NATIONAL MINERAL
DEVELOPMENT
CORPORATION
VOCATIONAL TRAINING
REPORT
MINES NAME- BAILADILA IRON ORE
MINES,KIRANDUL
Submitted by –
PRANJAL SAO
CONTENTS :-
• INTRODUCTION
• GEOLOGY
• MACHINERIES
• STEPS FOR EXPLORATION
• DRILLING
• CHARGING
• BLASTING
• LOADING & DUMPING
• CRUSHING
• SCREENING
• LOADING FOR TRANSPORTAION
INTRODUCTION :-
Bailadila Iron Ore Mines(commonly
known as BIOM) is located 100km away from Jagdalpur. It
is run by NMDC ltd. Which is a public limited company
incorporated under the Ministry of Steel,Govt. of India in
1958.
The BIOM consists of mines located
at Kirandul as well as Bacheli.
BIOM
KIRANDUL
14 11C
BACHELI
13
GEOLOGY :-
In the year 1934-35,Dr. Crook Shank and Dr.
P. K. Ghosh of Geological Survey of India mapped the entire
range geologically (1”=1 mile) scale for the first time. Crook
Shank(1938) divided the Iron Ore occurrences of bailadila range
into fourteen distinct deposits numbering 1 to 14.
P.K.Ghosh etal of GSI geologically mapped
the area on 1”=100 feet in 1961-63 and estimated the total reserves
of the tune of 1135 million tonnes.
Cntd…
GEOLOGY Cntd… :-
• Investigation By NMDC :-
Following long term agreement for the iron ore
export to Japan,NMDC comissioned its first mechanised mines in Bailadila
Deposit-14 which has been in production since 1968. Anticipating certain
constraints like handling of more waste from lower benches,having less ore
reserves etc. it was necessary to develop an alternating deposit adjacent to
Deposit-14 to initially supplement and finally replace Deposit-14 mine for
continued economic utilisation.
Based on the initial exploration conducted by
NMDC,deposit-11C was considered suitable to supplement/replace
Deposit-14 mine in future.
MACHINERIES :-
NAME OF MACHINE NUMBERS OF
MACHINES
SIZE/CAPACITY
ELECTRIC SHOVEL 4 8 mtr cube
DRILLING MACHINE(IDM) 5 250MM dia & 150mm dia
GRADER 3 -
DOZER 4 -
LOADER(FEL) 1 20-25 TONNES
DUMPER 11 85 TONNES & 100 TONNES
WATER TANK 3 635 LITERS
PUMP TRUCK 9 12 TONNES
 ELECTRIC SHOVEL
• The mining shovel
is designed &
constructed to
provide efficient
service under the
most severe
conditions.
• The machine is
built to the
highest possible
standards and
will provide
trouble free
operations if
properly
maintained.
 ELECTRIC SHOVEL cntd…
MAKE – Beml
MODEL - 182-M
COST – 20-25 crores
POWER – Electric (6.6KV)
BUCKET CAPACITY – 8 mtr cube(volume)
Number of E.S. present at
Deposit-11C is 04 i.e.,
ES-20 , ES-21 , ES-23 , ES-24
 DRILL MACHINE
• The INDIAN
DRILL
MASTER(IDM) is
designed
specially for the
purpose of
making blast
holes provided
with appropriate
whole diameter.
 DRILL MACHINE cntd…
MAKE – BUCYRUS
MODEL –
COST - 2.5 crores
POWER – Electric (6.6KV)
DRILLING METHOD – Rotary Drilling
Drill Rod Length – 7mtrs
(2 rods can be connected
togather as per
requirement,hence a max
depth of 14mtrs can be
drilled)
No. of IDM – 05 i.e.,
(IDM-1,IDM-4A,IDM-
5A,IDM-7 are of 250mm
dia & IDM-17 is 150mm dia)
 MOTER GRADER(MG)
• A Grader is generally
used in an OPEN CAST
mines for the purpose of
levelling the ground
wherever required.
• MAKE – Beml
• MODEL – BG 825
• TYPE – Diesel operated,
• 4 stroke
• FLYWHEEL POWER –
2100rpm
• No. of CYLINDERS – 6
 DOZER
• A BULDOZER is referred to
simply DOZER.
• It is a tractor with a pusher
blade attached to the front
portion.
• A Dozer blade is used for
pushing loose materials or
for digging in Soft
weathered rock.
• MAKE – Beml
• MODEL – BD 355
• TYPE – Diesel
• 4 stroke
• FLYWHEEL POWER –
2000rpm
 LOADER(FEL)
• FRONT END LOADER
(FEL) is a heavy
equipment machine
used to load materials
from surface to any
transporting body such
as Dumper.It is
hydraulically operated.
• MAKE – CAT
• MODEL – 992K
• TYPE – Diesel
• There is only one FEL
present in the deposit
11C
 DUMPER
• Dumpers are the main mode of transportation used in an
opencast mine.
• The dumpers are used in each n every mines for transporting the
Mineral/Ore from working place to the crushing plant.
• Dumpers are diesel
operated vehicles
which are designed
specially to make the
transportation of
mineral easy for
further process.
 DUMPER cntd…
• MAKE – CAT
• MODEL – 777D
• CAPACITY – 100tonnes & 85tonnes
• ENGINE – Diesel Operated
 IN DEPOSIT – 11C :-
• Total 11 dumpers are in operation
which are operated for
transporting both the Mineral to
crushing plant and waste to the
Waste Dump.
• Out of these 11 dumpers 9 are of
85 tonne while the other 2 are of
100 tonne capacity.
 WATER TANK
• Water tanks are
used to feed
water to the
roadways so as to
reduce the dust
particles.
• Tank Capacity –
4500-6000 litres.
• It is diesel
operated…
 PUMP TRUCK
• A pump truck is the
truck though which
the EMULSION is
brought to the
place of blasting
and also a system is
provided in it to fill
the blast holes with
suitable amount of
emulsion as per
requirement.
 PUMP TRUCK cntd…
• MAKE – Orica(3),Navbharat (3),KEL(3)
• TANKER CAPACITY – 12tonnes
• Diesel Operated
• Supply of emulsion is controlled by a system board
provided on the right side of the vehicle.
STEPS FOR EXPLORATION
For every mines,three steps are compulsory to extract the
minerals/ores and they are :-
DRILLING
(IDM is used)
BLASTING
(SME,Booster is used)
LOADING
(Electric Shovel is used)
DRILLING
In simple words, drilling can be defined as “The use of
any machine to create holes for exploration or for
charging of Explosives.”
Through drilling, we create BLAST HOLES of
depth around 14mtrs on the bench of 12mtrs.The
number of blast holes depends upon the nature of
Strata.If strata is loose then less number of holes are
required but for harder surface,more numbers of blast
holes are to be drilled.
Rotary drilling is used in NMDC for creating
the blast holes and this work is done though the machine
called as IDM.
CHARGING
CHARGING is the process in which “The explosives are loaded into
a blast hole for the purpose of blasting the material into which
the hole is drilled.”
PRIMEX
NONEL
D.F.
EMULSION
(SME)
STEMMING
 MATERIALS FILLED IN THE BLAST HOLES
WHILE CHARGING :-
• EMULSION – S.M.E.(Site Mixed
Emulsion) is used in an opencast
mines as explosive because it is
powerful enough to break the hard
rocks.
• BOOSTER – PRIMEX is used as a
booster which boosts/initiates the
SME for the explosion.
CHARGING Cntd…
NONEL – Non-Electric Initiation;A
NONEL is used to initiate the booster.Its
one end is connected to the booster
while other end is brought up to the
surface.
D.F. – Detonating Fuse; A DF is also used
as initiator to the PRIMEX, it is used as a
backup so as if due to any reason
NONEL fails to initiates DF does the job.
STEMMING :- Materials such as fine gravels, that is placed on top of blast
holes. When the explosives are fired, the stemming locks together from the
expanding gasses, and keeps the force of the explosion in the borehole until
rock begin to break.
BLASTING :-
Breaking of rock with the help of explosives is
called BLASTING.
It is preferred because its cheap and there is a
flexibility in this method.
 Blasting is done in a mine at
afternoon time during shift
change or during the lunch time
because at that time the workers
are not at the site and hence the
work is not affected a lot as well
as it becomes more safe.
BLAST SHELTER
LOADING & DUMPING :-
After Blasting, the loose rocks are
available to be transported to the
Crushing Plant for further process
hence the loose rocks so obtained are
loaded to the Dumpers through
Shovels and then dumpers dump
these materials at Hopper.
CRUSHING :-
The materials obtained through
blasting are not of regular size
so they are needed to be broken
into regular size which is done in
the CRUSHING PLANT.
 The process at crushing
plant advances in following
manner :-
• Dumper dumps irregular shaped
material at hopper.
• Material is passed from Hopper
to Apron Feeder and then to
Grizzly.
• The small particles fall down
through grizzly to a conveyor belt.
CRUSHING Cntd :-
• Those minerals which couldn’t fall
through grizzly passes to the Primary
Crusher.
• The rocks of larger size are broken into
smaller piece and then forwarded
through the conveyor.
• These minerals are again passed
through a grizzly and Secondary
Crusher for further reduction in their
size.
• When the rock minerals are broken
into regular sizes,then they are sent to
the screening plant through a number
og conveyors connected to eachother
from top of the hill to the bottom
where the Screening Plant is situated.
SCREENING :-
Screening is the practice of taking granulated ore material
and separating it into multiple grades by particle size.
 From NMDC, three different
sizes of ores are transported
and they are as follows :-
LUMP
CLO
FINES
40-150 mm
10-40 mm
0-10 mm
 LOADING FOR TRANSPORTATION :-
When the ore minerals are divided
into different grain sizes, they are
brought from screening plant to the
Loading Plant where the minerals are
loaded to the transport
medium(TRUCK or RAILS).
The B.I.O.M. transports its material to
many places VIZAC being at the top.
Other companies which take iron
ores from NMDC are MONET,
SHARDA, KIOCL, BSP, ESSAR etc.
Some ore minerals are also
transported to Japan, China & Korea.
National mineral development corporation

Weitere ähnliche Inhalte

Was ist angesagt?

DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINEDESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINEAnurag Jha
 
Metal Mines Blasting
Metal Mines BlastingMetal Mines Blasting
Metal Mines Blastingpartha sharma
 
Conversion of Underground Mine to Open Cast Mine
Conversion of Underground Mine to Open Cast MineConversion of Underground Mine to Open Cast Mine
Conversion of Underground Mine to Open Cast MineAbdul Mujeeb
 
Longwall Top Coal Caving Method
Longwall Top Coal Caving MethodLongwall Top Coal Caving Method
Longwall Top Coal Caving MethodAnil Kilania
 
Thin seam mining
Thin seam miningThin seam mining
Thin seam miningSafdar Ali
 
Optimization of Blasting Parameters in open cast mines
Optimization of Blasting Parameters in open cast minesOptimization of Blasting Parameters in open cast mines
Optimization of Blasting Parameters in open cast minesAnurag Jha
 
Overburden moment and abutment pressure in longwall mining
Overburden moment and abutment pressure in longwall miningOverburden moment and abutment pressure in longwall mining
Overburden moment and abutment pressure in longwall miningEr.Sunil Wasade
 

Was ist angesagt? (20)

Continuous miner
Continuous minerContinuous miner
Continuous miner
 
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINEDESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
 
Caving Underground Mining Methods (longwall, Sublevel caving, & Block caving)
Caving Underground Mining Methods (longwall, Sublevel caving, &  Block caving)Caving Underground Mining Methods (longwall, Sublevel caving, &  Block caving)
Caving Underground Mining Methods (longwall, Sublevel caving, & Block caving)
 
Rock blasting for mining
Rock blasting  for miningRock blasting  for mining
Rock blasting for mining
 
Longwall machinery
Longwall  machineryLongwall  machinery
Longwall machinery
 
Mine planning
Mine planning Mine planning
Mine planning
 
highwall mining know - how
highwall mining know - howhighwall mining know - how
highwall mining know - how
 
Metal Mines Blasting
Metal Mines BlastingMetal Mines Blasting
Metal Mines Blasting
 
Conversion of Underground Mine to Open Cast Mine
Conversion of Underground Mine to Open Cast MineConversion of Underground Mine to Open Cast Mine
Conversion of Underground Mine to Open Cast Mine
 
Longwall Top Coal Caving Method
Longwall Top Coal Caving MethodLongwall Top Coal Caving Method
Longwall Top Coal Caving Method
 
Shrinkage and Vertical Crater Retreat Stoping
Shrinkage and Vertical Crater Retreat StopingShrinkage and Vertical Crater Retreat Stoping
Shrinkage and Vertical Crater Retreat Stoping
 
Cut and Fill mining
Cut and Fill miningCut and Fill mining
Cut and Fill mining
 
ore dilution and ore recovery
ore dilution and ore recoveryore dilution and ore recovery
ore dilution and ore recovery
 
Applicability of hydraulic mining
Applicability of hydraulic miningApplicability of hydraulic mining
Applicability of hydraulic mining
 
Thin seam mining
Thin seam miningThin seam mining
Thin seam mining
 
Surface mining planning and design of open pit mining
Surface mining planning and design of open pit miningSurface mining planning and design of open pit mining
Surface mining planning and design of open pit mining
 
Optimization of Blasting Parameters in open cast mines
Optimization of Blasting Parameters in open cast minesOptimization of Blasting Parameters in open cast mines
Optimization of Blasting Parameters in open cast mines
 
Overburden moment and abutment pressure in longwall mining
Overburden moment and abutment pressure in longwall miningOverburden moment and abutment pressure in longwall mining
Overburden moment and abutment pressure in longwall mining
 
Underground Mining System Question Pattern and Answer
Underground Mining System Question Pattern and AnswerUnderground Mining System Question Pattern and Answer
Underground Mining System Question Pattern and Answer
 
Mine waste dump
Mine waste dumpMine waste dump
Mine waste dump
 

Andere mochten auch

Financial Chronicle 10 March 2010 NMDC Issue Gets Tepid Response On Day 1
Financial Chronicle 10 March 2010 NMDC Issue Gets Tepid Response On Day 1Financial Chronicle 10 March 2010 NMDC Issue Gets Tepid Response On Day 1
Financial Chronicle 10 March 2010 NMDC Issue Gets Tepid Response On Day 1Jagannadham Thunuguntla
 
An Equity Research Report on NMDC Ltd. by Action Financial Services.
An Equity Research Report on NMDC Ltd. by Action Financial Services.An Equity Research Report on NMDC Ltd. by Action Financial Services.
An Equity Research Report on NMDC Ltd. by Action Financial Services.charuboua
 
Transportaion
TransportaionTransportaion
TransportaionM.Amparo
 
Transportation in underground mines
Transportation  in underground mines Transportation  in underground mines
Transportation in underground mines vanam mareswara rao
 
Mining Machinery Learning Material
Mining Machinery Learning MaterialMining Machinery Learning Material
Mining Machinery Learning MaterialBhaskar Naidu
 
HR policies in HCL by monika ndim
HR policies in HCL by monika ndimHR policies in HCL by monika ndim
HR policies in HCL by monika ndimMonika S
 
TVS Motors _ Summer Intern PPt
TVS Motors _ Summer Intern PPtTVS Motors _ Summer Intern PPt
TVS Motors _ Summer Intern PPtMayank Mohan
 
Taglines and Logos - PPT
Taglines and Logos - PPTTaglines and Logos - PPT
Taglines and Logos - PPTMohit Pachauri
 

Andere mochten auch (14)

Financial Chronicle 10 March 2010 NMDC Issue Gets Tepid Response On Day 1
Financial Chronicle 10 March 2010 NMDC Issue Gets Tepid Response On Day 1Financial Chronicle 10 March 2010 NMDC Issue Gets Tepid Response On Day 1
Financial Chronicle 10 March 2010 NMDC Issue Gets Tepid Response On Day 1
 
Mahadevpuri ug mine
Mahadevpuri ug mineMahadevpuri ug mine
Mahadevpuri ug mine
 
An Equity Research Report on NMDC Ltd. by Action Financial Services.
An Equity Research Report on NMDC Ltd. by Action Financial Services.An Equity Research Report on NMDC Ltd. by Action Financial Services.
An Equity Research Report on NMDC Ltd. by Action Financial Services.
 
Travel With Technology
Travel With TechnologyTravel With Technology
Travel With Technology
 
Transportaion
TransportaionTransportaion
Transportaion
 
Transportation in underground mines
Transportation  in underground mines Transportation  in underground mines
Transportation in underground mines
 
Mining Machinery Learning Material
Mining Machinery Learning MaterialMining Machinery Learning Material
Mining Machinery Learning Material
 
HR policies in HCL by monika ndim
HR policies in HCL by monika ndimHR policies in HCL by monika ndim
HR policies in HCL by monika ndim
 
Conveyors
ConveyorsConveyors
Conveyors
 
Belt conveyor
Belt conveyorBelt conveyor
Belt conveyor
 
Tvs group of companies ppt
Tvs group of companies pptTvs group of companies ppt
Tvs group of companies ppt
 
TVS Motors _ Summer Intern PPt
TVS Motors _ Summer Intern PPtTVS Motors _ Summer Intern PPt
TVS Motors _ Summer Intern PPt
 
Tvs motors
Tvs motors Tvs motors
Tvs motors
 
Taglines and Logos - PPT
Taglines and Logos - PPTTaglines and Logos - PPT
Taglines and Logos - PPT
 

Ähnlich wie National mineral development corporation

61904252-ONGC-ANKLESHWAR-ASSET.pptx
61904252-ONGC-ANKLESHWAR-ASSET.pptx61904252-ONGC-ANKLESHWAR-ASSET.pptx
61904252-ONGC-ANKLESHWAR-ASSET.pptxVevietpomata
 
labour vs machionary (cep lecture)
labour vs machionary (cep lecture)labour vs machionary (cep lecture)
labour vs machionary (cep lecture)Safiullah Khan
 
Innovations and trend in metal mining & tunnellng
Innovations and trend in metal mining & tunnellngInnovations and trend in metal mining & tunnellng
Innovations and trend in metal mining & tunnellngSafdar Ali
 
Chhabra Thermal Power plant ppt by Cm lodha
Chhabra Thermal Power plant ppt by Cm lodhaChhabra Thermal Power plant ppt by Cm lodha
Chhabra Thermal Power plant ppt by Cm lodhaChandra Mohan Lodha
 
Develpoment and extraction of coal pillar by continuous
Develpoment and extraction of coal pillar by continuousDevelpoment and extraction of coal pillar by continuous
Develpoment and extraction of coal pillar by continuousShubham Agrawal
 
CPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTSCPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTSSuyash Awasthi
 
Sieving machine (1)
Sieving machine (1)Sieving machine (1)
Sieving machine (1)KRISHNARAJV2
 
Bucket wheel excavator ppt
Bucket wheel excavator pptBucket wheel excavator ppt
Bucket wheel excavator pptknowledge
 
Extending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine PlanningExtending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine PlanningJasmeet Singh Saluja
 
Basics to Mining & Mineral Processing
Basics to Mining & Mineral Processing Basics to Mining & Mineral Processing
Basics to Mining & Mineral Processing Rajesh Patnaik
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDFCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDFShankar Ramasamy
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTShankar Ramasamy
 
State of art of Mechanisation of Underground mines
State of art of Mechanisation of Underground minesState of art of Mechanisation of Underground mines
State of art of Mechanisation of Underground minesMD.Suresh Kumar
 
training and excursion
training and excursiontraining and excursion
training and excursionravi8492
 
CLAMPSHELL- CONSTRUCTION EQUIPMENT.pptx
CLAMPSHELL- CONSTRUCTION EQUIPMENT.pptxCLAMPSHELL- CONSTRUCTION EQUIPMENT.pptx
CLAMPSHELL- CONSTRUCTION EQUIPMENT.pptxAkankshaPendharkar1
 

Ähnlich wie National mineral development corporation (20)

61904252-ONGC-ANKLESHWAR-ASSET.pptx
61904252-ONGC-ANKLESHWAR-ASSET.pptx61904252-ONGC-ANKLESHWAR-ASSET.pptx
61904252-ONGC-ANKLESHWAR-ASSET.pptx
 
labour vs machionary (cep lecture)
labour vs machionary (cep lecture)labour vs machionary (cep lecture)
labour vs machionary (cep lecture)
 
Nitin
NitinNitin
Nitin
 
Innovations and trend in metal mining & tunnellng
Innovations and trend in metal mining & tunnellngInnovations and trend in metal mining & tunnellng
Innovations and trend in metal mining & tunnellng
 
Coal Handling Plant
Coal Handling PlantCoal Handling Plant
Coal Handling Plant
 
Chhabra Thermal Power plant ppt by Cm lodha
Chhabra Thermal Power plant ppt by Cm lodhaChhabra Thermal Power plant ppt by Cm lodha
Chhabra Thermal Power plant ppt by Cm lodha
 
Develpoment and extraction of coal pillar by continuous
Develpoment and extraction of coal pillar by continuousDevelpoment and extraction of coal pillar by continuous
Develpoment and extraction of coal pillar by continuous
 
Surface miner
Surface minerSurface miner
Surface miner
 
CPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTSCPM UNIT 2 CONSTRUCTION EQUIPMENTS
CPM UNIT 2 CONSTRUCTION EQUIPMENTS
 
Sieving machine (1)
Sieving machine (1)Sieving machine (1)
Sieving machine (1)
 
Bucket wheel excavator ppt
Bucket wheel excavator pptBucket wheel excavator ppt
Bucket wheel excavator ppt
 
Extending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine PlanningExtending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine Planning
 
Basics to Mining & Mineral Processing
Basics to Mining & Mineral Processing Basics to Mining & Mineral Processing
Basics to Mining & Mineral Processing
 
Oc mechanical excavation
Oc mechanical excavationOc mechanical excavation
Oc mechanical excavation
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDFCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPTCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PPT
 
State of art of Mechanisation of Underground mines
State of art of Mechanisation of Underground minesState of art of Mechanisation of Underground mines
State of art of Mechanisation of Underground mines
 
training and excursion
training and excursiontraining and excursion
training and excursion
 
CLAMPSHELL- CONSTRUCTION EQUIPMENT.pptx
CLAMPSHELL- CONSTRUCTION EQUIPMENT.pptxCLAMPSHELL- CONSTRUCTION EQUIPMENT.pptx
CLAMPSHELL- CONSTRUCTION EQUIPMENT.pptx
 
Tunnel boring machine
Tunnel boring machineTunnel boring machine
Tunnel boring machine
 

Kürzlich hochgeladen

How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseHow to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseCeline George
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptxmary850239
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptxDhatriParmar
 
How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17Celine George
 
Sulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesSulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesVijayaLaxmi84
 
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvRicaMaeCastro1
 
4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptxmary850239
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfChristalin Nelson
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWQuiz Club NITW
 
Tree View Decoration Attribute in the Odoo 17
Tree View Decoration Attribute in the Odoo 17Tree View Decoration Attribute in the Odoo 17
Tree View Decoration Attribute in the Odoo 17Celine George
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research DiscourseAnita GoswamiGiri
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxAnupam32727
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...DhatriParmar
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQuiz Club NITW
 

Kürzlich hochgeladen (20)

How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseHow to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 Database
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
 
How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17
 
Sulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesSulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their uses
 
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
 
4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdf
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITW
 
Tree View Decoration Attribute in the Odoo 17
Tree View Decoration Attribute in the Odoo 17Tree View Decoration Attribute in the Odoo 17
Tree View Decoration Attribute in the Odoo 17
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research Discourse
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
 
Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
 

National mineral development corporation

  • 1. NATIONAL MINERAL DEVELOPMENT CORPORATION VOCATIONAL TRAINING REPORT MINES NAME- BAILADILA IRON ORE MINES,KIRANDUL Submitted by – PRANJAL SAO
  • 2. CONTENTS :- • INTRODUCTION • GEOLOGY • MACHINERIES • STEPS FOR EXPLORATION • DRILLING • CHARGING • BLASTING • LOADING & DUMPING • CRUSHING • SCREENING • LOADING FOR TRANSPORTAION
  • 3. INTRODUCTION :- Bailadila Iron Ore Mines(commonly known as BIOM) is located 100km away from Jagdalpur. It is run by NMDC ltd. Which is a public limited company incorporated under the Ministry of Steel,Govt. of India in 1958. The BIOM consists of mines located at Kirandul as well as Bacheli. BIOM KIRANDUL 14 11C BACHELI 13
  • 4. GEOLOGY :- In the year 1934-35,Dr. Crook Shank and Dr. P. K. Ghosh of Geological Survey of India mapped the entire range geologically (1”=1 mile) scale for the first time. Crook Shank(1938) divided the Iron Ore occurrences of bailadila range into fourteen distinct deposits numbering 1 to 14. P.K.Ghosh etal of GSI geologically mapped the area on 1”=100 feet in 1961-63 and estimated the total reserves of the tune of 1135 million tonnes. Cntd…
  • 5. GEOLOGY Cntd… :- • Investigation By NMDC :- Following long term agreement for the iron ore export to Japan,NMDC comissioned its first mechanised mines in Bailadila Deposit-14 which has been in production since 1968. Anticipating certain constraints like handling of more waste from lower benches,having less ore reserves etc. it was necessary to develop an alternating deposit adjacent to Deposit-14 to initially supplement and finally replace Deposit-14 mine for continued economic utilisation. Based on the initial exploration conducted by NMDC,deposit-11C was considered suitable to supplement/replace Deposit-14 mine in future.
  • 6. MACHINERIES :- NAME OF MACHINE NUMBERS OF MACHINES SIZE/CAPACITY ELECTRIC SHOVEL 4 8 mtr cube DRILLING MACHINE(IDM) 5 250MM dia & 150mm dia GRADER 3 - DOZER 4 - LOADER(FEL) 1 20-25 TONNES DUMPER 11 85 TONNES & 100 TONNES WATER TANK 3 635 LITERS PUMP TRUCK 9 12 TONNES
  • 7.  ELECTRIC SHOVEL • The mining shovel is designed & constructed to provide efficient service under the most severe conditions. • The machine is built to the highest possible standards and will provide trouble free operations if properly maintained.
  • 8.  ELECTRIC SHOVEL cntd… MAKE – Beml MODEL - 182-M COST – 20-25 crores POWER – Electric (6.6KV) BUCKET CAPACITY – 8 mtr cube(volume) Number of E.S. present at Deposit-11C is 04 i.e., ES-20 , ES-21 , ES-23 , ES-24
  • 9.  DRILL MACHINE • The INDIAN DRILL MASTER(IDM) is designed specially for the purpose of making blast holes provided with appropriate whole diameter.
  • 10.  DRILL MACHINE cntd… MAKE – BUCYRUS MODEL – COST - 2.5 crores POWER – Electric (6.6KV) DRILLING METHOD – Rotary Drilling Drill Rod Length – 7mtrs (2 rods can be connected togather as per requirement,hence a max depth of 14mtrs can be drilled) No. of IDM – 05 i.e., (IDM-1,IDM-4A,IDM- 5A,IDM-7 are of 250mm dia & IDM-17 is 150mm dia)
  • 11.  MOTER GRADER(MG) • A Grader is generally used in an OPEN CAST mines for the purpose of levelling the ground wherever required. • MAKE – Beml • MODEL – BG 825 • TYPE – Diesel operated, • 4 stroke • FLYWHEEL POWER – 2100rpm • No. of CYLINDERS – 6
  • 12.  DOZER • A BULDOZER is referred to simply DOZER. • It is a tractor with a pusher blade attached to the front portion. • A Dozer blade is used for pushing loose materials or for digging in Soft weathered rock. • MAKE – Beml • MODEL – BD 355 • TYPE – Diesel • 4 stroke • FLYWHEEL POWER – 2000rpm
  • 13.  LOADER(FEL) • FRONT END LOADER (FEL) is a heavy equipment machine used to load materials from surface to any transporting body such as Dumper.It is hydraulically operated. • MAKE – CAT • MODEL – 992K • TYPE – Diesel • There is only one FEL present in the deposit 11C
  • 14.  DUMPER • Dumpers are the main mode of transportation used in an opencast mine. • The dumpers are used in each n every mines for transporting the Mineral/Ore from working place to the crushing plant. • Dumpers are diesel operated vehicles which are designed specially to make the transportation of mineral easy for further process.
  • 15.  DUMPER cntd… • MAKE – CAT • MODEL – 777D • CAPACITY – 100tonnes & 85tonnes • ENGINE – Diesel Operated  IN DEPOSIT – 11C :- • Total 11 dumpers are in operation which are operated for transporting both the Mineral to crushing plant and waste to the Waste Dump. • Out of these 11 dumpers 9 are of 85 tonne while the other 2 are of 100 tonne capacity.
  • 16.  WATER TANK • Water tanks are used to feed water to the roadways so as to reduce the dust particles. • Tank Capacity – 4500-6000 litres. • It is diesel operated…
  • 17.  PUMP TRUCK • A pump truck is the truck though which the EMULSION is brought to the place of blasting and also a system is provided in it to fill the blast holes with suitable amount of emulsion as per requirement.
  • 18.  PUMP TRUCK cntd… • MAKE – Orica(3),Navbharat (3),KEL(3) • TANKER CAPACITY – 12tonnes • Diesel Operated • Supply of emulsion is controlled by a system board provided on the right side of the vehicle.
  • 19. STEPS FOR EXPLORATION For every mines,three steps are compulsory to extract the minerals/ores and they are :- DRILLING (IDM is used) BLASTING (SME,Booster is used) LOADING (Electric Shovel is used)
  • 20. DRILLING In simple words, drilling can be defined as “The use of any machine to create holes for exploration or for charging of Explosives.” Through drilling, we create BLAST HOLES of depth around 14mtrs on the bench of 12mtrs.The number of blast holes depends upon the nature of Strata.If strata is loose then less number of holes are required but for harder surface,more numbers of blast holes are to be drilled. Rotary drilling is used in NMDC for creating the blast holes and this work is done though the machine called as IDM.
  • 21. CHARGING CHARGING is the process in which “The explosives are loaded into a blast hole for the purpose of blasting the material into which the hole is drilled.” PRIMEX NONEL D.F. EMULSION (SME) STEMMING  MATERIALS FILLED IN THE BLAST HOLES WHILE CHARGING :- • EMULSION – S.M.E.(Site Mixed Emulsion) is used in an opencast mines as explosive because it is powerful enough to break the hard rocks. • BOOSTER – PRIMEX is used as a booster which boosts/initiates the SME for the explosion.
  • 22. CHARGING Cntd… NONEL – Non-Electric Initiation;A NONEL is used to initiate the booster.Its one end is connected to the booster while other end is brought up to the surface. D.F. – Detonating Fuse; A DF is also used as initiator to the PRIMEX, it is used as a backup so as if due to any reason NONEL fails to initiates DF does the job. STEMMING :- Materials such as fine gravels, that is placed on top of blast holes. When the explosives are fired, the stemming locks together from the expanding gasses, and keeps the force of the explosion in the borehole until rock begin to break.
  • 23. BLASTING :- Breaking of rock with the help of explosives is called BLASTING. It is preferred because its cheap and there is a flexibility in this method.  Blasting is done in a mine at afternoon time during shift change or during the lunch time because at that time the workers are not at the site and hence the work is not affected a lot as well as it becomes more safe. BLAST SHELTER
  • 24. LOADING & DUMPING :- After Blasting, the loose rocks are available to be transported to the Crushing Plant for further process hence the loose rocks so obtained are loaded to the Dumpers through Shovels and then dumpers dump these materials at Hopper.
  • 25. CRUSHING :- The materials obtained through blasting are not of regular size so they are needed to be broken into regular size which is done in the CRUSHING PLANT.  The process at crushing plant advances in following manner :- • Dumper dumps irregular shaped material at hopper. • Material is passed from Hopper to Apron Feeder and then to Grizzly. • The small particles fall down through grizzly to a conveyor belt.
  • 26. CRUSHING Cntd :- • Those minerals which couldn’t fall through grizzly passes to the Primary Crusher. • The rocks of larger size are broken into smaller piece and then forwarded through the conveyor. • These minerals are again passed through a grizzly and Secondary Crusher for further reduction in their size. • When the rock minerals are broken into regular sizes,then they are sent to the screening plant through a number og conveyors connected to eachother from top of the hill to the bottom where the Screening Plant is situated.
  • 27. SCREENING :- Screening is the practice of taking granulated ore material and separating it into multiple grades by particle size.  From NMDC, three different sizes of ores are transported and they are as follows :- LUMP CLO FINES 40-150 mm 10-40 mm 0-10 mm
  • 28.  LOADING FOR TRANSPORTATION :- When the ore minerals are divided into different grain sizes, they are brought from screening plant to the Loading Plant where the minerals are loaded to the transport medium(TRUCK or RAILS). The B.I.O.M. transports its material to many places VIZAC being at the top. Other companies which take iron ores from NMDC are MONET, SHARDA, KIOCL, BSP, ESSAR etc. Some ore minerals are also transported to Japan, China & Korea.