SlideShare ist ein Scribd-Unternehmen logo
1 von 5
214-536-9755 Mobile                               972-890-8272 Home



Pete Day
Objective    A challenging position as a Construction Superintendent in a professional environment.

Experience   5-30-07 to Present                        Archer Western Contractors         Arlington, Texas
             Civil Superintendent       512-848-1744 Silas Fisher
                                        504-202-5348 Jason Burkhart

             •Assist estimating department in crew productions
             •Review plans, schedule locates, meet on-site to ensure all franchise utilities are clear before
             start of construction
             •Schedule crews, equipment, and sub-contractors prior to start of project
             •Conferred with owners rep. to ensure that all work conforms to plans and specifications set
             forth for the project
             • Follow progress of projects from pre-construction to final, to ensure timely completion
             •Directed activities of workers concerned with construction of highways, pipelines, and other
             construction projects
             •Executed daily operations of all field operations
             •Studied specifications to plan procedures for construction on basis of starting and completion
             times
             •Studied specifications to plan procedures for staffing requirements for each phase of
             construction, based on knowledge of available tools, equipment and various building methods
             •Ordered procurement of tools and materials to be delivered at specified times to conform to
             work schedules
             •Trained and managed 150 employees and achieved significant improvements in their
             productivity

             2-6-2006 to 5-30-2007                       Texas United Excavators         Carrolton, Texas
             General Superintendent     972-731-0300 Luis Uarite
             •Assist estimating department in crew productions
             •Review plans, schedule locates, meet on-site to ensure all franchise utilities are clear before
             start of construction
             •Schedule crews, equipment, and sub-contractors prior to start of project
             •Conferred with owners rep. to ensure that all work conforms to plans and specifications set
             forth for the project
             •Follow progress of projects from pre-construction to final, to ensure timely completion

             8-12-2005 to 2-6-2006                                    C.W. Young         Mansfield, Texas
             General Superintendent     817-477-1444 Chuck Young
•Directed activities of workers concerned with construction of highways, pipelines, and other
construction projects
•Executed daily operations of all field operations
•Studied specifications to plan procedures for construction on basis of starting and completion
times
•Studied specifications to plan procedures for staffing requirements for each phase of
construction, based on knowledge of available tools, equipment and various building methods
•Ordered procurement of tools and materials to be delivered at specified times to conform to
work schedules
•Trained and managed 150 employees and achieved significant improvements in their
productivity
•Conferred with and directed supervisory personnel, and sub-contractors engaged in planning
and executing work procedures, interpreting specifications and coordinating various phases of
construction to prevent delays
•Trained all field managers in cost management
•Conferred with supervisory personnel and labor representatives to resolve complaints and
grievances within work force
•Conferred with supervisory and engineering personnel, inspectors, and suppliers of tools and
materials to resolve construction problems and improve construction methods
•Supervised 150 employees, scheduled work hours, resolved conflicts, and determined salaries
•Prepared and received reports on progress, materials used and costs, and adjusted work
schedules as indicated by reports
•Directed workers concerned with major maintenance

8-01-2004 to 8-12-2005                            Moss Construction       Wylie, Texas
General Superintendent    Hal Moss 972-977-6600
•Directed activities of workers concerned with construction of highways, pipelines, and other
construction projects
•Executed daily operations of all field operations
•Studied specifications to plan procedures for construction on basis of starting and completion
times
•Studied specifications to plan procedures for staffing requirements for each phase of
construction, based on knowledge of available tools, equipment and various building methods
•Ordered procurement of tools and materials to be delivered at specified times to conform to
work schedules
•Trained and managed 150 employees and achieved significant improvements in their
productivity
•Conferred with and directed supervisory personnel, and sub-contractors engaged in planning
and executing work procedures, interpreting specifications and coordinating various phases of
construction to prevent delays
•Trained all field managers in cost management
•Conferred with supervisory personnel and labor representatives to resolve complaints and
grievances within work force
•Conferred with supervisory and engineering personnel, inspectors, and suppliers of tools and
materials to resolve construction problems and improve construction methods
            •Supervised 150 employees, scheduled work hours, resolved conflicts, and determined salaries
            •Prepared and received reports on progress, materials used and costs, and adjusted work
            schedules as indicated by reports
            •Directed workers concerned with major maintenance

            3-01-1999 to 8-01-2004                               Site Concrete       Grand Prairie, Texas
            Sr. Project Manager   Jean Boney 972-313-3140
            •Directed activities of workers concerned with construction of highways, pipelines, and other
            construction projects
            •Studied specifications to plan procedures for construction on basis of starting and completion
            times
            •Trained and managed 12 project managers, and achieved significant improvements in their
            productivity
            •Ordered procurement of tools and materials to be delivered at specified times to conform to
            work schedules
            •Conferred with and directed supervisory personnel, and sub-contractors engaged in planning
            and executing work procedures, interpreting specifications and coordinating various phases of
            construction to prevent delays
            •Conferred with supervisory and engineering personnel, inspectors, and suppliers of tools and
            materials to resolve construction problems and improve construction methods
            •Inspected work in progress to ensure that work conformed to specifications, and that
            construction schedules were followed
            •Supervised 12 project managers, scheduled work hours, resolved conflicts, and determined
            salaries
            •Prepared and received reports on progress, materials used and costs, adjusting work schedules
            as indicated by reports

Education   Sharpstown Sr. High Houston, Texas        Graduated 1979
            •O.S.H.A. 40 Hour Safety Training Dallas 1985 Updated as needed
            •O.S.H.A. Comp. Person Training Dallas 1985 Updated as needed
            •O.S.H.A. Confined space entry Dallas 1985 Updated as needed

Projects    1. USACE Levee Construction, Deep soil stabilization (to 60 Ft.), Levee construction, 3,500,000
Managed     CY, $480,200,000 New Orleans, LA.

            2. Dart Lite Rail CMGC-3 Sec. HW-2, Utility and paving improvements, excavation and soil
            stabilization, and rail construction, $465,800,000 Dallas, Farmers Branch, Carrollton TX.
            3. City of Arlington, Little Rd. Reconstruction, water, sewer, storm excavation and paving rehab
            projects $5,265,000 (Texas United)
            4. City of Rockwall, Tubbs Rd. Extension, 16” & 12” waterline, 10” & 8” sewer and 12x6 &
            11x4 precast box culvert $2,138,000 (Texas United)
            5. City of Dallas, Cedar Plaza, water and sewer rehab $1,430,067 (Texas United)
6. City of Irving, 2006 alley replacement II $264,196 (Texas United)
7. City of Irving, 2006 alley replacement $302,440 (Texas United)
8. Woodhaven Homes, Encino Hills Subdivision $1,986,000 (Texas United)
9. 4E Development, Segovillas Phase II & III $2,600,000 (Texas United)
10. City of Mesquite, Church Rd. Extension, 16” Ductal Iron waterline, 12” sewer and drainage
system, 60” to 24” R.C.P. excavation & paving by Glen Thurman $6,206,199 (Texas United)

11. Wynn Jackson, various single family developments 150-300 lots $500,000 to 2,000,000
(C.W. Young)

12. Schouburg Development, various single family developments 150-300 lots $500,00 to
$2,000,000 (C.W. Young)
13. N.T.M.W.D. Muddy Creek Sewer Interceptor 48” & 36” sewer line, with splitter boxes,
flow diversion, and bypass pumping $2,057,895 (Moss Construction)
14. N.T.M.W.D. Frisco McKinney Pipeline 66” Poly Coated steel cylinder pipe $3,581,486
(Moss Construction)
15. N.T.M.W.D. Mesquite to Forney 14” Waterline Replacement, 54”, 42”, & 36” concrete
coated steel cylinder pipe $8,686,639 (Moss Construction)
16. City of Frisco Westside Water Improvements 48” ductile iron waterline $2,043,527 (Moss
Construction)
17. City of Ovilla Duncanville Rd. Waterline 30” concrete coated steel cylinder pipe, with
paving improvements $1,479,041 (Moss Construction)
18. City of Arlington 16” waterline replacement, 16” P.V.C. Waterline $545,994 (Moss
Construction)
19. City of Malissia, Northcreek Estates Offsite Water, 16” P.V.C. Waterline $1,127,925 (Moss
Construction)
20. City of Irving, 2004 Water Replacement sec. 2, 18” 12” 8” 6” water rehab. $936,269 (Moss
Construction)
21. C.N.C. Development, Craig Ranch Infrastructure, various size water, sewer, and storm
sewer, for private development $3,581,486 (Moss Construction)
22. Wynne Jackson Inc. Moore Farms Phase 2, 3, 4, and 4b. Each phase 150 to 300 lot
development, water, sewer, and storm sewer with services $1,062,155 (Moss Construction)
23. Dallas County, Miller Rd. Phase 2 reconstruction, water, sewer, and storm sewer, and
paving $3,876,549 (Site Concrete)
24. Dallas County, Miller Rd. Phase 2 reconstruction, water, sewer, and storm sewer, and paving
$1,953,729 (Site Concrete)
25. TxDOT, Hwy. 66 reconstruction, paving and drainage $12,456,096 (Site Concrete)
26. TxDOT, Hwy. Bus.287 reconstruction, water, sewer, storm sewer, and paving $15,725,211
(Site Concrete)
27. TxDOT, Hwy. 380 @ FM. 377 reconstruction, paving and drainage $22,596,175 (Site
Concrete)
             28. City of Lewisville, Gardenridge Blvd. reconstruction, water, sewer, storm sewer, and paving
             $2,693,966 (Site Concrete)
             29. City of Lewisville, Kealy Rd. reconstruction, water, sewer, storm sewer, and paving
             $4,656,012 (Site Concrete)
             30. D.R. Horton, various subdivisions ranging from $150,000 to $5,000,000 (Site Concrete)
             31. City of Irving, various water, sewer, storm sewer and paving reconstruction projects over the
             ten years with B.C.I. Utility ranging from $50,000 to $3,500,000
             32. City of Plano, various water, sewer, storm sewer, and paving reconstruction projects over the
             ten years with B.C.I. Utility ranging from $150,000 to $5,000,000
             33. City of Dallas, various paving and drainage projects over the ten years with B.C.I. Utility
             ranging from $1,500,000 to $10,000,000
             34. City of Richardson, various water, sewer, paving, alley reconstruction ranging from $150,00
             to $500,000
             35.City of Lewisville, various water and sewer rehab projects over ten years with B.C.I. Utility
             ranging from $75,000 to $500,000
             36.City of Arlington, various water and sewer replacements over the ten years with B.C.I. Utility
             ranging from $150,00 to $250,000

References   Professional References

             1)City of Irving Larry Frasnelli: 972-721-2779
             2)City of Irving Roger Schellhorn: 972-742-2367
             3)City of Arlington James Essenmucher: 817-323-8357
             4)N.T.M.W.D. David Heartless: 972-442-5405
             5)Dallas County John Mears: 214-435-3884
             6)City of Lewisville Jerry Roberts: 972-219-3771
             7)Schouburg Development Jed Dolson: 469-450-5585
             8)Wynne Jackson Development Mark Edgren: 214-880-8600
             9)Cornerstone Safety Joe Smith: 972-576-5554
             10)City of Dallas Jim Ryan: 214-837-6100
             11)Bruce Shear 214-502-6414 (Personal Reference)
             12)Benny Davis 469-396-3718 (Personal Reference)
             13)Jim Oldenkamp 469-951-9995 (Personal Reference)

Weitere ähnliche Inhalte

Was ist angesagt?

CV -Hawkins_Ron doc 26-05214
CV -Hawkins_Ron doc 26-05214CV -Hawkins_Ron doc 26-05214
CV -Hawkins_Ron doc 26-05214Ron Hawkins
 
Paul vanson-resume
Paul vanson-resumePaul vanson-resume
Paul vanson-resumeiminneedofu
 
Nathan Mudd Resume
Nathan Mudd ResumeNathan Mudd Resume
Nathan Mudd ResumeNathan Mudd
 
CV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
CV 25-12-15 M.K.Narayana _ Seaport Technology & EngineeringCV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
CV 25-12-15 M.K.Narayana _ Seaport Technology & EngineeringM.K NARAYANA
 
1Erwin N De La Rosa jan2016CV
1Erwin N  De La Rosa jan2016CV1Erwin N  De La Rosa jan2016CV
1Erwin N De La Rosa jan2016CVErwin de la Rosa
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorandi dipayadnya
 
WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1William Brown
 
David Goodwin Resume 2015 LP
David Goodwin Resume 2015 LPDavid Goodwin Resume 2015 LP
David Goodwin Resume 2015 LPDavid Goodwin
 
William Cooper Resume Rev
William Cooper Resume RevWilliam Cooper Resume Rev
William Cooper Resume RevWscooper
 
Arun_Mangal_cv Feb 2015
Arun_Mangal_cv Feb 2015Arun_Mangal_cv Feb 2015
Arun_Mangal_cv Feb 2015ARUN MANGAL
 

Was ist angesagt? (20)

0 ranny ancero CV
0 ranny ancero CV0 ranny ancero CV
0 ranny ancero CV
 
CV -Hawkins_Ron doc 26-05214
CV -Hawkins_Ron doc 26-05214CV -Hawkins_Ron doc 26-05214
CV -Hawkins_Ron doc 26-05214
 
Vivencio pachoro cv 2016
Vivencio pachoro cv 2016Vivencio pachoro cv 2016
Vivencio pachoro cv 2016
 
Paul vanson-resume
Paul vanson-resumePaul vanson-resume
Paul vanson-resume
 
Joe Harris' Resume 2016
Joe Harris' Resume 2016Joe Harris' Resume 2016
Joe Harris' Resume 2016
 
Nathan Mudd Resume
Nathan Mudd ResumeNathan Mudd Resume
Nathan Mudd Resume
 
CV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
CV 25-12-15 M.K.Narayana _ Seaport Technology & EngineeringCV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
CV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
 
Stephen Cordova Final CV
Stephen Cordova Final CVStephen Cordova Final CV
Stephen Cordova Final CV
 
CV of CCEquibal
CV of CCEquibalCV of CCEquibal
CV of CCEquibal
 
1Erwin N De La Rosa jan2016CV
1Erwin N  De La Rosa jan2016CV1Erwin N  De La Rosa jan2016CV
1Erwin N De La Rosa jan2016CV
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisor
 
Z-FEBresume
Z-FEBresumeZ-FEBresume
Z-FEBresume
 
WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1
 
LGC PP-ABC Int
LGC PP-ABC IntLGC PP-ABC Int
LGC PP-ABC Int
 
David Goodwin Resume 2015 LP
David Goodwin Resume 2015 LPDavid Goodwin Resume 2015 LP
David Goodwin Resume 2015 LP
 
William Cooper Resume Rev
William Cooper Resume RevWilliam Cooper Resume Rev
William Cooper Resume Rev
 
Resume_Bobby_Horan
Resume_Bobby_HoranResume_Bobby_Horan
Resume_Bobby_Horan
 
Resume
ResumeResume
Resume
 
Dereque D.w-ref
Dereque D.w-refDereque D.w-ref
Dereque D.w-ref
 
Arun_Mangal_cv Feb 2015
Arun_Mangal_cv Feb 2015Arun_Mangal_cv Feb 2015
Arun_Mangal_cv Feb 2015
 

Andere mochten auch

resume 2015 short form
resume 2015 short formresume 2015 short form
resume 2015 short formJamie Grierson
 
DANIEL WATKINS Resume 1
DANIEL WATKINS Resume 1DANIEL WATKINS Resume 1
DANIEL WATKINS Resume 1Daniel Watkins
 
BENSON Randy update 10-25-16 revised
BENSON Randy update 10-25-16 revisedBENSON Randy update 10-25-16 revised
BENSON Randy update 10-25-16 revisedRandy Benson
 
Rodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction ManagerRodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction ManagerRodney Hibbard
 
Construction Management Resume 9.30.12
Construction Management Resume 9.30.12Construction Management Resume 9.30.12
Construction Management Resume 9.30.12cdelisi3386
 
J hay resume final res 2014 v dp
J hay resume final res 2014 v dpJ hay resume final res 2014 v dp
J hay resume final res 2014 v dpJonathan Hay
 
Corie Murrell resume
Corie Murrell resumeCorie Murrell resume
Corie Murrell resumeCorie Murrell
 
Josh Carson Resume
Josh Carson ResumeJosh Carson Resume
Josh Carson Resumejoshcarson
 
Audie Aker Resume 2
Audie Aker Resume 2Audie Aker Resume 2
Audie Aker Resume 2Audie Aker
 
Jerry Kennedy Resume
Jerry Kennedy ResumeJerry Kennedy Resume
Jerry Kennedy ResumeJerry Kennedy
 

Andere mochten auch (20)

Kuebrich Resume
Kuebrich ResumeKuebrich Resume
Kuebrich Resume
 
resume 2015 short form
resume 2015 short formresume 2015 short form
resume 2015 short form
 
Robs resume (1)
Robs resume (1)Robs resume (1)
Robs resume (1)
 
DANIEL WATKINS Resume 1
DANIEL WATKINS Resume 1DANIEL WATKINS Resume 1
DANIEL WATKINS Resume 1
 
Resume
ResumeResume
Resume
 
BENSON Randy update 10-25-16 revised
BENSON Randy update 10-25-16 revisedBENSON Randy update 10-25-16 revised
BENSON Randy update 10-25-16 revised
 
RESUME
RESUMERESUME
RESUME
 
Philip Kwiatkowski Resume
Philip Kwiatkowski ResumePhilip Kwiatkowski Resume
Philip Kwiatkowski Resume
 
Rodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction ManagerRodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction Manager
 
Jerrys 2016 Resume
Jerrys 2016 ResumeJerrys 2016 Resume
Jerrys 2016 Resume
 
John Richard Berry Sr Resume
John Richard Berry Sr ResumeJohn Richard Berry Sr Resume
John Richard Berry Sr Resume
 
J Przybytek - resume
J Przybytek - resumeJ Przybytek - resume
J Przybytek - resume
 
Construction Management Resume 9.30.12
Construction Management Resume 9.30.12Construction Management Resume 9.30.12
Construction Management Resume 9.30.12
 
J hay resume final res 2014 v dp
J hay resume final res 2014 v dpJ hay resume final res 2014 v dp
J hay resume final res 2014 v dp
 
RESUME 2016
RESUME 2016RESUME 2016
RESUME 2016
 
Corie Murrell resume
Corie Murrell resumeCorie Murrell resume
Corie Murrell resume
 
Josh Carson Resume
Josh Carson ResumeJosh Carson Resume
Josh Carson Resume
 
Audie Aker Resume 2
Audie Aker Resume 2Audie Aker Resume 2
Audie Aker Resume 2
 
BBrownResume2
BBrownResume2BBrownResume2
BBrownResume2
 
Jerry Kennedy Resume
Jerry Kennedy ResumeJerry Kennedy Resume
Jerry Kennedy Resume
 

Ähnlich wie Pete Day's Construction Experience

Rocky Nash Resume A
Rocky Nash Resume ARocky Nash Resume A
Rocky Nash Resume ARocky Nash
 
Waqar Hussain Mechanical Engineer
Waqar Hussain Mechanical EngineerWaqar Hussain Mechanical Engineer
Waqar Hussain Mechanical EngineerWaqar Hussain
 
Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016Ray Freiha
 
Wesley White Resume
Wesley White ResumeWesley White Resume
Wesley White ResumeWes White
 
Jose J Muraira LATEST Resume
Jose J  Muraira LATEST ResumeJose J  Muraira LATEST Resume
Jose J Muraira LATEST ResumeJose Muraira
 
2015 Phillip Ballinger Resume MB 20151028 Plain (1)
2015 Phillip Ballinger Resume MB 20151028 Plain (1)2015 Phillip Ballinger Resume MB 20151028 Plain (1)
2015 Phillip Ballinger Resume MB 20151028 Plain (1)Phillip Ballinger
 
2015 Phillip Ballinger Resume MB 20151028 Plain (1)
2015 Phillip Ballinger Resume MB 20151028 Plain (1)2015 Phillip Ballinger Resume MB 20151028 Plain (1)
2015 Phillip Ballinger Resume MB 20151028 Plain (1)Phillip Ballinger
 
RODRIGO+RODRIGUEZ copy 12-18-2015
RODRIGO+RODRIGUEZ copy 12-18-2015RODRIGO+RODRIGUEZ copy 12-18-2015
RODRIGO+RODRIGUEZ copy 12-18-2015Rodrigo Rodriguez
 
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015Partha Gorain
 
Boucher Andrew Cv 2010 Linked In 2
Boucher Andrew Cv 2010   Linked In 2Boucher Andrew Cv 2010   Linked In 2
Boucher Andrew Cv 2010 Linked In 2Andrew_Boucher
 

Ähnlich wie Pete Day's Construction Experience (20)

2015_Resume 2
2015_Resume 22015_Resume 2
2015_Resume 2
 
cv17 uk
cv17 ukcv17 uk
cv17 uk
 
Rocky Nash Resume A
Rocky Nash Resume ARocky Nash Resume A
Rocky Nash Resume A
 
Waqar Hussain Mechanical Engineer
Waqar Hussain Mechanical EngineerWaqar Hussain Mechanical Engineer
Waqar Hussain Mechanical Engineer
 
Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016
 
GOEFF STEBBINS RESUME
GOEFF STEBBINS RESUMEGOEFF STEBBINS RESUME
GOEFF STEBBINS RESUME
 
JOEY_STEPHENSON_(R1136)
JOEY_STEPHENSON_(R1136)JOEY_STEPHENSON_(R1136)
JOEY_STEPHENSON_(R1136)
 
Wesley White Resume
Wesley White ResumeWesley White Resume
Wesley White Resume
 
Jose J Muraira LATEST Resume
Jose J  Muraira LATEST ResumeJose J  Muraira LATEST Resume
Jose J Muraira LATEST Resume
 
Mike C LeBlanc REV3
Mike C LeBlanc REV3Mike C LeBlanc REV3
Mike C LeBlanc REV3
 
2015 Phillip Ballinger Resume MB 20151028 Plain (1)
2015 Phillip Ballinger Resume MB 20151028 Plain (1)2015 Phillip Ballinger Resume MB 20151028 Plain (1)
2015 Phillip Ballinger Resume MB 20151028 Plain (1)
 
2015 Phillip Ballinger Resume MB 20151028 Plain (1)
2015 Phillip Ballinger Resume MB 20151028 Plain (1)2015 Phillip Ballinger Resume MB 20151028 Plain (1)
2015 Phillip Ballinger Resume MB 20151028 Plain (1)
 
LONNIE L
LONNIE LLONNIE L
LONNIE L
 
Josefino Waje cv 2
Josefino Waje cv 2Josefino Waje cv 2
Josefino Waje cv 2
 
dean resume (1)
dean resume (1)dean resume (1)
dean resume (1)
 
RODRIGO+RODRIGUEZ copy 12-18-2015
RODRIGO+RODRIGUEZ copy 12-18-2015RODRIGO+RODRIGUEZ copy 12-18-2015
RODRIGO+RODRIGUEZ copy 12-18-2015
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
CV_PARTHA_PRATIM_GORAIN_18th_dec_2015
 
Boucher Andrew Cv 2010 Linked In 2
Boucher Andrew Cv 2010   Linked In 2Boucher Andrew Cv 2010   Linked In 2
Boucher Andrew Cv 2010 Linked In 2
 
QA/QC Inspector or Engineer
QA/QC Inspector or EngineerQA/QC Inspector or Engineer
QA/QC Inspector or Engineer
 

Kürzlich hochgeladen

Back on Track: Navigating the Return to Work after Parental Leave
Back on Track: Navigating the Return to Work after Parental LeaveBack on Track: Navigating the Return to Work after Parental Leave
Back on Track: Navigating the Return to Work after Parental LeaveMarharyta Nedzelska
 
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证nhjeo1gg
 
办理老道明大学毕业证成绩单|购买美国ODU文凭证书
办理老道明大学毕业证成绩单|购买美国ODU文凭证书办理老道明大学毕业证成绩单|购买美国ODU文凭证书
办理老道明大学毕业证成绩单|购买美国ODU文凭证书saphesg8
 
原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证
原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证
原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证diploma001
 
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改yuu sss
 
原版定制copy澳洲查尔斯达尔文大学毕业证CDU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲查尔斯达尔文大学毕业证CDU毕业证成绩单留信学历认证保障质量原版定制copy澳洲查尔斯达尔文大学毕业证CDU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲查尔斯达尔文大学毕业证CDU毕业证成绩单留信学历认证保障质量sehgh15heh
 
Black and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdfBlack and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdfpadillaangelina0023
 
LinkedIn Strategic Guidelines April 2024
LinkedIn Strategic Guidelines April 2024LinkedIn Strategic Guidelines April 2024
LinkedIn Strategic Guidelines April 2024Bruce Bennett
 
Unlock Your Creative Potential: 7 Skills for Content Creator Evolution
Unlock Your Creative Potential: 7 Skills for Content Creator EvolutionUnlock Your Creative Potential: 7 Skills for Content Creator Evolution
Unlock Your Creative Potential: 7 Skills for Content Creator EvolutionRhazes Ghaisan
 
办理学位证(UoM证书)北安普顿大学毕业证成绩单原版一比一
办理学位证(UoM证书)北安普顿大学毕业证成绩单原版一比一办理学位证(UoM证书)北安普顿大学毕业证成绩单原版一比一
办理学位证(UoM证书)北安普顿大学毕业证成绩单原版一比一A SSS
 
定制英国克兰菲尔德大学毕业证成绩单原版一比一
定制英国克兰菲尔德大学毕业证成绩单原版一比一定制英国克兰菲尔德大学毕业证成绩单原版一比一
定制英国克兰菲尔德大学毕业证成绩单原版一比一z zzz
 
Jumark Morit Diezmo- Career portfolio- BPED 3A
Jumark Morit Diezmo- Career portfolio- BPED 3AJumark Morit Diezmo- Career portfolio- BPED 3A
Jumark Morit Diezmo- Career portfolio- BPED 3Ajumarkdiezmo1
 
Nathan_Baughman_Resume_copywriter_and_editor
Nathan_Baughman_Resume_copywriter_and_editorNathan_Baughman_Resume_copywriter_and_editor
Nathan_Baughman_Resume_copywriter_and_editorNathanBaughman3
 
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一A SSS
 
Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...
Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...
Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...nitagrag2
 
Introduction to phyton , important topic
Introduction to phyton , important topicIntroduction to phyton , important topic
Introduction to phyton , important topicakpgenious67
 
AICTE PPT slide of Engineering college kr pete
AICTE PPT slide of Engineering college kr peteAICTE PPT slide of Engineering college kr pete
AICTE PPT slide of Engineering college kr peteshivubhavv
 
办理哈珀亚当斯大学学院毕业证书文凭学位证书
办理哈珀亚当斯大学学院毕业证书文凭学位证书办理哈珀亚当斯大学学院毕业证书文凭学位证书
办理哈珀亚当斯大学学院毕业证书文凭学位证书saphesg8
 
Human Rights are notes and helping material
Human Rights are notes and helping materialHuman Rights are notes and helping material
Human Rights are notes and helping materialnadeemcollege26
 

Kürzlich hochgeladen (20)

Back on Track: Navigating the Return to Work after Parental Leave
Back on Track: Navigating the Return to Work after Parental LeaveBack on Track: Navigating the Return to Work after Parental Leave
Back on Track: Navigating the Return to Work after Parental Leave
 
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
 
办理老道明大学毕业证成绩单|购买美国ODU文凭证书
办理老道明大学毕业证成绩单|购买美国ODU文凭证书办理老道明大学毕业证成绩单|购买美国ODU文凭证书
办理老道明大学毕业证成绩单|购买美国ODU文凭证书
 
原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证
原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证
原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证
 
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
 
原版定制copy澳洲查尔斯达尔文大学毕业证CDU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲查尔斯达尔文大学毕业证CDU毕业证成绩单留信学历认证保障质量原版定制copy澳洲查尔斯达尔文大学毕业证CDU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲查尔斯达尔文大学毕业证CDU毕业证成绩单留信学历认证保障质量
 
Black and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdfBlack and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdf
 
LinkedIn Strategic Guidelines April 2024
LinkedIn Strategic Guidelines April 2024LinkedIn Strategic Guidelines April 2024
LinkedIn Strategic Guidelines April 2024
 
Unlock Your Creative Potential: 7 Skills for Content Creator Evolution
Unlock Your Creative Potential: 7 Skills for Content Creator EvolutionUnlock Your Creative Potential: 7 Skills for Content Creator Evolution
Unlock Your Creative Potential: 7 Skills for Content Creator Evolution
 
办理学位证(UoM证书)北安普顿大学毕业证成绩单原版一比一
办理学位证(UoM证书)北安普顿大学毕业证成绩单原版一比一办理学位证(UoM证书)北安普顿大学毕业证成绩单原版一比一
办理学位证(UoM证书)北安普顿大学毕业证成绩单原版一比一
 
定制英国克兰菲尔德大学毕业证成绩单原版一比一
定制英国克兰菲尔德大学毕业证成绩单原版一比一定制英国克兰菲尔德大学毕业证成绩单原版一比一
定制英国克兰菲尔德大学毕业证成绩单原版一比一
 
Jumark Morit Diezmo- Career portfolio- BPED 3A
Jumark Morit Diezmo- Career portfolio- BPED 3AJumark Morit Diezmo- Career portfolio- BPED 3A
Jumark Morit Diezmo- Career portfolio- BPED 3A
 
Nathan_Baughman_Resume_copywriter_and_editor
Nathan_Baughman_Resume_copywriter_and_editorNathan_Baughman_Resume_copywriter_and_editor
Nathan_Baughman_Resume_copywriter_and_editor
 
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
 
Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...
Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...
Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...
 
Introduction to phyton , important topic
Introduction to phyton , important topicIntroduction to phyton , important topic
Introduction to phyton , important topic
 
Students with Oppositional Defiant Disorder
Students with Oppositional Defiant DisorderStudents with Oppositional Defiant Disorder
Students with Oppositional Defiant Disorder
 
AICTE PPT slide of Engineering college kr pete
AICTE PPT slide of Engineering college kr peteAICTE PPT slide of Engineering college kr pete
AICTE PPT slide of Engineering college kr pete
 
办理哈珀亚当斯大学学院毕业证书文凭学位证书
办理哈珀亚当斯大学学院毕业证书文凭学位证书办理哈珀亚当斯大学学院毕业证书文凭学位证书
办理哈珀亚当斯大学学院毕业证书文凭学位证书
 
Human Rights are notes and helping material
Human Rights are notes and helping materialHuman Rights are notes and helping material
Human Rights are notes and helping material
 

Pete Day's Construction Experience

  • 1. 214-536-9755 Mobile 972-890-8272 Home Pete Day Objective A challenging position as a Construction Superintendent in a professional environment. Experience 5-30-07 to Present Archer Western Contractors Arlington, Texas Civil Superintendent 512-848-1744 Silas Fisher 504-202-5348 Jason Burkhart •Assist estimating department in crew productions •Review plans, schedule locates, meet on-site to ensure all franchise utilities are clear before start of construction •Schedule crews, equipment, and sub-contractors prior to start of project •Conferred with owners rep. to ensure that all work conforms to plans and specifications set forth for the project • Follow progress of projects from pre-construction to final, to ensure timely completion •Directed activities of workers concerned with construction of highways, pipelines, and other construction projects •Executed daily operations of all field operations •Studied specifications to plan procedures for construction on basis of starting and completion times •Studied specifications to plan procedures for staffing requirements for each phase of construction, based on knowledge of available tools, equipment and various building methods •Ordered procurement of tools and materials to be delivered at specified times to conform to work schedules •Trained and managed 150 employees and achieved significant improvements in their productivity 2-6-2006 to 5-30-2007 Texas United Excavators Carrolton, Texas General Superintendent 972-731-0300 Luis Uarite •Assist estimating department in crew productions •Review plans, schedule locates, meet on-site to ensure all franchise utilities are clear before start of construction •Schedule crews, equipment, and sub-contractors prior to start of project •Conferred with owners rep. to ensure that all work conforms to plans and specifications set forth for the project •Follow progress of projects from pre-construction to final, to ensure timely completion 8-12-2005 to 2-6-2006 C.W. Young Mansfield, Texas General Superintendent 817-477-1444 Chuck Young
  • 2. •Directed activities of workers concerned with construction of highways, pipelines, and other construction projects •Executed daily operations of all field operations •Studied specifications to plan procedures for construction on basis of starting and completion times •Studied specifications to plan procedures for staffing requirements for each phase of construction, based on knowledge of available tools, equipment and various building methods •Ordered procurement of tools and materials to be delivered at specified times to conform to work schedules •Trained and managed 150 employees and achieved significant improvements in their productivity •Conferred with and directed supervisory personnel, and sub-contractors engaged in planning and executing work procedures, interpreting specifications and coordinating various phases of construction to prevent delays •Trained all field managers in cost management •Conferred with supervisory personnel and labor representatives to resolve complaints and grievances within work force •Conferred with supervisory and engineering personnel, inspectors, and suppliers of tools and materials to resolve construction problems and improve construction methods •Supervised 150 employees, scheduled work hours, resolved conflicts, and determined salaries •Prepared and received reports on progress, materials used and costs, and adjusted work schedules as indicated by reports •Directed workers concerned with major maintenance 8-01-2004 to 8-12-2005 Moss Construction Wylie, Texas General Superintendent Hal Moss 972-977-6600 •Directed activities of workers concerned with construction of highways, pipelines, and other construction projects •Executed daily operations of all field operations •Studied specifications to plan procedures for construction on basis of starting and completion times •Studied specifications to plan procedures for staffing requirements for each phase of construction, based on knowledge of available tools, equipment and various building methods •Ordered procurement of tools and materials to be delivered at specified times to conform to work schedules •Trained and managed 150 employees and achieved significant improvements in their productivity •Conferred with and directed supervisory personnel, and sub-contractors engaged in planning and executing work procedures, interpreting specifications and coordinating various phases of construction to prevent delays •Trained all field managers in cost management •Conferred with supervisory personnel and labor representatives to resolve complaints and grievances within work force •Conferred with supervisory and engineering personnel, inspectors, and suppliers of tools and
  • 3. materials to resolve construction problems and improve construction methods •Supervised 150 employees, scheduled work hours, resolved conflicts, and determined salaries •Prepared and received reports on progress, materials used and costs, and adjusted work schedules as indicated by reports •Directed workers concerned with major maintenance 3-01-1999 to 8-01-2004 Site Concrete Grand Prairie, Texas Sr. Project Manager Jean Boney 972-313-3140 •Directed activities of workers concerned with construction of highways, pipelines, and other construction projects •Studied specifications to plan procedures for construction on basis of starting and completion times •Trained and managed 12 project managers, and achieved significant improvements in their productivity •Ordered procurement of tools and materials to be delivered at specified times to conform to work schedules •Conferred with and directed supervisory personnel, and sub-contractors engaged in planning and executing work procedures, interpreting specifications and coordinating various phases of construction to prevent delays •Conferred with supervisory and engineering personnel, inspectors, and suppliers of tools and materials to resolve construction problems and improve construction methods •Inspected work in progress to ensure that work conformed to specifications, and that construction schedules were followed •Supervised 12 project managers, scheduled work hours, resolved conflicts, and determined salaries •Prepared and received reports on progress, materials used and costs, adjusting work schedules as indicated by reports Education Sharpstown Sr. High Houston, Texas Graduated 1979 •O.S.H.A. 40 Hour Safety Training Dallas 1985 Updated as needed •O.S.H.A. Comp. Person Training Dallas 1985 Updated as needed •O.S.H.A. Confined space entry Dallas 1985 Updated as needed Projects 1. USACE Levee Construction, Deep soil stabilization (to 60 Ft.), Levee construction, 3,500,000 Managed CY, $480,200,000 New Orleans, LA. 2. Dart Lite Rail CMGC-3 Sec. HW-2, Utility and paving improvements, excavation and soil stabilization, and rail construction, $465,800,000 Dallas, Farmers Branch, Carrollton TX. 3. City of Arlington, Little Rd. Reconstruction, water, sewer, storm excavation and paving rehab projects $5,265,000 (Texas United) 4. City of Rockwall, Tubbs Rd. Extension, 16” & 12” waterline, 10” & 8” sewer and 12x6 & 11x4 precast box culvert $2,138,000 (Texas United) 5. City of Dallas, Cedar Plaza, water and sewer rehab $1,430,067 (Texas United)
  • 4. 6. City of Irving, 2006 alley replacement II $264,196 (Texas United) 7. City of Irving, 2006 alley replacement $302,440 (Texas United) 8. Woodhaven Homes, Encino Hills Subdivision $1,986,000 (Texas United) 9. 4E Development, Segovillas Phase II & III $2,600,000 (Texas United) 10. City of Mesquite, Church Rd. Extension, 16” Ductal Iron waterline, 12” sewer and drainage system, 60” to 24” R.C.P. excavation & paving by Glen Thurman $6,206,199 (Texas United) 11. Wynn Jackson, various single family developments 150-300 lots $500,000 to 2,000,000 (C.W. Young) 12. Schouburg Development, various single family developments 150-300 lots $500,00 to $2,000,000 (C.W. Young) 13. N.T.M.W.D. Muddy Creek Sewer Interceptor 48” & 36” sewer line, with splitter boxes, flow diversion, and bypass pumping $2,057,895 (Moss Construction) 14. N.T.M.W.D. Frisco McKinney Pipeline 66” Poly Coated steel cylinder pipe $3,581,486 (Moss Construction) 15. N.T.M.W.D. Mesquite to Forney 14” Waterline Replacement, 54”, 42”, & 36” concrete coated steel cylinder pipe $8,686,639 (Moss Construction) 16. City of Frisco Westside Water Improvements 48” ductile iron waterline $2,043,527 (Moss Construction) 17. City of Ovilla Duncanville Rd. Waterline 30” concrete coated steel cylinder pipe, with paving improvements $1,479,041 (Moss Construction) 18. City of Arlington 16” waterline replacement, 16” P.V.C. Waterline $545,994 (Moss Construction) 19. City of Malissia, Northcreek Estates Offsite Water, 16” P.V.C. Waterline $1,127,925 (Moss Construction) 20. City of Irving, 2004 Water Replacement sec. 2, 18” 12” 8” 6” water rehab. $936,269 (Moss Construction) 21. C.N.C. Development, Craig Ranch Infrastructure, various size water, sewer, and storm sewer, for private development $3,581,486 (Moss Construction) 22. Wynne Jackson Inc. Moore Farms Phase 2, 3, 4, and 4b. Each phase 150 to 300 lot development, water, sewer, and storm sewer with services $1,062,155 (Moss Construction) 23. Dallas County, Miller Rd. Phase 2 reconstruction, water, sewer, and storm sewer, and paving $3,876,549 (Site Concrete) 24. Dallas County, Miller Rd. Phase 2 reconstruction, water, sewer, and storm sewer, and paving $1,953,729 (Site Concrete) 25. TxDOT, Hwy. 66 reconstruction, paving and drainage $12,456,096 (Site Concrete) 26. TxDOT, Hwy. Bus.287 reconstruction, water, sewer, storm sewer, and paving $15,725,211 (Site Concrete) 27. TxDOT, Hwy. 380 @ FM. 377 reconstruction, paving and drainage $22,596,175 (Site
  • 5. Concrete) 28. City of Lewisville, Gardenridge Blvd. reconstruction, water, sewer, storm sewer, and paving $2,693,966 (Site Concrete) 29. City of Lewisville, Kealy Rd. reconstruction, water, sewer, storm sewer, and paving $4,656,012 (Site Concrete) 30. D.R. Horton, various subdivisions ranging from $150,000 to $5,000,000 (Site Concrete) 31. City of Irving, various water, sewer, storm sewer and paving reconstruction projects over the ten years with B.C.I. Utility ranging from $50,000 to $3,500,000 32. City of Plano, various water, sewer, storm sewer, and paving reconstruction projects over the ten years with B.C.I. Utility ranging from $150,000 to $5,000,000 33. City of Dallas, various paving and drainage projects over the ten years with B.C.I. Utility ranging from $1,500,000 to $10,000,000 34. City of Richardson, various water, sewer, paving, alley reconstruction ranging from $150,00 to $500,000 35.City of Lewisville, various water and sewer rehab projects over ten years with B.C.I. Utility ranging from $75,000 to $500,000 36.City of Arlington, various water and sewer replacements over the ten years with B.C.I. Utility ranging from $150,00 to $250,000 References Professional References 1)City of Irving Larry Frasnelli: 972-721-2779 2)City of Irving Roger Schellhorn: 972-742-2367 3)City of Arlington James Essenmucher: 817-323-8357 4)N.T.M.W.D. David Heartless: 972-442-5405 5)Dallas County John Mears: 214-435-3884 6)City of Lewisville Jerry Roberts: 972-219-3771 7)Schouburg Development Jed Dolson: 469-450-5585 8)Wynne Jackson Development Mark Edgren: 214-880-8600 9)Cornerstone Safety Joe Smith: 972-576-5554 10)City of Dallas Jim Ryan: 214-837-6100 11)Bruce Shear 214-502-6414 (Personal Reference) 12)Benny Davis 469-396-3718 (Personal Reference) 13)Jim Oldenkamp 469-951-9995 (Personal Reference)