicircularsurface) discharge sill concrete platform channel for fish migration metal grill vertical sliding metal weirsmetal hinge security system (close) module 1 module 2 sheet piles of resistant rubber General scheme of fish migration system - indicative scheme These modules are fixed to the fish migration channel with the help of the metal hinges on one side and on the other side of the secured systems . Metal grill that defends the fish of poaching and the channel of logs that can be thrown over the discharge sill by the floods. The metal grids are fixed to the modules.
  • 20. Fish passage conference, December 10 -14, 2018, Albury, Australia The design of this system has been achieved to be robust and functional especially in mountain areas and not only. The proposed solution does not in any way diminish the structure and functionality of the weir. Where there are no concrete platforms, new concrete platforms with the heights and (as a foundation) larger (about 40cm on both sides) can be built than the fish migration channels. If fish migrate along side a shore, one of the fish migration channels may be downstream of that shore. This system can be adaptable depending on the characteristics and location of the discharge sill(weir). CONCLUSIONS
  • 21. Why are you so sad? I am so sad when I see a weir or dam you know… Why are you so optimistic? BECAUSE THERE ARE PEOPLE WHO WANT TO HELP US !!!! SEE THE FISH PASSAGE CONFERENCE, DECEMBER 10-14, 2018, ALBURY, AUSTRALIA ! Yes you are right, we never cross the dam! nou-nascuti.ro scrigroup.com mami.ro 1. 2. 3. 4. 5.
  • 22. getiiliberi@gmail.com Fish passage conference, December 10 -14, 2018, Albury, Australia THANK YOU! rzvnvoicu@yahoo.com lbaumgartner@csu.edu.au