VALIDATION AND CALIBRATION
OF MASTER PLAN
By
B.Prinkha.
M.Pharm 1st year
Modern pharmaceutics
CONTENT
 INTRODUCTION
 OBJECTIVE OF VALIDATION
 VALIDATION MASTER PLAN
 INTRODUCTION
 MEMBERS OF VMP
 CONTENT OF VMP
 CALIBRATION MASTER PLAN
 INTRODUCTION
 CALIBRATION PROCESS
 TIME INTERVAL OF CALIBRATION
 MAINTAINANCE OF RECORDS
 LABELLING
INTRODUCTION
VALIDATION DEFINITION:
According to FDA:
“Establishing the documented evidence which provides a high degree of
assurance that a specific process will consistently produce a product of
predetermined specifications and quality attributes”.
QUALIFICATION DEFINITION:
“Documented evidence that premises, systems or equipment are able to achieve
the predetermined specifications properly installed, and/or work correctly and lead to
the expected results”.
QUALIFICATION OR VALIDATION?
A system/equipment/premises must be Qualified to operate/work in a Validated
process:
QUALIFY: A system and/or equipment
VALIDATE: A process
Example: Qualify an autoclave, whereas you Validate a Sterilization process.
OBJECTIVES OF VALIDATION
 To reduces risk of regulatory non-compliance.
 To reduce the time to the market for the new products.
 To eliminate the scrap & reduces the defect cost.
 To reduce chances of product re-call from market.
 To accelerate the final release of the product batch.
 It requires less in-process control & end process testing.
 Amplified release of batch can be achieved in validation.
VALIDATION MASTER PLAN
A document that provides information on
company’s validation program.
It should define the details and time scales for
validation work to be performed.
Responsibilities relating to the plan should be
stated.
VALIDATION MASTER PLAN(VMP)
 A Validation Master Plan, also referred to as "VMP", outlines the principles
involved in the qualification of a facility, defining the areas and systems to be
validated, and provides a written program for achieving and maintaining a
qualified facility.
 A VMP is the foundation for the validation program and should include process
validation, facility and utility qualification and validation, equipment
qualification, cleaning and computer validation.
 It is a key document in the GMP (Good manufacturing practice) regulated
pharmaceutical industry as it drives a structured approach to validation projects.
 Food and Drug Administration inspectors often look at VMPs during audits to see
whether or not a facility's validation strategy is well thought-out and organized.
 A VMP should have logical reasoning for including or excluding every system
associated with a validation project based on a risk assessment.
VALIDATION
VMP
Basic Risk Analysis
(BRA)
Detailed Risk Analysis(RA)
QUALIFICATION
VALIDATION OF
COMPUTERIZED SYSTEM
VALIDATION
DESIGN
QUALIFICATION(DQ)
INSTALLATION
QUALIFICATION(IQ)
OPERATIONAL
QUALIFICATION(OQ)
PERFORMANCE
QUALIFICATION(PQ)
PROCESS VALIDATION
CLEANING VALIDATION
ANALYTICAL METHODS
VALIDATION
MEMBERS OF VMP
 Validation manager(quality assurance department)
 Member from production
 Members of engineering
 Members from calibration lab
 Members from QC lab
 Members from maintenance
 Members from HVAC department
 Members from product development lab
CONTENT OF VMP
(FACTORS TO BE CONSIDERED)
 Introduction
 Methodology
 Qualification
 Personnel
 Schedule
 Preventive maintenance
 Change control
 Procedure
 Documentation
 Appendices
 INTRODUCTION
 This section is written as an introduction to the validation process and the facility,
and it is intended to set the scene.
 The introduction of a VMP should include following details:-
• A description of facility, its premises and equipment, and its purpose
intension and scope of validation.
• Other relevant site policies and plans, like factory or corporate policy
statement on GMP, QA, etc.,.
 METHODOLOGY
 This section should address the predetermined requirements by identifying the
standards that are to be applied to the facility.
 These are then used in the development of the acceptance criteria that are used to
judge the validation
 It also involves planning and execution of documents such as, protocols, records,
reports, or other.
 The standard will involve three elements:
 Regulatory and guidance documents
 National standards
 Company standards
 QUALIFICATION
 This section encompasses all aspects of the design, procurement, installation, and
commissioning process.
 The important issue is to ensure that definitions in the organization and for a
specific project are consistent and cover all aspects of the validation process, and
that the validation structure and organization is clear to any inspection authority.
Qualification Purpose
Design
Qualification(DQ)
Design specifications to ensure that all specified design elements have
been included and that
• the design meets the relevant regulatory and statutory
requirements.
Installation
Qualification(IQ)
Verifies that
• the equipment/system/process is installed correctly
• supplied as specified
• integrated into the site calibration, maintenance systems and
available for use.
Operational
Qualification(OQ)
Verifies that
• the equipment/system/process is operating correctly,
• compliant with functionality requirements and
• integrated into the systems and QMS.
Performance
Qualification(PQ)
Verifies that
• the equipment/system/process is continuously meeting
performance criteria for routine use and
• performing adequately for routine use in commercial production.
 PERSONNEL
 The CFR 21 states “ Each person engaged in and each person responsible for
supervising the manufacture, processing, packaging or holding a drug product
shall have the education, training, and experience, or a combination thereof, to
enable that person to perform the assigned functions.”
 The VMP should lay down the principles for personnel requirements. It must
address the aspects like; experience of personnel (written biographies or CV), in-
house training reports, etc,.
 Documenting the training is essential and is a requisite of the GMPs.
 SCHEDULE
 This is the responsibility of Site maintenance and Operation department. This
activity should be performed during the design phase, and the documentation
required should be, included in the requisition.
 PREVENTIVE MAINTENANCE
 The work program is essential and should be prepared at an early stage.
 A good plan will contain all the necessary features which are to be considered
during execution of a plan and determines the control of the project.
 It ensures that all the personnel involved in the VMP are not only aware of the
engineering targets, but also the validation targets.
 CHANGE CONTROL
 These cover engineering standards used in the project design, through to
commissioning phases, and the facilities standard procedures (SOPs).
 PROCEDURE
 This section of VMP should lay down requirements for a set of procedures for
change control that cover:
• The project through design, construction, and commissioning
• The ongoing change that will inevitably occur in both the process and the
equipment and engineering aspects.
 DOCUMENTATION
 The appendix is mostly used VMP to hold the information of type of documents
and formats that will be used in the execution stage.
 APPENDICES
 This section usually used to identify the documentation that should be produced
for the processing like;
• Engineering drawing
• Equipment supplier drawing and documents
• Factory acceptance documents
• IQ documents
• OQ documents
• PQ documents
CALIBRATION MASTER PLAN
INTRODUCTION
 “Automatic, mechanical, or electronic equipment or other types of equipment,
including computers, or related systems that will perform a function satisfactorily,
may be used in the manufacture, processing, packing, and holding of a drug
product. If such equipment is so used, it shall be routinely calibrated, inspected, or
checked according to a written program designed to assure proper performance.
Written records of those calibration checks and inspections shall be maintained.”
-US Code of Federal Regulations, 21 CFR 211.68
CALIBRATION DEFINITION:
 The process of comparing the response of some instrument or system to a standard
instrument or system over some measurement range.
 It is based on the comparison of a primary standard or instrument of known
accuracy with another equipment (to be calibrated).
 It is used to detect, correlate, report or eliminate by adjustment of any variation in
the accuracy of the equipment being calibrated.
CALIBRATION MASTER PLAN:
 CMP is defined as a leading document in defining the requirement necessary for
establishing and implementing an effective calibration control program.
CALIBRATION PROCESS
 Calibration process must be managed and executed in a professional manner.
 A particular place for all calibration operations to take place and keeping all
instruments for calibration.
 A separate room is preferred:
• Better environmental control
• Better protection against unauthorized handling or use of the calibration
equipment.
 The performance of all calibration operations is assigned as the clear
responsibility of just one person.
 Calibration procedures, used for quality control functions, are controlled by the
international standards ISO 9000.
CALIBRATION PROCESS
 MASTER INSTRUMENT LIST
• Serial Number
• Name of Instrument
• Location
• Accuracy Required
• Range of Measurement
• Calibration Done Date
• Due Date for Next Calibration
• Calibration Certificate Number & Date
 EQUIPMENT CLASSIFICATION
• Critical equipment:
 Direct measurement that affect the final product quality.
 Measurement on critical process parameters in the process specification
• Non critical equipment:
 Indirect measurement that will not directly affect the final product quality
 Shall be maintained based on company maintenance schedule
 VERIFICATION
• Applicable to equipment that cannot be calibrated (adjustment,
correlation, etc)
• Verification against measurement standard with correction factor
documented
• Actual reporting of result shall include the correction factor
• Temperature correction factor “- 2℃”.
 Measured value: 24℃
 Reported value = 24℃ –2℃= 22℃
 OUT OF CALIBRATION
• Remove equipment from use
• Out of Calibration Investigation to be carried out to determine the source of
inaccuracy
• Evaluate the impact of OOC result on the final product quality and other
previously measured data
• All investigation findings should be documented.
 CALIBRATION CERTIFICATE
• Name and address of contracted calibration laboratory
• Name and address of client
• Description and identification of item calibrated
• Environment conditions when calibration was made
• Date of receipt of instrument, date of calibration date of next calibration
• Calibration method
• Result of calibration
• Signature and title of person responsible for the calibration
• External calibration contract shall be awarded to Accredited by the nation
institution
TIME INTERVAL OF CALIBRATION
Depending on:
 Classification of Critical or non-critical
Usage (light or heavy usage)
Handling (light or heavy handling)
 Manufacturer’s recommendation
 Reference to NIST or accreditation body guideline for a specific
measurement system
MAINTANANCE OF RECORD OF CALIBRATION
 Records will be maintained for all the calibrations done
 It should be according to the cGMP
 The individual calibration history files will be prepared and maintained for each
instrument
 The records will be maintained and stored in the metrology or QA department
LABELLING
 All calibrated equipment's are labelled or coded to indicate its status
 Labels should be design and made of material suitable to working environment
 Following declarations are to be made after calibration
 “calibrated”
 “calibration required”
 The label should contain
 Date of last calibration
 Date of recalibration
 Person responsible for calibration
 Calibration certificate number.
Validation and calibration of master plan

More Related Content

What's hot

Objectives and policies of cGMP & Inventory management and control
Objectives and policies of cGMP & Inventory management and controlObjectives and policies of cGMP & Inventory management and control
Objectives and policies of cGMP & Inventory management and controlArul Packiadhas
 
API, BIOLOGICS,NOVEL,THERAPIES........pptx
API, BIOLOGICS,NOVEL,THERAPIES........pptxAPI, BIOLOGICS,NOVEL,THERAPIES........pptx
API, BIOLOGICS,NOVEL,THERAPIES........pptxPawanDhamala1
 
Consolidation, effect of friction, distribution of forces, compaction profile
Consolidation, effect of friction, distribution of forces, compaction profileConsolidation, effect of friction, distribution of forces, compaction profile
Consolidation, effect of friction, distribution of forces, compaction profileZahid1392
 
Objectives and policies of c gmp, layout of building and services
Objectives and policies of c gmp, layout of building and servicesObjectives and policies of c gmp, layout of building and services
Objectives and policies of c gmp, layout of building and servicesSharwari Sapate
 
Current Good Manufacturing Practices(cGMP) and industrial management
Current Good Manufacturing Practices(cGMP) and industrial managementCurrent Good Manufacturing Practices(cGMP) and industrial management
Current Good Manufacturing Practices(cGMP) and industrial managementMahewash Sana Pathan
 
cGMP AND INDUSTRIAL MANAGEMENT
cGMP AND INDUSTRIAL MANAGEMENTcGMP AND INDUSTRIAL MANAGEMENT
cGMP AND INDUSTRIAL MANAGEMENTJayeshRajput7
 
Cmc, post approval and regulation
Cmc, post approval and regulationCmc, post approval and regulation
Cmc, post approval and regulationHimal Barakoti
 
Mp(theories of dispersion) seminar
Mp(theories of dispersion) seminarMp(theories of dispersion) seminar
Mp(theories of dispersion) seminarSachin G
 
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptxPharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptxMariaSaifee
 
Self Micro Emulsifying Drug Delivery System
Self Micro Emulsifying Drug Delivery SystemSelf Micro Emulsifying Drug Delivery System
Self Micro Emulsifying Drug Delivery SystemSagar Savale
 
Post approvai regulatory affairs
Post approvai regulatory affairsPost approvai regulatory affairs
Post approvai regulatory affairsJyotiMhoprekar
 
Government regulation in pharmaceutical validation
Government regulation in pharmaceutical validationGovernment regulation in pharmaceutical validation
Government regulation in pharmaceutical validationVaishnaviRaut6
 
Rate controlled drug delivery system
Rate controlled drug delivery systemRate controlled drug delivery system
Rate controlled drug delivery systemPankaj Verma
 
validation of dosage forms
validation of dosage formsvalidation of dosage forms
validation of dosage formsTejaswi Reddy
 
Drug excipient interaction different method
Drug excipient interaction different methodDrug excipient interaction different method
Drug excipient interaction different methodROHIT
 
Study of consolidation parameters
Study of consolidation parametersStudy of consolidation parameters
Study of consolidation parametersMehak AggarwAl
 
Kinetics of Stability & Stability Testing
Kinetics of Stability & Stability Testing Kinetics of Stability & Stability Testing
Kinetics of Stability & Stability Testing Sidharth Mehta
 
Self micro-emulsifying drug delivery system (SMEDDS)
Self micro-emulsifying drug delivery system (SMEDDS)Self micro-emulsifying drug delivery system (SMEDDS)
Self micro-emulsifying drug delivery system (SMEDDS)Himal Barakoti
 
Us registration for foreign drugs
Us registration for foreign drugsUs registration for foreign drugs
Us registration for foreign drugsNiva Rani Gogoi
 

What's hot (20)

Objectives and policies of cGMP & Inventory management and control
Objectives and policies of cGMP & Inventory management and controlObjectives and policies of cGMP & Inventory management and control
Objectives and policies of cGMP & Inventory management and control
 
API, BIOLOGICS,NOVEL,THERAPIES........pptx
API, BIOLOGICS,NOVEL,THERAPIES........pptxAPI, BIOLOGICS,NOVEL,THERAPIES........pptx
API, BIOLOGICS,NOVEL,THERAPIES........pptx
 
Consolidation, effect of friction, distribution of forces, compaction profile
Consolidation, effect of friction, distribution of forces, compaction profileConsolidation, effect of friction, distribution of forces, compaction profile
Consolidation, effect of friction, distribution of forces, compaction profile
 
Preformulation concept
Preformulation conceptPreformulation concept
Preformulation concept
 
Objectives and policies of c gmp, layout of building and services
Objectives and policies of c gmp, layout of building and servicesObjectives and policies of c gmp, layout of building and services
Objectives and policies of c gmp, layout of building and services
 
Current Good Manufacturing Practices(cGMP) and industrial management
Current Good Manufacturing Practices(cGMP) and industrial managementCurrent Good Manufacturing Practices(cGMP) and industrial management
Current Good Manufacturing Practices(cGMP) and industrial management
 
cGMP AND INDUSTRIAL MANAGEMENT
cGMP AND INDUSTRIAL MANAGEMENTcGMP AND INDUSTRIAL MANAGEMENT
cGMP AND INDUSTRIAL MANAGEMENT
 
Cmc, post approval and regulation
Cmc, post approval and regulationCmc, post approval and regulation
Cmc, post approval and regulation
 
Mp(theories of dispersion) seminar
Mp(theories of dispersion) seminarMp(theories of dispersion) seminar
Mp(theories of dispersion) seminar
 
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptxPharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
 
Self Micro Emulsifying Drug Delivery System
Self Micro Emulsifying Drug Delivery SystemSelf Micro Emulsifying Drug Delivery System
Self Micro Emulsifying Drug Delivery System
 
Post approvai regulatory affairs
Post approvai regulatory affairsPost approvai regulatory affairs
Post approvai regulatory affairs
 
Government regulation in pharmaceutical validation
Government regulation in pharmaceutical validationGovernment regulation in pharmaceutical validation
Government regulation in pharmaceutical validation
 
Rate controlled drug delivery system
Rate controlled drug delivery systemRate controlled drug delivery system
Rate controlled drug delivery system
 
validation of dosage forms
validation of dosage formsvalidation of dosage forms
validation of dosage forms
 
Drug excipient interaction different method
Drug excipient interaction different methodDrug excipient interaction different method
Drug excipient interaction different method
 
Study of consolidation parameters
Study of consolidation parametersStudy of consolidation parameters
Study of consolidation parameters
 
Kinetics of Stability & Stability Testing
Kinetics of Stability & Stability Testing Kinetics of Stability & Stability Testing
Kinetics of Stability & Stability Testing
 
Self micro-emulsifying drug delivery system (SMEDDS)
Self micro-emulsifying drug delivery system (SMEDDS)Self micro-emulsifying drug delivery system (SMEDDS)
Self micro-emulsifying drug delivery system (SMEDDS)
 
Us registration for foreign drugs
Us registration for foreign drugsUs registration for foreign drugs
Us registration for foreign drugs
 

Similar to Validation and calibration of master plan

validationandcalibrationmasterplan-190223191733.pptx
validationandcalibrationmasterplan-190223191733.pptxvalidationandcalibrationmasterplan-190223191733.pptx
validationandcalibrationmasterplan-190223191733.pptxTanmayPanigrahy
 
validationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdfvalidationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdfabdo badr
 
Validation master plan
Validation master planValidation master plan
Validation master planDr. Amsavel A
 
Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects Apoorva Bauskar
 
Pharmaceutical Validation.pdf
Pharmaceutical Validation.pdfPharmaceutical Validation.pdf
Pharmaceutical Validation.pdfGireesh Kumar Eri
 
Equipment qualification of medical device
Equipment qualification of medical deviceEquipment qualification of medical device
Equipment qualification of medical deviceNahri Musyrif
 
Qualification of Laboratory Equipments.pptx
Qualification of Laboratory Equipments.pptxQualification of Laboratory Equipments.pptx
Qualification of Laboratory Equipments.pptxHemlataMore3
 
Bioprocess Validation
Bioprocess Validation Bioprocess Validation
Bioprocess Validation Pramod Pal
 
Validation Master Plan Modern Pharmaceutics
Validation Master Plan Modern PharmaceuticsValidation Master Plan Modern Pharmaceutics
Validation Master Plan Modern PharmaceuticsMittalGandhi
 
Introduction to validation
Introduction to validation Introduction to validation
Introduction to validation Ankush Sule
 
TRS 937, 2006 ( validation HVAC).pdf
TRS 937, 2006 ( validation HVAC).pdfTRS 937, 2006 ( validation HVAC).pdf
TRS 937, 2006 ( validation HVAC).pdfleminhle2
 
Vish- Validation Master Plan
Vish- Validation Master PlanVish- Validation Master Plan
Vish- Validation Master PlanVishal Parikh
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical
 

Similar to Validation and calibration of master plan (20)

Validation master plan
Validation master planValidation master plan
Validation master plan
 
validationandcalibrationmasterplan-190223191733.pptx
validationandcalibrationmasterplan-190223191733.pptxvalidationandcalibrationmasterplan-190223191733.pptx
validationandcalibrationmasterplan-190223191733.pptx
 
validationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdfvalidationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdf
 
Validation master plan
Validation master planValidation master plan
Validation master plan
 
Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects
 
Pharmaceutical Validation.pdf
Pharmaceutical Validation.pdfPharmaceutical Validation.pdf
Pharmaceutical Validation.pdf
 
Validation qualification
Validation qualificationValidation qualification
Validation qualification
 
Equipment qualification of medical device
Equipment qualification of medical deviceEquipment qualification of medical device
Equipment qualification of medical device
 
Qualification of Laboratory Equipments.pptx
Qualification of Laboratory Equipments.pptxQualification of Laboratory Equipments.pptx
Qualification of Laboratory Equipments.pptx
 
Process validation ppt.
Process validation ppt.Process validation ppt.
Process validation ppt.
 
Qualification for validation
Qualification for validationQualification for validation
Qualification for validation
 
Validation
ValidationValidation
Validation
 
Bioprocess Validation
Bioprocess Validation Bioprocess Validation
Bioprocess Validation
 
Validation Master Plan Modern Pharmaceutics
Validation Master Plan Modern PharmaceuticsValidation Master Plan Modern Pharmaceutics
Validation Master Plan Modern Pharmaceutics
 
ValidationMasterPlan
ValidationMasterPlanValidationMasterPlan
ValidationMasterPlan
 
Introduction to validation
Introduction to validation Introduction to validation
Introduction to validation
 
Validation
ValidationValidation
Validation
 
TRS 937, 2006 ( validation HVAC).pdf
TRS 937, 2006 ( validation HVAC).pdfTRS 937, 2006 ( validation HVAC).pdf
TRS 937, 2006 ( validation HVAC).pdf
 
Vish- Validation Master Plan
Vish- Validation Master PlanVish- Validation Master Plan
Vish- Validation Master Plan
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & Validation
 

Recently uploaded

Environmental acoustics- noise criteria.pptx
Environmental acoustics- noise criteria.pptxEnvironmental acoustics- noise criteria.pptx
Environmental acoustics- noise criteria.pptxpriyankatabhane
 
Observation of Gravitational Waves from the Coalescence of a 2.5–4.5 M⊙ Compa...
Observation of Gravitational Waves from the Coalescence of a 2.5–4.5 M⊙ Compa...Observation of Gravitational Waves from the Coalescence of a 2.5–4.5 M⊙ Compa...
Observation of Gravitational Waves from the Coalescence of a 2.5–4.5 M⊙ Compa...Sérgio Sacani
 
LESSON PLAN IN SCIENCE GRADE 4 WEEK 1 DAY 2
LESSON PLAN IN SCIENCE GRADE 4 WEEK 1 DAY 2LESSON PLAN IN SCIENCE GRADE 4 WEEK 1 DAY 2
LESSON PLAN IN SCIENCE GRADE 4 WEEK 1 DAY 2AuEnriquezLontok
 
complex analysis best book for solving questions.pdf
complex analysis best book for solving questions.pdfcomplex analysis best book for solving questions.pdf
complex analysis best book for solving questions.pdfSubhamKumar3239
 
GLYCOSIDES Classification Of GLYCOSIDES Chemical Tests Glycosides
GLYCOSIDES Classification Of GLYCOSIDES  Chemical Tests GlycosidesGLYCOSIDES Classification Of GLYCOSIDES  Chemical Tests Glycosides
GLYCOSIDES Classification Of GLYCOSIDES Chemical Tests GlycosidesNandakishor Bhaurao Deshmukh
 
Combining Asynchronous Task Parallelism and Intel SGX for Secure Deep Learning
Combining Asynchronous Task Parallelism and Intel SGX for Secure Deep LearningCombining Asynchronous Task Parallelism and Intel SGX for Secure Deep Learning
Combining Asynchronous Task Parallelism and Intel SGX for Secure Deep Learningvschiavoni
 
FBI Profiling - Forensic Psychology.pptx
FBI Profiling - Forensic Psychology.pptxFBI Profiling - Forensic Psychology.pptx
FBI Profiling - Forensic Psychology.pptxPayal Shrivastava
 
How we decide powerpoint presentation.pptx
How we decide powerpoint presentation.pptxHow we decide powerpoint presentation.pptx
How we decide powerpoint presentation.pptxJosielynTars
 
Quarter 4_Grade 8_Digestive System Structure and Functions
Quarter 4_Grade 8_Digestive System Structure and FunctionsQuarter 4_Grade 8_Digestive System Structure and Functions
Quarter 4_Grade 8_Digestive System Structure and FunctionsCharlene Llagas
 
linear Regression, multiple Regression and Annova
linear Regression, multiple Regression and Annovalinear Regression, multiple Regression and Annova
linear Regression, multiple Regression and AnnovaMansi Rastogi
 
Q4-Mod-1c-Quiz-Projectile-333344444.pptx
Q4-Mod-1c-Quiz-Projectile-333344444.pptxQ4-Mod-1c-Quiz-Projectile-333344444.pptx
Q4-Mod-1c-Quiz-Projectile-333344444.pptxtuking87
 
whole genome sequencing new and its types including shortgun and clone by clone
whole genome sequencing new  and its types including shortgun and clone by clonewhole genome sequencing new  and its types including shortgun and clone by clone
whole genome sequencing new and its types including shortgun and clone by clonechaudhary charan shingh university
 
Introduction of Human Body & Structure of cell.pptx
Introduction of Human Body & Structure of cell.pptxIntroduction of Human Body & Structure of cell.pptx
Introduction of Human Body & Structure of cell.pptxMedical College
 
KDIGO-2023-CKD-Guideline-Public-Review-Draft_5-July-2023.pdf
KDIGO-2023-CKD-Guideline-Public-Review-Draft_5-July-2023.pdfKDIGO-2023-CKD-Guideline-Public-Review-Draft_5-July-2023.pdf
KDIGO-2023-CKD-Guideline-Public-Review-Draft_5-July-2023.pdfGABYFIORELAMALPARTID1
 
Gas-ExchangeS-in-Plants-and-Animals.pptx
Gas-ExchangeS-in-Plants-and-Animals.pptxGas-ExchangeS-in-Plants-and-Animals.pptx
Gas-ExchangeS-in-Plants-and-Animals.pptxGiovaniTrinidad
 
Oxo-Acids of Halogens and their Salts.pptx
Oxo-Acids of Halogens and their Salts.pptxOxo-Acids of Halogens and their Salts.pptx
Oxo-Acids of Halogens and their Salts.pptxfarhanvvdk
 
projectile motion, impulse and moment
projectile  motion, impulse  and  momentprojectile  motion, impulse  and  moment
projectile motion, impulse and momentdonamiaquintan2
 
GENERAL PHYSICS 2 REFRACTION OF LIGHT SENIOR HIGH SCHOOL GENPHYS2.pptx
GENERAL PHYSICS 2 REFRACTION OF LIGHT SENIOR HIGH SCHOOL GENPHYS2.pptxGENERAL PHYSICS 2 REFRACTION OF LIGHT SENIOR HIGH SCHOOL GENPHYS2.pptx
GENERAL PHYSICS 2 REFRACTION OF LIGHT SENIOR HIGH SCHOOL GENPHYS2.pptxRitchAndruAgustin
 

Recently uploaded (20)

AZOTOBACTER AS BIOFERILIZER.PPTX
AZOTOBACTER AS BIOFERILIZER.PPTXAZOTOBACTER AS BIOFERILIZER.PPTX
AZOTOBACTER AS BIOFERILIZER.PPTX
 
Environmental acoustics- noise criteria.pptx
Environmental acoustics- noise criteria.pptxEnvironmental acoustics- noise criteria.pptx
Environmental acoustics- noise criteria.pptx
 
Interferons.pptx.
Interferons.pptx.Interferons.pptx.
Interferons.pptx.
 
Observation of Gravitational Waves from the Coalescence of a 2.5–4.5 M⊙ Compa...
Observation of Gravitational Waves from the Coalescence of a 2.5–4.5 M⊙ Compa...Observation of Gravitational Waves from the Coalescence of a 2.5–4.5 M⊙ Compa...
Observation of Gravitational Waves from the Coalescence of a 2.5–4.5 M⊙ Compa...
 
LESSON PLAN IN SCIENCE GRADE 4 WEEK 1 DAY 2
LESSON PLAN IN SCIENCE GRADE 4 WEEK 1 DAY 2LESSON PLAN IN SCIENCE GRADE 4 WEEK 1 DAY 2
LESSON PLAN IN SCIENCE GRADE 4 WEEK 1 DAY 2
 
complex analysis best book for solving questions.pdf
complex analysis best book for solving questions.pdfcomplex analysis best book for solving questions.pdf
complex analysis best book for solving questions.pdf
 
GLYCOSIDES Classification Of GLYCOSIDES Chemical Tests Glycosides
GLYCOSIDES Classification Of GLYCOSIDES  Chemical Tests GlycosidesGLYCOSIDES Classification Of GLYCOSIDES  Chemical Tests Glycosides
GLYCOSIDES Classification Of GLYCOSIDES Chemical Tests Glycosides
 
Combining Asynchronous Task Parallelism and Intel SGX for Secure Deep Learning
Combining Asynchronous Task Parallelism and Intel SGX for Secure Deep LearningCombining Asynchronous Task Parallelism and Intel SGX for Secure Deep Learning
Combining Asynchronous Task Parallelism and Intel SGX for Secure Deep Learning
 
FBI Profiling - Forensic Psychology.pptx
FBI Profiling - Forensic Psychology.pptxFBI Profiling - Forensic Psychology.pptx
FBI Profiling - Forensic Psychology.pptx
 
How we decide powerpoint presentation.pptx
How we decide powerpoint presentation.pptxHow we decide powerpoint presentation.pptx
How we decide powerpoint presentation.pptx
 
Quarter 4_Grade 8_Digestive System Structure and Functions
Quarter 4_Grade 8_Digestive System Structure and FunctionsQuarter 4_Grade 8_Digestive System Structure and Functions
Quarter 4_Grade 8_Digestive System Structure and Functions
 
linear Regression, multiple Regression and Annova
linear Regression, multiple Regression and Annovalinear Regression, multiple Regression and Annova
linear Regression, multiple Regression and Annova
 
Q4-Mod-1c-Quiz-Projectile-333344444.pptx
Q4-Mod-1c-Quiz-Projectile-333344444.pptxQ4-Mod-1c-Quiz-Projectile-333344444.pptx
Q4-Mod-1c-Quiz-Projectile-333344444.pptx
 
whole genome sequencing new and its types including shortgun and clone by clone
whole genome sequencing new  and its types including shortgun and clone by clonewhole genome sequencing new  and its types including shortgun and clone by clone
whole genome sequencing new and its types including shortgun and clone by clone
 
Introduction of Human Body & Structure of cell.pptx
Introduction of Human Body & Structure of cell.pptxIntroduction of Human Body & Structure of cell.pptx
Introduction of Human Body & Structure of cell.pptx
 
KDIGO-2023-CKD-Guideline-Public-Review-Draft_5-July-2023.pdf
KDIGO-2023-CKD-Guideline-Public-Review-Draft_5-July-2023.pdfKDIGO-2023-CKD-Guideline-Public-Review-Draft_5-July-2023.pdf
KDIGO-2023-CKD-Guideline-Public-Review-Draft_5-July-2023.pdf
 
Gas-ExchangeS-in-Plants-and-Animals.pptx
Gas-ExchangeS-in-Plants-and-Animals.pptxGas-ExchangeS-in-Plants-and-Animals.pptx
Gas-ExchangeS-in-Plants-and-Animals.pptx
 
Oxo-Acids of Halogens and their Salts.pptx
Oxo-Acids of Halogens and their Salts.pptxOxo-Acids of Halogens and their Salts.pptx
Oxo-Acids of Halogens and their Salts.pptx
 
projectile motion, impulse and moment
projectile  motion, impulse  and  momentprojectile  motion, impulse  and  moment
projectile motion, impulse and moment
 
GENERAL PHYSICS 2 REFRACTION OF LIGHT SENIOR HIGH SCHOOL GENPHYS2.pptx
GENERAL PHYSICS 2 REFRACTION OF LIGHT SENIOR HIGH SCHOOL GENPHYS2.pptxGENERAL PHYSICS 2 REFRACTION OF LIGHT SENIOR HIGH SCHOOL GENPHYS2.pptx
GENERAL PHYSICS 2 REFRACTION OF LIGHT SENIOR HIGH SCHOOL GENPHYS2.pptx
 

Validation and calibration of master plan

  • 1. VALIDATION AND CALIBRATION OF MASTER PLAN By B.Prinkha. M.Pharm 1st year Modern pharmaceutics
  • 2. CONTENT  INTRODUCTION  OBJECTIVE OF VALIDATION  VALIDATION MASTER PLAN  INTRODUCTION  MEMBERS OF VMP  CONTENT OF VMP  CALIBRATION MASTER PLAN  INTRODUCTION  CALIBRATION PROCESS  TIME INTERVAL OF CALIBRATION  MAINTAINANCE OF RECORDS  LABELLING
  • 3. INTRODUCTION VALIDATION DEFINITION: According to FDA: “Establishing the documented evidence which provides a high degree of assurance that a specific process will consistently produce a product of predetermined specifications and quality attributes”. QUALIFICATION DEFINITION: “Documented evidence that premises, systems or equipment are able to achieve the predetermined specifications properly installed, and/or work correctly and lead to the expected results”.
  • 4. QUALIFICATION OR VALIDATION? A system/equipment/premises must be Qualified to operate/work in a Validated process: QUALIFY: A system and/or equipment VALIDATE: A process Example: Qualify an autoclave, whereas you Validate a Sterilization process.
  • 5. OBJECTIVES OF VALIDATION  To reduces risk of regulatory non-compliance.  To reduce the time to the market for the new products.  To eliminate the scrap & reduces the defect cost.  To reduce chances of product re-call from market.  To accelerate the final release of the product batch.  It requires less in-process control & end process testing.  Amplified release of batch can be achieved in validation.
  • 6. VALIDATION MASTER PLAN A document that provides information on company’s validation program. It should define the details and time scales for validation work to be performed. Responsibilities relating to the plan should be stated.
  • 7. VALIDATION MASTER PLAN(VMP)  A Validation Master Plan, also referred to as "VMP", outlines the principles involved in the qualification of a facility, defining the areas and systems to be validated, and provides a written program for achieving and maintaining a qualified facility.  A VMP is the foundation for the validation program and should include process validation, facility and utility qualification and validation, equipment qualification, cleaning and computer validation.  It is a key document in the GMP (Good manufacturing practice) regulated pharmaceutical industry as it drives a structured approach to validation projects.  Food and Drug Administration inspectors often look at VMPs during audits to see whether or not a facility's validation strategy is well thought-out and organized.  A VMP should have logical reasoning for including or excluding every system associated with a validation project based on a risk assessment.
  • 8. VALIDATION VMP Basic Risk Analysis (BRA) Detailed Risk Analysis(RA) QUALIFICATION VALIDATION OF COMPUTERIZED SYSTEM VALIDATION DESIGN QUALIFICATION(DQ) INSTALLATION QUALIFICATION(IQ) OPERATIONAL QUALIFICATION(OQ) PERFORMANCE QUALIFICATION(PQ) PROCESS VALIDATION CLEANING VALIDATION ANALYTICAL METHODS VALIDATION
  • 9. MEMBERS OF VMP  Validation manager(quality assurance department)  Member from production  Members of engineering  Members from calibration lab  Members from QC lab  Members from maintenance  Members from HVAC department  Members from product development lab
  • 10. CONTENT OF VMP (FACTORS TO BE CONSIDERED)  Introduction  Methodology  Qualification  Personnel  Schedule  Preventive maintenance  Change control  Procedure  Documentation  Appendices
  • 11.  INTRODUCTION  This section is written as an introduction to the validation process and the facility, and it is intended to set the scene.  The introduction of a VMP should include following details:- • A description of facility, its premises and equipment, and its purpose intension and scope of validation. • Other relevant site policies and plans, like factory or corporate policy statement on GMP, QA, etc.,.
  • 12.  METHODOLOGY  This section should address the predetermined requirements by identifying the standards that are to be applied to the facility.  These are then used in the development of the acceptance criteria that are used to judge the validation  It also involves planning and execution of documents such as, protocols, records, reports, or other.  The standard will involve three elements:  Regulatory and guidance documents  National standards  Company standards
  • 13.  QUALIFICATION  This section encompasses all aspects of the design, procurement, installation, and commissioning process.  The important issue is to ensure that definitions in the organization and for a specific project are consistent and cover all aspects of the validation process, and that the validation structure and organization is clear to any inspection authority.
  • 14. Qualification Purpose Design Qualification(DQ) Design specifications to ensure that all specified design elements have been included and that • the design meets the relevant regulatory and statutory requirements. Installation Qualification(IQ) Verifies that • the equipment/system/process is installed correctly • supplied as specified • integrated into the site calibration, maintenance systems and available for use. Operational Qualification(OQ) Verifies that • the equipment/system/process is operating correctly, • compliant with functionality requirements and • integrated into the systems and QMS. Performance Qualification(PQ) Verifies that • the equipment/system/process is continuously meeting performance criteria for routine use and • performing adequately for routine use in commercial production.
  • 15.  PERSONNEL  The CFR 21 states “ Each person engaged in and each person responsible for supervising the manufacture, processing, packaging or holding a drug product shall have the education, training, and experience, or a combination thereof, to enable that person to perform the assigned functions.”  The VMP should lay down the principles for personnel requirements. It must address the aspects like; experience of personnel (written biographies or CV), in- house training reports, etc,.  Documenting the training is essential and is a requisite of the GMPs.
  • 16.  SCHEDULE  This is the responsibility of Site maintenance and Operation department. This activity should be performed during the design phase, and the documentation required should be, included in the requisition.  PREVENTIVE MAINTENANCE  The work program is essential and should be prepared at an early stage.  A good plan will contain all the necessary features which are to be considered during execution of a plan and determines the control of the project.  It ensures that all the personnel involved in the VMP are not only aware of the engineering targets, but also the validation targets.
  • 17.  CHANGE CONTROL  These cover engineering standards used in the project design, through to commissioning phases, and the facilities standard procedures (SOPs).  PROCEDURE  This section of VMP should lay down requirements for a set of procedures for change control that cover: • The project through design, construction, and commissioning • The ongoing change that will inevitably occur in both the process and the equipment and engineering aspects.
  • 18.  DOCUMENTATION  The appendix is mostly used VMP to hold the information of type of documents and formats that will be used in the execution stage.  APPENDICES  This section usually used to identify the documentation that should be produced for the processing like; • Engineering drawing • Equipment supplier drawing and documents • Factory acceptance documents • IQ documents • OQ documents • PQ documents
  • 19. CALIBRATION MASTER PLAN INTRODUCTION  “Automatic, mechanical, or electronic equipment or other types of equipment, including computers, or related systems that will perform a function satisfactorily, may be used in the manufacture, processing, packing, and holding of a drug product. If such equipment is so used, it shall be routinely calibrated, inspected, or checked according to a written program designed to assure proper performance. Written records of those calibration checks and inspections shall be maintained.” -US Code of Federal Regulations, 21 CFR 211.68
  • 20. CALIBRATION DEFINITION:  The process of comparing the response of some instrument or system to a standard instrument or system over some measurement range.  It is based on the comparison of a primary standard or instrument of known accuracy with another equipment (to be calibrated).  It is used to detect, correlate, report or eliminate by adjustment of any variation in the accuracy of the equipment being calibrated. CALIBRATION MASTER PLAN:  CMP is defined as a leading document in defining the requirement necessary for establishing and implementing an effective calibration control program.
  • 21. CALIBRATION PROCESS  Calibration process must be managed and executed in a professional manner.  A particular place for all calibration operations to take place and keeping all instruments for calibration.  A separate room is preferred: • Better environmental control • Better protection against unauthorized handling or use of the calibration equipment.  The performance of all calibration operations is assigned as the clear responsibility of just one person.  Calibration procedures, used for quality control functions, are controlled by the international standards ISO 9000.
  • 22. CALIBRATION PROCESS  MASTER INSTRUMENT LIST • Serial Number • Name of Instrument • Location • Accuracy Required • Range of Measurement • Calibration Done Date • Due Date for Next Calibration • Calibration Certificate Number & Date
  • 23.  EQUIPMENT CLASSIFICATION • Critical equipment:  Direct measurement that affect the final product quality.  Measurement on critical process parameters in the process specification • Non critical equipment:  Indirect measurement that will not directly affect the final product quality  Shall be maintained based on company maintenance schedule
  • 24.  VERIFICATION • Applicable to equipment that cannot be calibrated (adjustment, correlation, etc) • Verification against measurement standard with correction factor documented • Actual reporting of result shall include the correction factor • Temperature correction factor “- 2℃”.  Measured value: 24℃  Reported value = 24℃ –2℃= 22℃
  • 25.  OUT OF CALIBRATION • Remove equipment from use • Out of Calibration Investigation to be carried out to determine the source of inaccuracy • Evaluate the impact of OOC result on the final product quality and other previously measured data • All investigation findings should be documented.
  • 26.  CALIBRATION CERTIFICATE • Name and address of contracted calibration laboratory • Name and address of client • Description and identification of item calibrated • Environment conditions when calibration was made • Date of receipt of instrument, date of calibration date of next calibration • Calibration method • Result of calibration • Signature and title of person responsible for the calibration • External calibration contract shall be awarded to Accredited by the nation institution
  • 27. TIME INTERVAL OF CALIBRATION Depending on:  Classification of Critical or non-critical Usage (light or heavy usage) Handling (light or heavy handling)  Manufacturer’s recommendation  Reference to NIST or accreditation body guideline for a specific measurement system
  • 28. MAINTANANCE OF RECORD OF CALIBRATION  Records will be maintained for all the calibrations done  It should be according to the cGMP  The individual calibration history files will be prepared and maintained for each instrument  The records will be maintained and stored in the metrology or QA department
  • 29. LABELLING  All calibrated equipment's are labelled or coded to indicate its status  Labels should be design and made of material suitable to working environment  Following declarations are to be made after calibration  “calibrated”  “calibration required”  The label should contain  Date of last calibration  Date of recalibration  Person responsible for calibration  Calibration certificate number.