By Gerrit Maess | Lovelyn George| Ramon Rios R | Zainab Sayyed
Project:
Automation of Business Process
Management System
Service Provider Client
WNS Introduction
• Business process management
company (Software and Web Services)
• Headquarter is in Mumbai, India
• The company serves over 200 Fortune
500 companies worldwide
1
2
Financial Models – Net Present Value and Payback Method
Selected Methods
2
Non-Financial Models - Multi Weighted Scoring Matrix
Selected Methods
2
Project Portfolio Matrix
Selected Methods
Net Present Value
Why WNS Selected BPM Automation
(Global Star Travels Project)?
 Strategic Project with the highest Net Present Value (NPV) of $196,338
 We can recover the investment in 10.9 months
 Having the highest weight score of 72
 This project is technological breakthrough with highest commercial payoff
3
Defining  Planning  Executing  Delivering
2
Project Life Cycle
Defining the Project
4
Defining Project Scope
Objective:
To design an automated Business Process Management System using MS SQL
Server and BI system within `12 months at a cost not to exceed $700,000.
Priority Matrix:
4
Specification
Hardware:
 Setup Database server
 Setup Web Server
 System down time < 4 hours
Software:
 BI system (middle and top
management)
 Web application system
4
Task
Deliverables:
 BI reports (Analytics tools) for
middle and top management
 Backend database system
 Interfaces / Middleware compatible
with existing front end solutions
 Technical reference document
Project Scope Checklist
5
Work Break Down Structure
3
Integration of WBS and OBS
Cost Account
The intersection of WP- Hardware
Service and Organization IT
department creates a cost account.
By rolling up Hardware Service and
Software License WP System
(deliverable) cost is calculated.
Planning
4
Bottom Up: Support Cost Est
6
Top-Down: Function Point
Contract Bid
Time and Cost Estimations
Contract Bid Summary Costs
Total Direct Cost $540,000.00
G&A overhead (10%) $54,000.00
Total Costs $594,000.00
Profit(17.5%) $103,950.00
Total Bid $697,950.00
PERT
6
Time and Cost Estimations
6
Managing Risk
6
Gantt Chart
Resource Allocation
Before Levelling: 230 days
6
After Leveling: 237 days
Executing
4
3
Tracking Gantt Chart (Jul-16)
Earned Value Chart
6
Indexes Period
$0.00
$50,000.00
$100,000.00
$150,000.00
$200,000.00
$250,000.00
$300,000.00
Jan'16
Feb'16
Mar'16
Apr'16
May'16
Jun'16
Jul'16
Aug'16
Sep'16
Oct'16
Nov'16
Dec'16
ACWP BCWP BCWS
Actual Cost Linear (ACWP)
0
0.2
0.4
0.6
0.8
1
1.2
Jan'16
Feb'16
Mar'16
Apr'16
May'16
Jun'16
Jul'16
Aug'16
Sep'16
Oct'16
Nov'16
Dec'16
SPI CPI
CPI <1 indicates over cost, SPI <1 indicates behind scheduled.
Status Report (Jul-16)
Forecast EAC (July 16)
EAC: $452,130
The final project projected cost forecast is
$452,130 versus $ 240,256 originally
planned.
To Complete Performance Index TCPI:
TCPI: 1.05
6
3
Crashing Activity
Activity 52, 53, 93, 97 are crashed. It cost
$7,400 and Project duration will be reduce
by 8days.
3
Control Chart
Period
Status
Report Task Name
Finish
Actual Finish Baseline
Start
Variance
Finish
Variance
Total
Variance
1 March 1st BPM Automation Mon 11/28/16 Mon 11/28/16 0 days 0 days 0
2 July 1st BPM Automation Thu 12/8/16 Mon 11/28/16 0 days 8 days -8
3 Oct 1st BPM Automation Mon 11/28/16 Thu 12/8/16 0 days -8 days 8
-20020
1 2 3
Variance
Time Period
3
Conclusion
 More time and cost should be spend in Planning Phase to avoid problems in later
stages
 Resource allocation might need to be reconsidered in Planning Phase
 Through out project life cycle objectives should always be at the center of attention
and decision making
 Once project starts, a dedicated team has to monitor project performance for cost and
schedule evaluation periodically - If required revise time phased schedule
 Based on status report and performance indices, actions like crashing or scope creep
have to be taken into consideration
Thank you for your attention!
Questions?
7

More Related Content

What's hot

COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJCOST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJTapesh Ajmera
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost ManagementHayat Denzi
 
Introduction to cost management &amp; control in construction projects
Introduction to cost management &amp; control in construction projectsIntroduction to cost management &amp; control in construction projects
Introduction to cost management &amp; control in construction projectsEssam Lotffy, PMP®, CCP®
 
Lecture 06 project_cost_management
Lecture 06 project_cost_managementLecture 06 project_cost_management
Lecture 06 project_cost_managementSayed Ahmed
 
PMP Training Project Cost Management Part 1
PMP Training Project Cost Management Part 1PMP Training Project Cost Management Part 1
PMP Training Project Cost Management Part 1Skillogic Solutions
 
Top Pillars | Cost & Time Management by Salameh Mahasneh
Top Pillars | Cost & Time Management by Salameh MahasnehTop Pillars | Cost & Time Management by Salameh Mahasneh
Top Pillars | Cost & Time Management by Salameh MahasnehTop Pillars
 
Cost baseline and cost budget
Cost baseline and cost budgetCost baseline and cost budget
Cost baseline and cost budgetMudassir Iqbal
 
PMBoK, discussion #5: Project Cost Management
PMBoK, discussion #5: Project Cost ManagementPMBoK, discussion #5: Project Cost Management
PMBoK, discussion #5: Project Cost ManagementOleksandr Lutsaievskyi
 

What's hot (20)

COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJCOST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
 
Project cost management
Project cost management Project cost management
Project cost management
 
07 project cost management
07 project cost management07 project cost management
07 project cost management
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Introduction to cost management &amp; control in construction projects
Introduction to cost management &amp; control in construction projectsIntroduction to cost management &amp; control in construction projects
Introduction to cost management &amp; control in construction projects
 
Monitoring the control
Monitoring the control Monitoring the control
Monitoring the control
 
Project Estimating
Project EstimatingProject Estimating
Project Estimating
 
Lecture 06 project_cost_management
Lecture 06 project_cost_managementLecture 06 project_cost_management
Lecture 06 project_cost_management
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
PMP Training Project Cost Management Part 1
PMP Training Project Cost Management Part 1PMP Training Project Cost Management Part 1
PMP Training Project Cost Management Part 1
 
Top Pillars | Cost & Time Management by Salameh Mahasneh
Top Pillars | Cost & Time Management by Salameh MahasnehTop Pillars | Cost & Time Management by Salameh Mahasneh
Top Pillars | Cost & Time Management by Salameh Mahasneh
 
Cost baseline and cost budget
Cost baseline and cost budgetCost baseline and cost budget
Cost baseline and cost budget
 
Project Management
Project ManagementProject Management
Project Management
 
Project cost management
Project cost managementProject cost management
Project cost management
 
CCP_SEC1_Cost
CCP_SEC1_CostCCP_SEC1_Cost
CCP_SEC1_Cost
 
ACH 216 Lecture 07 (Project Funding)
ACH 216 Lecture 07 (Project Funding)ACH 216 Lecture 07 (Project Funding)
ACH 216 Lecture 07 (Project Funding)
 
Cost Control Process for Construction
Cost Control Process for ConstructionCost Control Process for Construction
Cost Control Process for Construction
 
Project management
Project managementProject management
Project management
 
Cost management
Cost managementCost management
Cost management
 
PMBoK, discussion #5: Project Cost Management
PMBoK, discussion #5: Project Cost ManagementPMBoK, discussion #5: Project Cost Management
PMBoK, discussion #5: Project Cost Management
 

Similar to Project Management. Automation BPM

Project Management Analysis for WNS
Project Management Analysis for WNSProject Management Analysis for WNS
Project Management Analysis for WNSLovelyn George
 
Rpa conference new delhi
Rpa conference new delhiRpa conference new delhi
Rpa conference new delhigaurav
 
Rapid Economic Justifcation for Machine Learning in IoT
Rapid Economic Justifcation for Machine Learning in IoTRapid Economic Justifcation for Machine Learning in IoT
Rapid Economic Justifcation for Machine Learning in IoTValue Amplify Consulting
 
OpenText Live: Modeling your business processes to new ways of working
OpenText Live: Modeling your business processes to new ways of workingOpenText Live: Modeling your business processes to new ways of working
OpenText Live: Modeling your business processes to new ways of workingOpenText Portfolio
 
VMWorld 2009 - Gebelin Getting To Yes!
VMWorld 2009 -  Gebelin Getting To Yes!VMWorld 2009 -  Gebelin Getting To Yes!
VMWorld 2009 - Gebelin Getting To Yes!cgebelin
 
Chap 7.4 Control Cost
Chap 7.4   Control CostChap 7.4   Control Cost
Chap 7.4 Control CostAnand Bobade
 
Effective Cost Measurement through DMAIC.
Effective Cost Measurement through DMAIC.Effective Cost Measurement through DMAIC.
Effective Cost Measurement through DMAIC.Kaustav Lahiri
 
Nagios Conference 2014 - Jose Marroquin - How Revenue Increased After Impleme...
Nagios Conference 2014 - Jose Marroquin - How Revenue Increased After Impleme...Nagios Conference 2014 - Jose Marroquin - How Revenue Increased After Impleme...
Nagios Conference 2014 - Jose Marroquin - How Revenue Increased After Impleme...Nagios
 
desai_wharton2002
desai_wharton2002desai_wharton2002
desai_wharton2002Vijay Desai
 
Board Deck Template for SaaS Companies
 Board Deck Template for SaaS Companies Board Deck Template for SaaS Companies
Board Deck Template for SaaS Companiesserenacapital
 
PF_EarnedValuePresentation.ppt
PF_EarnedValuePresentation.pptPF_EarnedValuePresentation.ppt
PF_EarnedValuePresentation.pptyogeshagrawal84
 
EARNED VALUE MANAGEMENT ANALYS 1.ppt
EARNED VALUE MANAGEMENT ANALYS 1.pptEARNED VALUE MANAGEMENT ANALYS 1.ppt
EARNED VALUE MANAGEMENT ANALYS 1.pptBetshaTizazu1
 
agilefinancenarrated-190414134302.pptx
agilefinancenarrated-190414134302.pptxagilefinancenarrated-190414134302.pptx
agilefinancenarrated-190414134302.pptxssuser1ecf25
 
Maximizing the Impact of Your Projects
Maximizing the Impact of Your ProjectsMaximizing the Impact of Your Projects
Maximizing the Impact of Your ProjectsBrandon Olson
 
Encoursa Webinar: Developing Your First Cost and Price Proposal
Encoursa Webinar: Developing Your First Cost and Price ProposalEncoursa Webinar: Developing Your First Cost and Price Proposal
Encoursa Webinar: Developing Your First Cost and Price ProposalRobert E Jones
 
Vocera investordeck web january 2018
Vocera investordeck  web january 2018Vocera investordeck  web january 2018
Vocera investordeck web january 2018vocera2016ir
 
Financial Modeling for HCI/Cloud
Financial Modeling for HCI/CloudFinancial Modeling for HCI/Cloud
Financial Modeling for HCI/CloudNEXTtour
 

Similar to Project Management. Automation BPM (20)

Project Management Analysis for WNS
Project Management Analysis for WNSProject Management Analysis for WNS
Project Management Analysis for WNS
 
Rpa conference new delhi
Rpa conference new delhiRpa conference new delhi
Rpa conference new delhi
 
Rapid Economic Justifcation for Machine Learning in IoT
Rapid Economic Justifcation for Machine Learning in IoTRapid Economic Justifcation for Machine Learning in IoT
Rapid Economic Justifcation for Machine Learning in IoT
 
day 3 PMP.pptx
day 3 PMP.pptxday 3 PMP.pptx
day 3 PMP.pptx
 
OpenText Live: Modeling your business processes to new ways of working
OpenText Live: Modeling your business processes to new ways of workingOpenText Live: Modeling your business processes to new ways of working
OpenText Live: Modeling your business processes to new ways of working
 
VMWorld 2009 - Gebelin Getting To Yes!
VMWorld 2009 -  Gebelin Getting To Yes!VMWorld 2009 -  Gebelin Getting To Yes!
VMWorld 2009 - Gebelin Getting To Yes!
 
Chap 7.4 Control Cost
Chap 7.4   Control CostChap 7.4   Control Cost
Chap 7.4 Control Cost
 
Effective Cost Measurement through DMAIC.
Effective Cost Measurement through DMAIC.Effective Cost Measurement through DMAIC.
Effective Cost Measurement through DMAIC.
 
Project initiation
Project initiationProject initiation
Project initiation
 
ROI of Machine Learning In IoT
ROI of Machine Learning In IoTROI of Machine Learning In IoT
ROI of Machine Learning In IoT
 
Nagios Conference 2014 - Jose Marroquin - How Revenue Increased After Impleme...
Nagios Conference 2014 - Jose Marroquin - How Revenue Increased After Impleme...Nagios Conference 2014 - Jose Marroquin - How Revenue Increased After Impleme...
Nagios Conference 2014 - Jose Marroquin - How Revenue Increased After Impleme...
 
desai_wharton2002
desai_wharton2002desai_wharton2002
desai_wharton2002
 
Board Deck Template for SaaS Companies
 Board Deck Template for SaaS Companies Board Deck Template for SaaS Companies
Board Deck Template for SaaS Companies
 
PF_EarnedValuePresentation.ppt
PF_EarnedValuePresentation.pptPF_EarnedValuePresentation.ppt
PF_EarnedValuePresentation.ppt
 
EARNED VALUE MANAGEMENT ANALYS 1.ppt
EARNED VALUE MANAGEMENT ANALYS 1.pptEARNED VALUE MANAGEMENT ANALYS 1.ppt
EARNED VALUE MANAGEMENT ANALYS 1.ppt
 
agilefinancenarrated-190414134302.pptx
agilefinancenarrated-190414134302.pptxagilefinancenarrated-190414134302.pptx
agilefinancenarrated-190414134302.pptx
 
Maximizing the Impact of Your Projects
Maximizing the Impact of Your ProjectsMaximizing the Impact of Your Projects
Maximizing the Impact of Your Projects
 
Encoursa Webinar: Developing Your First Cost and Price Proposal
Encoursa Webinar: Developing Your First Cost and Price ProposalEncoursa Webinar: Developing Your First Cost and Price Proposal
Encoursa Webinar: Developing Your First Cost and Price Proposal
 
Vocera investordeck web january 2018
Vocera investordeck  web january 2018Vocera investordeck  web january 2018
Vocera investordeck web january 2018
 
Financial Modeling for HCI/Cloud
Financial Modeling for HCI/CloudFinancial Modeling for HCI/Cloud
Financial Modeling for HCI/Cloud
 

Recently uploaded

Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024VictoriaMetrics
 
WSO2CON 2024 Slides - Open Source to SaaS
WSO2CON 2024 Slides - Open Source to SaaSWSO2CON 2024 Slides - Open Source to SaaS
WSO2CON 2024 Slides - Open Source to SaaSWSO2
 
WSO2CON 2024 - Building the API First Enterprise – Running an API Program, fr...
WSO2CON 2024 - Building the API First Enterprise – Running an API Program, fr...WSO2CON 2024 - Building the API First Enterprise – Running an API Program, fr...
WSO2CON 2024 - Building the API First Enterprise – Running an API Program, fr...WSO2
 
%in kempton park+277-882-255-28 abortion pills for sale in kempton park
%in kempton park+277-882-255-28 abortion pills for sale in kempton park %in kempton park+277-882-255-28 abortion pills for sale in kempton park
%in kempton park+277-882-255-28 abortion pills for sale in kempton park masabamasaba
 
%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...
%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...
%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...masabamasaba
 
What Goes Wrong with Language Definitions and How to Improve the Situation
What Goes Wrong with Language Definitions and How to Improve the SituationWhat Goes Wrong with Language Definitions and How to Improve the Situation
What Goes Wrong with Language Definitions and How to Improve the SituationJuha-Pekka Tolvanen
 
%+27788225528 love spells in Huntington Beach Psychic Readings, Attraction sp...
%+27788225528 love spells in Huntington Beach Psychic Readings, Attraction sp...%+27788225528 love spells in Huntington Beach Psychic Readings, Attraction sp...
%+27788225528 love spells in Huntington Beach Psychic Readings, Attraction sp...masabamasaba
 
tonesoftg
tonesoftgtonesoftg
tonesoftglanshi9
 
Crypto Cloud Review - How To Earn Up To $500 Per DAY Of Bitcoin 100% On AutoP...
Crypto Cloud Review - How To Earn Up To $500 Per DAY Of Bitcoin 100% On AutoP...Crypto Cloud Review - How To Earn Up To $500 Per DAY Of Bitcoin 100% On AutoP...
Crypto Cloud Review - How To Earn Up To $500 Per DAY Of Bitcoin 100% On AutoP...SelfMade bd
 
VTU technical seminar 8Th Sem on Scikit-learn
VTU technical seminar 8Th Sem on Scikit-learnVTU technical seminar 8Th Sem on Scikit-learn
VTU technical seminar 8Th Sem on Scikit-learnAmarnathKambale
 
%in Stilfontein+277-882-255-28 abortion pills for sale in Stilfontein
%in Stilfontein+277-882-255-28 abortion pills for sale in Stilfontein%in Stilfontein+277-882-255-28 abortion pills for sale in Stilfontein
%in Stilfontein+277-882-255-28 abortion pills for sale in Stilfonteinmasabamasaba
 
Direct Style Effect Systems - The Print[A] Example - A Comprehension Aid
Direct Style Effect Systems -The Print[A] Example- A Comprehension AidDirect Style Effect Systems -The Print[A] Example- A Comprehension Aid
Direct Style Effect Systems - The Print[A] Example - A Comprehension AidPhilip Schwarz
 
Architecture decision records - How not to get lost in the past
Architecture decision records - How not to get lost in the pastArchitecture decision records - How not to get lost in the past
Architecture decision records - How not to get lost in the pastPapp Krisztián
 
Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...
Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...
Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...chiefasafspells
 
WSO2Con2024 - WSO2's IAM Vision: Identity-Led Digital Transformation
WSO2Con2024 - WSO2's IAM Vision: Identity-Led Digital TransformationWSO2Con2024 - WSO2's IAM Vision: Identity-Led Digital Transformation
WSO2Con2024 - WSO2's IAM Vision: Identity-Led Digital TransformationWSO2
 
%in tembisa+277-882-255-28 abortion pills for sale in tembisa
%in tembisa+277-882-255-28 abortion pills for sale in tembisa%in tembisa+277-882-255-28 abortion pills for sale in tembisa
%in tembisa+277-882-255-28 abortion pills for sale in tembisamasabamasaba
 
AI & Machine Learning Presentation Template
AI & Machine Learning Presentation TemplateAI & Machine Learning Presentation Template
AI & Machine Learning Presentation TemplatePresentation.STUDIO
 
%in Benoni+277-882-255-28 abortion pills for sale in Benoni
%in Benoni+277-882-255-28 abortion pills for sale in Benoni%in Benoni+277-882-255-28 abortion pills for sale in Benoni
%in Benoni+277-882-255-28 abortion pills for sale in Benonimasabamasaba
 
%in Soweto+277-882-255-28 abortion pills for sale in soweto
%in Soweto+277-882-255-28 abortion pills for sale in soweto%in Soweto+277-882-255-28 abortion pills for sale in soweto
%in Soweto+277-882-255-28 abortion pills for sale in sowetomasabamasaba
 

Recently uploaded (20)

Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
 
WSO2CON 2024 Slides - Open Source to SaaS
WSO2CON 2024 Slides - Open Source to SaaSWSO2CON 2024 Slides - Open Source to SaaS
WSO2CON 2024 Slides - Open Source to SaaS
 
WSO2CON 2024 - Building the API First Enterprise – Running an API Program, fr...
WSO2CON 2024 - Building the API First Enterprise – Running an API Program, fr...WSO2CON 2024 - Building the API First Enterprise – Running an API Program, fr...
WSO2CON 2024 - Building the API First Enterprise – Running an API Program, fr...
 
%in kempton park+277-882-255-28 abortion pills for sale in kempton park
%in kempton park+277-882-255-28 abortion pills for sale in kempton park %in kempton park+277-882-255-28 abortion pills for sale in kempton park
%in kempton park+277-882-255-28 abortion pills for sale in kempton park
 
%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...
%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...
%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...
 
What Goes Wrong with Language Definitions and How to Improve the Situation
What Goes Wrong with Language Definitions and How to Improve the SituationWhat Goes Wrong with Language Definitions and How to Improve the Situation
What Goes Wrong with Language Definitions and How to Improve the Situation
 
Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...
Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...
Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...
 
%+27788225528 love spells in Huntington Beach Psychic Readings, Attraction sp...
%+27788225528 love spells in Huntington Beach Psychic Readings, Attraction sp...%+27788225528 love spells in Huntington Beach Psychic Readings, Attraction sp...
%+27788225528 love spells in Huntington Beach Psychic Readings, Attraction sp...
 
tonesoftg
tonesoftgtonesoftg
tonesoftg
 
Crypto Cloud Review - How To Earn Up To $500 Per DAY Of Bitcoin 100% On AutoP...
Crypto Cloud Review - How To Earn Up To $500 Per DAY Of Bitcoin 100% On AutoP...Crypto Cloud Review - How To Earn Up To $500 Per DAY Of Bitcoin 100% On AutoP...
Crypto Cloud Review - How To Earn Up To $500 Per DAY Of Bitcoin 100% On AutoP...
 
VTU technical seminar 8Th Sem on Scikit-learn
VTU technical seminar 8Th Sem on Scikit-learnVTU technical seminar 8Th Sem on Scikit-learn
VTU technical seminar 8Th Sem on Scikit-learn
 
%in Stilfontein+277-882-255-28 abortion pills for sale in Stilfontein
%in Stilfontein+277-882-255-28 abortion pills for sale in Stilfontein%in Stilfontein+277-882-255-28 abortion pills for sale in Stilfontein
%in Stilfontein+277-882-255-28 abortion pills for sale in Stilfontein
 
Direct Style Effect Systems - The Print[A] Example - A Comprehension Aid
Direct Style Effect Systems -The Print[A] Example- A Comprehension AidDirect Style Effect Systems -The Print[A] Example- A Comprehension Aid
Direct Style Effect Systems - The Print[A] Example - A Comprehension Aid
 
Architecture decision records - How not to get lost in the past
Architecture decision records - How not to get lost in the pastArchitecture decision records - How not to get lost in the past
Architecture decision records - How not to get lost in the past
 
Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...
Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...
Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...
 
WSO2Con2024 - WSO2's IAM Vision: Identity-Led Digital Transformation
WSO2Con2024 - WSO2's IAM Vision: Identity-Led Digital TransformationWSO2Con2024 - WSO2's IAM Vision: Identity-Led Digital Transformation
WSO2Con2024 - WSO2's IAM Vision: Identity-Led Digital Transformation
 
%in tembisa+277-882-255-28 abortion pills for sale in tembisa
%in tembisa+277-882-255-28 abortion pills for sale in tembisa%in tembisa+277-882-255-28 abortion pills for sale in tembisa
%in tembisa+277-882-255-28 abortion pills for sale in tembisa
 
AI & Machine Learning Presentation Template
AI & Machine Learning Presentation TemplateAI & Machine Learning Presentation Template
AI & Machine Learning Presentation Template
 
%in Benoni+277-882-255-28 abortion pills for sale in Benoni
%in Benoni+277-882-255-28 abortion pills for sale in Benoni%in Benoni+277-882-255-28 abortion pills for sale in Benoni
%in Benoni+277-882-255-28 abortion pills for sale in Benoni
 
%in Soweto+277-882-255-28 abortion pills for sale in soweto
%in Soweto+277-882-255-28 abortion pills for sale in soweto%in Soweto+277-882-255-28 abortion pills for sale in soweto
%in Soweto+277-882-255-28 abortion pills for sale in soweto
 

Project Management. Automation BPM

  • 1. By Gerrit Maess | Lovelyn George| Ramon Rios R | Zainab Sayyed Project: Automation of Business Process Management System Service Provider Client
  • 2. WNS Introduction • Business process management company (Software and Web Services) • Headquarter is in Mumbai, India • The company serves over 200 Fortune 500 companies worldwide 1
  • 3. 2 Financial Models – Net Present Value and Payback Method Selected Methods
  • 4. 2 Non-Financial Models - Multi Weighted Scoring Matrix Selected Methods
  • 5. 2 Project Portfolio Matrix Selected Methods Net Present Value
  • 6. Why WNS Selected BPM Automation (Global Star Travels Project)?  Strategic Project with the highest Net Present Value (NPV) of $196,338  We can recover the investment in 10.9 months  Having the highest weight score of 72  This project is technological breakthrough with highest commercial payoff 3
  • 7. Defining  Planning  Executing  Delivering 2 Project Life Cycle
  • 9. Defining Project Scope Objective: To design an automated Business Process Management System using MS SQL Server and BI system within `12 months at a cost not to exceed $700,000. Priority Matrix: 4
  • 10. Specification Hardware:  Setup Database server  Setup Web Server  System down time < 4 hours Software:  BI system (middle and top management)  Web application system 4 Task Deliverables:  BI reports (Analytics tools) for middle and top management  Backend database system  Interfaces / Middleware compatible with existing front end solutions  Technical reference document Project Scope Checklist
  • 11. 5 Work Break Down Structure
  • 12. 3 Integration of WBS and OBS Cost Account The intersection of WP- Hardware Service and Organization IT department creates a cost account. By rolling up Hardware Service and Software License WP System (deliverable) cost is calculated.
  • 14. Bottom Up: Support Cost Est 6 Top-Down: Function Point Contract Bid Time and Cost Estimations Contract Bid Summary Costs Total Direct Cost $540,000.00 G&A overhead (10%) $54,000.00 Total Costs $594,000.00 Profit(17.5%) $103,950.00 Total Bid $697,950.00
  • 15. PERT 6 Time and Cost Estimations
  • 18. Resource Allocation Before Levelling: 230 days 6 After Leveling: 237 days
  • 21. Earned Value Chart 6 Indexes Period $0.00 $50,000.00 $100,000.00 $150,000.00 $200,000.00 $250,000.00 $300,000.00 Jan'16 Feb'16 Mar'16 Apr'16 May'16 Jun'16 Jul'16 Aug'16 Sep'16 Oct'16 Nov'16 Dec'16 ACWP BCWP BCWS Actual Cost Linear (ACWP) 0 0.2 0.4 0.6 0.8 1 1.2 Jan'16 Feb'16 Mar'16 Apr'16 May'16 Jun'16 Jul'16 Aug'16 Sep'16 Oct'16 Nov'16 Dec'16 SPI CPI CPI <1 indicates over cost, SPI <1 indicates behind scheduled. Status Report (Jul-16)
  • 22. Forecast EAC (July 16) EAC: $452,130 The final project projected cost forecast is $452,130 versus $ 240,256 originally planned. To Complete Performance Index TCPI: TCPI: 1.05 6
  • 23. 3 Crashing Activity Activity 52, 53, 93, 97 are crashed. It cost $7,400 and Project duration will be reduce by 8days.
  • 24. 3 Control Chart Period Status Report Task Name Finish Actual Finish Baseline Start Variance Finish Variance Total Variance 1 March 1st BPM Automation Mon 11/28/16 Mon 11/28/16 0 days 0 days 0 2 July 1st BPM Automation Thu 12/8/16 Mon 11/28/16 0 days 8 days -8 3 Oct 1st BPM Automation Mon 11/28/16 Thu 12/8/16 0 days -8 days 8 -20020 1 2 3 Variance Time Period
  • 25. 3 Conclusion  More time and cost should be spend in Planning Phase to avoid problems in later stages  Resource allocation might need to be reconsidered in Planning Phase  Through out project life cycle objectives should always be at the center of attention and decision making  Once project starts, a dedicated team has to monitor project performance for cost and schedule evaluation periodically - If required revise time phased schedule  Based on status report and performance indices, actions like crashing or scope creep have to be taken into consideration
  • 26. Thank you for your attention! Questions? 7