1. Page 1 of 3
CURRICULUM VITAE
RAJESH KUMAR SINGH
B.E (Civil)
Mobile: 09926900899,
E-mail: rajesh1703@yahoo.com, rajesh19011971@gmail.com 12.04.2015
CAREER OBJECTIVES:
To obtain a position as Project completer that will enable me to utilize my strong professional skills,
educational background, and capability to work well with group.
EXPERIENCE ( 20 yr’s )
Currently Working with Khanna properties infra structure (Sukh-Sagar Group) GSM Trust at
Jabalpur( Medical collage & 800 bed Medical Hospital From Dec 2012 to Till Date.As a (AGM –Project Operation)
Worked with EWDPL (Treasure Group) Sr.Project Manager at Indore for ITMC (Lagest Mall of central
india) from Auguest 2009 to Nov 2012.
Worked as Project Manager in EWDPL (Treasure Group) for jabalpur Treasure Island,
From Jan 2007 to August 2009.
Worked for State of Art GLOBAL PAGODA-PHASE-I In ESSEL GROUP.for Pagoda Project at Borivali
(Mumbai), Project Engineer. (From May 2005 TO Dec 2006).
Worked as Senior site Engineer in EWDPL (Treasure Group) for Treasure Island at Indore ,
From March 2004 to April 2005.
Worked for State of Art GLOBAL PAGODA PHASE-II In ESSEL GROUP for Project at Borivali
(Mumbai) Site Engineer.(May 1998 TO March 2004).
Worked as a Site Engineer at Mulund (Mumbai) in BEST bus depot construction By Mr. Pradeep assudani
(Govt. contractor) from July 1997 to May1998)
Worked as a site Engineer for AKCB PVT. Ltd. For construction of 12 nos G+6 Residential Building In
Kharghar (Navi Mumbai) from oct 1996 to May 1997)
Worked as a Engineer for Varsha construction co. Dhule for construction of Engineering Building Jalgaon,
Gunnating of Tapi Bridge at Sahada,ESR-Water supply Pipeline at wadibhokar Nr. Dhule (from Dec 1994 to
october 1996.
JOB PROFILE
Project Monitoring co-ordination with design team, architect & consultants.
Day to day Material Management & Execution of Project activity as per schedule.
Preparation of time line schedule for construction activity & its Analysis.
Checking of all vendors bill as per the work order and actual execution.
Technical aspects of the Project execution.
Complete material inventory report for Projects
JOB RESPONSIBILITY
Work planning and site execution planning. Supervise and manage the overall performance
of staff in his department.
Analyzing, reporting, giving recommendations and developing strategies on how to
improve quality and quantity.
Achieve business and organization goals, visions and objectives.
Identifying problems, creating choices and providing alternatives courses of actions.
2. Page 2 of 3
Site inspection related to quality and erection work.Planning for Target Achievement in
Project.
Act as an independent company representative for engineering project.
Respecting the target fixed by the company.
Ability to manage, monitor and control site activities.
To co ordinate with the team preparing the document relevant to the construction.
Co ordinate the engineering activities for site procurement.
Preparation of execution construction plan and construction procedures.
Approval of drawings, procedures for construction, Ensure the planning, scheduling and
feasibility.
Initiate execution strategy, plan and priorities workloads accordingly follow up plans and
supervise project task
Define the resources assess the man hour and cost required for the construction phase.
Identify and monitor risk associated with the project and devise strategies to deal with
unexpected crises and unresolved risk
Ensure strict adherence to quality procedures & practices and ensure the implementation of
the site quality control plan.
Coordinate and ensure interfaces with the field specialist engineers and vender
representatives, contactor and clients.
Define the site assignment chart, check progress and prepare reports on a weekly basis..
Ensure technical co ordination with client including participation in progress meetings
Ensure the correct filling and distribution of project documentation.
MY STRENGTHS:
Positive attitude intellectual ability,Quick learner, sincere towards work.
Strong will power,Truthness and determination
TECHNICAL DETAILS:
Examination Institute University Percentage
Matriculation Anugrah Inter collage
Aurangabad (Bihar)
Bihar school
Examination Board
Patna (Bihar)
60.11%
July 1986
B E (Civil) SSVPS Collage of
Engineering
Dhulia (M.S)
Poona
University Pune
64.46% --
Dec-1994
Lead Inspector-
Construction Quality
Monitoring “Course
Organized by
Acropolis Institute of
technology
ICQM
Certification
India Pvt. Ltd.
Successfully
completed
Dec 2010
CEP-“Base Isolation
for earthquake-
Resistance design of
structure
Indian Institute of
Technology
Bombay
IIT –Bombay Successfully
completed
June 2000.
COMPUTER LITERACY:
Knowledge of computer, worked on MS office, Adobe illustrator, Auto cad, etc.
PROJECT in collage: Multy storyed Building Earthquake Analysis
3. Page 3 of 3
SPECIAL ACHIEVEMENTS:
Completion of Monumental Project PAGODA in Mumbai which is unique.
Treasure Island Mall At Indore In 1.5 Yr’s,TI Mall Jabalpur-3yrs, ITMC Mall Indore 3-Yr’s
Sukh Sagar Medical collage & Hospital Jabalpur 2.5-Yr’s.(Current)
AVOCATION:
Construction in real estate.
PERSONAL DETAILS:
Name : RAJESH KUMAR SINGH
Father's Name : SHRI ANUGRAH NARAIN SINGH
Date of Birth : 19th JANUARY 1971.
Address : H.No.-08 MIG PP Colony Narmada road Jabalpur (M.P)
Indore.MP
Phone No. : Mobile no. 09926900899
EMOLUMENT DETAILS: -
* CURRENT SALARY PACKAGE: 17.225 LAKH/ANNUM (CTC)
*EXPECTATION AS NEGOTIABLE
DECLARATION
I here by declare that the above information provided by me is true to the best of my knowledge and belief.
Place: Jabalpur (M.P)
(RAJESH KUMAR SINGH)
Date: 12.04.2015