1. CURRICULUM VITAE
PRESENT ADDRESS: PERMENANT ADDRESS:
4/169 Plot No.22 & 23,
F2 Prompt Invent,
Sri Anandha Vinayagar Nagar,
Periyapanichery,
Chennai – 600128
Tamil Nadu, India
Phone : 096003 38481
S/O RM. Subramanian Chettiar Avl,
Amman koil street,
palayavalavu,
Paganeri – 630 558.
Sivaganga (TK & DT)
Tamil Nadu, India
MOBILE : +91 98414 96636
PHONE : +91 4575-231414
AGE : 36
DATE OF BIRTH : 25/07/1978
SEX : male
HEIGHT: 173 cm
WEIGHT: 74 kg
MARITAL
STATUS : Married
NATIONALITY : Indian
MOTHER
TONGUE : Tamil
LANGUAGES KNOWN:
PHOTO
NAME : S.RAMESH B.E., M.B.A.,
FATHER’S NAME: RM.SUBRAMANIAN
DEGREE : B.E. (Civil), M.B.A.,
E-MAIL : paganerirammu@rediffmail.com
PASSPORT NO.: G9885153
EXPIRE DATE: 20.08.2018
TO SPEAK : Tamil, English, Hindi
TO READ : Tamil, English
TO WRITE : Tamil, English
2. ACADEMIC DETAILS:
COURSE
INSTITUTION NAME
EXAMINATION AUTHORITY
MONTH & YEAR OF PASSING
PERCENTAGE OF MARKS
S.S.L.C
O.ER.M.Govt. Boys Hr.Sec School
State Board
April, 1993
55.4%
D.C.E
Ramu – Seetha Polytechnic
Directorate Of Technical Education
April, 1996
62.3%
B.E. (Civil)
College of Engineering Guindy, Anna University
Anna University (Main Campus)
May, 2007
69.4%
M.B.A. (General)
College of Engineering Guindy, Anna University
Anna University (Main Campus)
Aug, 2009
63.4%
SOFTWARE SKILLS:
UG / PG PROJECT DETAILS:
UG PROJECT: STUDY ON TERNARY BLENDED HIGH STRENGTH HIGH PERFORMANCE CONCRETE
PG PROJECT: A STUDY ON JOB STRESSORS AND THEIR EFFECTS ON PHYSICAL HEALTH, EMOTIONAL HEALTH AND JOB SATISFACTION
SLOGAN:
AUTO CADD 2014, STAAD PRO 2007, WINDOWS 8, LANGUAGE C++, MS PROJECT 2007, MS OFFICE 2013 (Excel, Word &Power Point)
“I CANNOT DO EVERYTHING. BUT STILL I CAN DO SOMETHING; I WILL NOT REFUSE TO DO SOMETHING I CAN DO.”
3. WORKING EXPERIENCE: 18+ YEARS
1. Larsen & Toubro Limited (03-Mar-11 to Till Now)
Supporting to Buildings & Factories independent company (It includes Residential Buildings, Commercial Buildings (IT Parks), Factories, Metro Rails and Airport project’s)
Working as an Asst. Manager (Civil) and Responsibilities are (In General):
Execution of Pre-stressing works (which includes all types of Buildings, Factories, Metro Rails & Airports) and based at Chennai. The prime responsibilities are:
Continuous monitoring and Supporting to all operating jobs for Pre- stressing related activities
Coordinating with PT Vendors, Consultants, Clients, Projects & clusters
Tender support and cost workings to the contracts department, for quoting the upcoming jobs on Post tensioning (PT) works
Supporting the Procurement team on PT Vendor Identification, negotiation and finalization for new jobs
Training the staff and workmen in PT Activities
Sound Knowledge in the specialized field of PT Work to prevent failures & corrective actions in PT works
Implement the modernization in PT work
Arrange Concrete pour sequence considering PT Layout to overcome quality related issues
Arrange dedicated PT Team for execute the PT job departmentally
2. SDS Foundations Engineers and Builders (4-May-09 to 02- Mar-11)
Execution of Residential Building at Nungambakkam, Chennai
Working as a Whole Site In-charge (Like Residential Engineer) and Responsibilities are (In General):
Complete execution work of Residential Building (Including of Supervision, Preparation of Purchase order for Bulk Construction materials and Man Power allocations for different type of Works, Sub contractor Weekly Billing, Co-ordination with Architect, Structural Consultants & Clients, Quality Control, Reconciliation of Sub contractor bills & Major Materials and Documentation / Sub mission of Reports in proper manner)
4. 3. VSL India Private Limited (12-Apr-01 to 30-Apr-09) (8Years 1Month)
Working as a Project Manager and Prime Responsibilities are (In General):
Preparation of Target Budget (i.e. Comparison of marketing & Construction Budget)
Planning of entire work (i.e. Requirement of Men (Staff & Workers), Major Materials and Machineries)
Organizing the all
Allocating the Staffs in Right manner in Right time
Work Instruction (Directing) to all my team members and conduct weekly meeting
Coordination with the clients, Contractor, Structural consultants and Architects
Reporting to the management (About Progress and Forecast)
Submit the Invoices, collect the payment and follow up the same
Reconciliation of Invoices and Major Materials
Proper Documentation
Western Region (Mumbai & Pune) (23-Oct-2008 To 30-Apr-2009)
Execution of Post tensioning and Pre-tensioning works in Maharashtra State
Execution of Bandra – Worli Sea Link Project (BWSLP) (i.e. Execution of Precast PT Segments and Erection of the same) for HCC at Mumbai
Execution of Post tensioning Buildings at Pune
Southern Region (Chennai & Bangalore) (01-Dec-2003 To 22-Oct-2008
Execution of Post tensioning and Pre-tensioning works in Tamilnadu State (4 Years 11 Months)
Execution of few Post tensioning buildings are Dowlath Towers, Infosys Hostel Facilities Phase II, IT Park at Kandan Chavadi, SDB 1 - Infosys Mahindra City, IT Park (Ascendas Tidel Park), Tek Meadows, Arihant Techno polis, The Infovil IT Park for Raj Kumar Constructions, SDB 2 - Infosys Mahindra City, Marg Square, Olympia Tech Park, Chettinad Hospital, Marg Square Block 2, IT Park (Prince Foundations) – Ambattur, SDB 3 - Infosys Mahindra City, Arihant Insight, Storage facility bldg – Poonamallee, IT Park Bldg - Block 2 (Prince Foundations) at ambattur, SDB 4 - Infosys Mahindra City and Karuna IT Park at ambattur
Execution of Pre-tensioning of RCC “I” Girder at Chennai By Pass (CBP- II) @ Maduravoil for HCC (Client NHAI) – 2 Years
5. Western Region (Mumbai & Pune) (12-Apr-2001 To 30-Nov-2003)
Execution of Post tensioning works in Maharashtra State (2 Years 8 Months)
Execution of few Post tensioning buildings are Sai Radhe, Sai Trinity, TATA Finance (Chaitanya), Poonawalla, Magarpatta Building II, Global Ikon, City Tower II, Tain Square (Residential Bldg), Time Square, HSBC, Kumarpuram, Koncord Towers, Godrej Eternia "C" and Nyati Meadows Business Park
Day to day Manpower allocation to all projects
Preparing the 3 months material requirement statement based on the site requirement
4. Er.Rajendran Consulting Engineer and Building contractor (05-May-1996 to 04-Apr-2001) (4 Years 11 Months)
Working as a Site Engineer and Prime Responsibilities are (In General):
Execution of PWD, CPWD works, Commercial Buildings and Factory Buildings (i.e. Supervision, Preparation of Indent for Bulk Construction materials and Man Power allocations for different type of Works, Client Billing, Co-ordination with Structural Consultants & Clients, Quality Control, Reconciliation of bills & Major Materials Documentation of Reports)
Execution of Shogun paper factory at Kadampuliyur near Panrutti (9 Months)
Execution of India Cements Ltd at Dalavoi near Pennadam (Cement Factory) (2 Years)
Execution of ICCU at Government Hospital, Pattukkottai (8 Months) – PWD Works
Execution of Taluk Office at Thiruvaiyaru near Tanjore (4 Months) – PWD Works
Execution of Indian Oil Corporation at Ponnamaravathi (3 Months)
Execution of Telephone exchange building (5K) at Pattukkottai (11 Months) – CPWD Works
DECLARATION
I do hereby declare that the particulars of information and facts stated herein above are true, correct and complete to the best of my knowledge.
Place: Chennai Signature:
Date: 2014 Name: S.RAMESH