SlideShare ist ein Scribd-Unternehmen logo
1 von 17
National President – MICHAEL ANG
   National Executive Vice President – LORA RIVERA
Vice-President for Area A – ARMANDO DE GUZMAN
             Vice-President for Area B – ENZ TIANCO
       Vice-President for Area C – PASTOR AVELINO
          Vice-President for Area D – MARLO BASCO
                   Secretary General – REY GABITAN
         National Treasurer – ALFRED CARANDANG
                  National Auditor – LITO SORIANO
Service to UAP:
FOR NATIONAL PRESIDENT
                                                     • Member, UAP SOCKSARGEN CHAPTER
MICHAEL “MIKE” T.                                              • Member, UAP College of Fellows
                                                                                 • APEC Architect
                             • UAP Representative NCCA Committee on Monuments and Sites
                                 (2011-2013)
                                                           • UAP Representative to CHED (2012)
                                     • Chairman, Singapore Rountable Discussion (2012-2014)
                                             • Chairman, Arcasia Council Meeting (2011-2012)
                                      • Chairman, Document 204 Task Force SPP (2009-2010)
                                                            • Chairman, UAP CPEC (2009-2012)
                                       • UAP National Executive Vice-President (FY 2009-2011)
                                    • Executive Director, Commission on Professional Practice
                                                                                   (FY 2007-2009)
                                                  • Vice President, UAP Area D (FY 2004-2007)
                                                   • Ex-Officio Conference Director NCA (2004)
                                                               • National Auditor (FY 2003-2004)
                                                 • District Director, UAP RD-D1 (FY 2002-2003)
                                         • Chapter President, UAP SOCKSARGEN (1995-1997)
                         • Chapter Vice President, UAP COTABATO-GENSAN (FY 1994-1995)
FOR NAT’L EXEC. VICE PRESIDENT                                                   Service to UAP:

                                                                 • Member, MAKATI CBD CHAPTER
LORA “LORA” B.                         • Convention Director, 38th National Convention (2011-2012)
                                 • Summit Director, Architects Summit on Collaborative Action and
                                                                             Leadership (2011-2012)
                                                  • Chair, Balangkasan Committee (FY 2009-2010)
                             • Chair, Finance Committee 36th National Convention (FY 2009-2010)
                            • Chair, Finance Committee 35th National Convention (FY 2008-2009)
                                    • Chair, Finance Committee National Conference for Architects
                                                                                     (FY 2007-2008)
                          • Deputy Convention Director 31     st National Convention (FY 2004-2005)

                        • Conference Adviser National Conference for Architects (FY 2003-2004)
                                                     • Vice President , UAP Area B (FY 2002-2004)
                                                                 • Secretary General (FY 2001-2002)
                                                     • District Director, UAP RD-B3 (FY 1998-1999)
                              • Executive Director, Commission on Internal Affairs (FY 1997-1998)
                                  • Chapter President, UAP Makati Central Business District (CBD)
                                                                               (FY 1992-1993; 1989)
FOR AREA A VICE PRESIDENT                                                  Service to UAP:

                                      • Member, UAP QUEZON CITY CENTRAL CHAPTER
ARMANDO EUGENE “DONDON” C.                  • National Treasurer (FY 2011-2012, 2010-2011)
                                             • District Director UAP RD- A3 (FY 2009-2010)
                                     • Convention Director 34th National Convention (2008)
                                      • Adviser 35th & 36th National Convention (2009, 2010)
                            • Chapter President, UAP QUEZON CITY CENTRAL CHAPTER
                                                                  (FY 2001-2002; 2002-2003)
                                 • Chapter Vice President, UAP QUEZON CITY CENTRAL
                                                                   CHAPTER (FY 1999-2000)
                                       • Chapter Secretary, UAP QUEZON CITY CENTRAL
                                                                   CHAPTER (FY 1998-1999)
Service to UAP:
FOR AREA B VICE PRESIDENT
                                         • Member, UAP LEGASPI CHAPTER
ERNESTO “ENDZ”                 • National Auditor, (FY 2009-2010; 2008-2009)
                                     • District Director, RD-B2 (FY 1995-1996)
                            • Chapter President, UAP Legaspi (FY 1990-1991)
Service to UAP:
FOR AREA C VICE PRESIDENT
                                                  • Member, UAP LEYTE WEST CHAPTER
                                                           • Chapter Director (FY 2009-2010)
                                              • Member, Committee on Nominations (2009)
AVELINO A.
                                            • District Director, UAP RD C-3 (FY 2006-2008)
                            • Chapter President, UAP LEYTE WEST CHAPTER (FY 2002-
                                                                           2004; 1987-1989)
                              • Chapter Vice President, UAP LEYTE WEST CHAPTER (FY
                                                                                 1977- 1979)
FOR AREA D VICE PRESIDENT                                                   Service to UAP:

                                                      • Member, UAP COTABATO CHAPTER
                                                                        • Chairman, NAW 2010
MARLO J.                                   • Chapter Boars of Directors (FY 2009-2010, 1997)
                                                    • District Director RD D-1 (FY 2006-2007)
                            • Chapter President, UAP COTABATO CHAPTER (FY 1998-2000)
Service to the UAP:
FOR SECRETARY GENERAL
                                                     • Member, UAP MANILA STA. MESA CHAPTER
REY S.                                                • Secretary General (FY 2011-2012; 2010-2011)
                                        • Project Director, UAP-CCD Center for Career Development
                                       • Board of Consultants, National Building Code Development
                                                                  Committee, DPWH (FY 2010- 2013)
                                       •Member, PRC CPE Council for Architecture, (FY 2010-2012)
                                            • Chairman, Special Projects Committee (FY 2011-2012)
                               • Member, TWG New Designs & Technology DEPED (FY 2011-2012)
                           • Chairman, UAP Competitions (FY 2009-2010; 2008-2009; 2007-2008)
                                    • Deputy Chairman, UAP Committee on Awards (FY 2007-2008)
                        • Chapter President, UAP MANILA STA. MESA CHAPTER (FY 2005-2007)
                        • Chapter Secretary, UAP MANILA STA. MESA CHAPTER (FY 2002-2004)
                                   • Member, Committee on UAP Long Range Plan (FY 2004-2005)
                                                   • Rapporteur, Balangkasan Forum (FY 2002-2004)
                             • Member, National Convention Organizing Committee (FY 2001-2005)
                             • Member, National Conference Organizing Committee (FY 2002-2004)
                                                    •Secretariat, 1st ILAW Conference (FY2010-2011)
                                   • Member, Architecture Council of Architectural Researchers and
                                                             Educators (ARCHCARE) (2002-present)
FOR NATIONAL TREASURER                                                      Service to UAP:

                                                   • Member, UAP QC SILANGAN CHAPTER
ALFRED GEOFFREY C.       • Chairman, UAP Building & Grounds Administration (FY 2011-2012)
                                                • District Director, UAP RD-A3 (FY 2010-2011)
                                 • Adviser, UAP QC SILANGAN CHAPTER (FY 2006-Present)
                                                   • Treasurer, Area A Council (FY 2010-2012)
                             • Chairman, Finance Committee, Area A Council (FY 2010-2011)
                               • Chairman, Promo and Publication of ILAW Conference (2010-
                                                                                        2011)
                                         • Chairman, UAP International Affairs (FY 2006-2007)
                              • Chapter President, UAP QC SILANGAN CHAPTER (FY 2005-
                                                                                        2006)
                              • Chapter Treasurer, UAP QC SILANGAN CHAPTER (FY 2002-
                                                                                        2005)
                              • Chairman, Ways and Means Committee, UAP QC SILANGAN
                                                                      CHAPTER (FY 2000-2001)
FOR NATIONAL AUDITOR                                               Service to UAP:

                                                  Member, UAP PASIG CHAPTER
ANGELITO “LITO” S.            National Auditor (FY 2010-2011; 2011 up to present)
                                             Chairman, Special Committee on IRR
                                   Chairman, Committee on Bid Book (2010-2011)
                        Chairman, Building Plans Evaluation Committee, Barangay
                                                    Laging Handa, (2010 to present)
                        Official Representative to the following: DTI, BPS, DepED,
                                                                        DPWH, CIAP
                           UAP-Center for Career Development Review Specialist
                                     Deputy Area A Vice President (FY 2009- 2010)
                                               A-5 District Director (FY 2008-2009)
                                       A-5 Deputy District Director (FY 2007-2008)
                                            Member, Green Architecture Movement
                                        Member, Philippine Green Building Initiative
                                        Vice Chairman, Committee on Competition
                           Chapter President, UAP Pasig Chapter (FY 1982-1985)
                                                           Charter President (1981)
VOTE
  STRAIGHT
PERFORMANCE
    TEAM
PRIORITY ACTION PLANS
ENSURE THE WINNABILITY OF THE RA9266 CASE AND THE FULL
IMPLEMENTATION THEREOF.
STRATEGY: STRENGTHEN OUR POSITION IN THE UAP-PICE CASE
RE RA 9266 BY REINFORCING OUR LEGAL COUNSELS WITH
ADDITIONAL LEGAL MINDS AND THRU FREQUENT
COORDINATION WITH THE NEWLY ESTABLISHED COUNCIL FOR
THE ARCHITECTURAL PROFESSION WHICH WAS CREATED
SPECIFICALLY TO MONITOR THE STATUS OF THE RA 9266 CASE.
SEEK THE SUPPORT OF THE OFFICE OF THE SOLICITOR GENERAL
IN SUPPORTING OUR CAUSE. ADAPT A MORE AGGRESSIVE STAND
AGAINST VIOLATORS OF RA 9266 BY ENSURING THAT THESE
VIOLATORS WILL BE PENALIZED.
PRIORITY ACTION PLANS
UPDATING OF THE TEN YEAR LONG RANGE PLAN: THE TEN YEAR
LONG RANGE PLAN WHICH IDENTIFIED THE PRIORITY
CONCERNS OF THE GENERAL MEMBERSHIP IS NOW ON ITS
EIGHT YEAR OF IMPLEMENTATION. THE TIME IS RIPE TO REVISIT
THE ISSUES AND CONCERNS IDENTIFIED IN THE PLAN AND A
NEW CONSULTATION BE MADE WITH THE GENERAL
MEMBERSHIP IN ORDER TO IDENTIFY THE MORE RELEVANT
ISSUES THAT HAVE ARISEN DUE TO DEVELOPMENTS AND
REFOCUS CONCERNS THAT HAVE BEEN RENDERED OBSOLETE BY
TIME. THIS UPDATING IS OF UTMOST IMPORTANCE AND WILL BE
ADDRESSED IMMEDIATELY.
PRIORITY ACTION PLANS
IN ORDER TO ENHANCE THE COMPETITIVENESS OF OUR
MEMBER ARCHITECTS, CONTINUING POFESSIONAL
DEELOPMENT AND ENHANCEMENT NEED TO BE POVIDED,
ONLINE CPE COURSES AND WEB JOURNALS WILL BE MADE
AVAILABLE WITH EASE OF ACCESS BY THE GENERAL MEMBERSIP
TO AVAIL OF THE CPE PROGRAMS AT THEIR OWN CONVENIENT
TIME. SCHOLARSHIP/FREE SLOTS TO BE PROVIDED TO
MARGINALIZED MEMBERS. CONDUCT TOURING CPEs TO REACH
OUT TO THE REGIONAL CHAPTERS
PRIORITY ACTION PLANS
INSTITUTIONALIZATION OF ARCHITECTURAL SPECIALIZATION IS
A GLOBAL TREND. OUR SPECIALTY COUNCIL WILL BE
IMPLEMENTED IN COLLABORATION WITH THE PRC AND THE
CHED FOR GLOBAL RECOGNITION, ENABLING OUR MEMBERS TO
LEVEL THE PLAYING FIELD IN THE GLOBAL MARKET.


ADVOCATE FOR RESPONSIBLE AND SUSTAINABLE PRACTICE
THRU ADAPTION OF SUSTAINABLE AND GREEN STRATEGIES TO
ENSURE A SAFE, RESILIENT, AND SUSTAINABLE BUILD AND
NATURAL ENVIRONMENT ELEVATING THE ARCHITECTS TO A
MORE RESPONSIVE POSITION IN OUR COMMUNITIES AND IN
THE BUILT INDUSTRY.
PRIORITY ACTION PLANS
IMPLEMENT MORE RESPONSIVE STANDARDS OF PROFESSIONAL
PRACTICE THRU A MORE MARKET ORIENTED SCHEDULE OF FEES
AND SCOPE OF PRACTICE.

STRENGTHEN GLOBAL NETWORKING WITH INTERNATIONAL
ORGANIZATION OF ARCHITECTS IN ORDER TO PROVIDE MORE
OPPORTUNITIES FOR THE GENERAL MEMBERSHIP.

COLLABORATE CLOSELY WITH CODHASP, BOA, AND CHED,
TOWARDS ENHANCEMENT OF THE ARCHITECTURAL
CURRICULUM TO ENSURE ITS RESPONSIVENESS TO GLOBAL
PRACTICE.
PRIORITY ACTION PLANS
PROMOTE THE IMPORTANCE OF ARCHITECTURE TO
GOVERNMENT BOTH IN THE NATIONAL AND LOCAL LEVEL TO
OPEN OPPORTUNITIES FOR UAP MEMBERS TO BE INVOLVED IN
GOVERNMENT PROJECTS THRU THE GOVERNMENT
PROCUREMENT ACT. LOBBY FOR THE MANDATORY CREATION OF
THE OFFICE OF THE CITY ARCHITECT WITH THE DILG.

ENSURE FISCAL STABILITY AND EFFICIENCY OF THE
ORGANIZATION THROUGH OPTIMUM USE OF INFORMATION
TECHNOLOGY IN COMMUNICATION AND DELIVERY OF SERVICES.

Weitere ähnliche Inhalte

Andere mochten auch

EDUARDO H. PARE WORK CERTIFICATE_ENEL1
EDUARDO H. PARE WORK CERTIFICATE_ENEL1EDUARDO H. PARE WORK CERTIFICATE_ENEL1
EDUARDO H. PARE WORK CERTIFICATE_ENEL1Eduardo H. Pare
 
EDUARDO H. PARE CIVIL, STRUCTURAL & ARCHITECTURAL DESIGN & CONSTRUCTION SPECI...
EDUARDO H. PARE CIVIL, STRUCTURAL & ARCHITECTURAL DESIGN & CONSTRUCTION SPECI...EDUARDO H. PARE CIVIL, STRUCTURAL & ARCHITECTURAL DESIGN & CONSTRUCTION SPECI...
EDUARDO H. PARE CIVIL, STRUCTURAL & ARCHITECTURAL DESIGN & CONSTRUCTION SPECI...Eduardo H. Pare
 
Ra 9053 landscape architecture law
Ra 9053 landscape architecture lawRa 9053 landscape architecture law
Ra 9053 landscape architecture lawjbonvier
 
Spp 201-pre-design services
Spp 201-pre-design servicesSpp 201-pre-design services
Spp 201-pre-design servicesMelvin Patawaran
 
Project Specifications and Building Code
Project Specifications and Building CodeProject Specifications and Building Code
Project Specifications and Building Codetboyko
 
APEC ARCHITECTS' OPERATION MANUAL
APEC ARCHITECTS' OPERATION MANUALAPEC ARCHITECTS' OPERATION MANUAL
APEC ARCHITECTS' OPERATION MANUALJennilyn Tagupa
 
NONLINEAR STRUCTURAL ANALYSIS FOR SEISMIC DESIGN (ALL COPYRIGHT BY NIST - US ...
NONLINEAR STRUCTURAL ANALYSIS FOR SEISMIC DESIGN (ALL COPYRIGHT BY NIST - US ...NONLINEAR STRUCTURAL ANALYSIS FOR SEISMIC DESIGN (ALL COPYRIGHT BY NIST - US ...
NONLINEAR STRUCTURAL ANALYSIS FOR SEISMIC DESIGN (ALL COPYRIGHT BY NIST - US ...Eduardo H. Pare
 
EDUARDO H. PARE WORK CERTIFICATE_LI_QATAR
EDUARDO H. PARE WORK CERTIFICATE_LI_QATAREDUARDO H. PARE WORK CERTIFICATE_LI_QATAR
EDUARDO H. PARE WORK CERTIFICATE_LI_QATAREduardo H. Pare
 
Ppt draft standards travel agencies
Ppt draft standards travel agenciesPpt draft standards travel agencies
Ppt draft standards travel agenciestourismregion3
 
Ppt barrier free tourism arch eustaquio
Ppt barrier free tourism arch eustaquioPpt barrier free tourism arch eustaquio
Ppt barrier free tourism arch eustaquiotourismregion3
 
Project Specifications
Project SpecificationsProject Specifications
Project SpecificationsEric Anderson
 
Specifications 101
Specifications 101Specifications 101
Specifications 101Andrej_M
 
Specification writting civil construction
Specification writting civil constructionSpecification writting civil construction
Specification writting civil constructiondiasawada12345
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and materialALI HYDER GADHI
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONAr Naveen Naveen
 
605 s anotationsbypr_boa
605 s anotationsbypr_boa605 s anotationsbypr_boa
605 s anotationsbypr_boaLm Sothea
 

Andere mochten auch (19)

EDUARDO H. PARE WORK CERTIFICATE_ENEL1
EDUARDO H. PARE WORK CERTIFICATE_ENEL1EDUARDO H. PARE WORK CERTIFICATE_ENEL1
EDUARDO H. PARE WORK CERTIFICATE_ENEL1
 
EDUARDO H. PARE CIVIL, STRUCTURAL & ARCHITECTURAL DESIGN & CONSTRUCTION SPECI...
EDUARDO H. PARE CIVIL, STRUCTURAL & ARCHITECTURAL DESIGN & CONSTRUCTION SPECI...EDUARDO H. PARE CIVIL, STRUCTURAL & ARCHITECTURAL DESIGN & CONSTRUCTION SPECI...
EDUARDO H. PARE CIVIL, STRUCTURAL & ARCHITECTURAL DESIGN & CONSTRUCTION SPECI...
 
Ra 9053 landscape architecture law
Ra 9053 landscape architecture lawRa 9053 landscape architecture law
Ra 9053 landscape architecture law
 
Accessibility Law
Accessibility LawAccessibility Law
Accessibility Law
 
uap doc 207-208
uap doc 207-208uap doc 207-208
uap doc 207-208
 
Spp 201-pre-design services
Spp 201-pre-design servicesSpp 201-pre-design services
Spp 201-pre-design services
 
Project Specifications and Building Code
Project Specifications and Building CodeProject Specifications and Building Code
Project Specifications and Building Code
 
APEC ARCHITECTS' OPERATION MANUAL
APEC ARCHITECTS' OPERATION MANUALAPEC ARCHITECTS' OPERATION MANUAL
APEC ARCHITECTS' OPERATION MANUAL
 
NONLINEAR STRUCTURAL ANALYSIS FOR SEISMIC DESIGN (ALL COPYRIGHT BY NIST - US ...
NONLINEAR STRUCTURAL ANALYSIS FOR SEISMIC DESIGN (ALL COPYRIGHT BY NIST - US ...NONLINEAR STRUCTURAL ANALYSIS FOR SEISMIC DESIGN (ALL COPYRIGHT BY NIST - US ...
NONLINEAR STRUCTURAL ANALYSIS FOR SEISMIC DESIGN (ALL COPYRIGHT BY NIST - US ...
 
EDUARDO H. PARE WORK CERTIFICATE_LI_QATAR
EDUARDO H. PARE WORK CERTIFICATE_LI_QATAREDUARDO H. PARE WORK CERTIFICATE_LI_QATAR
EDUARDO H. PARE WORK CERTIFICATE_LI_QATAR
 
Ppt draft standards travel agencies
Ppt draft standards travel agenciesPpt draft standards travel agencies
Ppt draft standards travel agencies
 
Ppt barrier free tourism arch eustaquio
Ppt barrier free tourism arch eustaquioPpt barrier free tourism arch eustaquio
Ppt barrier free tourism arch eustaquio
 
Project Specifications
Project SpecificationsProject Specifications
Project Specifications
 
Specifications 101
Specifications 101Specifications 101
Specifications 101
 
Specification writting civil construction
Specification writting civil constructionSpecification writting civil construction
Specification writting civil construction
 
SPECIFICATIONS
SPECIFICATIONSSPECIFICATIONS
SPECIFICATIONS
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and material
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATION
 
605 s anotationsbypr_boa
605 s anotationsbypr_boa605 s anotationsbypr_boa
605 s anotationsbypr_boa
 

Kürzlich hochgeladen

Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一Fi L
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVAAnastasiya Kudinova
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一Fi sss
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIyuj
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书zdzoqco
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubaikojalkojal131
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts ServiceCall Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Servicejennyeacort
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一z xss
 
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10uasjlagroup
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfneelspinoy
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一F La
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degreeyuu sss
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxmapanig881
 
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一A SSS
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一diploma 1
 

Kürzlich hochgeladen (20)

Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AI
 
Call Girls in Pratap Nagar, 9953056974 Escort Service
Call Girls in Pratap Nagar,  9953056974 Escort ServiceCall Girls in Pratap Nagar,  9953056974 Escort Service
Call Girls in Pratap Nagar, 9953056974 Escort Service
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts ServiceCall Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
 
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdf
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptx
 
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
 

National Officers of the United Architects of the Philippines for 2012-2013

  • 1. National President – MICHAEL ANG National Executive Vice President – LORA RIVERA Vice-President for Area A – ARMANDO DE GUZMAN Vice-President for Area B – ENZ TIANCO Vice-President for Area C – PASTOR AVELINO Vice-President for Area D – MARLO BASCO Secretary General – REY GABITAN National Treasurer – ALFRED CARANDANG National Auditor – LITO SORIANO
  • 2. Service to UAP: FOR NATIONAL PRESIDENT • Member, UAP SOCKSARGEN CHAPTER MICHAEL “MIKE” T. • Member, UAP College of Fellows • APEC Architect • UAP Representative NCCA Committee on Monuments and Sites (2011-2013) • UAP Representative to CHED (2012) • Chairman, Singapore Rountable Discussion (2012-2014) • Chairman, Arcasia Council Meeting (2011-2012) • Chairman, Document 204 Task Force SPP (2009-2010) • Chairman, UAP CPEC (2009-2012) • UAP National Executive Vice-President (FY 2009-2011) • Executive Director, Commission on Professional Practice (FY 2007-2009) • Vice President, UAP Area D (FY 2004-2007) • Ex-Officio Conference Director NCA (2004) • National Auditor (FY 2003-2004) • District Director, UAP RD-D1 (FY 2002-2003) • Chapter President, UAP SOCKSARGEN (1995-1997) • Chapter Vice President, UAP COTABATO-GENSAN (FY 1994-1995)
  • 3. FOR NAT’L EXEC. VICE PRESIDENT Service to UAP: • Member, MAKATI CBD CHAPTER LORA “LORA” B. • Convention Director, 38th National Convention (2011-2012) • Summit Director, Architects Summit on Collaborative Action and Leadership (2011-2012) • Chair, Balangkasan Committee (FY 2009-2010) • Chair, Finance Committee 36th National Convention (FY 2009-2010) • Chair, Finance Committee 35th National Convention (FY 2008-2009) • Chair, Finance Committee National Conference for Architects (FY 2007-2008) • Deputy Convention Director 31 st National Convention (FY 2004-2005) • Conference Adviser National Conference for Architects (FY 2003-2004) • Vice President , UAP Area B (FY 2002-2004) • Secretary General (FY 2001-2002) • District Director, UAP RD-B3 (FY 1998-1999) • Executive Director, Commission on Internal Affairs (FY 1997-1998) • Chapter President, UAP Makati Central Business District (CBD) (FY 1992-1993; 1989)
  • 4. FOR AREA A VICE PRESIDENT Service to UAP: • Member, UAP QUEZON CITY CENTRAL CHAPTER ARMANDO EUGENE “DONDON” C. • National Treasurer (FY 2011-2012, 2010-2011) • District Director UAP RD- A3 (FY 2009-2010) • Convention Director 34th National Convention (2008) • Adviser 35th & 36th National Convention (2009, 2010) • Chapter President, UAP QUEZON CITY CENTRAL CHAPTER (FY 2001-2002; 2002-2003) • Chapter Vice President, UAP QUEZON CITY CENTRAL CHAPTER (FY 1999-2000) • Chapter Secretary, UAP QUEZON CITY CENTRAL CHAPTER (FY 1998-1999)
  • 5. Service to UAP: FOR AREA B VICE PRESIDENT • Member, UAP LEGASPI CHAPTER ERNESTO “ENDZ” • National Auditor, (FY 2009-2010; 2008-2009) • District Director, RD-B2 (FY 1995-1996) • Chapter President, UAP Legaspi (FY 1990-1991)
  • 6. Service to UAP: FOR AREA C VICE PRESIDENT • Member, UAP LEYTE WEST CHAPTER • Chapter Director (FY 2009-2010) • Member, Committee on Nominations (2009) AVELINO A. • District Director, UAP RD C-3 (FY 2006-2008) • Chapter President, UAP LEYTE WEST CHAPTER (FY 2002- 2004; 1987-1989) • Chapter Vice President, UAP LEYTE WEST CHAPTER (FY 1977- 1979)
  • 7. FOR AREA D VICE PRESIDENT Service to UAP: • Member, UAP COTABATO CHAPTER • Chairman, NAW 2010 MARLO J. • Chapter Boars of Directors (FY 2009-2010, 1997) • District Director RD D-1 (FY 2006-2007) • Chapter President, UAP COTABATO CHAPTER (FY 1998-2000)
  • 8. Service to the UAP: FOR SECRETARY GENERAL • Member, UAP MANILA STA. MESA CHAPTER REY S. • Secretary General (FY 2011-2012; 2010-2011) • Project Director, UAP-CCD Center for Career Development • Board of Consultants, National Building Code Development Committee, DPWH (FY 2010- 2013) •Member, PRC CPE Council for Architecture, (FY 2010-2012) • Chairman, Special Projects Committee (FY 2011-2012) • Member, TWG New Designs & Technology DEPED (FY 2011-2012) • Chairman, UAP Competitions (FY 2009-2010; 2008-2009; 2007-2008) • Deputy Chairman, UAP Committee on Awards (FY 2007-2008) • Chapter President, UAP MANILA STA. MESA CHAPTER (FY 2005-2007) • Chapter Secretary, UAP MANILA STA. MESA CHAPTER (FY 2002-2004) • Member, Committee on UAP Long Range Plan (FY 2004-2005) • Rapporteur, Balangkasan Forum (FY 2002-2004) • Member, National Convention Organizing Committee (FY 2001-2005) • Member, National Conference Organizing Committee (FY 2002-2004) •Secretariat, 1st ILAW Conference (FY2010-2011) • Member, Architecture Council of Architectural Researchers and Educators (ARCHCARE) (2002-present)
  • 9. FOR NATIONAL TREASURER Service to UAP: • Member, UAP QC SILANGAN CHAPTER ALFRED GEOFFREY C. • Chairman, UAP Building & Grounds Administration (FY 2011-2012) • District Director, UAP RD-A3 (FY 2010-2011) • Adviser, UAP QC SILANGAN CHAPTER (FY 2006-Present) • Treasurer, Area A Council (FY 2010-2012) • Chairman, Finance Committee, Area A Council (FY 2010-2011) • Chairman, Promo and Publication of ILAW Conference (2010- 2011) • Chairman, UAP International Affairs (FY 2006-2007) • Chapter President, UAP QC SILANGAN CHAPTER (FY 2005- 2006) • Chapter Treasurer, UAP QC SILANGAN CHAPTER (FY 2002- 2005) • Chairman, Ways and Means Committee, UAP QC SILANGAN CHAPTER (FY 2000-2001)
  • 10. FOR NATIONAL AUDITOR Service to UAP:  Member, UAP PASIG CHAPTER ANGELITO “LITO” S.  National Auditor (FY 2010-2011; 2011 up to present)  Chairman, Special Committee on IRR  Chairman, Committee on Bid Book (2010-2011)  Chairman, Building Plans Evaluation Committee, Barangay Laging Handa, (2010 to present)  Official Representative to the following: DTI, BPS, DepED, DPWH, CIAP  UAP-Center for Career Development Review Specialist  Deputy Area A Vice President (FY 2009- 2010)  A-5 District Director (FY 2008-2009)  A-5 Deputy District Director (FY 2007-2008)  Member, Green Architecture Movement  Member, Philippine Green Building Initiative  Vice Chairman, Committee on Competition  Chapter President, UAP Pasig Chapter (FY 1982-1985)  Charter President (1981)
  • 12. PRIORITY ACTION PLANS ENSURE THE WINNABILITY OF THE RA9266 CASE AND THE FULL IMPLEMENTATION THEREOF. STRATEGY: STRENGTHEN OUR POSITION IN THE UAP-PICE CASE RE RA 9266 BY REINFORCING OUR LEGAL COUNSELS WITH ADDITIONAL LEGAL MINDS AND THRU FREQUENT COORDINATION WITH THE NEWLY ESTABLISHED COUNCIL FOR THE ARCHITECTURAL PROFESSION WHICH WAS CREATED SPECIFICALLY TO MONITOR THE STATUS OF THE RA 9266 CASE. SEEK THE SUPPORT OF THE OFFICE OF THE SOLICITOR GENERAL IN SUPPORTING OUR CAUSE. ADAPT A MORE AGGRESSIVE STAND AGAINST VIOLATORS OF RA 9266 BY ENSURING THAT THESE VIOLATORS WILL BE PENALIZED.
  • 13. PRIORITY ACTION PLANS UPDATING OF THE TEN YEAR LONG RANGE PLAN: THE TEN YEAR LONG RANGE PLAN WHICH IDENTIFIED THE PRIORITY CONCERNS OF THE GENERAL MEMBERSHIP IS NOW ON ITS EIGHT YEAR OF IMPLEMENTATION. THE TIME IS RIPE TO REVISIT THE ISSUES AND CONCERNS IDENTIFIED IN THE PLAN AND A NEW CONSULTATION BE MADE WITH THE GENERAL MEMBERSHIP IN ORDER TO IDENTIFY THE MORE RELEVANT ISSUES THAT HAVE ARISEN DUE TO DEVELOPMENTS AND REFOCUS CONCERNS THAT HAVE BEEN RENDERED OBSOLETE BY TIME. THIS UPDATING IS OF UTMOST IMPORTANCE AND WILL BE ADDRESSED IMMEDIATELY.
  • 14. PRIORITY ACTION PLANS IN ORDER TO ENHANCE THE COMPETITIVENESS OF OUR MEMBER ARCHITECTS, CONTINUING POFESSIONAL DEELOPMENT AND ENHANCEMENT NEED TO BE POVIDED, ONLINE CPE COURSES AND WEB JOURNALS WILL BE MADE AVAILABLE WITH EASE OF ACCESS BY THE GENERAL MEMBERSIP TO AVAIL OF THE CPE PROGRAMS AT THEIR OWN CONVENIENT TIME. SCHOLARSHIP/FREE SLOTS TO BE PROVIDED TO MARGINALIZED MEMBERS. CONDUCT TOURING CPEs TO REACH OUT TO THE REGIONAL CHAPTERS
  • 15. PRIORITY ACTION PLANS INSTITUTIONALIZATION OF ARCHITECTURAL SPECIALIZATION IS A GLOBAL TREND. OUR SPECIALTY COUNCIL WILL BE IMPLEMENTED IN COLLABORATION WITH THE PRC AND THE CHED FOR GLOBAL RECOGNITION, ENABLING OUR MEMBERS TO LEVEL THE PLAYING FIELD IN THE GLOBAL MARKET. ADVOCATE FOR RESPONSIBLE AND SUSTAINABLE PRACTICE THRU ADAPTION OF SUSTAINABLE AND GREEN STRATEGIES TO ENSURE A SAFE, RESILIENT, AND SUSTAINABLE BUILD AND NATURAL ENVIRONMENT ELEVATING THE ARCHITECTS TO A MORE RESPONSIVE POSITION IN OUR COMMUNITIES AND IN THE BUILT INDUSTRY.
  • 16. PRIORITY ACTION PLANS IMPLEMENT MORE RESPONSIVE STANDARDS OF PROFESSIONAL PRACTICE THRU A MORE MARKET ORIENTED SCHEDULE OF FEES AND SCOPE OF PRACTICE. STRENGTHEN GLOBAL NETWORKING WITH INTERNATIONAL ORGANIZATION OF ARCHITECTS IN ORDER TO PROVIDE MORE OPPORTUNITIES FOR THE GENERAL MEMBERSHIP. COLLABORATE CLOSELY WITH CODHASP, BOA, AND CHED, TOWARDS ENHANCEMENT OF THE ARCHITECTURAL CURRICULUM TO ENSURE ITS RESPONSIVENESS TO GLOBAL PRACTICE.
  • 17. PRIORITY ACTION PLANS PROMOTE THE IMPORTANCE OF ARCHITECTURE TO GOVERNMENT BOTH IN THE NATIONAL AND LOCAL LEVEL TO OPEN OPPORTUNITIES FOR UAP MEMBERS TO BE INVOLVED IN GOVERNMENT PROJECTS THRU THE GOVERNMENT PROCUREMENT ACT. LOBBY FOR THE MANDATORY CREATION OF THE OFFICE OF THE CITY ARCHITECT WITH THE DILG. ENSURE FISCAL STABILITY AND EFFICIENCY OF THE ORGANIZATION THROUGH OPTIMUM USE OF INFORMATION TECHNOLOGY IN COMMUNICATION AND DELIVERY OF SERVICES.