SlideShare ist ein Scribd-Unternehmen logo
1 von 104
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 1
Oleh :
Gondang Riyadi
TGM
UGM
Infrastruktur Drainase
September 5, 2016 pengukuran Beda Tinggi - MGR 2
TGM
UGM
3
MGR - Kartografi - PSLH
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 4
TGM
UGM
September 5, 2016 Penggambaran Detil - MGR 5
TGM
UGM
PETA ISO KWALITAS BATUBARAPETA ISO KWALITAS BATUBARA
September 5, 2016 pengukuran Beda Tinggi - MGR 6
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 7
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 8
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 9
TGM
UGM
 ALTIMETER
 BAROMETRIC LEVELLING
 TRIGONOMETRIC LEVELING
 WATERPASSING (PENYIPAT DATAR)
September 5, 2016 pengukuran Beda Tinggi - MGR 10
TGM
UGM
 Alat penyipat datar : konvensional maupun yang
modern (baru)
 Rambu ukur (baak) baik dilengkapi dengan mistar
skala maupun tidak
 Sepatu rambu sebagai alas dari rambu ukur
 Statif rambu untuk menjaga rambu supaya tidak
jatuh
 Nivo kotak untuk membuat rambu supaya tidak
miring (baik kemuka atau kebelakang dan ke kiri
atau ke kanan
September 5, 2016 pengukuran Beda Tinggi - MGR 11
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 12
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 13
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 14
TGM
UGM
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 16
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 17
1. Base Plate
2. Horizontal Circle
3. Eyepiece
4. Circular Bubble
5. Sighting Pointer
6. Objective Lens
7. Focusing Knob
8. Fine Motion Drive
9. Footscrew
10. Bubble Mirror
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 18
TGM
UGM
September 5, 2016pengukuran Beda Tinggi - MGR 19
Automatic Level Staff Readings
on
a staff
TGM
UGM
Panjangnya bisa 3 s/d 5 meter
Dibuat bisa dari kayu atau
aluminium
Ada yang sederhana dan ada
yang dilengkapi dengan
mistar skala (skala baar)
September 5, 2016 pengukuran Beda Tinggi - MGR 20
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 21
•Setiap meter diberi warna
yang berbeda
•Setiap graduation sebesar
100 mm
•Setiap “E” adalah 50 mm
•Rambu dibaca dalam satuan
milimeter
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 22
0.3
0.33
0.339
TGM
UGM
2
1
3 Large numbers are even feet
Small numbers are 10th
of a foot
TGM
UGM
1
3
.10
.09
.08
.07
.06
.05
.04
.03
.02
.01
10equalspaces
100th
ofafoot
.00
TGM
UGM
2
1
3
3.14
.10
.09
.08
.07
.06
.05
.04
.03
.02
.01
.00
FYI
Foot Reading
10ths Reading
100ths Reading
TGM
UGM
Actual Rod Reading
2
1
5
5.05
.10
.09
.08
.07
.06
.05
.04
.03
.02
.01
.00
FYI
TGM
UGM
TGM
UGM
1. 1.09 2. 4.17
3. 7.01 4. 3.89
TGM
UGM
Memerlukan peralatan optis yang mempunyai
Benang silang
September 5, 2016 pengukuran Beda Tinggi - MGR 29
TGM
UGM
 Jarak antara TSR (benang atas) dan BSR (benang
bawah) disebut interval stadia .
September 5, 2016 pengukuran Beda Tinggi - MGR 30
Hor. Dist. = SI x SF
SI = Stadia interval
SF = Stadia factor
TGM
UGM Garis silang
merupakan garis
kolimasi
 BB dan BA disebut
dengan garis stadia
 Biasanya stadia
mempunyai faktor
pengali 100
September 5, 2016 pengukuran Beda Tinggi - MGR 31
TGM
UGM
 BA = 3.040
 BB = 2.946
 BA – BB = 0.094
 Jarak optis =
0.094 x 100 = 9.4
metres
September 5, 2016 pengukuran Beda Tinggi - MGR 32
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 33
Hor. Dist. = TSR - BSR( )x SF
Dist = TSR - BSR( ) x SF
= 6.01 - 5.47( ) x 100
= 0.54 x 100
= 54 ft
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 34
Dist = TSR - BSR( ) x SF
= 7.844 - 4.619( ) x 100
= 3.225 x 100
= 322.5 ft
TGM
UGM
Apabila Benang atas atau benang
bawah terhalang, bisa digunakan
cara ½ stadia. ½ stadia adalah
setengah dari interval stadia
September 5, 2016 pengukuran Beda Tinggi - MGR 35
Contoh :
Jika TRS = 7.34 dan
elevasi 6.21, maka jarak
mendatarnya :
Horizontal Distance = TSR - Elev( )x 2[ ]x 100
= 7.34 - 6.21( )x 2[ ]x 100
= 226 ft
TGM
UGM
 Ada beberapa faktor yang mempengaruhi kesalahan
pengukuran beda tinggi yang menggunakan penyipat
datar, di antaranya :: 
 •        Kesalahan garis kolimasi
 •        Karena kelengkungan bumi
 •        Kesalahan refraksi (undulasi)
 •        Kesalahan paralaks
September 5, 2016 pengukuran Beda Tinggi - MGR 36
TGM
UGM
 Garis kolimasi
adalah garis
imaginer yang lebat
benang silang pada
teropong sipat datar
September 5, 2016 pengukuran Beda Tinggi - MGR 37
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 38
TGM
UGM
TGM
UGM
TGM
UGM
TGM
UGM
 Karena panas sinar matahari akan
mengakibatkan bacaan di rambu kabur / tidak
jelas (undulasi)
TGM
UGM
Step 1 Staff Slowly Leant
Towards Instrument
Important Note – The
person using the instrument
keeps the staff vertical by
use of the Vertical line in the
instrument.
Step 2 Staff Slowly
Tilted away from
Instrument. When
Vertical lowest reading
will be reading
recorded
Step 3 Staff Slowly Tilted
away from instrument.
Once past vertical
readings will increase
Kesalahan dalam Pembacaan
Rambu Ukur
September 5, 2016 pengukuran Beda Tinggi - MGR 43
TGM
UGM
A
B
ba
dHab
d1 d2
HB = HA + dHab
= HA + (a – b )
September 5, 2016 pengukuran Beda Tinggi - MGR 44
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 45
B/S 2.510
F/S 1.202
Diff Between 1.308
B/S 2.301
F/S 1.517
Diff Between 0.784
TGM
UGM
MSL
Pengukuran beda tinggi
dengan metode sipat
datar
September 5, 2016 pengukuran Beda Tinggi - MGR 46
TGM
UGM
p0
p1
p0 = known point (benchmark)
BS IS IS FS
September 5, 2016 pengukuran Beda Tinggi - MGR 47
TGM
UGM
A
B
ba
dHab
d1 d2
HB = HA + dHab
= HA + (a – b )
September 5, 2016 pengukuran Beda Tinggi - MGR 48
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 49
TGM
UGM
 Baca TOR pengukuran
 Buat SKETSA Lapangan
 Pemasangan titik ikat di lapangan
 Mengukur sudut
 Mengukur Jarak
 Mengukur Beda Tinggi
 Mengukur Detil di lapangan
September 5, 2016 pengukuran Beda Tinggi - MGR 50
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 51
1. Jarak maksimum antara alat
sipat datar ke rambu 60 meter.
2. Kedudukan alat pada setiap
slag pengukuran harus pada
jarak yang sama antara jarak
instrumen ke rambu depan dan
instrumen ke rambu belakang.
TOR / KAK
Kerangka acuan Kerja
Baca
TOR
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 52
PENGUKURAN TITIK KONTROL VERTIKAL
1.Pengukuran tinggi titik-titik kontrol vertikal dilakukan dengan
metode sipat datar. Spesifikasi pengukuran adalah sebagai
berikut:
2.Sebelum alat digunakan harus dicek garis kolimasinya
terlebih dahulu.
3.Pengukuran beda tinggi dalam satu seksi dilakukan pergi
pulang dalam satu hari.
4.Jarak maksimum antara alat sipatdatar ke rambu 60 meter.
5.Kedudukan alat pada setiap slag pengukuran harus pada
jarak yang sama antara jarak instrumen ke rambu depan dan
instrumen ke rambu belakang.
6.Kesalahan penutup maksimum ukuran pergi-pulang sebesar
10 mm √L (L: dalam kilometer).
TGM
UGM
p0
PENGUKURAN SATU SLAG
BS
FS
September 5, 2016 pengukuran Beda Tinggi - MGR 53
TGM
UGM
p0
p1
PENGUKURAN SATU SEKSI
BS FS
September 5, 2016 pengukuran Beda Tinggi - MGR 54
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 55
p0
p1
P0 dan P1 = (benchmark))
TGM
UGM
MSL
Pengukuran beda tinggi
dengan metode sipat
datar
September 5, 2016 pengukuran Beda Tinggi - MGR 56
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 57
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 58
Pengukuran PERGI ><PULANG
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 59
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 60
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 61
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 62
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 63
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 64
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 65
TGM
UGM
 A benchmark in every-day language is a point
of reference for a measurement. In surveying a
benchmark is specifically any permanent
marker placed by a surveyor with a precisely
known vertical elevation (but not necessarily a
precisely known horizontal location). Designed
to be used for many projects.
TGM
UGM
TGM
UGM
TGM
UGM
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 70
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 71
Set up the instrument where the benchmark can be viewed within
correct parameters and a reasonable number of sights can be
viewed. This location is identified as L1 circled in red
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 72
Surveyor______________________ Chainmen_________________________________
Instrument No___________________ Date__________________
Backsight
Intermediate
Sight Foresight Rise Fall
Reduced
Level Top Bottom Dist Remarks
1.575 47.195 1.817 1.377 44.000 BM
Booking Sheet
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 73
Surveyor______________________ Chainmen_________________________________
Instrument No___________________ Date__________________
Backsight
Intermediate
Sight Foresight Rise Fall
Reduced
Level Top Bottom Dist Remarks
1.575 47.195 1.817 1.377 44.000 BM
1.250 Station 1
0.850 Station 2
1.330 Station 3
1.580 Station 4
Booking Sheet
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 74
Surveyor______________________ Chainmen_______________________________
Instrument No___________________ Date__________________
Backsight
Intermediate
Sight Foresight Rise Fall
Reduced
Level Top Bottom Dist Remarks
1.575 47.195 1.817 1.377 44.000 BM
1.250 Station 1
0.850 Station 2
1.330 Station 3
1.580 Station 4
1.450 1.462 1.438 24.000 S5 (CP)
Booking Sheet
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 75
Surveyor______________________ Chainmen________________________________
Instrument No___________________ Date__________________
Backsight
Intermediate
Sight Foresight Rise Fall
Reduced
Level Top Bottom Dist Remarks
1.575 47.195 1.817 1.377 44.000 BM
1.250 Station 1
0.850 Station 2
1.330 Station 3
1.580 Station 4
1.450 1.570 1.330 24.000 S5 (CP)
2.550 2.680 2.420 26.000 S5 (CP)
Booking Sheet
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 76
Surveyor______________________ Chainmen_________________________________
Instrument No___________________ Date__________________
Backsight
Intermediate
Sight Foresight Rise Fall
Reduced
Level Top Bottom Dist Remarks
1.575 47.195 1.597 1.553 44.000 BM
1.250 S1
0.850 S2
1.330 S3
1.580 S4
1.450 1.570 1.330 24.000 S5 (CP)
2.550 2.680 2.420 26.000 S5 (CP)
1.980 S6
1.760 S7
1.710 S8
1.840 S9
1.920 S10
Booking Sheet
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 77
Surveyor______________________ Chainmen_________________________________
Instrument No___________________ Date__________________
Backsight
Intermediate
Sight Foresight Rise Fall
Reduced
Level Top Bottom Dist Remarks
1.575 47.195 1.597 1.553 44.000 BM
1.250 S1
0.850 S2
1.330 S3
1.580 S4
1.450 1.570 1.330 24.000 S5 (CP)
2.550 2.680 2.420 26.000 S5 (CP)
1.980 S6
1.760 S7
1.710 S8
1.840 S9
1.920 S10
3.250 S11 (CP)
Booking Sheet
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 78
Surveyor______________________ Chainmen_________________________________
Instrument No___________________ Date__________________
Backsight
Intermediate
Sight Foresight Rise Fall
Reduced
Level Top Bottom Dist Remarks
1.575 47.195 1.597 1.553 44.000 BM
1.250 S1
0.850 S2
1.330 S3
1.580 S4
1.450 1.570 1.330 24.000 S5 (CP)
2.550 2.680 2.420 26.000 S5 (CP)
1.980 S6
1.760 S7
1.710 S8
1.840 S9
1.920 S10
3.250 3.400 3.100 30.000 S11 (CP)
1.831 2.021 1.641 38.000 S11 (CP)
1.258 1.418 1.098 32.000 BM
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 79
Surveyor______________________ Chainmen_________________________________
Instrument No___________________ Date__________________
Backsight
Intermediate
Sight Foresight Rise Fall
Reduced
Level Top Bottom Dist Remarks
1.575 47.195 1.597 1.553 44.000 BM
1.250 S1
0.850 S2
1.330 S3
1.580 S4
1.450 1.570 1.330 24.000 S5 (CP)
2.550 2.680 2.420 26.000 S5 (CP)
1.980 S6
1.760 S7
1.710 S8
1.840 S9
1.920 S10
3.250 3.400 3.100 30.000 S11 (CP)
1.831 2.021 1.641 38.000 S11 (CP)
1.258 1.418 1.098 32.000 BM
5.956 5.958 (Misclose) 194.000
Booking Sheet
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 80
Surveyor______________________ Chainmen_________________________________
Instrument No___________________ Date__________________
Backsight
Intermediate
Sight Foresight Rise Fall
Reduced
Level Top Bottom Dist Remarks
1.575 47.195 1.597 1.553 44.000 BM
1.250 0.325 S1
0.850 0.400 S2
1.330 -0.480 S3
1.580 -0.250 S4
1.450 0.130 1.570 1.330 24.000 S5 (CP)
2.550 2.680 2.420 26.000 S5 (CP)
1.980 0.570 S6
1.760 0.220 S7
1.710 0.050 S8
1.840 -0.130 S9
1.920 -0.080 S10
3.250 -1.330 3.400 3.100 30.000 S11 (CP)
1.831 2.021 1.641 38.000 S11 (CP)
1.258 0.573 1.418 1.098 32.000 BM
5.956 5.958 194.000
Booking Sheet
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 81
Surveyor______________________ Chainmen_________________________________
Instrument No___________________ Date__________________
Backsight
Intermediate
Sight Foresight Rise Fall
Reduced
Level Top Bottom Dist Remarks
1.575 47.195 1.597 1.553 44.000 BM
1.250 0.325 S1
0.850 0.400 S2
1.330 -0.480 S3
1.580 -0.250 S4
1.450 0.130 1.570 1.330 24.000 S5 (CP)
2.550 2.680 2.420 26.000 S5 (CP)
1.980 0.570 S6
1.760 0.220 S7
1.710 0.050 S8
1.840 -0.130 S9
1.920 -0.080 S10
3.250 -1.330 3.400 3.100 30.000 S11 (CP)
1.831 2.021 1.641 38.000 S11 (CP)
1.258 0.573 1.418 1.098 32.000 BM
5.956 5.958 2.268 -2.270 194.000
Booking Sheet
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 82
Surveyor______________________ Chainmen_________________________________
Instrument No___________________ Date__________________
Backsight
Intermediate
Sight Foresight Rise Fall
Reduced
Level Top Bottom Dist Remarks
1.575 47.195 1.597 1.553 44.000 BM
1.250 0.325 47.520 S1
0.850 0.400 47.920 S2
1.330 -0.480 47.440 S3
1.580 -0.250 47.190 S4
1.450 0.130 47.320 1.570 1.330 24.000 S5 (CP)
2.550 2.680 2.420 26.000 S5 (CP)
1.980 0.570 47.890 S6
1.760 0.220 48.110 S7
1.710 0.050 48.160 S8
1.840 -0.130 48.030 S9
1.920 -0.080 47.950 S10
3.250 -1.330 46.620 3.400 3.100 30.000 S11 (CP)
1.831 2.021 1.641 38.000 S11 (CP)
1.258 0.573 47.193 1.418 1.098 32.000 BM
5.956 5.958 2.268 -2.270 -0.002 194.000
Booking Sheet
TGM
UGM
 Traverse Length = 190 metres
 Allowable Misclose = 12 x SQRT(0.190)
= 12 x 0.4359
= 5.23mm
September 5, 2016 pengukuran Beda Tinggi - MGR 83
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 84
Backsight
Intermediate
Sight Foresight Rise Fall
1.350
1.850
2.250
2.535
3.030
2.780
2.500
2.190
3.140
3.380
2.230
1.960
1.680
2.360
1.480
1.256
0.570
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 85
Surveyor______________________ Chainmen_________________________________
Instrument No___________________ Date__________________
Backsight
Intermediate
Sight Foresight Rise Fall
Reduced
Level Top Bottom Dist Remarks
1.350 BM
1.850 B
2.250 C
2.535 D
3.030 E (CP)
2.780 F (CP)
2.500 F (CP)
2.190 G
3.140 H
3.380 I
2.230 J
1.960 K (CP)
1.680 K (CP)
2.360 L
1.480 M (CP)
1.256 BM
0.570
6.786 -6.790 0.000 0.000
B/S 6.786 RISE 0.000 END 0.000
F/S -6.790 FALL 0.000 START 0.000
Misclose -0.004 0.000 0.000
Booking Sheet
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 86
Backsight
Intermediate
Sight Foresight Rise Fall
0.655
0.465
1.215
0.365
0.690
1.100
0.455
0.760
1.200
0.985
2.100
2.560
0.755
1.645
3.273
2.100
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 87
Surveyor______________________ Chainmen_________________________________
Instrument No___________________ Date__________________
Backsight
Intermediate
Sight Foresight Rise Fall
Reduced
Level Top Bottom Dist Remarks
0.655 3.650 BM
0.465 0.190 3.840 B
1.215 -0.750 3.090 C
0.365 0.850 3.940 D
0.690 -0.325 3.615 E
1.100 -0.410 3.205 F (CP)
0.455 F (CP)
0.760 -0.305 2.900 G
1.200 -0.440 2.460 H
0.985 0.215 2.675 I
2.100 -1.115 1.560 J (CP)
2.560 J (CP)
0.755 1.805 3.365 K
1.645 -0.890 2.475 L (CP)
3.273 L (CP)
2.100 1.173 3.648 BM
6.943 -6.945 4.233 -4.235
B/S 6.943 RISE 4.233 END 3.648
F/S -6.945 FALL -4.235 START 3.650
Misclose -0.002 -0.002 -0.002
Booking Sheet
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 88
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 89
Surveyor______________________ Chainmen_________________________________
Instrument No___________________ Date__________________
Backsight
Intermediate
Sight
Fore
sight
Height of
Collimation
Reduced
Level Top Bottom Dist Remarks
1.575 48.770 47.195
1.250 47.520
0.850 47.920
1.330 47.440
1.580 47.190
Booking Sheet
• It is more convenient for “Area Levelling” and can become
cumbersome on long traverses.
It is also an easier method for “On the Fly Levelling”
• Also Known as Instrument Height Method
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 90
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 91
Set up the instrument where the benchmark can be viewed within
correct parameters and a reasonable number of sights can be
viewed. This location is identified as L1 circled in red
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 92
Surveyor______________________ Chainmen_________________________________
Instrument No___________________ Date__________________
Backsight
Intermediate
Sight
Fore
sight
Height of
Collimation
Reduced
Level Top Bottom Dist Remarks
1.575 48.770 47.195
Booking Sheet
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 93
Surveyor______________________ Chainmen_________________________________
Instrument No___________________ Date__________________
Backsight
Intermediate
Sight
Fore
sight
Height of
Collimation
Reduced
Level Top Bottom Dist Remarks
1.575 48.770 47.195
1.250 47.520 S1
0.850 47.920 S2
1.330 47.440 S3
1.580 47.190 S4
Booking Sheet
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 94
Surveyor______________________ Chainmen_________________________________
Instrument No___________________ Date__________________
Backsight
Intermediate
Sight
Fore
sight
Height of
Collimation
Reduced
Level Top Bottom Dist Remarks
1.575 48.770 47.195 BM
1.250 47.520 S1
0.850 47.920 S2
1.330 47.440 S3
1.580 47.190 S4
1.450 48.770 S5
Booking Sheet
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 95
Surveyor______________________ Chainmen_________________________________
Instrument No___________________ Date__________________
Backsight
Intermediate
Sight
Fore
sight
Height of
Collimation
Reduced
Level Top Bottom Dist Remarks
1.575 48.770 47.195 BM
1.250 47.520 S1
0.850 47.920 S2
1.330 47.440 S3
1.580 47.190 S4
2.550 1.450 49.870 47.320 S5
Booking Sheet
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 96
Surveyor______________________ Chainmen_________________________________
Instrument No___________________ Date__________________
Backsight
Intermediate
Sight
Fore
sight
Height of
Collimation
Reduced
Level Top Bottom Dist Remarks
1.575 48.770 47.195 BM
1.250 47.520 S1
0.850 47.920 S2
1.330 47.440 S3
1.580 47.190 S4
2.550 1.450 49.870 47.320 S5
1.980 47.890 S6
1.760 48.110 S7
1.710 48.160 S8
1.840 48.030 S9
1.920 47.950 S10
Booking Sheet
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 97
Surveyor______________________ Chainmen_________________________________
Instrument No___________________ Date__________________
Backsight
Intermediate
Sight
Fore
sight
Height of
Collimation
Reduced
Level Top Bottom Dist Remarks
1.575 48.770 47.195 BM
1.250 47.520 S1
0.850 47.920 S2
1.330 47.440 S3
1.580 47.190 S4
2.550 1.450 49.870 47.320 S5
1.980 47.890 S6
1.760 48.110 S7
1.710 48.160 S8
1.840 48.030 S9
1.920 47.950 S10
3.250 46.620 S11 (CP)
Booking Sheet
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 98
Surveyor______________________ Chainmen_________________________________
Instrument No___________________ Date__________________
Backsight
Intermediate
Sight Fore sight
Height of
Collimation
Reduced
Level Top Bottom Dist Remarks
1.575 48.770 47.195 BM
1.250 47.520 S1
0.850 47.920 S2
1.330 47.440 S3
1.580 47.190 S4
2.550 1.450 49.870 47.320 S5
1.980 47.890 S6
1.760 48.110 S7
1.710 48.160 S8
1.840 48.030 S9
1.920 47.950 S10
1.831 3.250 48.451 46.620 S11 (CP)
1.258 47.193 BM
Booking Sheet
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 99
Surveyor______________________ Chainmen_________________________________
Instrument No___________________ Date__________________
Backsight
Intermediate
Sight Fore sight
Height of
Collimation
Reduced
Level Top Bottom Dist Remarks
1.575 48.770 47.195 BM
1.250 47.520 S1
0.850 47.920 S2
1.330 47.440 S3
1.580 47.190 S4
2.550 1.450 49.870 47.320 S5
1.980 47.890 S6
1.760 48.110 S7
1.710 48.160 S8
1.840 48.030 S9
1.920 47.950 S10
1.831 3.250 48.451 46.620 S11 (CP)
1.258 47.193 BM
5.956 5.958
5.958
-0.002 Misclose
Booking Sheet
TGM
UGM
September 5, 2016 pengukuran Beda Tinggi - MGR 100
Surveyor______________________ Chainmen_________________________________
Instrument No___________________ Date__________________
Backsight
Intermediate
Sight Fore sight
Height of
Collimation
Reduced
Level Top Bottom Dist Remarks
1.575 48.770 47.195 BM
1.250 47.520 S1
0.850 47.920 S2
1.330 47.440 S3
1.580 47.190 S4
2.550 1.450 49.870 47.320 S5
1.980 47.890 S6
1.760 48.110 S7
1.710 48.160 S8
1.840 48.030 S9
1.920 47.950 S10
1.831 3.250 48.451 46.620 S11 (CP)
1.258 47.193 BM
5.956 5.958
5.958
-0.002 Misclose
End RL 47.193
Start BM 47.195
Misclose -0.002
Booking Sheet
TGM
UGM
 Definition – Misclose- is when closing
of a traverse due to errors in readings
and instrument limitations there is a
discrepancy.
 The allowable discrepancy is (12 x square
root of traverse in kilometres)
September 5, 2016 pengukuran Beda Tinggi - MGR 101
TGM
UGM
 Traverse Length = 190 metres
 Allowable Misclose = 12 x SQRT(0.190)
= 12 x 0.4359
= 5.23mm
September 5, 2016 pengukuran Beda Tinggi - MGR 102
TGM
UGM
TERIMA
KASIH
Terimakasih
PT. Waindo SpecTerra
Geomatic Training and Research Center (GTRC)
September 5, 2016 pengukuran Beda Tinggi - MGR 103
TGM
UGM
PRAKTEK LAPANGANPRAKTEK LAPANGAN
September 5, 2016 pengukuran Beda Tinggi - MGR 104

Weitere ähnliche Inhalte

Andere mochten auch

UAV Application to Mangroves
UAV Application to MangrovesUAV Application to Mangroves
UAV Application to Mangrovesopafem
 
Accuracy of UAV Photogrammetry
Accuracy of UAV PhotogrammetryAccuracy of UAV Photogrammetry
Accuracy of UAV Photogrammetrybaselinesurvey
 
Materi Kuliah Penginderaan Jauh Dasar (FOTOGRAMETRI)
Materi Kuliah Penginderaan Jauh Dasar (FOTOGRAMETRI)Materi Kuliah Penginderaan Jauh Dasar (FOTOGRAMETRI)
Materi Kuliah Penginderaan Jauh Dasar (FOTOGRAMETRI)Nurul Afdal Haris
 
LAPORAN IbM PEMETAAN POTENSI UNGGULAN BERBASIS CLUSTER DI DESA KLANTINGSARI K...
LAPORAN IbM PEMETAAN POTENSI UNGGULAN BERBASIS CLUSTER DI DESA KLANTINGSARI K...LAPORAN IbM PEMETAAN POTENSI UNGGULAN BERBASIS CLUSTER DI DESA KLANTINGSARI K...
LAPORAN IbM PEMETAAN POTENSI UNGGULAN BERBASIS CLUSTER DI DESA KLANTINGSARI K...suningterusberkarya
 
Laporan vertical photograpy
Laporan vertical photograpyLaporan vertical photograpy
Laporan vertical photograpySyaefudin Volk
 
Laporan Praktikum Cropping Citra
Laporan Praktikum Cropping CitraLaporan Praktikum Cropping Citra
Laporan Praktikum Cropping CitraSally Indah N
 
Pengukuran Theodolit Poligon
Pengukuran Theodolit PoligonPengukuran Theodolit Poligon
Pengukuran Theodolit Poligonlia anggraini
 
Laporan kegiatan magang teknis
Laporan kegiatan magang teknisLaporan kegiatan magang teknis
Laporan kegiatan magang teknisMokh Afifuddin
 
Modul 3 waterpass memanjang
Modul 3 waterpass memanjangModul 3 waterpass memanjang
Modul 3 waterpass memanjangafadliansyah
 
DSM Generation Using High Resolution UAV Images
DSM Generation Using High Resolution UAV ImagesDSM Generation Using High Resolution UAV Images
DSM Generation Using High Resolution UAV ImagesBiplov Bhandari
 
Traverse Survey Part 2/2
Traverse Survey Part 2/2Traverse Survey Part 2/2
Traverse Survey Part 2/2Muhammad Zubair
 
Geo Sense Unmanned Aerial Mapping Services
Geo Sense Unmanned Aerial Mapping ServicesGeo Sense Unmanned Aerial Mapping Services
Geo Sense Unmanned Aerial Mapping ServicesIsmail Ibrahim
 
Presentasi pci klp i
Presentasi pci klp iPresentasi pci klp i
Presentasi pci klp idianretno16
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2Muhammad Zubair
 
Chap.6 traverse surveys
Chap.6 traverse surveysChap.6 traverse surveys
Chap.6 traverse surveysstudent
 
Cara pengukuran menggunakan total station
Cara pengukuran menggunakan total station Cara pengukuran menggunakan total station
Cara pengukuran menggunakan total station Edho Wiranata
 
Pengukuran poligon tertutup
Pengukuran poligon tertutupPengukuran poligon tertutup
Pengukuran poligon tertutupAmilia Tiara
 
Foto Udara menggunakan Pesawat tanpa awak - UAV
Foto Udara menggunakan Pesawat tanpa awak - UAVFoto Udara menggunakan Pesawat tanpa awak - UAV
Foto Udara menggunakan Pesawat tanpa awak - UAVAnton Suprojo
 

Andere mochten auch (20)

UAV Application to Mangroves
UAV Application to MangrovesUAV Application to Mangroves
UAV Application to Mangroves
 
Accuracy of UAV Photogrammetry
Accuracy of UAV PhotogrammetryAccuracy of UAV Photogrammetry
Accuracy of UAV Photogrammetry
 
Materi Kuliah Penginderaan Jauh Dasar (FOTOGRAMETRI)
Materi Kuliah Penginderaan Jauh Dasar (FOTOGRAMETRI)Materi Kuliah Penginderaan Jauh Dasar (FOTOGRAMETRI)
Materi Kuliah Penginderaan Jauh Dasar (FOTOGRAMETRI)
 
LAPORAN IbM PEMETAAN POTENSI UNGGULAN BERBASIS CLUSTER DI DESA KLANTINGSARI K...
LAPORAN IbM PEMETAAN POTENSI UNGGULAN BERBASIS CLUSTER DI DESA KLANTINGSARI K...LAPORAN IbM PEMETAAN POTENSI UNGGULAN BERBASIS CLUSTER DI DESA KLANTINGSARI K...
LAPORAN IbM PEMETAAN POTENSI UNGGULAN BERBASIS CLUSTER DI DESA KLANTINGSARI K...
 
Laporan vertical photograpy
Laporan vertical photograpyLaporan vertical photograpy
Laporan vertical photograpy
 
Laporan Praktikum Cropping Citra
Laporan Praktikum Cropping CitraLaporan Praktikum Cropping Citra
Laporan Praktikum Cropping Citra
 
Bab 7 menyipat datar 2
Bab 7 menyipat datar 2Bab 7 menyipat datar 2
Bab 7 menyipat datar 2
 
Pengukuran Theodolit Poligon
Pengukuran Theodolit PoligonPengukuran Theodolit Poligon
Pengukuran Theodolit Poligon
 
Laporan kegiatan magang teknis
Laporan kegiatan magang teknisLaporan kegiatan magang teknis
Laporan kegiatan magang teknis
 
Modul 3 waterpass memanjang
Modul 3 waterpass memanjangModul 3 waterpass memanjang
Modul 3 waterpass memanjang
 
DSM Generation Using High Resolution UAV Images
DSM Generation Using High Resolution UAV ImagesDSM Generation Using High Resolution UAV Images
DSM Generation Using High Resolution UAV Images
 
Traverse Survey Part 2/2
Traverse Survey Part 2/2Traverse Survey Part 2/2
Traverse Survey Part 2/2
 
Geo Sense Unmanned Aerial Mapping Services
Geo Sense Unmanned Aerial Mapping ServicesGeo Sense Unmanned Aerial Mapping Services
Geo Sense Unmanned Aerial Mapping Services
 
Presentasi pci klp i
Presentasi pci klp iPresentasi pci klp i
Presentasi pci klp i
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2
 
Traverse surveiying
Traverse surveiyingTraverse surveiying
Traverse surveiying
 
Chap.6 traverse surveys
Chap.6 traverse surveysChap.6 traverse surveys
Chap.6 traverse surveys
 
Cara pengukuran menggunakan total station
Cara pengukuran menggunakan total station Cara pengukuran menggunakan total station
Cara pengukuran menggunakan total station
 
Pengukuran poligon tertutup
Pengukuran poligon tertutupPengukuran poligon tertutup
Pengukuran poligon tertutup
 
Foto Udara menggunakan Pesawat tanpa awak - UAV
Foto Udara menggunakan Pesawat tanpa awak - UAVFoto Udara menggunakan Pesawat tanpa awak - UAV
Foto Udara menggunakan Pesawat tanpa awak - UAV
 

Kürzlich hochgeladen

Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringJuanCarlosMorales19600
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 

Kürzlich hochgeladen (20)

Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineering
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 

MGR Leveling Measurements

  • 1. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 1 Oleh : Gondang Riyadi
  • 2. TGM UGM Infrastruktur Drainase September 5, 2016 pengukuran Beda Tinggi - MGR 2
  • 4. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 4
  • 5. TGM UGM September 5, 2016 Penggambaran Detil - MGR 5
  • 6. TGM UGM PETA ISO KWALITAS BATUBARAPETA ISO KWALITAS BATUBARA September 5, 2016 pengukuran Beda Tinggi - MGR 6
  • 7. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 7
  • 8. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 8
  • 9. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 9
  • 10. TGM UGM  ALTIMETER  BAROMETRIC LEVELLING  TRIGONOMETRIC LEVELING  WATERPASSING (PENYIPAT DATAR) September 5, 2016 pengukuran Beda Tinggi - MGR 10
  • 11. TGM UGM  Alat penyipat datar : konvensional maupun yang modern (baru)  Rambu ukur (baak) baik dilengkapi dengan mistar skala maupun tidak  Sepatu rambu sebagai alas dari rambu ukur  Statif rambu untuk menjaga rambu supaya tidak jatuh  Nivo kotak untuk membuat rambu supaya tidak miring (baik kemuka atau kebelakang dan ke kiri atau ke kanan September 5, 2016 pengukuran Beda Tinggi - MGR 11
  • 12. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 12
  • 13. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 13
  • 14. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 14
  • 16. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 16
  • 17. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 17 1. Base Plate 2. Horizontal Circle 3. Eyepiece 4. Circular Bubble 5. Sighting Pointer 6. Objective Lens 7. Focusing Knob 8. Fine Motion Drive 9. Footscrew 10. Bubble Mirror
  • 18. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 18
  • 19. TGM UGM September 5, 2016pengukuran Beda Tinggi - MGR 19 Automatic Level Staff Readings on a staff
  • 20. TGM UGM Panjangnya bisa 3 s/d 5 meter Dibuat bisa dari kayu atau aluminium Ada yang sederhana dan ada yang dilengkapi dengan mistar skala (skala baar) September 5, 2016 pengukuran Beda Tinggi - MGR 20
  • 21. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 21 •Setiap meter diberi warna yang berbeda •Setiap graduation sebesar 100 mm •Setiap “E” adalah 50 mm •Rambu dibaca dalam satuan milimeter
  • 22. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 22 0.3 0.33 0.339
  • 23. TGM UGM 2 1 3 Large numbers are even feet Small numbers are 10th of a foot
  • 28. TGM UGM 1. 1.09 2. 4.17 3. 7.01 4. 3.89
  • 29. TGM UGM Memerlukan peralatan optis yang mempunyai Benang silang September 5, 2016 pengukuran Beda Tinggi - MGR 29
  • 30. TGM UGM  Jarak antara TSR (benang atas) dan BSR (benang bawah) disebut interval stadia . September 5, 2016 pengukuran Beda Tinggi - MGR 30 Hor. Dist. = SI x SF SI = Stadia interval SF = Stadia factor
  • 31. TGM UGM Garis silang merupakan garis kolimasi  BB dan BA disebut dengan garis stadia  Biasanya stadia mempunyai faktor pengali 100 September 5, 2016 pengukuran Beda Tinggi - MGR 31
  • 32. TGM UGM  BA = 3.040  BB = 2.946  BA – BB = 0.094  Jarak optis = 0.094 x 100 = 9.4 metres September 5, 2016 pengukuran Beda Tinggi - MGR 32
  • 33. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 33 Hor. Dist. = TSR - BSR( )x SF Dist = TSR - BSR( ) x SF = 6.01 - 5.47( ) x 100 = 0.54 x 100 = 54 ft
  • 34. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 34 Dist = TSR - BSR( ) x SF = 7.844 - 4.619( ) x 100 = 3.225 x 100 = 322.5 ft
  • 35. TGM UGM Apabila Benang atas atau benang bawah terhalang, bisa digunakan cara ½ stadia. ½ stadia adalah setengah dari interval stadia September 5, 2016 pengukuran Beda Tinggi - MGR 35 Contoh : Jika TRS = 7.34 dan elevasi 6.21, maka jarak mendatarnya : Horizontal Distance = TSR - Elev( )x 2[ ]x 100 = 7.34 - 6.21( )x 2[ ]x 100 = 226 ft
  • 36. TGM UGM  Ada beberapa faktor yang mempengaruhi kesalahan pengukuran beda tinggi yang menggunakan penyipat datar, di antaranya ::   •        Kesalahan garis kolimasi  •        Karena kelengkungan bumi  •        Kesalahan refraksi (undulasi)  •        Kesalahan paralaks September 5, 2016 pengukuran Beda Tinggi - MGR 36
  • 37. TGM UGM  Garis kolimasi adalah garis imaginer yang lebat benang silang pada teropong sipat datar September 5, 2016 pengukuran Beda Tinggi - MGR 37
  • 38. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 38
  • 42. TGM UGM  Karena panas sinar matahari akan mengakibatkan bacaan di rambu kabur / tidak jelas (undulasi)
  • 43. TGM UGM Step 1 Staff Slowly Leant Towards Instrument Important Note – The person using the instrument keeps the staff vertical by use of the Vertical line in the instrument. Step 2 Staff Slowly Tilted away from Instrument. When Vertical lowest reading will be reading recorded Step 3 Staff Slowly Tilted away from instrument. Once past vertical readings will increase Kesalahan dalam Pembacaan Rambu Ukur September 5, 2016 pengukuran Beda Tinggi - MGR 43
  • 44. TGM UGM A B ba dHab d1 d2 HB = HA + dHab = HA + (a – b ) September 5, 2016 pengukuran Beda Tinggi - MGR 44
  • 45. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 45 B/S 2.510 F/S 1.202 Diff Between 1.308 B/S 2.301 F/S 1.517 Diff Between 0.784
  • 46. TGM UGM MSL Pengukuran beda tinggi dengan metode sipat datar September 5, 2016 pengukuran Beda Tinggi - MGR 46
  • 47. TGM UGM p0 p1 p0 = known point (benchmark) BS IS IS FS September 5, 2016 pengukuran Beda Tinggi - MGR 47
  • 48. TGM UGM A B ba dHab d1 d2 HB = HA + dHab = HA + (a – b ) September 5, 2016 pengukuran Beda Tinggi - MGR 48
  • 49. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 49
  • 50. TGM UGM  Baca TOR pengukuran  Buat SKETSA Lapangan  Pemasangan titik ikat di lapangan  Mengukur sudut  Mengukur Jarak  Mengukur Beda Tinggi  Mengukur Detil di lapangan September 5, 2016 pengukuran Beda Tinggi - MGR 50
  • 51. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 51 1. Jarak maksimum antara alat sipat datar ke rambu 60 meter. 2. Kedudukan alat pada setiap slag pengukuran harus pada jarak yang sama antara jarak instrumen ke rambu depan dan instrumen ke rambu belakang. TOR / KAK Kerangka acuan Kerja Baca TOR
  • 52. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 52 PENGUKURAN TITIK KONTROL VERTIKAL 1.Pengukuran tinggi titik-titik kontrol vertikal dilakukan dengan metode sipat datar. Spesifikasi pengukuran adalah sebagai berikut: 2.Sebelum alat digunakan harus dicek garis kolimasinya terlebih dahulu. 3.Pengukuran beda tinggi dalam satu seksi dilakukan pergi pulang dalam satu hari. 4.Jarak maksimum antara alat sipatdatar ke rambu 60 meter. 5.Kedudukan alat pada setiap slag pengukuran harus pada jarak yang sama antara jarak instrumen ke rambu depan dan instrumen ke rambu belakang. 6.Kesalahan penutup maksimum ukuran pergi-pulang sebesar 10 mm √L (L: dalam kilometer).
  • 53. TGM UGM p0 PENGUKURAN SATU SLAG BS FS September 5, 2016 pengukuran Beda Tinggi - MGR 53
  • 54. TGM UGM p0 p1 PENGUKURAN SATU SEKSI BS FS September 5, 2016 pengukuran Beda Tinggi - MGR 54
  • 55. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 55 p0 p1 P0 dan P1 = (benchmark))
  • 56. TGM UGM MSL Pengukuran beda tinggi dengan metode sipat datar September 5, 2016 pengukuran Beda Tinggi - MGR 56
  • 57. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 57
  • 58. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 58 Pengukuran PERGI ><PULANG
  • 59. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 59
  • 60. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 60
  • 61. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 61
  • 62. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 62
  • 63. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 63
  • 64. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 64
  • 65. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 65
  • 66. TGM UGM  A benchmark in every-day language is a point of reference for a measurement. In surveying a benchmark is specifically any permanent marker placed by a surveyor with a precisely known vertical elevation (but not necessarily a precisely known horizontal location). Designed to be used for many projects.
  • 70. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 70
  • 71. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 71 Set up the instrument where the benchmark can be viewed within correct parameters and a reasonable number of sights can be viewed. This location is identified as L1 circled in red
  • 72. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 72 Surveyor______________________ Chainmen_________________________________ Instrument No___________________ Date__________________ Backsight Intermediate Sight Foresight Rise Fall Reduced Level Top Bottom Dist Remarks 1.575 47.195 1.817 1.377 44.000 BM Booking Sheet
  • 73. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 73 Surveyor______________________ Chainmen_________________________________ Instrument No___________________ Date__________________ Backsight Intermediate Sight Foresight Rise Fall Reduced Level Top Bottom Dist Remarks 1.575 47.195 1.817 1.377 44.000 BM 1.250 Station 1 0.850 Station 2 1.330 Station 3 1.580 Station 4 Booking Sheet
  • 74. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 74 Surveyor______________________ Chainmen_______________________________ Instrument No___________________ Date__________________ Backsight Intermediate Sight Foresight Rise Fall Reduced Level Top Bottom Dist Remarks 1.575 47.195 1.817 1.377 44.000 BM 1.250 Station 1 0.850 Station 2 1.330 Station 3 1.580 Station 4 1.450 1.462 1.438 24.000 S5 (CP) Booking Sheet
  • 75. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 75 Surveyor______________________ Chainmen________________________________ Instrument No___________________ Date__________________ Backsight Intermediate Sight Foresight Rise Fall Reduced Level Top Bottom Dist Remarks 1.575 47.195 1.817 1.377 44.000 BM 1.250 Station 1 0.850 Station 2 1.330 Station 3 1.580 Station 4 1.450 1.570 1.330 24.000 S5 (CP) 2.550 2.680 2.420 26.000 S5 (CP) Booking Sheet
  • 76. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 76 Surveyor______________________ Chainmen_________________________________ Instrument No___________________ Date__________________ Backsight Intermediate Sight Foresight Rise Fall Reduced Level Top Bottom Dist Remarks 1.575 47.195 1.597 1.553 44.000 BM 1.250 S1 0.850 S2 1.330 S3 1.580 S4 1.450 1.570 1.330 24.000 S5 (CP) 2.550 2.680 2.420 26.000 S5 (CP) 1.980 S6 1.760 S7 1.710 S8 1.840 S9 1.920 S10 Booking Sheet
  • 77. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 77 Surveyor______________________ Chainmen_________________________________ Instrument No___________________ Date__________________ Backsight Intermediate Sight Foresight Rise Fall Reduced Level Top Bottom Dist Remarks 1.575 47.195 1.597 1.553 44.000 BM 1.250 S1 0.850 S2 1.330 S3 1.580 S4 1.450 1.570 1.330 24.000 S5 (CP) 2.550 2.680 2.420 26.000 S5 (CP) 1.980 S6 1.760 S7 1.710 S8 1.840 S9 1.920 S10 3.250 S11 (CP) Booking Sheet
  • 78. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 78 Surveyor______________________ Chainmen_________________________________ Instrument No___________________ Date__________________ Backsight Intermediate Sight Foresight Rise Fall Reduced Level Top Bottom Dist Remarks 1.575 47.195 1.597 1.553 44.000 BM 1.250 S1 0.850 S2 1.330 S3 1.580 S4 1.450 1.570 1.330 24.000 S5 (CP) 2.550 2.680 2.420 26.000 S5 (CP) 1.980 S6 1.760 S7 1.710 S8 1.840 S9 1.920 S10 3.250 3.400 3.100 30.000 S11 (CP) 1.831 2.021 1.641 38.000 S11 (CP) 1.258 1.418 1.098 32.000 BM
  • 79. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 79 Surveyor______________________ Chainmen_________________________________ Instrument No___________________ Date__________________ Backsight Intermediate Sight Foresight Rise Fall Reduced Level Top Bottom Dist Remarks 1.575 47.195 1.597 1.553 44.000 BM 1.250 S1 0.850 S2 1.330 S3 1.580 S4 1.450 1.570 1.330 24.000 S5 (CP) 2.550 2.680 2.420 26.000 S5 (CP) 1.980 S6 1.760 S7 1.710 S8 1.840 S9 1.920 S10 3.250 3.400 3.100 30.000 S11 (CP) 1.831 2.021 1.641 38.000 S11 (CP) 1.258 1.418 1.098 32.000 BM 5.956 5.958 (Misclose) 194.000 Booking Sheet
  • 80. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 80 Surveyor______________________ Chainmen_________________________________ Instrument No___________________ Date__________________ Backsight Intermediate Sight Foresight Rise Fall Reduced Level Top Bottom Dist Remarks 1.575 47.195 1.597 1.553 44.000 BM 1.250 0.325 S1 0.850 0.400 S2 1.330 -0.480 S3 1.580 -0.250 S4 1.450 0.130 1.570 1.330 24.000 S5 (CP) 2.550 2.680 2.420 26.000 S5 (CP) 1.980 0.570 S6 1.760 0.220 S7 1.710 0.050 S8 1.840 -0.130 S9 1.920 -0.080 S10 3.250 -1.330 3.400 3.100 30.000 S11 (CP) 1.831 2.021 1.641 38.000 S11 (CP) 1.258 0.573 1.418 1.098 32.000 BM 5.956 5.958 194.000 Booking Sheet
  • 81. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 81 Surveyor______________________ Chainmen_________________________________ Instrument No___________________ Date__________________ Backsight Intermediate Sight Foresight Rise Fall Reduced Level Top Bottom Dist Remarks 1.575 47.195 1.597 1.553 44.000 BM 1.250 0.325 S1 0.850 0.400 S2 1.330 -0.480 S3 1.580 -0.250 S4 1.450 0.130 1.570 1.330 24.000 S5 (CP) 2.550 2.680 2.420 26.000 S5 (CP) 1.980 0.570 S6 1.760 0.220 S7 1.710 0.050 S8 1.840 -0.130 S9 1.920 -0.080 S10 3.250 -1.330 3.400 3.100 30.000 S11 (CP) 1.831 2.021 1.641 38.000 S11 (CP) 1.258 0.573 1.418 1.098 32.000 BM 5.956 5.958 2.268 -2.270 194.000 Booking Sheet
  • 82. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 82 Surveyor______________________ Chainmen_________________________________ Instrument No___________________ Date__________________ Backsight Intermediate Sight Foresight Rise Fall Reduced Level Top Bottom Dist Remarks 1.575 47.195 1.597 1.553 44.000 BM 1.250 0.325 47.520 S1 0.850 0.400 47.920 S2 1.330 -0.480 47.440 S3 1.580 -0.250 47.190 S4 1.450 0.130 47.320 1.570 1.330 24.000 S5 (CP) 2.550 2.680 2.420 26.000 S5 (CP) 1.980 0.570 47.890 S6 1.760 0.220 48.110 S7 1.710 0.050 48.160 S8 1.840 -0.130 48.030 S9 1.920 -0.080 47.950 S10 3.250 -1.330 46.620 3.400 3.100 30.000 S11 (CP) 1.831 2.021 1.641 38.000 S11 (CP) 1.258 0.573 47.193 1.418 1.098 32.000 BM 5.956 5.958 2.268 -2.270 -0.002 194.000 Booking Sheet
  • 83. TGM UGM  Traverse Length = 190 metres  Allowable Misclose = 12 x SQRT(0.190) = 12 x 0.4359 = 5.23mm September 5, 2016 pengukuran Beda Tinggi - MGR 83
  • 84. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 84 Backsight Intermediate Sight Foresight Rise Fall 1.350 1.850 2.250 2.535 3.030 2.780 2.500 2.190 3.140 3.380 2.230 1.960 1.680 2.360 1.480 1.256 0.570
  • 85. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 85 Surveyor______________________ Chainmen_________________________________ Instrument No___________________ Date__________________ Backsight Intermediate Sight Foresight Rise Fall Reduced Level Top Bottom Dist Remarks 1.350 BM 1.850 B 2.250 C 2.535 D 3.030 E (CP) 2.780 F (CP) 2.500 F (CP) 2.190 G 3.140 H 3.380 I 2.230 J 1.960 K (CP) 1.680 K (CP) 2.360 L 1.480 M (CP) 1.256 BM 0.570 6.786 -6.790 0.000 0.000 B/S 6.786 RISE 0.000 END 0.000 F/S -6.790 FALL 0.000 START 0.000 Misclose -0.004 0.000 0.000 Booking Sheet
  • 86. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 86 Backsight Intermediate Sight Foresight Rise Fall 0.655 0.465 1.215 0.365 0.690 1.100 0.455 0.760 1.200 0.985 2.100 2.560 0.755 1.645 3.273 2.100
  • 87. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 87 Surveyor______________________ Chainmen_________________________________ Instrument No___________________ Date__________________ Backsight Intermediate Sight Foresight Rise Fall Reduced Level Top Bottom Dist Remarks 0.655 3.650 BM 0.465 0.190 3.840 B 1.215 -0.750 3.090 C 0.365 0.850 3.940 D 0.690 -0.325 3.615 E 1.100 -0.410 3.205 F (CP) 0.455 F (CP) 0.760 -0.305 2.900 G 1.200 -0.440 2.460 H 0.985 0.215 2.675 I 2.100 -1.115 1.560 J (CP) 2.560 J (CP) 0.755 1.805 3.365 K 1.645 -0.890 2.475 L (CP) 3.273 L (CP) 2.100 1.173 3.648 BM 6.943 -6.945 4.233 -4.235 B/S 6.943 RISE 4.233 END 3.648 F/S -6.945 FALL -4.235 START 3.650 Misclose -0.002 -0.002 -0.002 Booking Sheet
  • 88. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 88
  • 89. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 89 Surveyor______________________ Chainmen_________________________________ Instrument No___________________ Date__________________ Backsight Intermediate Sight Fore sight Height of Collimation Reduced Level Top Bottom Dist Remarks 1.575 48.770 47.195 1.250 47.520 0.850 47.920 1.330 47.440 1.580 47.190 Booking Sheet • It is more convenient for “Area Levelling” and can become cumbersome on long traverses. It is also an easier method for “On the Fly Levelling” • Also Known as Instrument Height Method
  • 90. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 90
  • 91. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 91 Set up the instrument where the benchmark can be viewed within correct parameters and a reasonable number of sights can be viewed. This location is identified as L1 circled in red
  • 92. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 92 Surveyor______________________ Chainmen_________________________________ Instrument No___________________ Date__________________ Backsight Intermediate Sight Fore sight Height of Collimation Reduced Level Top Bottom Dist Remarks 1.575 48.770 47.195 Booking Sheet
  • 93. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 93 Surveyor______________________ Chainmen_________________________________ Instrument No___________________ Date__________________ Backsight Intermediate Sight Fore sight Height of Collimation Reduced Level Top Bottom Dist Remarks 1.575 48.770 47.195 1.250 47.520 S1 0.850 47.920 S2 1.330 47.440 S3 1.580 47.190 S4 Booking Sheet
  • 94. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 94 Surveyor______________________ Chainmen_________________________________ Instrument No___________________ Date__________________ Backsight Intermediate Sight Fore sight Height of Collimation Reduced Level Top Bottom Dist Remarks 1.575 48.770 47.195 BM 1.250 47.520 S1 0.850 47.920 S2 1.330 47.440 S3 1.580 47.190 S4 1.450 48.770 S5 Booking Sheet
  • 95. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 95 Surveyor______________________ Chainmen_________________________________ Instrument No___________________ Date__________________ Backsight Intermediate Sight Fore sight Height of Collimation Reduced Level Top Bottom Dist Remarks 1.575 48.770 47.195 BM 1.250 47.520 S1 0.850 47.920 S2 1.330 47.440 S3 1.580 47.190 S4 2.550 1.450 49.870 47.320 S5 Booking Sheet
  • 96. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 96 Surveyor______________________ Chainmen_________________________________ Instrument No___________________ Date__________________ Backsight Intermediate Sight Fore sight Height of Collimation Reduced Level Top Bottom Dist Remarks 1.575 48.770 47.195 BM 1.250 47.520 S1 0.850 47.920 S2 1.330 47.440 S3 1.580 47.190 S4 2.550 1.450 49.870 47.320 S5 1.980 47.890 S6 1.760 48.110 S7 1.710 48.160 S8 1.840 48.030 S9 1.920 47.950 S10 Booking Sheet
  • 97. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 97 Surveyor______________________ Chainmen_________________________________ Instrument No___________________ Date__________________ Backsight Intermediate Sight Fore sight Height of Collimation Reduced Level Top Bottom Dist Remarks 1.575 48.770 47.195 BM 1.250 47.520 S1 0.850 47.920 S2 1.330 47.440 S3 1.580 47.190 S4 2.550 1.450 49.870 47.320 S5 1.980 47.890 S6 1.760 48.110 S7 1.710 48.160 S8 1.840 48.030 S9 1.920 47.950 S10 3.250 46.620 S11 (CP) Booking Sheet
  • 98. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 98 Surveyor______________________ Chainmen_________________________________ Instrument No___________________ Date__________________ Backsight Intermediate Sight Fore sight Height of Collimation Reduced Level Top Bottom Dist Remarks 1.575 48.770 47.195 BM 1.250 47.520 S1 0.850 47.920 S2 1.330 47.440 S3 1.580 47.190 S4 2.550 1.450 49.870 47.320 S5 1.980 47.890 S6 1.760 48.110 S7 1.710 48.160 S8 1.840 48.030 S9 1.920 47.950 S10 1.831 3.250 48.451 46.620 S11 (CP) 1.258 47.193 BM Booking Sheet
  • 99. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 99 Surveyor______________________ Chainmen_________________________________ Instrument No___________________ Date__________________ Backsight Intermediate Sight Fore sight Height of Collimation Reduced Level Top Bottom Dist Remarks 1.575 48.770 47.195 BM 1.250 47.520 S1 0.850 47.920 S2 1.330 47.440 S3 1.580 47.190 S4 2.550 1.450 49.870 47.320 S5 1.980 47.890 S6 1.760 48.110 S7 1.710 48.160 S8 1.840 48.030 S9 1.920 47.950 S10 1.831 3.250 48.451 46.620 S11 (CP) 1.258 47.193 BM 5.956 5.958 5.958 -0.002 Misclose Booking Sheet
  • 100. TGM UGM September 5, 2016 pengukuran Beda Tinggi - MGR 100 Surveyor______________________ Chainmen_________________________________ Instrument No___________________ Date__________________ Backsight Intermediate Sight Fore sight Height of Collimation Reduced Level Top Bottom Dist Remarks 1.575 48.770 47.195 BM 1.250 47.520 S1 0.850 47.920 S2 1.330 47.440 S3 1.580 47.190 S4 2.550 1.450 49.870 47.320 S5 1.980 47.890 S6 1.760 48.110 S7 1.710 48.160 S8 1.840 48.030 S9 1.920 47.950 S10 1.831 3.250 48.451 46.620 S11 (CP) 1.258 47.193 BM 5.956 5.958 5.958 -0.002 Misclose End RL 47.193 Start BM 47.195 Misclose -0.002 Booking Sheet
  • 101. TGM UGM  Definition – Misclose- is when closing of a traverse due to errors in readings and instrument limitations there is a discrepancy.  The allowable discrepancy is (12 x square root of traverse in kilometres) September 5, 2016 pengukuran Beda Tinggi - MGR 101
  • 102. TGM UGM  Traverse Length = 190 metres  Allowable Misclose = 12 x SQRT(0.190) = 12 x 0.4359 = 5.23mm September 5, 2016 pengukuran Beda Tinggi - MGR 102
  • 103. TGM UGM TERIMA KASIH Terimakasih PT. Waindo SpecTerra Geomatic Training and Research Center (GTRC) September 5, 2016 pengukuran Beda Tinggi - MGR 103
  • 104. TGM UGM PRAKTEK LAPANGANPRAKTEK LAPANGAN September 5, 2016 pengukuran Beda Tinggi - MGR 104

Hinweis der Redaktion

  1. Intermediate sights area measured staff positions that are not followed by relocation of the instrument (as this would be a foresight)
  2. Intermediate sights area measured staff positions that are not followed by relocation of the instrument (as this would be a foresight)
  3. Intermediate sights area measured staff positions that are not followed by relocation of the instrument (as this would be a foresight)
  4. STOP - ask students where should put staff to get most realism