The document summarizes planned improvements to East Park Reservoir in the city. The reservoir was originally constructed in 1869 following a drought. It will now be upgraded with two new 400-foot diameter concrete water storage tanks to replace aging infrastructure and protect water quality for many decades to come. Construction will take place primarily within the existing berm and last around 3.5 years, with some short-term external work requiring traffic mitigation. Community input has been incorporated into the design.