Diese Präsentation wurde erfolgreich gemeldet.
Wir verwenden Ihre LinkedIn Profilangaben und Informationen zu Ihren Aktivitäten, um Anzeigen zu personalisieren und Ihnen relevantere Inhalte anzuzeigen. Sie können Ihre Anzeigeneinstellungen jederzeit ändern.
YÜKSEL İNŞAAT A.Ş.
Company Presentation | As of 01 January 2015
V10 / Jan 2015
2
Section 2
Section 4
Section 3
Section 5
Capabilities
Management
Diversification
References
Table of Conte...
Section 1 | Company Overview
V10 / Jan 2015
4
An International Construction Company with Strong Technical Capabilities
• Yüksel İnşaat is a privately o...
V10 / Jan 2015
5
ENR Global Sourcebook Rankings, 2013 & 2014
GENERAL RANKINGS
SEGMENTAL RANKINGS
Based on International Re...
V10 / Jan 2015
6
Award of 2030m
Karakaya
Reservoir
Railway Bridge-
the longest
railroad bridge
in Turkey.
A Strong 52-Year...
V10 / Jan 2015
7
Steady Growth in Revenue
 The above values represent the turnover of the Yüksel İnşaat A.Ş. only.
7
0
10...
V10 / Jan 2015
8
0
500
1000
1500
2000
2500
3000
2008 2009 2010 2011 2012 2013 2014
2989
2430
2487
2285
2522
2507
2450
1388...
V10 / Jan 2015
9
Competent and Qualified Senior Management Team
Vice President
(Senior)
Bülent GÜNGÖR
40 years experience
...
V10 / Jan 2015
10
Yüksel Controls Most of the Major Group Entities
 Further information on the Yüksel Group Companies cou...
V10 / Jan 2015
11
Real Estate Development
Fiba – Yüksel Uluslararası
Proje Geliştirme ve Yatırım A.Ş.
• International cons...
V10 / Jan 2015
12
Transportation Power, Dams & Industrial Buildings Pipelines Environmental
• The segment covers the
const...
V10 / Jan 2015
13
 US$ amounts shown above are based on the total updated contract amounts of on-going and completed proj...
V10 / Jan 2015
14
Geographical Diversification
 Yüksel has worked in 15 different countries.
Current
Markets
New
Markets ...
Section 2 | Capabilities
V10 / Jan 2015
16
Strong construction capabilities
With solid history of project
execution and delivery
Sound order book o...
V10 / Jan 2015
17
 Values shown above represent the total updated contract amounts in US$ (share of Yüksel in the contrac...
V10 / Jan 2015
18
30 No. Construction Sites Abroad
Saudi Arabia - 17 no.
Afghanistan - 1 no.
Libya - 4 no.
Qatar - 3 no.
I...
V10 / Jan 2015
19
Manpower
As of 01 January 2015
Distribution of Manpower based on Education Distribution of Manpower base...
Section 3 | Diversification
V10 / Jan 2015
21
Reasonably spread across geographies Diversified portfolio by project segments
Broad Segmental Diversifi...
V10 / Jan 2015
22
Reasonably spread across geographies
Distribution of Turnover
Distribution of Turnover across countries ...
V10 / Jan 2015
23
Sizeable order books of US$4.59 billion across various project types (Yüksel Share: US$2.63 billion)
S/N...
Section 4 | Management
V10 / Jan 2015
25
Project Manager
Group Manager
Vice President
President
Board of Directors
VISITING SCHEME REPORTING SCHE...
V10 / Jan 2015
26
Identification Selection Tender
Award &
Performance
Development
 Periodicals (for tenders)
 Publicatio...
V10 / Jan 2015
27
Well defined selection process Careful selection of subcontractors and suppliers
 Best qualified and ex...
Section 5 | References
V10 / Jan 2015
29
126 projects of US$7.99 billion completed in Turkey (Yüksel Share: US$5.32 billion)
Power, Dams & Indust...
V10 / Jan 2015
30
221 overseas projects completed totaling US$7.91 billion (Yüksel Share: US$5.65 billion)
Saudi Arabia (3...
Section 5.1 | Completed Projects
V10 / Jan 2015
32
1) Altınkaya Dam and HEPP 700 MW, Turkey
 Rock fill / clay core type
 Installed Power Cap. / Annual En...
V10 / Jan 2015
33
2) Borçka Dam and HEPP 300 MW (2X150MW), Turkey
 Rock fill on clay core type
 Installed Power Cap. / A...
V10 / Jan 2015
34
3) Karkamış Dam and HEPP 189MW (6x31,5 MW), Turkey
 Earthfill on Clay Core (Run of River type)
 Instal...
V10 / Jan 2015
35
4) Kandil Group of Dams and HEPPs 440 MW, Turkey
 Project Place: Kahramanmaraş
 Project Country: Turke...
V10 / Jan 2015
36
5) Bolaman - Perşembe Highway, Turkey
 On Black Sea coastline
 Construction of 2 x 2 lane – 27.5 kilom...
V10 / Jan 2015
37
 North-South Extensions to Ras Abu Abboud Road
 Project Place: Doha
 Project Country: Qatar
 Employe...
V10 / Jan 2015
38
 Project Place: Doha
 Project Country: Qatar
 Employer: Public Works Authority (ASHGHAL)
 Date of Co...
V10 / Jan 2015
39
 Project Place: Şanlıurfa
 Project Country: Turkey
 Employer: KRG – General Directorate of State High...
V10 / Jan 2015
40
9) Ankara Light Rail Transit System, Turkey
 Project Place: Ankara
 Project Country: Turkey
 Employer...
V10 / Jan 2015
41
 Excavation support and design works of double lane subway tunnels
in length of 8,888 m
 1,025,215 m3 ...
V10 / Jan 2015
42
11) Yanbu – Medina Water Transmission System, Saudi Arabia
 Design-Build Project of transmission of des...
V10 / Jan 2015
43
12) Eastern Province Water Transmission System – Phase 2, Saudi Arabia
 Design-Build Project of treated...
V10 / Jan 2015
44
13) Ankara Central Wastewater Treatment Plant, Turkey
 Project Place: Ankara
 Project Country: Turkey
...
V10 / Jan 2015
45
14) Metrocity Business & Trade Center – Residence Complex, Turkey
 Design-Build Project in Levent on 24...
V10 / Jan 2015
46
15) Jordan Armed Forces General Headquarters Complex, Jordan
 Total construction area of 112,500 m2 on ...
V10 / Jan 2015
47
 Project Place: Kabul
 Project Country: Afghanistan
 Employer: NATO Maintenance and Supply Agency (NA...
Section 5.2 | Ongoing Projects
V10 / Jan 2015
49
1) Silvan Dam Construction (160 MW), Turkey
 Project Place: Diyarbakır
 Project Country: Turkey
 Empl...
V10 / Jan 2015
50
 Project Place: Erbil
 Project Country: Iraq
 Employer: KRG - Ministry of Construction & Housing, Gen...
V10 / Jan 2015
51
 Project Place: Ordu
 Project Country: Turkey
 Employer: General Directorate of State Highways
 Date...
V10 / Jan 2015
52
 Project Place: Doha
 Project Country: Qatar
 Employer: Lusail Development Company
 Date of Contract...
V10 / Jan 2015
53
 Project Place: Riyadh
 Project Country: Saudi Arabia
 Employer: Ar Riyadh Development Authority (ADA...
V10 / Jan 2015
54
 Project Place: İstanbul
 Project Country: Turkey
 Employer: İstanbul Metropolitan Municipality
 Dat...
V10 / Jan 2015
55
 Project Place: Doha
 Project Country: Qatar
 Employer: Qatar Rail Company (QRail)
 Date of Contract...
V10 / Jan 2015
56
8) Water Transmission from Hali, Yubah and Al Laith Dams to Shu’aibah Plant (Ph 2), Saudi Arabia
 Treat...
V10 / Jan 2015
57
 Project Place: Riyadh
 Project Country: Saudi Arabia
 Employer: Riyadh Municipality
 Date of Contra...
V10 / Jan 2015
58
 Project Place: Ras Al Khair
 Project Country: Saudi Arabia
 Employer: Royal Commission for Yanbu & J...
V10 / Jan 2015
59
 Project Place: Ankara
 Project Country: Turkey
 Employer: Ankara Water Channel Administration Water ...
V10 / Jan 2015
60
 Project Place: Brazzaville
 Project Country: Republic of Congo
 Employer: Anonim Congo Construction ...
V10 / Jan 2015
61
 Project Place: Kamis Mushayt
 Project Country: Saudi Arabia
 Employer: Gilbane Federal
 Date of Con...
V10 / Jan 2015
62
 Project Country: Oman
 Employer: Ministry of Transport and Communication, Sultanate of
Oman Directora...
V10 / Jan 2015
63
 Project Place: Sivas, Erzincan, Gümüşhane and Bayburt
 Project Country: Turkey
 Employer: Tanap Doğa...
V10 / Jan 2015
64
 Project Place: Riyadh
 Project Country: Saudi Arabia
 Employer: Ar-Riyadh Development Authority (ADA...
V10 / Jan 2015
65
Thank you for your attention.
Questions?
Contact Information:
E-mail: yuksel@yuksel.net
Phone: +90 312 2...
Nächste SlideShare
Wird geladen in …5
×

Main Yuksel Presentation 06_15v10-long-Rev13-June2015

2.092 Aufrufe

Veröffentlicht am

  • Als Erste(r) kommentieren

Main Yuksel Presentation 06_15v10-long-Rev13-June2015

  1. 1. YÜKSEL İNŞAAT A.Ş. Company Presentation | As of 01 January 2015
  2. 2. V10 / Jan 2015 2 Section 2 Section 4 Section 3 Section 5 Capabilities Management Diversification References Table of Contents Section 1 Company Overview 2
  3. 3. Section 1 | Company Overview
  4. 4. V10 / Jan 2015 4 An International Construction Company with Strong Technical Capabilities • Yüksel İnşaat is a privately owned, incorporated company having a capital of TL300 million. • Yüksel İnşaat is the flagship of Yüksel Holding with US$486 million annual turnover in 2014, which is more than 94% of Yüksel group companies’ turnover in the same period, that is US$515 million. • For 2014, total assets and equity of Yüksel Group were recorded as US$1,165 million and US$372 million respectively. • As of 01 January 2015, the company had order book of US$4.32 billion (Yüksel share US$2.45 billion) and backlog of US$1.31 billion largely in public-sector infrastructure. • Yüksel has 52 years of experience in construction industry. • Yüksel is ranked consistently among the top 250 International Contractors over the last 10 years according to Engineering News Record Magazine (ENR250). Yüksel was ranked from 85th to 132nd place between 2006 and 2015. • Approximately 7,000 employees are working for Yüksel. • Yüksel provides high-quality works and possess ISO 9001 Quality Reassurance, OHSAS 18001 Occupational Health and Safety and ISO 14001 Environmental Management Systems. QUALITY ENVIRONMENTAL HEALTH & SAFETY 4
  5. 5. V10 / Jan 2015 5 ENR Global Sourcebook Rankings, 2013 & 2014 GENERAL RANKINGS SEGMENTAL RANKINGS Based on International Revenue GENERAL RANKINGS SEGMENTAL RANKINGS 124th in Top 250 229th in Top 250Based on Total Revenue Highways 25th in Top 25 Transmission Lines & Aqueducts 18th in Top 25 Water Treatment & Desalination 25th in Top 25 Water Supply 32nd in Top 50 Hotels, Motels & Convention Centers 18th in Top 25 Government Offices 16th in Top 25 Water Treatment & Desalination 24th in Top 25 Water Supply 33th in Top 50 Transmission Lines & Aqueducts 13th in Top 25 Government Offices 19th in Top 25 Based on International Revenue 132nd in Top 250 230th in Top 250Based on Total Revenue 5
  6. 6. V10 / Jan 2015 6 Award of 2030m Karakaya Reservoir Railway Bridge- the longest railroad bridge in Turkey. A Strong 52-Years Track Record in Infrastructure Construction First international venture was in Saudi Arabia – Riyadh Quassim Water Transmission System and Reservoir Project Yüksel, the flagship entity of the Group, established in Ankara Completed construction of 700MW Altinkaya Dam and Hydro- Electric Power Plant in Turkey Yüksel Holding was formed as the umbrella company for the Group Largest infrastructure project in Turkey: the Gebze – Izmir Motorway and Izmit Bay Crossing under BOT scheme. Contract value of USD 6.8bn Award of the construction of infrastructure facilities in Kabul, by NATO Maintenance and Supply Agency 2008 First contract for U.S. Government was signed Key Milestones 1991 / 1995 Award of Ankaray (8.7 km double track Light Rail Mass Transit System) and Urfa- Suruç (76 km Motorway) Award of the largest natural gas pipeline project in Turkey: TANAP (Trans-Anatolian Natural Gas Pipeline) Completed construction of Ankara Waste Water Treatment Plant, the largest in Turkey and the second largest of its kind in Europe 1963 1983 1998 2014 1981 1989 1997 2003 2010 6
  7. 7. V10 / Jan 2015 7 Steady Growth in Revenue  The above values represent the turnover of the Yüksel İnşaat A.Ş. only. 7 0 100 200 300 400 500 600 700 800 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 159 127 297 396 446 571 623 720 716 521 654 721 486 Yüksel (Total Sales) x million USD
  8. 8. V10 / Jan 2015 8 0 500 1000 1500 2000 2500 3000 2008 2009 2010 2011 2012 2013 2014 2989 2430 2487 2285 2522 2507 2450 1388 1144 983 1383 1223 1397 1311 Order Book and Backlog Values as of 31st of Decembers Order Book (Yüksel Share) - USD million Backlog - USD million Order Book, Backlog & New Awards  New awards Values are updated according to U.S. Department of Labor / Bureau of Labor Statistics / PPI Finishes goods 0 200 400 600 800 1000 1200 1400 1600 1800 2000 2006 2007 2008 2009 2010 2011 2012 2013 2014 685 1216 1401 426 834 960 365 1015 1852 503 914 1389 426 531 694 168 648 714 New Awards as of 31st of Decembers New Awards - USD million New Awards (Yuksel Share) - USD million 8
  9. 9. V10 / Jan 2015 9 Competent and Qualified Senior Management Team Vice President (Senior) Bülent GÜNGÖR 40 years experience Vice President (Technical) Adil AĞOĞLU 38 years experience Vice President (Technical) Cüneyt KARACASU 32 years experience Vice President (Financial) Candan AK 33 years experience Chairman & CEO Emin SAZAK 27 years experience President Suha ÜNSAL 39 years experience Vice President (Technical) Erol ÖZDEMİR 29 years experience Vice President (Technical) Tolga AKKAŞ 20 years experience 9
  10. 10. V10 / Jan 2015 10 Yüksel Controls Most of the Major Group Entities  Further information on the Yüksel Group Companies could be obtained from www.yuksel.net 10
  11. 11. V10 / Jan 2015 11 Real Estate Development Fiba – Yüksel Uluslararası Proje Geliştirme ve Yatırım A.Ş. • International construction company with 52 years of experience in Turkey and abroad • Specialization in infrastructure and superstructure construction projects with focus on value added services • Diversified portfolio in terms of project type and geography • Ability to bid for large and complex contracts • Long-standing relations with Governments Contracting Sasel Elektromekanik A.Ş. Yüksel Yapı A.Ş. Yüksel İnşaat A.Ş. The Flagship of the Group Energy Yüksel Enerji Elektrik Üret. & Yüksel Enerji Holding Hydroelectric Power Plant Projects • Ownership in 250 acres of land in Çubuklu, İstanbul having wide views of the Bosphorus and close proximity to city center • A Green Field Project, Fiba – Yüksel Çubuklu Valley, which involves the development of high-end modern homes, recreation areas and a hotel • First phase of the Project, total value of around US$ 100 mn, sold out • One of the leading expertise companies providing design, engineering and contracting services in electromechanical works • Turn-key prefabricated structural elements production and erection Business Verticals • A Plant having 74MW installed capacity is under operation since 2012. • A Plant with 19 MW installed capacity started operation in 2013 and was sold in 2014. 11
  12. 12. V10 / Jan 2015 12 Transportation Power, Dams & Industrial Buildings Pipelines Environmental • The segment covers the construction of roads, motorways, highways, bridges, railways, rail mass transit systems and light rail transit systems (LRTS) and airports • Construction of 11 highways, 7 motorways and 4 light/heavy railway system projects in Turkey and abroad • In total, 25 km of bridges, 971 km of highways, 208 km of motorways, 60 km of tunnels and 39 km of railway system/railway infrastructure have been committed • The segment includes the construction of dams, HEPPs, civil works of combined cycle power plants, factories • Construction of 8 rock filled, 3 earth filled and 4 concrete major Dams & HEPPs in Turkey and Saudi Arabia • Total installed capacity of HEPPs undertaken by Yüksel is 2,421MW • The segment covers the construction of business and trade centers, high-end office buildings, five-star hotels, shopping malls, airport terminals, holiday villages, tourist resorts, residential high rise buildings, university complexes, warehouses and hospitals • Has been involved in more than 75 prominent building projects in Turkey and abroad • It has committed circa 3 mn m2 of total construction area over the last 52 years • The segment includes the construction of potable water lines, sewage lines, pumping stations and reservoirs • Has signed numerous contracts to undertake several large scale water transmission lines and reservoirs both in Turkey and the Gulf Region • In aggregate more then 1,800 km of pipelines have been accomplished • The segment covers the construction of waste and potable water treatment plants and infrastructural networks • Has accomplished a total treatment capacity of 2.1 million m3/day Order Book Order Book Order Book Order Book Order Book 1,084 97 469 533 267 Completed Completed Completed Completed Completed 2,279 2,014 3,688 1,326 653 Total Order Book = 2,450 Total Completed = 10,973 * * The total value for completed projects also includes works in other construction segments.  All values indicate Yüksel share in the contracts in US$ million.  The completed projects’ values are based on the updated contract amounts according to U.S. Department of Labor / Bureau of Labor Statistics / PPI Finishes goods Diversified Construction Segments 12
  13. 13. V10 / Jan 2015 13  US$ amounts shown above are based on the total updated contract amounts of on-going and completed projects  US Government and NATO Projects are also accounted for in the breakdown by project type. Marine Structures (Since 1963) Environmental (Since 1978) Transportation ( Since 1973) Power & Dams & Industrial (Since 1980) Material Supply & O&M (Since 2003) 1960 1970 20101980 1990 2000 US Govt. & NATO Projects (Since 2003) Oil & Gas and Water Pipelines (Since 1973) Buildings (Since 1974) Energy (Since 2005) Land Development (Since 1997) ContractingServices RealEstate &Energy Strong Track Record US$490m US$6,395m US$2,945m US$4,794m US$1,842m US$3,488m US$530m US$2,212m* US$220m US$320m 13
  14. 14. V10 / Jan 2015 14 Geographical Diversification  Yüksel has worked in 15 different countries. Current Markets New Markets / Offices 14
  15. 15. Section 2 | Capabilities
  16. 16. V10 / Jan 2015 16 Strong construction capabilities With solid history of project execution and delivery Sound order book of projects largely with government entities across geographies Diversified business model across geographical regions and project types Established track record of operational efficiency and financial performance Highly qualified, competent and experienced management team and workforce Prudent and proactive corporate strategy with robust risk management practice Key Strengths 16
  17. 17. V10 / Jan 2015 17  Values shown above represent the total updated contract amounts in US$ (share of Yüksel in the contracts are shown in paranthesis) as of 01 January 2015  Contract values are updated according to U.S. Department of Labor / Bureau of Labor Statistics / PPI Finishes goods Summary of Completed and Ongoing Projects Completed Projects Ongoing Projects Total Turkey International Turkey International Turkey International 126 projects $7.99 billion ($5.32 billion) 221 projects $7.91 billion ($5.65 billion) 9 projects $1.55 billion ($613 million) 28 projects $3.04 billion ($2.01 billion) 135 projects $9.54 billion ($5.93 billion) 249 projects $10.95 billion ($7.66 billion) 347 projects $15.90 billion ($10.97 billion) 37 projects $4.59 billion ($2.63 billion) 384 projects $20.49 billion ($13.60 billion) 17
  18. 18. V10 / Jan 2015 18 30 No. Construction Sites Abroad Saudi Arabia - 17 no. Afghanistan - 1 no. Libya - 4 no. Qatar - 3 no. Iraq - 2 no. Kazakhstan - 1 no. Republic of Congo - 1 no. Oman - 1 no. Turkish = 561 Non-Turkish = 4,527 Subcontractor = 383 Hired = 81 Total = 5,552 Head Office, Ankara Main Logistic Area, Ankara Liaison Office, Istanbul Turkish = 200 Total = 200 9 No. Construction Sites in Turkey Turkish = 316 Subcontractor = 775 Hired = 23 Total = 1,114 Global Presence As of 01 January 2015 GRAND TOTAL 6,866 Employees 18
  19. 19. V10 / Jan 2015 19 Manpower As of 01 January 2015 Distribution of Manpower based on Education Distribution of Manpower based on Source & Nationality Geographical Distribution of Manpower 0 500 1,000 1,500 2,000 2,500 3,000 1313 2624 2082 80 171 123 96 344 17 15 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 427 498 421 930 4589 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 1076 4527 1158 104 19
  20. 20. Section 3 | Diversification
  21. 21. V10 / Jan 2015 21 Reasonably spread across geographies Diversified portfolio by project segments Broad Segmental Diversification Across Geographical Regions Distribution of Completed Projects ($15.90 Billion in Total) Distribution of Order Book ($4.59 Billion in Total) Distribution of Completed Projects ($15.90 Billion in Total) Distribution of Order Book ($4.59 Billion in Total)  Contract values are updated according to U.S. Department of Labor / Bureau of Labor Statistics / PPI Finishes goods 21
  22. 22. V10 / Jan 2015 22 Reasonably spread across geographies Distribution of Turnover Distribution of Turnover across countries ($486 million in Total) Diversified portfolio by project segments Distribution of Turnover according to work segments ($486 million in Total) 22
  23. 23. V10 / Jan 2015 23 Sizeable order books of US$4.59 billion across various project types (Yüksel Share: US$2.63 billion) S/N Contract Client Country Value (US$ million) 1 Doha Metro, Red Line South Elevated & At Grade Package (22.50 %) Government Qatar 654 2 Infrastructure of the Third Phase of Riyadh Bus Rapid Transit System (BRT) Project (100%) * Government Saudi Arabia 610 3 TANAP - Trans-Anatolian Natural Gas Pipeline, Lot 2 (25 %) Government Turkey 540 4 Lusail Development CP4 – A1, A6 Roads, Marina and Southern Interchanges (50.00 %) Government Qatar 463 5 Kora-Shaqlawa-Qandeel Highway (100.00 %) Government Iraq 256 6 Ordu Ring Road Construction of the section btw. Km: 21+000 - 40+114.544 (25.00 %) Government Turkey 242 7 İstanbul Metro, between Unkapanı and Yenikapı - İstanbul (49.50 %) Government Turkey 206 8 Water Transmission from Dams of Hilli, Yobba and Al Laith to Shu’aibah Plant (Phase 2) (100.00 %) Government Saudi Arabia 174 9 Stormwater Networks in Al Naseem East, Al Naseem West and Maizaliah in Riyadh (100.00 %) Government Saudi Arabia 172 10 Construction of 1585 Houses and facilities, infrastructure and landscape works in Ankara Gölbaşı İncek (50.00 %) Government Turkey 167 11 Al Fateh University Agriculture, Veterinary and Science Faculty Buildings Projects Tripoli (100.00 %) Government Libya 160 12 F-15 Modernization Program, King Khalid Air Base Campus Construction (100.00 %) Government Saudi Arabia 136 13 Construction of infrastructure work of campuse A in Al Fateh University Tripoli (100.00 %) Government Libya 119 14 Establishment of Sea Water Pumping stations (201 C01) (50.00 %) Government Saudi Arabia 117 15 Gebze Orhangazi İzmir Highway between Km 19+213 - Km 30+700 construction work (50.00 %) Government Turkey 116 16 Dualization of Ibri - Yanqoul Stage 2 (60.00 %) Government Oman 109 17 Silvan Dam Construction (55.00 %) Government Turkey 107 18 Maintenance of Coastal Road Sirte – Ajdabiyah Section (90.74 %) Government Libya 105 19 Maintenance of Coastal Road Dernah-Imsaad Section (90.00 %) Government Libya 96 20 University of Dammam : Girls Colleges in Al Rayan Complex (50.00 %) Government Saudi Arabia 95 21 Çetin Hydropower Plant Civil Works including Hydraulic Steelworks and Auxiliary Powerhouse (55.00 %) Government Turkey 78 22 The First Stretch of Abu Bakr Siddique Road Development Project (100.00 %) Government Saudi Arabia 76 23 Faisal University, Teaching Hospital Al Hassa Phase 2A (50.00 %) Government Saudi Arabia 65 24 Ivedik Drinking Water Treatment Plant, Improvement of Unit 1 & Unit 2 & Construction of Unit 3 (100.00 %) Government Turkey 53 25 Refurbishment of King Fahad Hospital – Hofuf (50.00 %) Government Saudi Arabia 47 26 Mbamou Palace Hotel Construction & Renovation – Brazzaville (90.00 %) Government Republic of Congo 34 27 Others Government Various 202 Note: Values shown above represent the total updated contract amounts according to U.S. Department of Labor / Bureau of Labor Statistics / PPI Finishes goods. Share of Yüksel in the contracts are shown in paranthesis Sound Order Book of Projects Largely with Government Entities 37 no. of Current Projects; 37 no. for Governmental Entities 23 * This project has been awarded to Yüksel in 2015. The Value of this Project is not included in the Total Value of Ongoing Projects.
  24. 24. Section 4 | Management
  25. 25. V10 / Jan 2015 25 Project Manager Group Manager Vice President President Board of Directors VISITING SCHEME REPORTING SCHEME Daily communication Weekly reporting Monthly written reporting Quarterly reporting Twice a year Every two months Once a month Twice a month Work Sites Everyday Robust Management Culture 25
  26. 26. V10 / Jan 2015 26 Identification Selection Tender Award & Performance Development  Periodicals (for tenders)  Publications and/or web sites (of investing institutions)  Geographical/country based investment announcements and publications  Invitations from current or past clients  Introduction by clients or business associates  Size  Duration  Suitable scope  Country  Fund availability  Client profile and reputation  Pre-qualification criteria  Decision to participate  Partnering/teaming discussions  Prospective partner selection (scope suitability, resource availability, past experience and performance)  Assessment of project, contractual, market, etc. risks  Detailed cost estimation and projection  Tender preparation and submission  Key personnel planning  Appointment of Front End Management and Key Staff  Financial modelling, planning and scheduling  Detailed project planning  Execution of project plan with strict adherence to project timeline and costs  Handing Over Process duration can be 1 to 5 years with 2 to 3 years as average Superior project management capability gained over 52 years of successful operations A Systematic Work Flow Process 26
  27. 27. V10 / Jan 2015 27 Well defined selection process Careful selection of subcontractors and suppliers  Best qualified and experienced subcontractors/suppliers  Experienced in project territory  Demonstrate sound & enough resources to execute the contract  Financial resources  Technical resources (equipments & plants & robust database etc.)  Human resources (qualified manpower and experienced technical staff)  Capable of sharing the risk of the project (bonds, etc.)  Demonstrate good partnership skills in its past performance  Good relationships with the potential clients (preferably)  No bad litigation history  Open to direct communication  Good understanding of project requirements  Prepared to invest same effort with Yüksel throughout the project execution 1 Definition of procurement requirement  Procurement Conditions (Warranties, Planned budget, delivery schedule, technical qualifications, requested norms & standards, mock-ups, etc.)  Bill of Quantities  Place of Procurement (Head Office or Site) 2 Issuing of the RFQ (Request for Quotation) 3 Collecting the quotations 4 Evaluation of received quotations  Registering of Supplier/Subcontractors, which are complying with the conditions of RFQ, in Approved Vendors/Subcontractors List  Verification of Supplier/Subcontractors (Should not be in the Black List)  Defining the optimum proposal by technical and financial analysis 5 Negotiations with the short listed suitable suppliers/subcontractors 6 Signing Agreement with the Supplier/Sub-Contractor  Proper initial selection  Preliminary planning meetings to assure a complete understanding of scope, quality requirements, safety requirements and schedule  Detailed execution plans from subcontractors that will address schedules, manpower and supervision in detail  Inclusion of subcontractors in all weekly project planning meetings  Inclusion of subcontractors in the detailed schedule and in short term look-ahead schedule development to assures buy-in, understanding and cooperation  Inclusion of subcontractors in the CAPP safety incentive plans. Efforts to integrate partners Care and Effort Invested in Selecting Subcontractors and Partners 27
  28. 28. Section 5 | References
  29. 29. V10 / Jan 2015 29 126 projects of US$7.99 billion completed in Turkey (Yüksel Share: US$5.32 billion) Power, Dams & Industrial (3,302) Altınkaya Dam and Hydraulic Power Plant – SAMSUN (50.00 %) 616 Kandil Group Projects (Kandil, Sarıgüzel & Hacınınoğlu Dams & HEPPs) – KAHRAMANMARAŞ (100.00%) 583 Borçka Dam and Hydroelectric Power Plant – ARTVİN (55.25 %) 536 Karkamış Dam and Hydroelectric Power Plant – GAZİANTEP (55.00 %) 358 Muratlı Dam and Hydroelectric Power Plant – ARTVİN (31.13 %) 353 Transportation (2,248) ANKARAY-Ankara Light Rail Transit System – ANKARA (17.87 %) 517 Bolaman-Perşembe (Blacksea Coastal) Highway – ORDU (33.33 %) 427 Ankara-Pozantı Motorway, between Kemerhisar – Eminlik – NİĞDE (25.00 %) 309 Gaziantep-Şanlıurfa Motorway, between Suruç-Şanlıurfa – ŞANLIURFA (50.00 %) 290 Kadıköy-Kartal Rail Mass Transportation System Construction Works – İSTANBUL (26.00 %) 233 Borçka-Artvin ve Borçka-Murgul 1st Stage Highway – Borçka-Artvin 2nd Stage Highway ARTVİN (96.67 %) 153 İstanbul Metro, Taksim and Unkapanı – İSTANBUL (49.00 %) 105 Buildings (1,508) Metrocity Business &Trade Center – Residence Complex ISTANBUL (100.00 %) 185 Construction of Bosphorus (Swiss) Hotel – ISTANBUL (100.00 %) 109 Akmerkez Shopping, Offices, Apart Hotel Complex – İSTANBUL (100.00 %) 106 Hapimag Holiday Village and Hotel Bodrum – MUĞLA (100.00 %) 91 Construction of General Directorate Facilities for Turkish Radio and Television Establishment – ANKARA (100.00 %) 85 Restoration of Çırağan Palace and Construction of Çırağan Hotel – İSTANBUL (100.00 %) 78 Environmental (541) Ankara Central Wastewater Treatment Plant – ANKARA (31.31 %) 317 Turnkey Construction, Commissioning and Operation Works for three years of Adana East and West Wastewater Treatment Plants – ADANA (24.43 %) 101 Marine Structures (484) Bandırma Harbor – BALIKESİR (100.00 %) 68 Petrochemical Complex Port Aliaga – İZMİR (100.00 %) 48 Completion Construction for Extending the İsdemir Port – İSKENDERUN (100.00 %) 44 Pipelines (483) Melen Intake Weir and Melen & Cumhuriyet Pumping System – SAKARYA-İSTANBUL (55.00%) 93 Berdan-Mersin Pipeline for Supplying Water for Potable and Industrial Use of Mersin – MERSİN (100.00 %) 67 Van Drinking Water Line – VAN (100.00 %) 66 Note: Above list includes only the major projects completed; values shown above represent the total updated contract amounts in US$m (share of Yüksel in the contracts are shown in paranthesis); contract values are updated according to U.S. Department of Labor / Bureau of Labor Statistics / PPI Finishes goods Solid History of Project Execution and Delivery in Turkey 29
  30. 30. V10 / Jan 2015 30 221 overseas projects completed totaling US$7.91 billion (Yüksel Share: US$5.65 billion) Saudi Arabia (3,040) Yanbu - Medine Water Transmission System (32.59 %) 712 Eastern Province Water Transmission System - Phase 2 (100.00 %) 459 Medine -Yanbu Power Plant, Phase 2 – Lot 1 (12.45 %) 365 Al-Jubail Reverse Osmosis Desalination Plant (17.38 %) 240 King Faisal University Al Hasa Campus Phase 3 Infrastructure Works (50.00%) 209 Murwani Dam (100.00 %) 104 Afghanistan (1,058) Kabul International Airport NATO Facilities (100.00 %) 132 FY08-FY09 Projects, Bagram Air Base (100.00 %) 113 Afghan National Army Regional Brigade Facilities, Khost, Afghanistan (100.00 %) 78 Construction of USA Embassy in Kabul – AFGHANISTAN (100.00 %) 64 Iraq (843) Reoccurring and Non-reoccurring O&M for all H Sites (100.00 %) 202 Various services and material supply in Camp Anaconda (100.00 %) 62 Uzbekistan (816) Horezm Sugar Plant – URGENCH (46.30 %) 134 ITEC Business Center – TASHKENT (100.00 %) 111 ITEC Intercontinental Hotel – TASHKENT (100.00 %) 94 Construction of Tashkent U.S. Embassy Compound in UZBEKISTAN (40.00 %) 82 National Bank of Uzbekistan (NBU) Head Office Building – TASHKENT (100.00 %) 57 Kazakhstan (576) Almaty Financial District D Block ALMATY (50.00 %) 99 Alma-Ata Ankara Hotel /ALMATY (100.00 %) 89 Qatar (803) Doha Expressway (Package 7) Salwa Road – Phase 2 (Industrial I/C to Al Asiri I/C) (50.00 %) 500 North-South Extensions of Ras Abu Abboud Road - Doha (50.00%) 250 NDIA Project – Airside & Landside Roadways & Parking / Bridge Construction Works (100.00 %) 38 Jordan (236) Jordan Armed Forces General Headquarters Complex (100.00 %) 205 United Arab Emirates (222) Widening of Existing Dubai Bypass – Phase I and II (100.00 %) 123 Dubai International Airport Roads - Phase II – Expansions Beirut Road / Al Nahda Junction (100.00 %) 99 Romania (91) Bucharest - Constanta Motorway Construction Project - Subsection 2-Fundulea – Lehliu (34.00 %) 91 Georgia (81) Construction of Tblisi U.S. Embassy Compound in GEORGIA (40.00 %) 81 Ukraine (77) ST. Sophia Hyatt Regency Hotel Project – KIEV (100.00 %) 77 Note: Above list includes only the major projects completed; values shown above represent the total updated contract amounts in US$m (share of Yüksel in the contracts are shown in paranthesis); contract values are updated according to U.S. Department of Labor / Bureau of Labor Statistics / PPI Finishes goods Solid History of Project Execution and Delivery in International Markets 30
  31. 31. Section 5.1 | Completed Projects
  32. 32. V10 / Jan 2015 32 1) Altınkaya Dam and HEPP 700 MW, Turkey  Rock fill / clay core type  Installed Power Cap. / Annual Energ. Gen: 4x175 = 700 MW / 1,632GWh  Reservoir Capacity of 5763 hm3,  Crest Height and Length:195 / 634 m.  Amount of rock fill : 16,000,000cu.m,  Amount of concrete: 575,000m³,  Tunnel Length / Cross Section: 1,700m. / 9.8m.  Design-Build Project Highlights Project Statistics  Project Place: Samsun  Project Country: Turkey  Employer: General Directorate of State Water Works (DSI)  Date of Contract: 1980  Date of Completion: 1989  Project Value: US$ 270.7 million (Yüksel Share: 50 %)  Updated Project Value (as per PPI of USA) : US$ 616.2 million 32
  33. 33. V10 / Jan 2015 33 2) Borçka Dam and HEPP 300 MW (2X150MW), Turkey  Rock fill on clay core type  Installed Power Cap. / Annual Energ. Gen: 2x 150 = 300 MW / 1039GWh  Reservoir Capacity of 419 hm3  Crest Height and Length: 86 / 728 m.  Amount fill : 7.78 Million cu.m  Design-Build Project Project Highlights Project Statistics  Project Place: Artvin  Project Country: Turkey  Employer: DSI (General Directorate of State Hydraulic Works)  Date of Contract: 1999  Date of Completion: 2008  Project Value: US$ 457.5million (Yüksel Share: 64.8%)  Updated Project Value (as per PPI of USA) : US$ 688.9 million  Consortium Partners: Yüksel-Strabag-Temelsu (Construction) ; Va Tech Elin-Va Tech Voest-Verbundplan Voith Sulzer Papiermaschinen (Electromechanical) 33
  34. 34. V10 / Jan 2015 34 3) Karkamış Dam and HEPP 189MW (6x31,5 MW), Turkey  Earthfill on Clay Core (Run of River type)  Installed Power Capacity: 189MW (6x31,5 MW)  Annual Energy Generation: 653 GWh  Reservoir Capacity of 157 hm3  Crest Height and Length: 40 / 1647 m.  Amount fill : 2.1 Million cu.m,  Design-Build Project Project Highlights Project Statistics  Project Place: Gaziantep  Project Country: Turkey  Employer: DSI (General Directorate of State Hydraulic Works)  Date of Contract: 1995  Date of Completion: 2010  Project Value: US$ 228.6 million (Yüksel Share: 54.8%)  Updated Project Value (as per PPI of USA) : US$ 358.05 million  Consort. Partners: Va Tech Elin-Verbundplan -Voit Sulzer-Temelsu 34
  35. 35. V10 / Jan 2015 35 4) Kandil Group of Dams and HEPPs 440 MW, Turkey  Project Place: Kahramanmaraş  Project Country: Turkey  Employer: ERE Hidroelektrik Üretim A.Ş. (ENERJİSA)  Date of Contract: 2008  Date of Completion: 2013  Project Value: US$ 516.1 million (Yüksel Share: 100 %)  Updated Project Value (as per PPI of USA) : US$ 583.2 million Project Highlights Project Statistics  Kandil Dam & HEPP Concrete face rock fill type, Energy tunnel 9,400 m Crest Height and Length: 104 / 347 m  Sarıgüzel Dam & HEPP Sand-gravel fill concrete covered front face, Energy tunnel 4,000 m Crest Height and Length: 82 / 464 m  Hacınınoğlu Dam & Regulator Concrete gravity type, Energy tunnel of 5,500 m in length Crest Height and Length: 32 / 177 m  Installed capacity: 440 MW, Energy production: 1117.6 GWh  Hydro-mechanical equipment supply and erection included in scope 35
  36. 36. V10 / Jan 2015 36 5) Bolaman - Perşembe Highway, Turkey  On Black Sea coastline  Construction of 2 x 2 lane – 27.5 kilometres highway  Five tunnels having a total length of 2 x 4,587 metres  34 bridges having a total length of 7,600 metres  The longest highway tunnel in Turkey, Nefise Akçelik Tüneli, forms part of this project with a length of 2 x 3,777 metres. Project Highlights Project Statistics  Project Place: Ordu  Project Country: Turkey  Employer: General Directorate of State Highways  Date of Contract: 1997  Date of Completion: 2009  Project Value: US$ 280.7 million (Yüksel Share: 33.3 %)  Updated Project Value (as per PPI of USA) : US$ 426.6 million  Joint Venture Partners: Nurol and Tekfen 36
  37. 37. V10 / Jan 2015 37  North-South Extensions to Ras Abu Abboud Road  Project Place: Doha  Project Country: Qatar  Employer: NDIA (New Doha International Airport)  Date of Contract: 2007  Date of Completion: 2009  Project Value: US$ 208.2 million Yüksel Share: 50 %)  Updated Project Value (as per PPI of USA) : US$ 250.3 million Project Highlights Project Statistics  Construction of a dual four to five lanes free carriageway of approximately 4 km length  Construction of a two lane directional link tunnel of approximately 740 m length  Reconstruction of the east-west bridge at Ras Abu Abboud Road interchange  Construction of an underpass at the Naval Base junction  Construction of a buried drainage compound for storm water 6) North-South Extensions to Ras Abu Abboud Road, Qatar 37
  38. 38. V10 / Jan 2015 38  Project Place: Doha  Project Country: Qatar  Employer: Public Works Authority (ASHGHAL)  Date of Contract: 2010  Date of Completion: 2013  Project Value: US$ 446.2 million (Yüksel Share: 50 %)  Updated Project Value (as per PPI of USA) : US$ 497.03 million Project Highlights Project Statistics  Construction of 6.8 Km long 2x4 Expressway plus 2x3 slip roads  4 signalized interchanges with 3 underpasses along the mainline  New asphalt pavement construction, storm water drainage system, TSE network  Relocating and upgrading the existing utilities network  Relocating foul sewerage lines  2200 linear meters of micro tunneling  Street lighting, traffic signs, road markings and traffic signals  Landscaping work 7) Doha Expressway (Package 7) Salwa Road – Phase 2, Qatar 38
  39. 39. V10 / Jan 2015 39  Project Place: Şanlıurfa  Project Country: Turkey  Employer: KRG – General Directorate of State Highways  Date of Contract: 1998  Date of Completion: 2010  Project Value: US$ 189.32 million (Yüksel Share: 50 %)  Updated Project Value (as per PPI of USA) : US$ 290.23 million Project Highlights Project Statistics  The Project is a connection for TEM (Trans European Motorway) to GAP area and then to the Syria / Habur border crossing.  The scope of work includes 17.26 km of 2x2-lane and 58.50 km of 2x3-lane highway sections  The Project was undertaken by a partnership including Yüksel İnşaat A.Ş. 8) Gaziantep – Şanlıurfa Motorway, Turkey 39
  40. 40. V10 / Jan 2015 40 9) Ankara Light Rail Transit System, Turkey  Project Place: Ankara  Project Country: Turkey  Employer: Ankara Metropolitan Municipality General Directorate of Electricity Gas and Public Transportaton.(EGO) Date of Contract: 1991  Date of Completion: 1996  Project Value: US$ 314.35 million (Yüksel Share: 17.9 %.)  Updated Project Value (as per PPI of USA) : US$ 517.36 million  Consortium Partners: Siemens-AEG-Breda-Simko-Bayindir) Project Highlights Project Statistics  8,527 km in length together with all auxillary facilities  11 Stations, 1,226 m  1,754 m Bored Tunnel  4,917m cut and cover Tunnel  412 m open trench  217 m at grade  Design-Build Project 40
  41. 41. V10 / Jan 2015 41  Excavation support and design works of double lane subway tunnels in length of 8,888 m  1,025,215 m3 excavation work  51,691 m3 concrete  18,907 ton re-bar  8,304 units TBM pre-cast segments  12,328 m (6,164 x 2) bore tunnel (EPB-TBM) and 5,448 m (2,724 x 2) deep tunnel (NATM)  7 underground deep tunnel Project Highlights Project Statistics  Project Place: İstanbul  Project Country: Turkey  Employer: İstanbul Metropolitan Municipality İETT General Directorate  Date of Contract: 2005  Date of Completion: 2010  Project Value: US$ 181.45 million (Yüksel Share: 26 %)  Updated Project Value (as per PPI of USA) : US$ 233.33 million 10) Kadıköy – Kartal Mass Transportation System, Turkey 41
  42. 42. V10 / Jan 2015 42 11) Yanbu – Medina Water Transmission System, Saudi Arabia  Design-Build Project of transmission of desalinated water from the Yanbu industrial area to Yanbu city, Rayyis and Madinah with a capacity of 363,000 m³/day.  The project consists of four different groups of work: pipeline, stations, reservoirs and housing compound.  Yüksel performed a 60” and 32” steel pipeline work of 200 kilometers  Yüksel constructed a 4 x 140,000 m³ steel reservoir foundation (101.8m dia.),10 x 50,000 m³ 1 x 35,000 m³, 2 x 25,000 m³, 2 x 5,000 m³,1 x 1,000 m³ reinforced concrete reservoirs and station buildings  18 luxurious three floor buildings (108 flats) at Yanbu, a house at Musayjeed, two guest villas and a house in Medinah with a total gross construction area of 40,000 m² Project Highlights Project Statistics  Project Place: Yanbu - Medina  Project Country: Saudi Arabia  Employer: Saline Water Conversion Corporation (SWCC)  Date of Contract: 1993  Date of Completion: 2001  Project Value: US$ 443.5 million (Yüksel Share: 31.9%)  Updated Project Value (as per PPI of USA) : US$ 712.16 million  Consortium Partners: Saudi Techint Co. Ltd.-Techint International Construction Co./Yüksel İnşaat Saudia Co. 42
  43. 43. V10 / Jan 2015 43 12) Eastern Province Water Transmission System – Phase 2, Saudi Arabia  Design-Build Project of treated water transmission line from Marafia seawater treatment plant in Jubail to Damman  133km steel pipeline which shall transmit 500,000 m3 water/day  78km – 76”  24km – 68”  17km – 64”  Contract includes construction of 2 pump stations with 8 pumps having 14,623 m3/hr total capacity as well as water tanks having 730,000 m3 reservoir volume Project Highlights Project Statistics  Project Place: Jubail-Al Khobar  Project Country: Saudi Arabia  Employer: Saline Water Conversion Corporation (SWCC)  Date of Contract: 2008  Date of Completion: 2011  Project Value: US$ 406.6 million (Yüksel Share: 100 %)  Updated Project Value (as per PPI of USA) : US$ 459.48 million  Siemens was supplier and Electrical Services Provider) 43
  44. 44. V10 / Jan 2015 44 13) Ankara Central Wastewater Treatment Plant, Turkey  Project Place: Ankara  Project Country: Turkey  Employer: Ankara Metropolitan Municipality General Directorate of Ankara Water and Sewerage Administration  Date of Contract: 1992  Date of Completion: 1998  Project Value: US$ 194.88 million (Yüksel Share: 31.3 %)  Updated Project Value (as per PPI of USA) : US$ 316.85 million  Consortium Partners: Brochier GmbH, Preussag Noell, AEG Project Highlights Project Statistics  Construction land : 182 ha  Domestic effluent : 676,200m3/day  Industrial effluent : 103,680m3/day  Excavation : 3,000,000 m3  Concrete : 250,000 m3  Reinforcement : 20,000 tons  Second largest in Europe and largest in Turkey  Design-Build Project 44
  45. 45. V10 / Jan 2015 45 14) Metrocity Business & Trade Center – Residence Complex, Turkey  Design-Build Project in Levent on 24,000 m2 land area.  Consists of a total construction area of 210,200 m2, including a 23- storey 16,500 m2 office block, two 27-storey residential blocks having an area of 46,700 m2, a 52,000 m2 shopping center and 85,000 m2 social facilities as well as parking lots.  The first section, Metrocity Millennium, has two 27-storey residential towers.  The other sections of the complex contain a 23-storey office tower with a total of 16,500 square meters, social facilities, a 52,000 m2 shopping center and parking for 2,200 vehicles. Project Highlights Project Statistics  Project Place: Istanbul  Project Country: Turkey  Employer: Yüksel Yapı A.Ş.  Date of Contract: 1997  Date of Completion: 2006  Project Value: US$ 122 million (Yüksel Share: 100 %)  Updated Project Value (as per PPI of USA) : US$ 185.4 million 45
  46. 46. V10 / Jan 2015 46 15) Jordan Armed Forces General Headquarters Complex, Jordan  Total construction area of 112,500 m2 on 350,000 m2 land area  14 typical office buildings, a main administrative building, a blast proof underground command center building, 3 soldier dormitories, a sports center facility with a swimming pool, 3 admin and depot buildings, a mosque, a heating center and fire brigade building, 5 burried potable and storm water tanks, 1 large and 3 small size transformer buildings, 9 compound access control buildings, 27 observing structures  Design-Build Project including all infrastructural and landscaping works within the compund area.  4,000m long reinforced concrete high perimeter walls, 105,000m² asphalt roads, 2 helipads and 864 vehicle capacity parking lots. Project Highlights Project Statistics  Project Place: Amman  Project Country: Jordan  Employer: DIP (Development & Investment Project Foundation)  Date of Contract: 2004  Date of Completion: 2008  Project Value: US$ 151.7 million (Yüksel Share: 100 %)  Updated Project Value (as per PPI of USA) : US$ 204.6 million 46
  47. 47. V10 / Jan 2015 47  Project Place: Kabul  Project Country: Afghanistan  Employer: NATO Maintenance and Supply Agency (NAMSA)  Date of Contract: 2008  Date of Completion: 2010  Project Value: US$ 116.6 million (Yüksel Share: 100 %)  Updated Project Value (as per PPI of USA) : US$ 131.75 million Project Highlights Project Statistics  Design-Build Project  Infrastructural works on 1,000,000 m2 land area  Construction of 30 buildings including terminal, main office, temporary and permanent accommodation facilities, canteen, treatment and maintenance having about total 30,000 m2 gross construction area  The facility shall be used by the International Security Assistance Force (ISAF) and will be providing service for total of 3,800 people 16) Kabul International Airport NATO Facilities, Afghanistan 47
  48. 48. Section 5.2 | Ongoing Projects
  49. 49. V10 / Jan 2015 49 1) Silvan Dam Construction (160 MW), Turkey  Project Place: Diyarbakır  Project Country: Turkey  Employer: DSI (General Directorate of State Hydraulic Works)  Date of Contract: 2011  Date of Completion: Ongoing  Project Value: US$ 102.23 million (Yüksel Share: 50 %)  Updated Project Value (as per PPI of USA) : US$ 107.49 million Project Highlights Project Statistics  Rock Fill Dam with Concrete Covered Face  Crest Height and Length: 174.5 m / 440 m  Dam Body Volume: 8,50 hm3  Construction of the dam body, downstream and upstream cofferdams, power and derivation tunnels, spillway and injection works.  The dam access road, temporary downstream bridge, other bridges as required by the project, and material transport roads are also included in the scope. 49
  50. 50. V10 / Jan 2015 50  Project Place: Erbil  Project Country: Iraq  Employer: KRG - Ministry of Construction & Housing, General Directorate of Roads & Bridges  Date of Contract: 2009  Date of Completion: Ongoing  Project Value: US$ 220.82 million (Yüksel Share: 100 %)  Updated Project Value (as per PPI of USA) : US$ 256.27 million Project Highlights Project Statistics  51 km 2 x 2 highway construction  Contract include 2 tunnels having total length of 1,315 m  The project is a section of the main highway to Iran  Excavation works over 5,000,000 m3  Fill and compaction works over 3,500,000 m3 2) Kora-Shaqlawa-Qandeel Highway, Iraq 50
  51. 51. V10 / Jan 2015 51  Project Place: Ordu  Project Country: Turkey  Employer: General Directorate of State Highways  Date of Contract: 2012  Date of Completion: Ongoing  Project Value: US$ 234.42 million (Yüksel Share: 25%)  Updated Project Value (as per PPI of USA) : US$ 241.78 million Project Highlights Project Statistics  19.1 km of 2X2 lane ring road construction from Km: 21+000 and to Km: 41+114  Earthworks, road construction, asphalt pavement, road marking, road drainage and small culvert structures within the scope  Constrution of two double tube tunnels and two viaducts.  Boztepe Tunnel: 3311 m (twin tube)  Öceli Tunnel : 2020 m (twin tube)  Civil Viaduct: 672 m (13,5 m x 2)  Melet Viaduct: 1198 m (13,5 m x 2) 3) Ordu Ring Road, Turkey 51
  52. 52. V10 / Jan 2015 52  Project Place: Doha  Project Country: Qatar  Employer: Lusail Development Company  Date of Contract: 2013  Date of Completion: Ongoing  Project Value: US$ 454.77 million (Yüksel Share: 50%)  Updated Project Value (as per PPI of USA) : US$ 463.29 million Project Highlights Project Statistics  Construction of 4.8 km long, 2x4 expressway with 6 signalized grade  separated interchanges on the roads A1, A6, A10, D11.  6 underpasses at Junction 12, Junction 13, Junction 14, Marina,  Wadi and at Southern interchange.  Construction of 2 flyovers at Marina and Southern interchanges.  Construction of feature Arch at Marina interchange.  Construction of 2 tunnels along road A1.  Construction of new storm-water drainage system which  involves construction of 15 shafts, 4’600 lm micro-tunneling of  2’400 and 3’000 mm diameters.  Construction of new utilities such as TSE network, waste water,  foul sewer lines, district cooling and gas distribution system,  telecom network, fire protection network, irrigation network, 4 electrical  substations with electrical cable lines.  Street lighting, traffic signs, road markings and traffic signals.  Landscaping. 4) Lusail Development – Construction Package 4 (CP4) – A1, A6 Roads, Marina and Southern Interchanges, Qatar 52
  53. 53. V10 / Jan 2015 53  Project Place: Riyadh  Project Country: Saudi Arabia  Employer: Ar Riyadh Development Authority (ADA)  Date of Contract: 2013  Date of Completion: Ongoing  Project Value: US$ 74.94 million (Yüksel Share: 100.0 %)  Updated Project Value (as per PPI of USA) : US$ 76.34 million Project Highlights Project Statistics  Construction of 2.2 km asphalt road  326m overfly bridge  3 no. pedestrian overpasses  All civil mechanical and electrical infrastructure works  16,980m storm drainage pipeline  Construction of Reverse Osmosis Plant with tanks and 3 water wells  Landscaping & hardscaping works  Relocation of existing utilities at junction points. 5) The First Stretch of Abu Bakr Siddique Road Development Project, Saudi Arabia 53
  54. 54. V10 / Jan 2015 54  Project Place: İstanbul  Project Country: Turkey  Employer: İstanbul Metropolitan Municipality  Date of Contract: 1998 (Taksim-Unkapanı) & (Unkapanı – Yenikapı)  Date of Completion: 2009 (Taksim-Unkapanı) Ongoing (Unkapanı-Yenikapı)  Project Value: US$ 68.32 million (Yüksel Share: 49.0 %) (Taksim - Unkapanı) US$ 134.29 million (Yüksel Share: 49.5 %) (Unkapanı - Yenikapı)  Updated Project Value (as per PPI of USA) : US$ 104.73 million (Taksim – Unkapanı) US$ 205.87 million (Unkapanı - Yenikapı) Project Highlights Project Statistics  2 Contracts  Taksim – Unkapanı (completed) 4.029 m.of bored tunnel One station in Sishane Protection of historical structures.  Unkapanı – Yenikapı (ongoing) 6,270m. of bored tunnel 600m. of light rail system, 20m. of depressed (with retaining wall) Two stations in Yenikapı (cut and cover) and Şehzadebaşı (bored). The Yenikapı Station is cut and covered and also is designed as a station for the light rail metro. 6) Taksim - Unkapanı & Unkapanı - Yenikapı Metro System, Turkey 54
  55. 55. V10 / Jan 2015 55  Project Place: Doha  Project Country: Qatar  Employer: Qatar Rail Company (QRail)  Date of Contract: 2014  Date of Completion: Ongoing  Project Value: US$ 653.89 million (Yüksel Share: 22.5 %)  Updated Project Value (as per PPI of USA) : US$ 653.89 million Project Highlights Project Statistics  Design-Build Turn – Key contract for civil works of the elevated and at-grade sections of the Doha Metro Red Line South  Total Line Length: 7,432 m  Elevated Viaduct: 6,295 m  Ramp Section: 715 m  At-Grade Section: 422 m  3 No. of Elevated Metro Stations  Highway Works: 1,570 m of trough and underpass  Utility relocations;  Related MEP works 7) Doha Metro Project Redline South Elevated and At Grade, Qatar 55
  56. 56. V10 / Jan 2015 56 8) Water Transmission from Hali, Yubah and Al Laith Dams to Shu’aibah Plant (Ph 2), Saudi Arabia  Treated water transmission line from Hali, Yubah and Al Laith Dams to Shu’aibah Plant to supply water to Makkah.  175 km steel pipeline of 60’’  Construction of line valves chambers, air and drain valve chambers including necessary valves, fiber optic cables, and thrust boring activities Project Highlights Project Statistics  Project Place: Saudi Arabia (Western Region)  Project Country: Saudi Arabia  Employer: Ministry of Water and Electricity  Date of Contract: 2011  Date of Completion: Ongoing  Project Value: US$ 165.74 million (Yüksel Share: 100 %)  Updated Project Value (as per PPI of USA) : US$ 174.26 million 56
  57. 57. V10 / Jan 2015 57  Project Place: Riyadh  Project Country: Saudi Arabia  Employer: Riyadh Municipality  Date of Contract: 2013  Date of Completion: Ongoing  Project Value: US$ 168.8 million (Yüksel Share: 100 %)  Updated Project Value (as per PPI of USA) : US$ 171.96 million Project Highlights Project Statistics  Construction of Storm Water Drainage System in Naseem East, West and Al Maizaliah Districts in Riyadh City  Box culverts with 40 km total length  GRP pipelines with 300-1200mm diameter having 126 km total length including all civil and mechanical works  413,249 m2 re-asphalting works  226,000 m long traffic diversion  Relocation of existing utilities 9) Stormwater Networks in Al Naseem East & West and Maizaliah Districts in Riyadh, Saudi Arabia 57
  58. 58. V10 / Jan 2015 58  Project Place: Ras Al Khair  Project Country: Saudi Arabia  Employer: Royal Commission for Yanbu & Jubail  Date of Contract: 2013  Date of Completion: Ongoing  Project Value: US$ 114.49 million (Yüksel Share: 50 %)  Updated Project Value (as per PPI of USA) : US$ 116.63 million Project Highlights Project Statistics  Construction of seawater cooling pump station  Construction of Hypochlorite Generation Building and all associated ancillary buildings including civil, architectural, electromechanical works  Dredging of Intake Canal and Depositing on Site: 200,000 m3  Shaping Dredged Fill to Achieve Required Grades: 200,000 m2  Asphalt Concrete Surface & Base Courses: 24,000 m2  Potable Water & Stormwater RTRP & PVC Pipelines: 2,690 m  Storm Channel Reinforced Concrete: 1,600 m  Sanitary Lift Station: 1 No 10) Procurement & Construction of Sea Water Pump Stations 201-C01, Saudi Arabia 58
  59. 59. V10 / Jan 2015 59  Project Place: Ankara  Project Country: Turkey  Employer: Ankara Water Channel Administration Water Construction Department Head Office  Date of Contract: 2012  Date of Completion: Ongoing  Project Value: US$ 51.17 million (Yüksel Share: 100 %)  Updated Project Value (as per PPI of USA) : US$ 52.78 million Project Highlights Project Statistics  The biggest water treatment plant of Turkey, the “İvedik Water Treatment Plant” designed to supply water for drinking, usage and industrial purposes to Ankara until year 2020.  Planned to be constructed in four stages (Units I., II., III., & IV.)  Each stage containes units with capacity of 564 000 m3/day.  Units I. and II. completed and put in operation in 1984 and 1992.  The rehabilitation of Units I. & II. and the construction of Unit III. with capacity of 564 000 m3/day are included in the scope of the contract 11) İvedik Drinking Water Treatment Plant, Improvement of Unit I & Unit II, Construction of Unit III, Turkey 59
  60. 60. V10 / Jan 2015 60  Project Place: Brazzaville  Project Country: Republic of Congo  Employer: Anonim Congo Construction (ACC)  Date of Contract: 2014  Date of Completion: Ongoing  Project Value: US$ 33.9 million (Yüksel Share: 90 %)  Updated Project Value (as per PPI of USA) : US$ 33.9 million Project Highlights Project Statistics  The gross construction area of the building: Approximately 21,000 m2,  Converting the existing facility to a five star hotel complex,  Performing design studies, finishing works, mechanical-electrical installations, interior design and landscape activities,  Construction of ballroom/restaurant along with underground parking facilitie. 12) Mbamou Palace Hotel Construction & Renovation – Brazzaville, Republic of the Congo 60
  61. 61. V10 / Jan 2015 61  Project Place: Kamis Mushayt  Project Country: Saudi Arabia  Employer: Gilbane Federal  Date of Contract: 2014  Date of Completion: Ongoing  Project Value: US$ 135.56 million (Yüksel Share: 100 %)  Updated Project Value (as per PPI of USA) : US$ 135.56 million Project Highlights Project Statistics  Construction of additional facilities that shall be used for training 1200 RSAD personnel in total related with F-15 aircrafts in King Khalid Airport located,  Approximate area of the aforementioned facilities is equal to 46.000 m2 in total,  Four sleeping quarters (28.800 m2 in total), Military Training Facilities: (10.550 m2), Headquarters Building: (790 m2), Kitchen and Dining Hall Building (2.770 m2), Mosque (600 m2), Social Facilities (530 m2)  Aviation Electronics Facilities- 1830 m2 13) F-15 Fleet Modernization Program, Royal Saudi Air Force Projects: KKAB-13-0001, KKAB-13- 0002 At King Khalid Air Base (KKAB), Khamis Mushayt - Saudi Arabia 61
  62. 62. V10 / Jan 2015 62  Project Country: Oman  Employer: Ministry of Transport and Communication, Sultanate of Oman Directorate General of Roads & Land Transport  Date of Contract: 2014  Date of Completion: Ongoing  Project Value: US$ 109.18 million (Yüksel Share: 60 %)  Updated Project Value (as per PPI of USA) : US$ 109.18 million Project Highlights Project Statistics  Dualization of 38 km existing single lane,  Construction of 65 km single lane along with rehabilition of 4.5 km Al- Arid Road,  The alignment consists of 10 roundabout,4 vehicular underpass and total 735 culvert cell in 110 different locations. 14) Dualization of Ibri - Yanqul Road (Stage II) - Oman 62
  63. 63. V10 / Jan 2015 63  Project Place: Sivas, Erzincan, Gümüşhane and Bayburt  Project Country: Turkey  Employer: Tanap Doğalgaz İletişim A.Ş.  Date of Contract: 2014  Date of Completion: Ongoing  Project Value: US$ 539.84 million (Yüksel Share: 25 %)  Updated Project Value (as per PPI of USA) : US$ 539.84 million Project Highlights Project Statistics  Second lot out of 1334 km long three pipeline construction packages  Construction of 450 km (between km 375 and km 825), 56’’ diameter pipeline that will go through Sivas, Erzincan, Gümüşhane and Bayburt cities of Turkey.  The works, including procurement of materials (except for CLIENT Supplied Items), construction, installation, testing, training CLIENT personnel, pre-commissioning and providing commissioning assistance, are planned to be completed in 36 months.  Starting from the Georgia border, TANAP will cross Turkey in east- west direction and connect to TAP Project (Trans Adriatic Pipeline) in Greece border. 15) TANAP (Trans-Anatolian Natural Gas Pipeline) II. Lot - Turkey 63
  64. 64. V10 / Jan 2015 64  Project Place: Riyadh  Project Country: Saudi Arabia  Employer: Ar-Riyadh Development Authority (ADA)  Date of Contract: 2015  Date of Completion: Ongoing  Project Value: US$ 610 million (Yüksel Share: 100 %)  Updated Project Value (as per PPI of USA) : US$ 610 million Project Highlights Project Statistics  22 km road rehabilitation works,  Construction of 21 pairs of Bus Rapid Transit System Stations, 2574 ea. Community Bus Stops and 7 ea. Pedestrian Bridges with all civil, mechanical and electrical works,  The project consists of two different packages (Package A and Package B) and comprises of supply, installation, testing & commissioning of all project materials. 16) Infrastructure of the Third Phase of Riyadh Bus Rapid Transit System (BRT) Project – Saudi Arabia * 64 * This project has been awarded to Yüksel in 2015. The Value of this Project is not included in the Total Value of Ongoing Projects.
  65. 65. V10 / Jan 2015 65 Thank you for your attention. Questions? Contact Information: E-mail: yuksel@yuksel.net Phone: +90 312 284 25 45 Fax: +90 312 286 17 37 Address: Yüksel İnşaat A.Ş., Söğütözü Cad. 14/A-B 06560 Beştepeler-Ankara/Turkey

×