 Airports are essential components of modern air
travel.
 An airport is an area of land that is used or
intended to be used for the landing and takeoff
of aircraft, and includes its buildings and
facilities, if any.
 Aircraft :-
An aircraft is a heavier-than-air flying machine,
which includes fixed and rotary wing vehicles:
airplanes, helicopters, gliders, ultralights,
gyrocopters, and unmanned aerial vehicles
(UAV’s).
Airport Engineering
Airport Site Layout
Components of Airport
RUNWAY- A runway is a defined rectangular
surface on an airport suitable for the landing or
takeoff of aircraft.
Runway–Strip provided specifically for landing
and take-off.
A single airport may have multiple runways.
Runways may be man-made (asphalt and/or
concrete) or natural surfaces such as ice, turf,
dirt, or sand.
TAXILANE
 Taxilanes provide access from taxiways to aircraft parking
positions and other terminal areas. Taxilanes are usually,
but not always, located outside the movement area on an
airport.
 TAXIWAY- A taxiway is a defined path established for the
taxiing of aircraft from one part of an airport to another.
 Taxiway design incorporates low speed and precise taxiing,
integrating safety as the basis of design. Taxiways are
generally hard surfaces, although some airports may use
gravel or grass.
 Airport guidance signs provide directions and information
to taxiing aircraft and airport vehicles.
Continued……
Continued……
Apron–Hard standing area where aircraft are parked.
 Passengers emplane/deplane here and cargo is
loaded/unloaded here. Fuelling and other servicing is
also carried out here.
 This is the paved area in front of terminal building
(between landing area and terminal building) for parking
of the aircraft, so that the loading unloading of the
passengers, baggage can be done.
 An apron is a surface (usually paved) that is employed
for various purposes, including aircraft tie downs, short
and long-term parking, fueling, washing, or
maintenance.
Continued……
 HANGAR
 Hangars are buildings used to maintain and store aircraft
for security and protection against wind and other
adverse weather conditions.
 Hangars vary in size and shape; box hangars can size
larger and multiple aircraft, while T-hangars maximize
the number of aircraft per apron area.
 Corporate hangars may have small offices and other
amenities. Standard hangar design includes safety
measures such as proper clearances, hazard mitigation
(fuel spills, fume accumulation, etc.), and security
considerations.
Continued……
 Hangars–A hangar is a closed structure to hold aircraft
or space craft in protective storage.
Used for–Protection from weather, protection from direct
sunlight, maintenance, repair, manufacture, assembly
and storage of aircraft on airfields.
Continued……
TERMINAL BUILDING-
 The terminal building is where passengers enter and exit
the airport facility. The terminal usually contains check-in
services, baggage handling, security checkpoints, and
gates that convey passengers to board and deplane an
aircraft.
 At small airports, a single terminal building serves all
functions of a terminal and concourse, while large
airports may have multiple concourses linked by tunnels,
walkways, or bridges.
 Satellite terminals allow aircraft to park around the
entire circumference of the building.
Engine Type and Propulsion
Size of aircraft
Aircraft weight and wheel configuration
Minimum turning radius
Minimum circling radius
Speed
Capacity
Noise
Vortices at tail ends
Jet Blast
Fuel Spillage
Aircraft Chacteristics
THANK YOU........

More Related Content

What's hot

What's hot (20)

TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERINGTRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
 
Terminal area
Terminal areaTerminal area
Terminal area
 
Air port presentation 6th unit
Air port presentation 6th unitAir port presentation 6th unit
Air port presentation 6th unit
 
Design Of Modern Airports (RGIA HYD)
Design Of Modern Airports (RGIA HYD)Design Of Modern Airports (RGIA HYD)
Design Of Modern Airports (RGIA HYD)
 
Runway orientation
Runway orientationRunway orientation
Runway orientation
 
Taxiway design
Taxiway designTaxiway design
Taxiway design
 
Design and planning of airport
Design and planning of airportDesign and planning of airport
Design and planning of airport
 
Airport obstructions
Airport obstructionsAirport obstructions
Airport obstructions
 
Components of Airfield
Components of AirfieldComponents of Airfield
Components of Airfield
 
Airport Planning & Terminal Building Design
Airport Planning & Terminal Building DesignAirport Planning & Terminal Building Design
Airport Planning & Terminal Building Design
 
Airport planning and Design
Airport planning and DesignAirport planning and Design
Airport planning and Design
 
Airport Layout
Airport LayoutAirport Layout
Airport Layout
 
HARBOURS ENGINEERING
HARBOURS ENGINEERING HARBOURS ENGINEERING
HARBOURS ENGINEERING
 
Airport Planning and Design
Airport Planning and Design Airport Planning and Design
Airport Planning and Design
 
Airport engineering
Airport engineeringAirport engineering
Airport engineering
 
Parking study
Parking studyParking study
Parking study
 
Spot speed studies and speed delay time survey
Spot speed studies and speed delay time surveySpot speed studies and speed delay time survey
Spot speed studies and speed delay time survey
 
Airport apron and holding bays
Airport apron and holding baysAirport apron and holding bays
Airport apron and holding bays
 
AIRPORT PLANNING AND DESIGN BY NIRANJAN
AIRPORT PLANNING AND DESIGN BY NIRANJANAIRPORT PLANNING AND DESIGN BY NIRANJAN
AIRPORT PLANNING AND DESIGN BY NIRANJAN
 
1.introduction
1.introduction1.introduction
1.introduction
 

Similar to Airport Components ppt.pptx

Similar to Airport Components ppt.pptx (20)

Airport Planning RHTA - VTU Module 4
Airport Planning RHTA - VTU Module 4Airport Planning RHTA - VTU Module 4
Airport Planning RHTA - VTU Module 4
 
Lecture 7 (1).pptx
Lecture 7 (1).pptxLecture 7 (1).pptx
Lecture 7 (1).pptx
 
Airport aprons & holding bays
Airport  aprons & holding baysAirport  aprons & holding bays
Airport aprons & holding bays
 
01 Problem Statement
01 Problem Statement01 Problem Statement
01 Problem Statement
 
Airport component & layout seminar report
Airport component & layout seminar reportAirport component & layout seminar report
Airport component & layout seminar report
 
Airport & railways engineering ce467 pdf
Airport & railways engineering   ce467 pdfAirport & railways engineering   ce467 pdf
Airport & railways engineering ce467 pdf
 
Airport terminal planning and design
Airport terminal planning and designAirport terminal planning and design
Airport terminal planning and design
 
Airport Planning and Design
Airport Planning and DesignAirport Planning and Design
Airport Planning and Design
 
airsight - Wind Turbines & Aviation Safety
airsight - Wind Turbines & Aviation Safetyairsight - Wind Turbines & Aviation Safety
airsight - Wind Turbines & Aviation Safety
 
As kumar
As kumarAs kumar
As kumar
 
Introduction to Airport Engineering ppt.pptx
Introduction to Airport Engineering ppt.pptxIntroduction to Airport Engineering ppt.pptx
Introduction to Airport Engineering ppt.pptx
 
Batangas Airport Philippines.pdf
Batangas Airport Philippines.pdfBatangas Airport Philippines.pdf
Batangas Airport Philippines.pdf
 
Batangas Airport.pdf
Batangas Airport.pdfBatangas Airport.pdf
Batangas Airport.pdf
 
Challenges to airport
Challenges to airportChallenges to airport
Challenges to airport
 
Terminal Design
Terminal DesignTerminal Design
Terminal Design
 
airport - configuration-1 Dr.Sherif El badaway
 airport - configuration-1 Dr.Sherif El badaway airport - configuration-1 Dr.Sherif El badaway
airport - configuration-1 Dr.Sherif El badaway
 
08-Airport Configuration-1 ( Highway and Airport Engineering Dr. Sherif El-Ba...
08-Airport Configuration-1 ( Highway and Airport Engineering Dr. Sherif El-Ba...08-Airport Configuration-1 ( Highway and Airport Engineering Dr. Sherif El-Ba...
08-Airport Configuration-1 ( Highway and Airport Engineering Dr. Sherif El-Ba...
 
Airport planning - Railways, airports, docks and harbour engineering (RAHE)
Airport planning - Railways, airports, docks and harbour engineering  (RAHE)Airport planning - Railways, airports, docks and harbour engineering  (RAHE)
Airport planning - Railways, airports, docks and harbour engineering (RAHE)
 
Presentation on Airport Engineering
Presentation on Airport EngineeringPresentation on Airport Engineering
Presentation on Airport Engineering
 
Upington Project (2)
Upington Project (2)Upington Project (2)
Upington Project (2)
 

Recently uploaded

1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 

Recently uploaded (20)

1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 

Airport Components ppt.pptx

  • 1. by Prof P.P. Dange (Assistant Professor) Department of Civil Engineering Sanjivani College of Engineering, Kopargaon, 423603 Subject :Infrastructural Projects B.Tech. Civil Airport Engineering Sanjivani Rural Education Society’s Sanjivani College of Engineering, Kopargaon, 423603 An Autonomous Institute Affiliated to Savitribai Phule Pune University, Pune ISO 9001-2015 Certified, Accredited by NAAC (A Grade)
  • 2.  Airports are essential components of modern air travel.  An airport is an area of land that is used or intended to be used for the landing and takeoff of aircraft, and includes its buildings and facilities, if any.  Aircraft :- An aircraft is a heavier-than-air flying machine, which includes fixed and rotary wing vehicles: airplanes, helicopters, gliders, ultralights, gyrocopters, and unmanned aerial vehicles (UAV’s). Airport Engineering
  • 4. Components of Airport RUNWAY- A runway is a defined rectangular surface on an airport suitable for the landing or takeoff of aircraft. Runway–Strip provided specifically for landing and take-off. A single airport may have multiple runways. Runways may be man-made (asphalt and/or concrete) or natural surfaces such as ice, turf, dirt, or sand.
  • 5. TAXILANE  Taxilanes provide access from taxiways to aircraft parking positions and other terminal areas. Taxilanes are usually, but not always, located outside the movement area on an airport.  TAXIWAY- A taxiway is a defined path established for the taxiing of aircraft from one part of an airport to another.  Taxiway design incorporates low speed and precise taxiing, integrating safety as the basis of design. Taxiways are generally hard surfaces, although some airports may use gravel or grass.  Airport guidance signs provide directions and information to taxiing aircraft and airport vehicles. Continued……
  • 6. Continued…… Apron–Hard standing area where aircraft are parked.  Passengers emplane/deplane here and cargo is loaded/unloaded here. Fuelling and other servicing is also carried out here.  This is the paved area in front of terminal building (between landing area and terminal building) for parking of the aircraft, so that the loading unloading of the passengers, baggage can be done.  An apron is a surface (usually paved) that is employed for various purposes, including aircraft tie downs, short and long-term parking, fueling, washing, or maintenance.
  • 7. Continued……  HANGAR  Hangars are buildings used to maintain and store aircraft for security and protection against wind and other adverse weather conditions.  Hangars vary in size and shape; box hangars can size larger and multiple aircraft, while T-hangars maximize the number of aircraft per apron area.  Corporate hangars may have small offices and other amenities. Standard hangar design includes safety measures such as proper clearances, hazard mitigation (fuel spills, fume accumulation, etc.), and security considerations.
  • 8. Continued……  Hangars–A hangar is a closed structure to hold aircraft or space craft in protective storage. Used for–Protection from weather, protection from direct sunlight, maintenance, repair, manufacture, assembly and storage of aircraft on airfields.
  • 9. Continued…… TERMINAL BUILDING-  The terminal building is where passengers enter and exit the airport facility. The terminal usually contains check-in services, baggage handling, security checkpoints, and gates that convey passengers to board and deplane an aircraft.  At small airports, a single terminal building serves all functions of a terminal and concourse, while large airports may have multiple concourses linked by tunnels, walkways, or bridges.  Satellite terminals allow aircraft to park around the entire circumference of the building.
  • 10. Engine Type and Propulsion Size of aircraft Aircraft weight and wheel configuration Minimum turning radius Minimum circling radius Speed Capacity Noise Vortices at tail ends Jet Blast Fuel Spillage Aircraft Chacteristics