Mooring Line Failures
Ref: Underlying causes of Mooring line Failures
24th March 2015
• 107 mooring incidents from 73 facilities across the industry (1997-2012)
• 51 single line failures – 9 multiple line failures
• 38 pre-emptive replacement events – 9 reports of severe degradation
• 150 lines replaced/repaired 2001-2011 (Ref: OTC 24181)
www.pulse-monitoring.com
Failures rate per line per year of exposure (1997 – 2014)
Mooring Line Failures
• Long term Mooring system design life: 15-25yrs
• 1:50 chance of a failure per asset per year
• Considering 25 years of design life: chance of 50% failure
during the lifetime of a mooring line
Ref: Underlying causes of Mooring line Failures
24th March 2015
50% chance of
failure of a
mooring line
www.pulse-monitoring.com
T
H
R
E
A
T
S
T
H
R
E
A
T
S
C
O
N
S
E
Q
U
E
N
C
E
S
C
O
N
S
E
Q
U
E
N
C
E
S
INCIDENTINCIDENT
Enhancing operational safety
Safety Barrier Principle
Fatigue
Corrosion
Overload
Multiple line failure
Loss of production
early detection of
single line failure
Monitoring fatigue
accumulation
N-1 design
Environmental
damage
Monitoring tension & fatigue
Extreme tensions and cumulative
fatigue issue
Detection of single mooring line failure
Preventative action to prevent multiple line
failure
Detection of large
tension events
www.pulse-monitoring.com
Pulse Mooring Monitoring Solutions
Topside tension (Load cells)
In-line tension (Inter-M Pulse)
Mooring line inclination
Excursion monitoring
www.pulse-monitoring.com
Main mooring monitoring technologies - comparison
How to Monitor?
Parameter Inclination In-line Tension Load Cells
Data
Communication
Acoustic Acoustic Hardwired
Data Availability On Demand On Demand Continuous
Direct Tension   
Battery Life
Dependent on
operating mode
Dependent on
operating mode
Unlimited
Reliability High High Low
Serviceable   
Retrofittable   
www.pulse-monitoring.com
Improving reliability
Mooring Integrity Monitoring
• Assist with development of specification
• Early involvement with project
• System redundancy
• Serviceable systems
DesignInstallation
• Robust installation procedure
• Use experience and best practice
• Cable management
• Smart integration
Operation
• Ongoing maintenance & service plan
• Data analysis and reporting
• Not “fit and forget”
www.pulse-monitoring.com 8
Questions on How to
specify a mooring line
monitoring system ?
www.pulse-monitoring.com
Contact Us
info@pulse-monitoring.com
www.pulse-monitoring.com

Weitere ähnliche Inhalte

Andere mochten auch

Ship handling basics
Ship handling basicsShip handling basics
Ship handling basicsmoney2j
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Engineers Australia
 
Lesson 2 Deck Equipment And Marlinspike Seamanship
Lesson 2 Deck Equipment And Marlinspike SeamanshipLesson 2 Deck Equipment And Marlinspike Seamanship
Lesson 2 Deck Equipment And Marlinspike SeamanshipGuilherme Azevedo
 
MOORING STATIONS - FOR MARITIME CADETS
MOORING STATIONS -    FOR MARITIME  CADETSMOORING STATIONS -    FOR MARITIME  CADETS
MOORING STATIONS - FOR MARITIME CADETSCapt.Vivek Trivedi
 
Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)DEEPAK SAHOO
 

Andere mochten auch (8)

Ship handling basics
Ship handling basicsShip handling basics
Ship handling basics
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems
 
Lesson 2 Deck Equipment And Marlinspike Seamanship
Lesson 2 Deck Equipment And Marlinspike SeamanshipLesson 2 Deck Equipment And Marlinspike Seamanship
Lesson 2 Deck Equipment And Marlinspike Seamanship
 
anchorage Fondeo
anchorage Fondeoanchorage Fondeo
anchorage Fondeo
 
MOORING STATIONS - FOR MARITIME CADETS
MOORING STATIONS -    FOR MARITIME  CADETSMOORING STATIONS -    FOR MARITIME  CADETS
MOORING STATIONS - FOR MARITIME CADETS
 
Floting Production Storage and Offloading
Floting Production Storage  and OffloadingFloting Production Storage  and Offloading
Floting Production Storage and Offloading
 
RCM
RCMRCM
RCM
 
Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)
 

Kürzlich hochgeladen

Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESNarmatha D
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...Amil Baba Dawood bangali
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 

Kürzlich hochgeladen (20)

Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIES
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 

Mooring Line Integrity Monitoring Solutions Overview

  • 2. www.pulse-monitoring.com Mooring Line Failures Ref: Underlying causes of Mooring line Failures 24th March 2015 • 107 mooring incidents from 73 facilities across the industry (1997-2012) • 51 single line failures – 9 multiple line failures • 38 pre-emptive replacement events – 9 reports of severe degradation • 150 lines replaced/repaired 2001-2011 (Ref: OTC 24181)
  • 3. www.pulse-monitoring.com Failures rate per line per year of exposure (1997 – 2014) Mooring Line Failures • Long term Mooring system design life: 15-25yrs • 1:50 chance of a failure per asset per year • Considering 25 years of design life: chance of 50% failure during the lifetime of a mooring line Ref: Underlying causes of Mooring line Failures 24th March 2015 50% chance of failure of a mooring line
  • 4. www.pulse-monitoring.com T H R E A T S T H R E A T S C O N S E Q U E N C E S C O N S E Q U E N C E S INCIDENTINCIDENT Enhancing operational safety Safety Barrier Principle Fatigue Corrosion Overload Multiple line failure Loss of production early detection of single line failure Monitoring fatigue accumulation N-1 design Environmental damage Monitoring tension & fatigue Extreme tensions and cumulative fatigue issue Detection of single mooring line failure Preventative action to prevent multiple line failure Detection of large tension events
  • 5. www.pulse-monitoring.com Pulse Mooring Monitoring Solutions Topside tension (Load cells) In-line tension (Inter-M Pulse) Mooring line inclination Excursion monitoring
  • 6. www.pulse-monitoring.com Main mooring monitoring technologies - comparison How to Monitor? Parameter Inclination In-line Tension Load Cells Data Communication Acoustic Acoustic Hardwired Data Availability On Demand On Demand Continuous Direct Tension    Battery Life Dependent on operating mode Dependent on operating mode Unlimited Reliability High High Low Serviceable    Retrofittable   
  • 7. www.pulse-monitoring.com Improving reliability Mooring Integrity Monitoring • Assist with development of specification • Early involvement with project • System redundancy • Serviceable systems DesignInstallation • Robust installation procedure • Use experience and best practice • Cable management • Smart integration Operation • Ongoing maintenance & service plan • Data analysis and reporting • Not “fit and forget”
  • 8. www.pulse-monitoring.com 8 Questions on How to specify a mooring line monitoring system ? www.pulse-monitoring.com Contact Us info@pulse-monitoring.com www.pulse-monitoring.com