Summer Internship
By
Rajat Saxena
2
3
OVERVIEW
Make
Vs Buy
ASSIGNMENTS MANAGER STATUS
Sop Design - Mast Assembly Ricky G. Completed
Plant Layout -fabrication shop Saul Completed
Time Study- EOS fabrication Afework Completed
Time- Kibo EM Kutty Completed
Design & Prototype for bench vise
installation
Dinesh Completed
Design & prototype of Hose Support Yonas Completed
C.G.- Tilt Table Dinesh Completed
Make vs. Buy Yonas Completed
Approach
4
Assignment-1 (Standard Operating Procedure-
Mast Assembly)
Take pictures Use drawing
Spec. from the
drawing
Match the
drawing part
nos. with B.O.M.
Check the parts
no. with ASO
400
Updates the SOP
with correct
drawing no.
5
Sample SOP
No.
5
4
8 3
8 2
8 1
Qty No.
4
3
2
1
0 RS
CHG Init.
Legend: Visual Check Torque Requirement Critical Dimension
Quality Control Special Requirement Jig/Fixture Indicator
Safety Environment Procedure Setup/Repeat
9421010912
9421010911
Part Number
9421111800
Mast Assembly- 5M25C37 1/6
6/11/2015
Date
Review for initial release
Description of Change
Document Name Page
N/A
EO - MO
Note
Shim T-0.5
For all three
channels
Shim T-1.0
Roller Main
Part Name
Any shim can be used
as per requirement
Bearing should have proper
fit with item 2
Mitsubishi Caterpillar Production System
Standard Operating Procedure
Procedure Quality Point
1
Placing shim(item 1) onto inner shaft
2 of middle and outer channel.
Lubricate no.2 before
installations
2
Installing roller main (item 3) with the
help of pnematic bering press(item4)
onto inner shaft of outer and middle
channel.
Step # 1 Step # 1
Step # 2 Step # 2
1
3
2
4
6
Suggestion
1. Flow Diagram
7
2. Control Plan
Prototype Prelaunch Model Documentno
Partname Personincharge Preparedby
Partno. Customername Checkedby
Drg.Name Suppliername Approvedby
Drgno. Coreteam
Size Freq. Y/N SIZE
94111-07500 Shim-0.5 0.1mm Fillerguage 4
94111-07400 Shim-1.0 0.1mm Fillerguage 4
Line
operatorInstallingtheshim
ontotheshaft
1
CONTROLPLAN
Through
hands
Sample Reccording
Part/
Processno.
Processname/
Operation
description
M/CJigs,
Toolsfor
MFG
PartNo. ProductName Process
Class
Product/Process
specification
tolerance
Characteristic
Evaluation
measurement
technique
Method
Photo
InspectedBy
Control
Method
ReactionPlan
Revisionno.
Dateorg.
Daterev.
Production
MastAssembly
Pageno
1. Layout of fabrication shop
8
Assignment-2 Fabrication Layout
Old Layout
9
Progress
New Layout
10
Progress
Approach
 Dimension of fabrication layout
 Studied the flow
 Studied the Constraints
 Layout Design
Constraints
11
Robots are fixed
Space
Conveyors are fixed
Space for fork lift
movement
Magellan and
Victoria should be
closed to Robot
One directional
Flow
Electrical
Connections
Budget
Total Flow Dimension Required for each shop
12
Studies Required
Model
No. of units
produced
Total
Flow
Magellan/Victoria 739 739
Atlas/Kibo 124 124
Centaur/EOS 80 80
Mercury 79 79
Apollo 23 23
PlannedArea
Vertical Horizontal Area Vertical Horizontal Area
EOSWeld 29 26 754
EOSFabrication 29 20 580
Polaris 29 23 667 31 23 713
Centaur 29 27 783 35 23 805
Mercury/Mars 29 79 2291 66 35 2310
Apollo 29 82 2378 29 83 2407
Atlas 29 98 2842 30 100 3000
Helios 29 28 812 29 30 870
30 23 690
54 15 810
TotalArea 12298 12991
CurrentDimension
ShopName
66 21 1386
Dashboard 29 41.06 1191
Material
Handling
Punch
Press,
Laserand
plasma
Frame
Fabricatio
n
Robot Stamping
Shot
Blasting
Paint Storage
Scheduling
Material
Handling
PunchPress,
Laserand
plasma
Frame
Fabrication
Robot
Stamping
ShotBlasting
Paint
From
Atlas/Madgella/Victoria
To
Material
Handling
Punch
Press,
Laserand
plasma
Frame
Fabricatio
n
Stamping
Shot
Blasting
Paint Storage
Scheduling
Material
Handling
Punch
Press,Laser
andplasma
Frame
Fabrication
`
Stamping
Shot
Blasting
Paint
From
EOS/POLARIS/CENTAUR/MARS&MERCURY/APOLLO/
HELIOS
To
13
From- To Chart Analysis
14
Suggestion 3
Creo Drawing Model
15
Assignment-3 Design Table for Bench-vise
Installation
16
Assignment-4 Time Study for EOS Mast
(Sample)
Time Measurement
 Used stop Watch to measure the time.
 Machine Time
 Loading & Unloading Time
 Average time
Challenges faced
 Shift Changes
 No specific schedule followed by the
supervisor
 Machining time is different for similar cut
 Operator has to wait for the forklift to flip the
part.
17
Approach
Advantages
• Reduce waste of time
• Forklift Operator can see the flag from
any part of the plant.
• It is also helpful for the maintenance
department
18
Suggestion-4 Flag interpretation to call forklift operator to avoid
time waste
Formula Used
Momentum
M1R1 + M2R2 = (M1 + M2)R
R = M1R1 + M2R2/ (M1 + M2
Moment of body A
Area of square / 2 * Area of triangle
10 *38.05/8 *38.08 = 5/4
Mass of rectangle = 5/9*500 =277
Mass of two triangles = 500- 277 =223
Center of gravity with reference to plane A
C.G. of the body A
= (277 * 19.04 + 223 * 12.69)/ 500 =14.3
C.G. of the whole body (A and B)
= (268 * 40.08 + 500 * 14.3)/768= 23.29
Center of gravity with reference to plane B
C.G. of the whole system (A+B+C)
= ((12+5)*4500 + (272+23.29)*(500+268))/
(500+268+4500) = 57.75
Drawing
19
Assignment-5 Center of Gravity of Tilt Table
Challenges Faced
 Hanging hoses create disruption
during the processes.
 Hose- Stand in not utilized well
 Existing are not perfectly aligned
 Hoses are entangle with each other
20
Assignment-6 Design for new Hose Support-
Kaizen
Creo Drawing Prototype
21
Design in Creo & Prototype
22
TOTAL
STUDY
TIME:
Date:
Serial No. Process Start Time End Time Cycle Time
1 Gear oil (Differential) filling to the front axle 0:00:00 0:05:40 0:05:40
2 Engine Oil (Motor oil) filling 0:00:45 0:02:30 0:01:45
3 Coolant(ATF) filling to the radiator 0:02:10 0:04:30 0:02:20
4 Coolant(ATF) filling to the reserviour tank 0:04:50 0:05:08 0:00:18
5 Hydraullic oil filling 0:00:40 0:06:02 0:05:22
6 Bolting the front axle 0:06:40 0:07:50 0:01:10
7 Bolting the hydrallic tank 0:08:01 0:08:18 0:00:17
8 Instal floor plate L.H. with insulator 0:09:26 0:11:52 0:02:26
0:11:52
0:01:00
Total cycle time ( filled simultaneously)
Total motion time
MCFA Time & Motion Study
PRODUCT DESCRIPTION: KIBO EMERGINGMARKET PERFORMED BY: RAJAT
OPERATION DESCRIPTION: OIL FILLING STUDYBY:
START TIME:
Assignment 7 Time Study for the Kibo Truck
Approach
 Recorded the video for each station.
 Calculated the start time and end time for
each process.
 Calculated the material Handling time for
motion study.
Challenges faced
 Part Shortage
 Mismatch in scheduling plan vs action plan
 Waiting for the frame or other parts
23
Table
Process TotalCycleTime TotalMotionTime TotalTime
Sub-Assembly 4:12:34 1:24:50 5:37:24
PowerStation1&2 0:47:56 0:09:34 0:57:30
PowerStation3&4 1:00:11 0:35:22 1:35:33
MainlineStation1&2 1:09:17 0:53:09 2:02:26
MainlineStation3&4 1:23:09 0:48:52 2:12:01
MainlineStation5 0:46:23 0:07:24 0:53:47
MainlineStation6 0:11:52 0:01:00 0:12:52
Total 9:31:22 4:00:11 13:31:33
Graph
24
Results
0:00:00
1:12:00
2:24:00
3:36:00
4:48:00
6:00:00
Total Cycle Time
Total Motion Time
Total Time
25
Suggestion 5 - For Scheduling
Total Cost
Make Buy
OrderingCost 3,250.00$ 101,000.00$
TotalcutCost 91,617.03$
HoldingCost 6,673.03$ 2,200.61$
TotalUncutCost 58,672.54$
LabourCost 6,100.38$
TotalCost 74,695.95$ 194,817.64$
Graphical Representation
26
Assignment 8 Make Vs Buy for the Hose Cut
$- $50,000.00 $100,000.00$150,000.00$200,000.00$250,000.00
Ordering Cost
Total cut Cost
Holding Cost
Total Uncut Cost
Labour Cost
Total Cost
Chart Title
Buy Make
27
Suggestions
28
Suggestion 6- for sensitive machines
Questions?
29

Weitere ähnliche Inhalte

Andere mochten auch

Concept Plan, music video
Concept Plan, music videoConcept Plan, music video
Concept Plan, music videoZali Wright
 
Treatment for "Tamam Shud" - Edited
Treatment for "Tamam Shud" - EditedTreatment for "Tamam Shud" - Edited
Treatment for "Tamam Shud" - EditedGabrielle Orr
 
Back to the future II
Back to the future IIBack to the future II
Back to the future IIheaven2000
 
Amigos para siempre,celina
Amigos para siempre,celinaAmigos para siempre,celina
Amigos para siempre,celinaCelina Arencibia
 
Presentacion - Tendencias Informaticas
Presentacion - Tendencias InformaticasPresentacion - Tendencias Informaticas
Presentacion - Tendencias InformaticasSaúl Hernández
 
온라인북 사이트 『OX600』。『COM』야마토 싸이트
온라인북 사이트 『OX600』。『COM』야마토 싸이트온라인북 사이트 『OX600』。『COM』야마토 싸이트
온라인북 사이트 『OX600』。『COM』야마토 싸이트hkspodf
 
Simplify and run your development environments with Vagrant on OpenStack
Simplify and run your development environments with Vagrant on OpenStackSimplify and run your development environments with Vagrant on OpenStack
Simplify and run your development environments with Vagrant on OpenStackB1 Systems GmbH
 
strengthening of steel structures with fiber reinforced polymers
strengthening of steel structures with fiber reinforced polymersstrengthening of steel structures with fiber reinforced polymers
strengthening of steel structures with fiber reinforced polymersKorrapati Pratyusha
 
Proyecto final. Método Cientifico
Proyecto final. Método CientificoProyecto final. Método Cientifico
Proyecto final. Método CientificoEulogia Montero
 
Conheça o Roseapple Pi - Computador de Placa ùnica
Conheça o Roseapple Pi - Computador de Placa ùnicaConheça o Roseapple Pi - Computador de Placa ùnica
Conheça o Roseapple Pi - Computador de Placa ùnicaFábio dos Reis
 
Demultiplexer presentation
Demultiplexer presentationDemultiplexer presentation
Demultiplexer presentationShaikat Saha
 
Informative speech outline (overcome insomnia)
Informative speech outline (overcome insomnia)Informative speech outline (overcome insomnia)
Informative speech outline (overcome insomnia)Naquiah Khesa
 

Andere mochten auch (17)

Concept Plan, music video
Concept Plan, music videoConcept Plan, music video
Concept Plan, music video
 
Treatment for "Tamam Shud" - Edited
Treatment for "Tamam Shud" - EditedTreatment for "Tamam Shud" - Edited
Treatment for "Tamam Shud" - Edited
 
Back to the future II
Back to the future IIBack to the future II
Back to the future II
 
580808 lesson 333
580808 lesson 333580808 lesson 333
580808 lesson 333
 
Amigos para siempre,celina
Amigos para siempre,celinaAmigos para siempre,celina
Amigos para siempre,celina
 
Presentacion - Tendencias Informaticas
Presentacion - Tendencias InformaticasPresentacion - Tendencias Informaticas
Presentacion - Tendencias Informaticas
 
온라인북 사이트 『OX600』。『COM』야마토 싸이트
온라인북 사이트 『OX600』。『COM』야마토 싸이트온라인북 사이트 『OX600』。『COM』야마토 싸이트
온라인북 사이트 『OX600』。『COM』야마토 싸이트
 
Simplify and run your development environments with Vagrant on OpenStack
Simplify and run your development environments with Vagrant on OpenStackSimplify and run your development environments with Vagrant on OpenStack
Simplify and run your development environments with Vagrant on OpenStack
 
strengthening of steel structures with fiber reinforced polymers
strengthening of steel structures with fiber reinforced polymersstrengthening of steel structures with fiber reinforced polymers
strengthening of steel structures with fiber reinforced polymers
 
Treatment
Treatment Treatment
Treatment
 
ALM com VSTS (v2)
ALM com VSTS (v2)ALM com VSTS (v2)
ALM com VSTS (v2)
 
Proyecto final. Método Cientifico
Proyecto final. Método CientificoProyecto final. Método Cientifico
Proyecto final. Método Cientifico
 
Recommendation letter- Amelia Tarozzo
Recommendation letter- Amelia TarozzoRecommendation letter- Amelia Tarozzo
Recommendation letter- Amelia Tarozzo
 
Leadership Mantras From Indian Mythology
Leadership Mantras From Indian MythologyLeadership Mantras From Indian Mythology
Leadership Mantras From Indian Mythology
 
Conheça o Roseapple Pi - Computador de Placa ùnica
Conheça o Roseapple Pi - Computador de Placa ùnicaConheça o Roseapple Pi - Computador de Placa ùnica
Conheça o Roseapple Pi - Computador de Placa ùnica
 
Demultiplexer presentation
Demultiplexer presentationDemultiplexer presentation
Demultiplexer presentation
 
Informative speech outline (overcome insomnia)
Informative speech outline (overcome insomnia)Informative speech outline (overcome insomnia)
Informative speech outline (overcome insomnia)
 

Ähnlich wie Presentation-MCFA

Jawanza Bassue Design Portfolio
Jawanza Bassue Design PortfolioJawanza Bassue Design Portfolio
Jawanza Bassue Design PortfolioJawanza Bassue
 
Senior year project report
Senior year project reportSenior year project report
Senior year project reportPritam Solanki
 
Enigma of 'six sigma' for foundry sm es in india
Enigma of 'six sigma' for foundry sm es in indiaEnigma of 'six sigma' for foundry sm es in india
Enigma of 'six sigma' for foundry sm es in indiaDr. Bikram Jit Singh
 
ie550cappie550cappie550cappie550capp.ppt
ie550cappie550cappie550cappie550capp.pptie550cappie550cappie550cappie550capp.ppt
ie550cappie550cappie550cappie550capp.pptBasemAbdo4
 
Design Optimization of Drone propeller
Design Optimization of Drone propellerDesign Optimization of Drone propeller
Design Optimization of Drone propellerMun Lai
 
Quick Cast
Quick CastQuick Cast
Quick Castvins049
 
Paper id 35201501
Paper id 35201501Paper id 35201501
Paper id 35201501IJRAT
 
ccl-weekly report week8.pptx
ccl-weekly report week8.pptxccl-weekly report week8.pptx
ccl-weekly report week8.pptxssuser3e37d9
 
Proceso de fabricación del monoblock de un motor
Proceso de fabricación del monoblock de un motorProceso de fabricación del monoblock de un motor
Proceso de fabricación del monoblock de un motorIvan Heli
 
Scope of six sigma in indian foundry operations
Scope of six sigma in indian foundry operationsScope of six sigma in indian foundry operations
Scope of six sigma in indian foundry operationsDr. Bikram Jit Singh
 
Casting manufacturing process improvement
Casting manufacturing process improvementCasting manufacturing process improvement
Casting manufacturing process improvementAbdullah Ansari
 
Image segmentation, Rough set Theory, Game Theory, Image processing
Image segmentation, Rough set Theory, Game Theory, Image processingImage segmentation, Rough set Theory, Game Theory, Image processing
Image segmentation, Rough set Theory, Game Theory, Image processingijsrd.com
 
Development and design validation of pneumatic tool for stem seal collet fi...
Development and design validation of pneumatic tool for stem seal   collet fi...Development and design validation of pneumatic tool for stem seal   collet fi...
Development and design validation of pneumatic tool for stem seal collet fi...Dr.Vikas Deulgaonkar
 
Presentation for DHA on project progress(08-09-22).pptx
Presentation for DHA on project progress(08-09-22).pptxPresentation for DHA on project progress(08-09-22).pptx
Presentation for DHA on project progress(08-09-22).pptxFaisalGulzar19
 
Roll grinding Six Sigma project
Roll grinding Six Sigma projectRoll grinding Six Sigma project
Roll grinding Six Sigma projectTariq Aziz
 
ECS Design Project Presentation
ECS Design Project PresentationECS Design Project Presentation
ECS Design Project PresentationGuillermo Waldo
 
bosch_report.revised (1)
bosch_report.revised (1)bosch_report.revised (1)
bosch_report.revised (1)Ashutosh Singh
 

Ähnlich wie Presentation-MCFA (20)

Jawanza Bassue Design Portfolio
Jawanza Bassue Design PortfolioJawanza Bassue Design Portfolio
Jawanza Bassue Design Portfolio
 
Senior year project report
Senior year project reportSenior year project report
Senior year project report
 
Enigma of 'six sigma' for foundry sm es in india
Enigma of 'six sigma' for foundry sm es in indiaEnigma of 'six sigma' for foundry sm es in india
Enigma of 'six sigma' for foundry sm es in india
 
ie550cappie550cappie550cappie550capp.ppt
ie550cappie550cappie550cappie550capp.pptie550cappie550cappie550cappie550capp.ppt
ie550cappie550cappie550cappie550capp.ppt
 
Design Optimization of Drone propeller
Design Optimization of Drone propellerDesign Optimization of Drone propeller
Design Optimization of Drone propeller
 
Quick Cast
Quick CastQuick Cast
Quick Cast
 
Paper id 35201501
Paper id 35201501Paper id 35201501
Paper id 35201501
 
ccl-weekly report week8.pptx
ccl-weekly report week8.pptxccl-weekly report week8.pptx
ccl-weekly report week8.pptx
 
Proceso de fabricación del monoblock de un motor
Proceso de fabricación del monoblock de un motorProceso de fabricación del monoblock de un motor
Proceso de fabricación del monoblock de un motor
 
Scope of six sigma in indian foundry operations
Scope of six sigma in indian foundry operationsScope of six sigma in indian foundry operations
Scope of six sigma in indian foundry operations
 
Casting manufacturing process improvement
Casting manufacturing process improvementCasting manufacturing process improvement
Casting manufacturing process improvement
 
Introduction to manufacturing process
Introduction to manufacturing processIntroduction to manufacturing process
Introduction to manufacturing process
 
Image segmentation, Rough set Theory, Game Theory, Image processing
Image segmentation, Rough set Theory, Game Theory, Image processingImage segmentation, Rough set Theory, Game Theory, Image processing
Image segmentation, Rough set Theory, Game Theory, Image processing
 
Development and design validation of pneumatic tool for stem seal collet fi...
Development and design validation of pneumatic tool for stem seal   collet fi...Development and design validation of pneumatic tool for stem seal   collet fi...
Development and design validation of pneumatic tool for stem seal collet fi...
 
Shale & tight reservoir simulation cmg
Shale & tight reservoir simulation cmgShale & tight reservoir simulation cmg
Shale & tight reservoir simulation cmg
 
Presentation for DHA on project progress(08-09-22).pptx
Presentation for DHA on project progress(08-09-22).pptxPresentation for DHA on project progress(08-09-22).pptx
Presentation for DHA on project progress(08-09-22).pptx
 
Line sizing
Line sizingLine sizing
Line sizing
 
Roll grinding Six Sigma project
Roll grinding Six Sigma projectRoll grinding Six Sigma project
Roll grinding Six Sigma project
 
ECS Design Project Presentation
ECS Design Project PresentationECS Design Project Presentation
ECS Design Project Presentation
 
bosch_report.revised (1)
bosch_report.revised (1)bosch_report.revised (1)
bosch_report.revised (1)
 

Presentation-MCFA

  • 1.
  • 3. 3 OVERVIEW Make Vs Buy ASSIGNMENTS MANAGER STATUS Sop Design - Mast Assembly Ricky G. Completed Plant Layout -fabrication shop Saul Completed Time Study- EOS fabrication Afework Completed Time- Kibo EM Kutty Completed Design & Prototype for bench vise installation Dinesh Completed Design & prototype of Hose Support Yonas Completed C.G.- Tilt Table Dinesh Completed Make vs. Buy Yonas Completed
  • 4. Approach 4 Assignment-1 (Standard Operating Procedure- Mast Assembly) Take pictures Use drawing Spec. from the drawing Match the drawing part nos. with B.O.M. Check the parts no. with ASO 400 Updates the SOP with correct drawing no.
  • 5. 5 Sample SOP No. 5 4 8 3 8 2 8 1 Qty No. 4 3 2 1 0 RS CHG Init. Legend: Visual Check Torque Requirement Critical Dimension Quality Control Special Requirement Jig/Fixture Indicator Safety Environment Procedure Setup/Repeat 9421010912 9421010911 Part Number 9421111800 Mast Assembly- 5M25C37 1/6 6/11/2015 Date Review for initial release Description of Change Document Name Page N/A EO - MO Note Shim T-0.5 For all three channels Shim T-1.0 Roller Main Part Name Any shim can be used as per requirement Bearing should have proper fit with item 2 Mitsubishi Caterpillar Production System Standard Operating Procedure Procedure Quality Point 1 Placing shim(item 1) onto inner shaft 2 of middle and outer channel. Lubricate no.2 before installations 2 Installing roller main (item 3) with the help of pnematic bering press(item4) onto inner shaft of outer and middle channel. Step # 1 Step # 1 Step # 2 Step # 2 1 3 2 4
  • 7. 7 2. Control Plan Prototype Prelaunch Model Documentno Partname Personincharge Preparedby Partno. Customername Checkedby Drg.Name Suppliername Approvedby Drgno. Coreteam Size Freq. Y/N SIZE 94111-07500 Shim-0.5 0.1mm Fillerguage 4 94111-07400 Shim-1.0 0.1mm Fillerguage 4 Line operatorInstallingtheshim ontotheshaft 1 CONTROLPLAN Through hands Sample Reccording Part/ Processno. Processname/ Operation description M/CJigs, Toolsfor MFG PartNo. ProductName Process Class Product/Process specification tolerance Characteristic Evaluation measurement technique Method Photo InspectedBy Control Method ReactionPlan Revisionno. Dateorg. Daterev. Production MastAssembly Pageno
  • 8. 1. Layout of fabrication shop 8 Assignment-2 Fabrication Layout
  • 11. Approach  Dimension of fabrication layout  Studied the flow  Studied the Constraints  Layout Design Constraints 11 Robots are fixed Space Conveyors are fixed Space for fork lift movement Magellan and Victoria should be closed to Robot One directional Flow Electrical Connections Budget
  • 12. Total Flow Dimension Required for each shop 12 Studies Required Model No. of units produced Total Flow Magellan/Victoria 739 739 Atlas/Kibo 124 124 Centaur/EOS 80 80 Mercury 79 79 Apollo 23 23 PlannedArea Vertical Horizontal Area Vertical Horizontal Area EOSWeld 29 26 754 EOSFabrication 29 20 580 Polaris 29 23 667 31 23 713 Centaur 29 27 783 35 23 805 Mercury/Mars 29 79 2291 66 35 2310 Apollo 29 82 2378 29 83 2407 Atlas 29 98 2842 30 100 3000 Helios 29 28 812 29 30 870 30 23 690 54 15 810 TotalArea 12298 12991 CurrentDimension ShopName 66 21 1386 Dashboard 29 41.06 1191
  • 15. Creo Drawing Model 15 Assignment-3 Design Table for Bench-vise Installation
  • 16. 16 Assignment-4 Time Study for EOS Mast (Sample)
  • 17. Time Measurement  Used stop Watch to measure the time.  Machine Time  Loading & Unloading Time  Average time Challenges faced  Shift Changes  No specific schedule followed by the supervisor  Machining time is different for similar cut  Operator has to wait for the forklift to flip the part. 17 Approach
  • 18. Advantages • Reduce waste of time • Forklift Operator can see the flag from any part of the plant. • It is also helpful for the maintenance department 18 Suggestion-4 Flag interpretation to call forklift operator to avoid time waste
  • 19. Formula Used Momentum M1R1 + M2R2 = (M1 + M2)R R = M1R1 + M2R2/ (M1 + M2 Moment of body A Area of square / 2 * Area of triangle 10 *38.05/8 *38.08 = 5/4 Mass of rectangle = 5/9*500 =277 Mass of two triangles = 500- 277 =223 Center of gravity with reference to plane A C.G. of the body A = (277 * 19.04 + 223 * 12.69)/ 500 =14.3 C.G. of the whole body (A and B) = (268 * 40.08 + 500 * 14.3)/768= 23.29 Center of gravity with reference to plane B C.G. of the whole system (A+B+C) = ((12+5)*4500 + (272+23.29)*(500+268))/ (500+268+4500) = 57.75 Drawing 19 Assignment-5 Center of Gravity of Tilt Table
  • 20. Challenges Faced  Hanging hoses create disruption during the processes.  Hose- Stand in not utilized well  Existing are not perfectly aligned  Hoses are entangle with each other 20 Assignment-6 Design for new Hose Support- Kaizen
  • 21. Creo Drawing Prototype 21 Design in Creo & Prototype
  • 22. 22 TOTAL STUDY TIME: Date: Serial No. Process Start Time End Time Cycle Time 1 Gear oil (Differential) filling to the front axle 0:00:00 0:05:40 0:05:40 2 Engine Oil (Motor oil) filling 0:00:45 0:02:30 0:01:45 3 Coolant(ATF) filling to the radiator 0:02:10 0:04:30 0:02:20 4 Coolant(ATF) filling to the reserviour tank 0:04:50 0:05:08 0:00:18 5 Hydraullic oil filling 0:00:40 0:06:02 0:05:22 6 Bolting the front axle 0:06:40 0:07:50 0:01:10 7 Bolting the hydrallic tank 0:08:01 0:08:18 0:00:17 8 Instal floor plate L.H. with insulator 0:09:26 0:11:52 0:02:26 0:11:52 0:01:00 Total cycle time ( filled simultaneously) Total motion time MCFA Time & Motion Study PRODUCT DESCRIPTION: KIBO EMERGINGMARKET PERFORMED BY: RAJAT OPERATION DESCRIPTION: OIL FILLING STUDYBY: START TIME: Assignment 7 Time Study for the Kibo Truck
  • 23. Approach  Recorded the video for each station.  Calculated the start time and end time for each process.  Calculated the material Handling time for motion study. Challenges faced  Part Shortage  Mismatch in scheduling plan vs action plan  Waiting for the frame or other parts 23
  • 24. Table Process TotalCycleTime TotalMotionTime TotalTime Sub-Assembly 4:12:34 1:24:50 5:37:24 PowerStation1&2 0:47:56 0:09:34 0:57:30 PowerStation3&4 1:00:11 0:35:22 1:35:33 MainlineStation1&2 1:09:17 0:53:09 2:02:26 MainlineStation3&4 1:23:09 0:48:52 2:12:01 MainlineStation5 0:46:23 0:07:24 0:53:47 MainlineStation6 0:11:52 0:01:00 0:12:52 Total 9:31:22 4:00:11 13:31:33 Graph 24 Results 0:00:00 1:12:00 2:24:00 3:36:00 4:48:00 6:00:00 Total Cycle Time Total Motion Time Total Time
  • 25. 25 Suggestion 5 - For Scheduling
  • 26. Total Cost Make Buy OrderingCost 3,250.00$ 101,000.00$ TotalcutCost 91,617.03$ HoldingCost 6,673.03$ 2,200.61$ TotalUncutCost 58,672.54$ LabourCost 6,100.38$ TotalCost 74,695.95$ 194,817.64$ Graphical Representation 26 Assignment 8 Make Vs Buy for the Hose Cut $- $50,000.00 $100,000.00$150,000.00$200,000.00$250,000.00 Ordering Cost Total cut Cost Holding Cost Total Uncut Cost Labour Cost Total Cost Chart Title Buy Make
  • 28. 28 Suggestion 6- for sensitive machines