1. RAVINDRA S BHAT #548, Lakshmikantha nagar,
1st
Stage,Hebbal,Mysore
PIN 570017
Mob:+91 7204204771
Email:rsbhat8@gmail.com
Qualification:
B.E. in Mechanical Engineering from Maharaja Institute of Technology, Mysore affiliated to
Vishveswaraiya Technological University, Karnataka with 72% aggregate marks.
Educational qualifications :-
Year of
passing
Qualification School/College Board/University Marks (%)
2005 Xth Standard Jawahar Navodaya
Vidyalaya Hassan
CBSE /
NCERT
67.8
2007 X11th
standard
K.P Pre
University College
Mysore
Karnataka state
P U board
74
2011 B.E
-MECHANICAL
ENGINEERING
Maharaja Institute
Of Technology
Mysore
Vishveswaraiya
Technological
University
72
WORK EXPERIENCE: From July 2011 to till date.
Trainee Engineer in L&T Integrated Engineering Services from July 2011 to October
2012.
Design Engineer(drawing and drafting support) in ASKAR MICRONS PVT LTD from
December 2012 to October 2013.
As Engineer in Materials Management & QA Department in ASKAR MICRONS PVT
LTD from October 2013 to till date.
• worked on planning sheets,program sheets,cost sheets and related documents using SAP.
• MR(Management Representative)
• Third party Inspector in QUALITY ASSURANCE.
• Vendor development - extensively worked in streamling procedure and mass production
of lathe beds in foundry for mill train project.
RESPONSIBILITIES HANDLED:
Engineer in Materials department(supply chain management).
Quality Inspector, production compliant handling.
MR (Management Representative) Maintaining records as pre ISO 9001-2008.
Skill Summary
Engineering Tools: SAP-Materials management, Draft site, Auto CAD,Solid Works, Pro-E,
Unigraphics Nx .
2. Domain : Industrial Products.
Experience:
Total years of experience : 4 Years
Organization : ASKAR MICRONS PVT LTD MYSORE.
Designation : Engineer in Materials Management and Planning.
Department : Materials Management and Planning & Manufacturing Support.
Period of Service : Dec 2012 to till date.
Career Development Summary :
• 1 year as Trainee Engineer in L&T Integrated Engineering Services. Worked on new product
design, development and Sustenance support for industrial product.
• Worked extensively in creating 3D models, assembly and manufacturing drawings using
Engineering Tools under Industrial Product Department.
• As Materials management and quality Engineer -worked on planning sheets,program
sheets and cost sheets and making purchase orders using SAP in supply chain management.
• MR(Management Representative) -working on ISO activities.
• As Engineer in design- Worked on CNC LATHE design, development and assembly of CNC
LATHE MACHINES.Worked extensively in creating 3D models, assembly, manufacturing
drawings and manufacturing of precised CNC machines.
GD&T Experience:-
Attended GD&T Basics workshop conducted at L&T IES Bangalore in April 2012.
Duration: 2 Days.
Experience Details:
Materials management and quality Engineer:
worked on planning sheets,program sheets,cost sheets, materials procurement and purchasing ,
making purchase orders-service sheets using SAP in supply chain management.
Responsibilities involved are,
• Making planning sheets,program sheets,cost sheets.
• Materials procurement and purchasing.
• Creating purchase orders-service sheets using SAP.
• QUALITY INSPECTION at vendor place and follow-up.
• Vendor development and related works.
MR (Management Representative) activities.
• Verify the ISO documents of each individual department.
• Review the NC & CAPA reports.
• Review the objectives of each individual department.
• ISO audits (Internal).
• Kaizen implementation.
3. • Review MRM
Design , development and assembly of CNC LATHE MACHINES:
Worked in Designing and development of Slant bed lathe machine with capacity of
Machining heavy and lengthier jobs.
Responsibilities involved are,
o New Product Development & Inspection.
o Creating 3D models and drawings for parts & assemblies.
o Working in shop floor doing assembly of turning machine solving Technical issues & attending
KAIZENS in Production item.
o Designing of Chuck flange for customized collet chuck for special clamping and decamping
arrangement.
o Worked on assembly of newly developed twin spindle CNC lathe machine from BASE to
GUARD.
o Preparation of Technical Data’s like Data Sheet, Inspection Plans & quality plans.
o Preparing in Stage Drawings & Standard Operating Procedures for Newly Developing
Components.
o Inspection of developing components.
o Responsible for Reducing Machining Lead Time & Cost Control for Development components.
o Preparation of Final Report, Inspection report.
o CAD Environment: Solid works and Draft site.
o PROJECT HOURS SPENT: 300 Hours.
Re- Engineering for Tissue Processor: Worked on tissue processor project which is an automatic
machine used for fixation, dehydration and filtration of histological tissue samples with fixatives,
alcohol, solvents and paraffin wax. Scope of work is to create manufacturing drawing for assemblies,
sub-assemblies and components after verifying with physical sample.
Responsibilities involved are,
o Input study and clarification with customer and onsite engineer.
o Inspection of the drawings for their compliance with physical samples and make necessary
update as required.
o Generate Manufacturing drawing in PRO-E for assemblies, sub-assemblies and components.
o Cleanup the existing CAD assembly data to reflect the SAP BOM structure.
o Translation of all German translation to English translation
o Create a new BOM structure for each instrument.
o Uploading to Final delivered assembly, drawing in Pro-Intralink
o CAD Environment: Pro-E.
Re- Engineering for Tissue Processor-electrical cable drawings and wiring diagram:
Generate cable drawings in E3-Cables for cables, cable networks and components including final wiring
diagram.
o Translation of all German translation to English translation
o Uploading to Final delivered assembly
4. o CAD Environment: Pro-E, E3 Cables.
o PROJECT HOURS SPENT: 150 Hours.
Development of Hardware Software Integrated Testing Rig (HS): CAD support for development of
HSIT project. This RIG is designed for automated quality checking of PCB’s (SMC&LPMC).Scope of
work was to design INTEGRATED TESTING RIG that support mechanical and electronic components
which intensively used to check PCB’s in large numbers.
Responsibilities involved are,
o Input study and clarification with onsite customer.
o Mechanical design and development.
o Creation of 3D casing part and Assembly which includes a computer.
o Creation of manufacturing drawings.
o Production support and vendor co-ordination till shipping.
o CAD Environment: Unigraphics Nx.
o PROJECT HOURS SPENT: 100 Hours.
PROJECT HANDLED.
o Spinner -25 3000ABC.
Base, Head stock, Saddle, Cross slide, Tailstock, Tailstock base plate and small parts.
o Spin flat- 2000ABC.
Base, Head stock, Saddle, Cross slide, Tailstock, Tailstock base plate and small parts.
.
o Spinner-15.
Base, Head stock, Saddle, Cross slide, Tailstock, Tailstock base plate and small parts.
Personal Details:
DOB: 30th
May 1989
Sex: Male
Marital Status: Single
Languages known: English, Hindi, Kannada
Interests:
Reading, traveling, cooking.
DECLARATION:I hereby declare that the above written information is true to best of my
knowledge.
JANUARY - 2016 __________________
Mysore Ravindra S Bhat