1. RESUME
H.No. C-59, Surya Vihar
Opp: Sector – 4,
Gurgaon – 122001,(INDIA)
Mob:+91-9350110621
+ 91-9711903672
RAJIV CHATURVEDI Email ID: Chaturvedirajiv2013@gmail.com
OBJECTIVE
To be associated with a progressive organization that gives scope to update my practical knowledge and skills in
accordance with latest trend and be part of the team that dynamically works towards growth of the organization and gain
satisfaction thereof,
PERFORMANCE SKILL DIMENSIONS
Result oriented person with a strong analytical and verbal communication skills. Dedicated, energetic, self-motivated,
individual and positive attitude that enables me to handle the responsibilities of Manpower management, Primavera
Project Monitoring, preparing action plan, manpower plan, S curve, preparing daily, weekly site progress report ,Preparing
bill of quantity from Isometric & drawings & project material plan requirements and adhering to project specification.
PROFESSIONAL & ACADEMIC QUALIFICATION
MBA passed with 67 % with (B + 5 Star NAAC Accredited, I.A.S, E. University).
B. Tech. Mechanical GVM University passed with 71.15% in 2007, (Aggregate up to all semester).
Senior secondary in 2002 CBSE with 61.22%
Secondary School passed HBSE in 1999 with 75%
TECHNICAL SKILLS
Primavera 6.2,6.8 & Ms-Project, ERP, FMS software,
Familiar with AUTO - CAD basic, Tekla Navisworks- Structure.
Worked on MS – Office, (Word, Excel, Email, I’net).
WORK EXEPERIENCE & PROJECT UNDERTAKING.
1. Presently work in EPC with K.E.Industries: A leading organization working for the growth of Packaging Sector
and allied industries and provides assistance and support to Small, Medium and Large Companies for domestic
business growth, export promotion, international collaborations, joint ventures, identify advanced technologies and
industrial and business expansion. PIAI has been on the forefront for the marketing and promotion of packaging
products, packaging piping, equipment, machinery, materials and advanced technologies at National and
International markets.
Location : Plot-1437/26, Baldev Nagar Industrial Area Near Sector-10, Gurgaon Haryana 122001.
Company : K.E.Industries (Indian Group).
Position : Planning Engineer in PPC Dept.
Work duration: 6July.2015 –Till date
2. Saipem Co. Ltd. (STAR) Italian Group, in PPC Dept. This company engaged in WORLD LARGEST Oil & Gas
Design Structure, Fabrication, Pressure Piping, Industrial requirement of Heavy Engineering Steel DECK &
JACKET Offshore or Onshore with Green field & Brown Field Facilities.
Project : Arabiyah & Hasbah, Wasit, Offshore/Onshore Facilities
Shut-Down : LTA, MRN-JULF Project Shut-down Facility
Location : Star Yard Gate 10, King Abdulaziz Seaport, Dammam Saudi Arabia
Main Client : Saudi Aramco
Company : Saipem Co. Ltd
2. Position: : Project // Production Planner in PPC Dept.
Duration : 26, Aug. 2014 –18.June.2015
3. Project/Onshore, Manufacture Cement, OIL& Gas, Power Plant Equipment : Roto-Packer, SRP, WLM,
SWLM, TLM, Belt Conv. Screw Conv. Different Chutes, Open & Closed Air Slide unit Complete Mechanical
Rotating, Static & Packing, loading Equipment & all Compress Air Piping & Aeration Piping Units with
fittings. Water distribution networks Items, with Ducting & Plumbing services, Drainage systems, Sewage
Treatments Plants, irrigation systems, Mechanical, Water Distribution Networks.
Location : ETT building, 1st
floor Near Hero Honda Sector-34, Gurgaon122016,
Haryana (INDIA).
Company : FLSmith Ventomatic Limited (Italian Group).
Position: : Project Planning Engineer Mechanical .in PPC Dept.
Work duration : 3Jan.2011 –20st
Aug 2014
4. Project Onshore : DIAL Terminal-3
Location : New Delhi
Client / Owner : GMR
Main Contractor: GMR/ L& T Company
Company : ABB Limited
Position : Project Planning Engineer (Piping & Distributional Terminal or Infrastructure)
Duration : 4, Feb. 2010 –31st
Dec 2010
Project Onshore : DMRC Project Anand Vihar Delhi.
Location : A-2, 1st
Floor a block Market Sahibabad,GZB.(U.P).INDIA
Company : MB Technology
Position : Project Planning Engineer (Piping & Distributional Terminal or Infrastructure).
Duration : Mar. 2009 – Jan.2010
5. Project : Ras Gas Onshore Expansion Project Phase 2 (Train- 6, Train-7 & AKG2)
Location : Ras Gas Industrial City, Doha, Qatar
Client / Owner : Ras Gas
Client : Chiyoda Technip Joint-Venture (CTJV)
Main Contractor: Consolidated Contractors Co. L.L.C (CCC)
Company : CCIC in PPC Dept.(Intech Group)
Position : Project Planning Engineer
Duration : 15Jan. 2008 – 24 Feb.2009
The company is a part of The Intech Group (CCIC) which is actively involved in the Piping, turnkey
contracting of Insulation, refractory Lining & Scaffolding activities for the various Oil, Gas, fertilizer, Power &
Cement industries in the Middle East.
6. Worked with Star Alubuild Pvt. Ltd. (sister concern of DLF L’OURK) in INDIA, as Graduate Engineer trainee,
for a period of six months. This Company is engaged in Infrastructural construction activities like as Glass,
Aluminums, Glazing, and windows curtain walls.
Project : CSE NOIDA MALL
Client / Owner : DLF L’OURK
Position : Graduate Engineer Trainee (PPC Dept.)
Duration : July 2007-December2007
JOB RESPONSIBILITIES PLANNING & MAINTAINENCE:
3. Prepare and manage overall master & maintenance schedule integrating work breakdown structure using
scheduling software Primavera. Understand contractual matter; earn value method, familiar with scope
management and change or control.
Coordinate schedule from multiple contractors and incorporate the information gathered into the overall project
master schedule. Prepare cost estimation and schedule bar chart plan considering all in puts (manpower,
equipment and materials) availability, production, and maintenance or construction sequences.
Develop work method of statement procedure as required to understand and able to utilize planning tools such as
MS excel, Access, MS Project, and Primavera.
Develop and update resource (manpower and equipment) histogram weekly or monthly as required.
Evaluate allocation of resources and provide recommendations to maintain required progress.
Develop and implement plan versus actual progress charts (histograms/S curves). Reports and analyses
deviation from plan.
Track, monitor and forecast progress of all activities and deliverable such as products, engineering documents,
fabrication, and maintenance status as from plan.
Analyze gaps between the planned and actual progress and highlight the areas of concern which required action
of the associate task member. Prepare and update three weeks and three months look-ahead schedule that
reflect the priority activities.
Preparing Project controls Plan, Mobilization plan &Schedule in software, derive material quantity based on bill of
material. Coordination from head office catering all manufacturing requirements of sites & In House, not limited to
manpower, materials, plant & machinery, maintenance procurement etc
Respond to the requirements of the project under the direction of the Project Manager/Construction Manager.
Incorporate interface requirements between Engineering, Procurement, Construction, Fabrication, Installation,
and Commissioning, maintenance Dispatches, Load out-Sail away as appropriate into project programs.
Co-coordinating with design and welding, quality assurance dept. For pre-production activities& Collaborate
design-fabrication, maintenance problems with the engineering project dept.
Overall Site Supervision for an example:: House Keeping, piping prefabrication including pipe supports, piping
erections including pipe supports, spool pieces control, check and monitor tools, equipment and welding
consumables, check and monitor preservation, pipe internal cleaning for small bore and large bore, including
jacket pipes for storage tanks & monitoring for manpower mobilization welding Dia-inch, No. of spools and Pipe
Supports. Check if the latest construction drawings, consult engineering Problem, spool delivery work front spool
delivery & request for scaffolding construction. Ensure work permits (confined space welding, grinding, erection,
work for high level, etc).Check flange alignment & follow up punch list.
Preparing Bill of quantity & fabrication, maintenance under the planning section by the site requirement from piping
isometric & Equipment, Vessel & Columns Drawings .Mostly requirement for fabrication ASTM & BSI, EEUMA
Codes ISO 9000 quality System. Establish effective working relationships with appropriate project staff to assist in
provision of timely and accurate program interface and update & control Vendor manufacturing, Sub-contractor
progress information for Site.
TRAINING:
Anukaran Industrial Spares Mfs. Co. – Gurgaon, Haryana from 13th
March 2006 – 14th
June 2006, in the Tool
Room Department and submitted a project report study in the Tool Room Department.
Sona Koyo Steering System Ltd. – Gurgaon, Haryana from 1st
March 2007 – 31st
May 2007, in the Production
Department and submitted a project report study of RBS, Axcel Assembly, Propeller Shafts.
ACHIEVEMENT:
Participated in various skits 1st
&3rd
Prize in cricket, chess competition at School level.
Active Member of School Parliament Discipline Committee.
PERSONAL DETAILS:
Date of Birth 17th
May 1984
Father’s Name Sh. Virender Chaubey
Contact No. 91-9350110621,9711903672
Marital Status Single
Nationality Indian
Passport Number N-6845290
Languages English and Hindi
With pleasing personality and sound health, I am ready to meet any challenging assignments.