1. Eng. Qasim Irshid CV
Page 1 of 12
More than 30 years experience in the business of construction. The
following job titles I may occupy comfortably:
Project Management, Construction Management, Contract Administration, Claims,Estimation,
Planning,Quantity Surveying, Costingand Pricing,Fabrication,Risk Management, Technical support&
Procurement…..I have the ability to work on and manage several projects
Eng. Qasim A. Irshid
Mobile#+966-50 661 4418
qasimirshid1@hotmail.com:Email
Gender:Male
Date of Birth: 27/09/1958
Nationality:Jordan
Current location:Riyadh-Saudi Arabia
Preferredlocations:Anywhere inSaudi Arabia/Gulf Countries
Education:
B.Sc. in EngineeringScience-Civil 1983
Lancaster University– UK (1980-1983)
A-Levels(Pure Math,AppliedMathandPhysics)
Dacorum College –UK (1978-1980)
Languages:
Arabic (Native) and English(Fluent)
Computerskills:
Excel/word/AutoCad/Planning-Scheduling
2. Eng. Qasim Irshid CV
Page 2 of 12
Work Experience:
Nucleus Construction Est. 07/03/2011-Present
Exit 2 Riyadh:Al Ajlan Commercial office Buildings-1
ranageMProject2015-2012
Precast/pre - stressedconcrete columns, beams, shear walls, hollow
core slabs and external wall panel claddings.
2 basements, GF, FF & Penthouse
66000 M2 TOTAL – SR 330M
Riyadh–illa Housing Complex: MalqaVAl Dwayyan-2
anagerMProject2015-2014
Cast - in- place reinforcedconcrete –Ribbed Hordi Slabs
3 Typical Villas (1300 M2 each)
1 Main Villa& Annex (3600 M2)
4 other servicebuildings ---SR. 48M
Riyadh-Al Khuzama Residential Building: King Khalid Road-3
anagerMProject2015-2014
hordi slabsRibbed–place reinforcedconcrete-in-Cast
42 flats – Basement, GF, FF, SF & Roof (10800 M2 Total – SR. 35M)
Tower: Exit 4 RiyadhOffice/hotelHital-4
anagerMProject2014-2013
place reinforcedconcrete-in-slabs &CastConcretetensioned-Post
4 basements, GF + 17 Floors
4. Eng. Qasim Irshid CV
Page 4 of 12
Al Harbi Trading and Contracting Co.
02/01/2011-06/03/2011
Headof Purchasers-1
Sourcing out all materials and services according to material requests
forwarded to the purchasing departmentfromall sites
Hanam for Construction and Contracting Est.
01/09/2010-01/01/2011
UniversityPrincess Noura-1
SupervisorFinishing works
Block-work – Plastering- Gypsum-Partitions- Floor Tiling- wall Tiling and Natural
Stone Mechanical Fixing.
Tannah United Company
12/11/1996-31/08/2010
1-Technical Engineer atTechnical Office
Supervising and preparing Shop drawings of built-in Furniture
Wooden Doors, Reception Counters, NurseStations, Built-in Wardrobes,
Kitchen Cabinets and vanities
2-InstallationManager
3-ProductionManager atplant- Establishing production and fabrication
lines- planning
4-Site Engineer: Supervised theconstruction of Factory officebuilding,
warehouseand paint shop.
5. Eng. Qasim Irshid CV
Page 5 of 12
Dar Al Khubara Est.
199611/11/-199502/04/
1-Executive Manager:Wood Industries
Tannah United Company
199501/04/-02/04/1989
1-SH. Abdulrahman AlHudaithy Palace SR. 25M.
Project Engineer
2-Eng. Sulaiman Al Hudaithy Villa SR.17M
ConstructionManager
3-Eng. Saleh Al Hudaith Villa compound – SR. 21M
Project Manager
4-Sh. Ali Al Hudaithy Palace SR. 33M
Interior Finishes & Decoration Supervisor
5-MR. IbrahimAl Hudaithy Mosque –SR. 45M
Owner’s Representative
6-Al Hudaitht Mall – Al Kharj – SR. 180M
Project Manager
7-Mr. Mesfer Al Hudaithy Villa – SR. 15.5M
Project Manager
6. Eng. Qasim Irshid CV
Page 6 of 12
Civil Establishmentfor road Construction
25/03/1989-819802/04/
1-Riyadh Municipality – Central Heating and Air Conditioning Building
SR. 15M
Project Manager
2-MOFA – Pumping SewageStation SR. 10M
Project Manager
3- Severalroads and streets inside Riyadh city. SR. 76M
Technical Site Engineer
Kasim Al-Akil Contracting Est.
8198/036/2-198530/10/
1-PrivateVilla and 2 Commercial/Residential Buildings SR. 22M
Owner Representative
Al Sarif Corporatioon
5/1980/129-1985/04/20
1-Technical Engineer atTechnical Office
Rayek Kamel Engineering Office
198531/01/-198312/07/
1-Soil and FoundationEngineer
7. Eng. Qasim Irshid CV
Page 7 of 12
Full knowledge of the following works:
Costing & pricing of all types of work (Div 1-16)
Quantity Survey of all works
Statement Methods for all types of work
Surveying (coordinates and leveling, volumes & areas)
Excavation, Backfilling & Waterproofing
Cast-In-Place, Precast & Post-tensioned Concrete
Dewatering / Retaining walls
External and Internal Finishes
mechanical works-Excellent understanding of Electro
Swimming pools, Elevators, Building Maintenance Units (BMU), HVAC, Fire alarm &
Fighting systems, Plumbing (H&C Water Supplies) , Storm water and sanitary
drainage, grounding, lighting, power, low current, audio-video systems & BMS
esponsibilitiesR
* Monitoring external suppliers in relation to project
management schedules, use of sub-contractors, and on-siteconstruction
engineering activities
* Planning, executing, and finalization (commissioning) of
projects in line with strict deadlines and within budget and
Specifications
* Managing resources and coordinating the effortsof team
members in order to deliver project according to plan
Defining objectives and overseeing thequality control
throughoutits life cycle
* Participating in the formulation and implementation of the
ProjectManagement strategy
* Managing day-to-day operations to ensurehigh performance
standards in line with projectplan
8. Eng. Qasim Irshid CV
Page 8 of 12
* Ensuring that the quality of materials and the installation of
work (workmanship) arein accordancewith the criteria identified for
the project
* Following up of the preparation of BidSummaries in
conjunction with the Contracts / Commercial Departments
* Interact on day to day basis with the procurementand logistics
team
* Recommending the award of subcontract work
* Receiving of all relevant information regarding design drawings
and engineering
* Reviewing with the site staff and the Planning Engineer the
detailedprograms for the execution of the project
* All aspects of the project Quality Management and Control
system
* Ensuring that suitably qualifiedpersonnel required for the
projectare mobilized in a timely manner, as required
* Follow up all aspects related for project health, safety and
security
* Follow up with the purchasing section for the procurement of
material
* Reviewing the manpower requirements for the project
Ensureproper material planning*
Compilation of all necessary progress reports*
* Attending meetings with the Consultant, Client and
Subcontractors
Issuing instructions to the Subcontractors*
9. Eng. Qasim Irshid CV
Page 9 of 12
* Identifying and taking the necessary corrective action to
improvethe progress and quality of work (Risk Management)
* Handling of projectpetty cash, matters related to invoices,
payments
* Receiving and auctioning project correspondence* Writing
with other relevant staff
Staff training and appraisal*
* Follow up of execution of works according of agreed
procedures and methodstatements
* Issuing instruction to the ProjectEngineer to complete work in
accordancewith projectplanning and schedules and allocation
resources
* Monitoring all Subcontractors’ work closely to ensurethat the quality
of the work is as per specification and is completed on time
* Review of short-termplanning.
* Monitoring and compiling relevant information of production
rates.
* Conducting daily meetings with site staff to organizework for
the day / next day/week/next week/month/next month
*Handling of variations including supervision of submittals and
negotiations
*Report and update to management the progress on regular
basis
* Co-ordination with Head Office – purchase, cost control,
planning and estimation
*Follow up of timely preparation and submittal of “as-built”
drawings and O&M Manuals
10. Eng. Qasim Irshid CV
Page 10 of 12
* Produceperformance report and introduceappropriate
remedial measures monthly AND WHENrequired and necessary.
* Review the invoice of Client before issuing
I have an excellent experiencein
Construction...villas, malls, commercial & office buildings, warehouses, mosques,
towers, housing compounds
All types of structures: Steel, cast-in-place, precast, post-tension concrete
Surveying works: leveling, coordinates, areas, volumes
Excavation & Back-filling (earth works), water proofing
Architectural and Finishing works: block work, plastering, tiling (walls & floors),
stone/granite/marble works, gypsum works (false ceiling/wall partitioning), glass
works, painting
Planning: Management of Materials, Manpower & Machines (Equipment)
Coordination between all parties...client, designer, consultant, sub-contractors, local
authorities (Tele-communications, Traffic, Electric Company and Municipality)
Starting with the site visit prior to any activity until commissioning and handover the
works of the project/s to the full satisfaction of the client/s:
I have an adequate experience and technical knowledge to supervise and taking
total responsibility of all projects classified as:
Residential buildings, Housing Complex, Villas, Palaces, Mosques,
High Rise Buildings (Towers- offices, hotels, hospitals),
Warehouses, Factories,
Landscaping,
Commercial centers / Malls....
Comfortably, I can handle the following works from the start until the end:
Excavation,
Supporting sides of the excavation if necessary,
Filling & Back-filling
11. Eng. Qasim Irshid CV
Page 11 of 12
Dewatering as and when necessary...
Surveying works (locating coordinates of excavation and construction,
Leveling: fixing all levels according to shop drawings and/or as the case requires at
site depending on the ground and earth nature)
Shuttering / Form work for all types of
Foundation: Isolated/combined footings, Mat/ strip / raft foundation,
Columns (Square, rectangular, circular and other irregular shapes)
Beams (Dropped, cantilevered and inverted)
Slabs (Flat, waffle, Ribbed (Hordi), openings in slabs & recessed slabs for plumbing
and drainage requirements)
Shear walls (Elevator and service shafts & staircases)
Steel reinforcement - Preparing Bar Bending Schedules – BBS, placement and fixing
keeping concrete covers as specified in the shop drawings.
Waterproofing: all practices & systems in the industry
Vapor Barrier, Termite control
I have a very good experience in all internal and external finishing works:
Plastering, gypsum partitioning, false ceilings, wall cladding (Acoustic) , built-in-
furniture, counters, wardrobes, kitchen cabinets, DOORS ( wooden and metal-
Aluminum / glass...Curtain walls....Fire rating--- Flooring: Ceramic, Granite, Marble,
Stone, Raised floors
Quality Control and Quality Assurance fromday one to the project completion day
establishing, enforcing, monitoring and documenting
Checking, verifying & matching alldrawings together: Architectural, Structural & M
E P drawings and rectifying any Mismatch and discrepancies.
I can handle all detailing of structural, architectural & Finishes....
I can propose Statement Methods of all types of work...
Excellent coordination with all concerned parties...owners, consultants,
Sub-contractors, suppliers, Technical and administrative staffs
I can handle Quantity calculations for all types of work, costing and pricing
12. Eng. Qasim Irshid CV
Page 12 of 12
Preparing accumulative invoices - monthly or as agreed...
I am very keen and paying close attention to variations and changes...resulted from
any source ... work scope, quantity, delays, obstacles, Specification change....what so
ever, and claim such and get them approved by the authorized person.
I can supervise the preparation of Structural and Architectural Shop drawings...
Planning for Material Delivery, Labor mobilization and Equipment/Tools provision as
required on site.
Reporting: daily, weekly & monthly and whenever necessary.
I am excellent in Correspondence writing (English/Arabic) and document control.
END OF CV