I. INTRODUCTION
• Provision of adequate drainage is an essential part of
pavement design.
– Protection of pavement structure
– Improves road safety
• Can be categorically studied in three parts:
1. Surface Drainage
• Drainage on the adjoining land and roadway
surface
• Side Drainage and Cross Drainage
2. Sub-surface Drainage
I. INTRODUCTION
• Effects of water on the pavement
structure
• Presence of moisture causes:
o reduction in the stability of the soil mass.
o considerable variation in volume of subgrade in clayey
soils.
o Waves and corrugations failure in flexible pavements.
o Stripping failure in flexible pavements.
o Mud pumping failure in rigid pavements.
II.DESIGN OFSURFACE DRAINAGE SYSTEMS
• Can be divided into three phases:
i. Estimation of the quantity of water that can
iii.
reach any element of the system.
ii. Hydraulic design of each element of the
system.
Comparison of alternative systems and
materials
• Criteria-Lowest annual cost alternative
II.DESIGN OFSURFACE DRAINAGE SYSTEMS
1. Rainfall Intensity
• Runoff is obtained by considering expected sever
storm.
 Return period of 5, 10, 20, 25, 50, and 1 0 0
years
• Quantity of runoff depends on intensity and duration.
• Duration= Time of Concentration
• The time required for water from the remotest place
to reach a specific point on the drainage system.
• =T1 +T2
• T1 = over land flow time
• T2 = time of flow in the longitudinal drain
II.DESIGN OFSURFACE DRAINAGE SYSTEMS
Source: ERA Manual, 2002
II. DESIGN OF SURFACE
DRAINAGE
SYSTEMS
Source: ERA Manual, 2002
II.DESIGN OFSURFACE DRAINAGE SYSTEMS
2. Computation of Runoff
• Rain water expelled from the road surface
i. Infiltration
ii. Runoff
iii. Evaporation- insignificant
• Infiltration depends on:
• Type and gradation of soil
• Soil covers, moisture content of the soil
• Presence of impervious layers near the surface.
II.DESIGN OFSURFACE DRAINAGE SYSTEMS
• Infiltration contd.
• Rate of infiltration on bare soil is less than on a
turfed soil.
constant
• Frozen soil is impervious
• Rate of infiltration is assumed to be
during any specific design storm.
• Runoff depends on:
• Nature of the ground, degree of saturation, and
slope of the surface
• Rate of runoff greater on smooth surfaces.
II.DESIGN OFSURFACE DRAINAGE SYSTEMS
• Rational Formula- accurate way of estimating
runoff up to areas of 0.5 km2
Q  0.00278 CIA
C 1 A1  C 2 A 2
C 
A1 A 2
• If the water shade
is made up of
different surfaces
• = runoff (m3/sec)
• C=coefficient, representing ratio of runoff to rainfall
• I = intensity of rainfall (mm/hr)for a duration equal to the time
of concentration
• A = catchment area tributary to the design location, ha
II.DESIGN OFSURFACE DRAINAGE SYSTEMS
II.DESIGN OFSURFACE DRAINAGE SYSTEMS
• tc=distance/velocity
of flow
• tc is then used to
determine the rainfall
intensity (I)
II.DESIGN OFSURFACE DRAINAGE SYSTEMS
• This chart can also
be alternatively used
to determinec.
III.DESIGN OFSIDE DITCHESAND OPEN
CHANNELS
• THE MANNING’S FORMULA
• Once the quantity of runoff is known, the design of
ditches and similar structures is based on the
principles of open channel flow.
• Mannings’s formula assumes steady flow in a
uniform channel.
V 
1
R 2 / 3
S1 / 2
n
Q  V  A
Where:
• V = mean velocity (m/sec)
• R = hydraulic radius (m)= Area/wetted perimeter
• S=slope of the channel (m/m)
• n=Manning’s roughness coefficient
III.DESIGN OFSIDE DITCHESAND OPEN
CHANNELS
• The Manning’s Formula
III.DESIGN OFSIDE DITCHESAND OPEN
CHANNELS
• Capacity of a Trapezoidal Channel
III.DESIGN OFSIDE DITCHESAND OPEN
CHANNELS
• Examples:
1. The maximum quantity of water expected in one of the
open longitudinal drains on clayey soil is 0.9
m3/sec. Design the cross section and longitudinal
slope of trapezoidal drain assuming the bottom
width of the trapezoidal section to be 1.0 m and
cross slopes to be 1V:1.5H. The allowable velocity
of flow in the drain is 1.2 m/sec and Manning’s
roughness coefficient is 0.02.
III.DESIGN OFSIDE DITCHESAND OPEN
CHANNELS
• Examples:
2. The surface water from road side is drained to the
longitudinal side drain from across one half a bituminous
pavement surface of total width 7.0 m, shoulder and adjoining
land of width 8.0 m one side of the drain. On the other side of
the longitudinal drain, water flows across from reserved land
with grass and 2% cross slope towards the side drain, the
width of this strip of land being 2 5 m. The run off coefficients
of the pavement, shoulder and reserve land with grass surface
are 0.8, 0.25, and 0 3 5 respectively. The length of the
stretch of land parallel to the road from where water is
expected to flow to the side drain is about 4 0 0 m. Estimate
the quantity of run-off flowing in the drain assuming 2 5 years
period of frequency.
IV.SUBSURFACE DRAINAGE
1. Lowering of Water Table
• Highest level of water table should be below the
subgrade.
• Practically 1.0 to 1.2 m below subgrade
• Relatively permeable soil-
• Longitudinal drains are mainly used
• Impermeable soils-
• Transverse drains may be necessary inaddition
to longitudinal drains
IV.SUBSURFACE DRAINAGE
1. Lowering of Water Table
Fig. Symmetrical longitudinal drains used to lower the
groundwater table and to collect water infiltrating the
pavement.
• Lowering of Water Table
IV. SUBSURFACE DRAINAGE
Longitudinal
Drain
Transverse
Drains
Fig. Lowering of water table using
Transverse Drains (Plan View)
IV.SUBSURFACE DRAINAGE
2. Seepage Control
• If seepage zone is at a depth less than
0.6 to 0.9 m below subgrade level,
• Use longitudinal pipe drain in
trench with filter material to
intercept the seepage flow.
• This phenomenon can be
explained using figures.
IV.SUBSURFACE DRAINAGE
2. Seepage Control
Fig. Longitudinal interceptor drain used to cut off
seepage and lower the groundwater table.
IV.SUBSURFACE DRAINAGE
 2. Seepage Control
 Groundwater seeps through the slope where the
water table intersects the land slope, and
 Groundwater flows beneath the pavement while
also entering the pavement foundation materials.
Fig. (A) Illustration of ground water flow along a sloping
impervious layer toward a roadway.
IV.SUBSURFACE DRAINAGE
2. Seepage Control
Fig. (B) Illustration of interceptor drain on the drawdown of
the groundwater table.
IV.SUBSURFACE DRAINAGE
2. Seepage Control
Fig. Longitudinal collector drain used to remove
water seeping into the pavement structural
section.
IV.SUBSURFACE DRAINAGE
3. Control of Capillary Rise
• Capillary rise can be controlled by
 Using a layer of granular material of suitable thickness.
 Using a layer of impermeable capillary cutoff.
 Capillary water should not rise above the thickness of the
granular layer
Granular material
Capillary rise
Highest water
Fig. Gtraabnleularcapillary
cutoff
IV.SUBSURFACE DRAINAGE
3. Control of Capillary Rise
• Bituminous layer or other geo-textiles can be used
as an impermeable layer.
Impermeable layer
Capillary rise
Highest water table
Fig. Impermeable layer capillary cutoff
IV.SUBSURFACE DRAINAGE
4. Design of Filter Material
• Proper filter material should be used for:
 Subsurface drainage system and backfilling the
drainage trenches and
 Criteria:
 Permeability and Piping
 5 Permeability criteria
D15 offilter
D15 of foundation
 5
D15
of filter
of foundationD85
Piping criteria
IV.SUBSURFACE DRAINAGE
1 0
4. Design of Filter Material
 DP=size of perforation in drain pipe
 D85 Filter = 2DP
0
8 0
2DP○
6 0
4 0
Foundation
soil
Filter
Material
The area between
the two red curves
represents the
filler material.
Percent
passing
1.0
0.
0
2 0
0.0
5
○ ○5D1
85D
5
0.
Particle siz1e (mm), l1og scale
0 .00
1
1.
0
Fig. Design of Filter Material
• REFERENCES:
1. Highway Engineering, 7th Ed. Paul H. Wright and Karen
K. Dixon. Wiley (2004)
2. Highway Engineering, 8th Ed. S.K. Khanna and C.E.G.
Justo. (2001)
THANK YOU!

More Related Content

What's hot

Hydrology (Runoff and factors affecting Run off)
Hydrology (Runoff and factors affecting Run off)Hydrology (Runoff and factors affecting Run off)
Hydrology (Runoff and factors affecting Run off)
Latif Hyder Wadho
 

What's hot (20)

Duty And Delta
Duty And DeltaDuty And Delta
Duty And Delta
 
Duty delta etc
Duty delta etcDuty delta etc
Duty delta etc
 
Canal alignment
Canal alignmentCanal alignment
Canal alignment
 
Reservoir Planning
Reservoir PlanningReservoir Planning
Reservoir Planning
 
Unit 1 Crop Water Requirement
Unit 1 Crop Water RequirementUnit 1 Crop Water Requirement
Unit 1 Crop Water Requirement
 
Irrigation Engineering Unit-II
Irrigation Engineering Unit-IIIrrigation Engineering Unit-II
Irrigation Engineering Unit-II
 
Runoff
RunoffRunoff
Runoff
 
Design of Lined Canal and Canal Lining
Design of Lined Canal and Canal LiningDesign of Lined Canal and Canal Lining
Design of Lined Canal and Canal Lining
 
Irrigation Engineering
Irrigation EngineeringIrrigation Engineering
Irrigation Engineering
 
Introduction to irrigation and hydrology
Introduction to irrigation and hydrologyIntroduction to irrigation and hydrology
Introduction to irrigation and hydrology
 
Flood frequency analyses
Flood frequency analysesFlood frequency analyses
Flood frequency analyses
 
Flood estimation
Flood estimation Flood estimation
Flood estimation
 
Reservior planning
Reservior    planningReservior    planning
Reservior planning
 
Irrigation Engineering
Irrigation EngineeringIrrigation Engineering
Irrigation Engineering
 
Engineering Hydrology
Engineering HydrologyEngineering Hydrology
Engineering Hydrology
 
Hydrology (Runoff and factors affecting Run off)
Hydrology (Runoff and factors affecting Run off)Hydrology (Runoff and factors affecting Run off)
Hydrology (Runoff and factors affecting Run off)
 
choosing an irrigation methods
choosing an irrigation methods choosing an irrigation methods
choosing an irrigation methods
 
Canal
CanalCanal
Canal
 
GROUND WATER RECHARGE TECHNIQUES BY CH.APPARAO (Research Associate, ARS, ATP)
GROUND WATER RECHARGE TECHNIQUES BY CH.APPARAO (Research Associate, ARS, ATP)GROUND WATER RECHARGE TECHNIQUES BY CH.APPARAO (Research Associate, ARS, ATP)
GROUND WATER RECHARGE TECHNIQUES BY CH.APPARAO (Research Associate, ARS, ATP)
 
Spillway and its types
Spillway and its typesSpillway and its types
Spillway and its types
 

Similar to Drainage system

14 d&i design of surface drainage
14 d&i design of surface drainage14 d&i design of surface drainage
14 d&i design of surface drainage
MuhammadImran1202
 
Lec 9 Border irrigation – Design and hydraulics.ppt
Lec 9 Border irrigation – Design and hydraulics.pptLec 9 Border irrigation – Design and hydraulics.ppt
Lec 9 Border irrigation – Design and hydraulics.ppt
pavik13
 

Similar to Drainage system (20)

3. Highway Drainage.pdf
3. Highway Drainage.pdf3. Highway Drainage.pdf
3. Highway Drainage.pdf
 
3. Highway Drainage.pdf
3. Highway Drainage.pdf3. Highway Drainage.pdf
3. Highway Drainage.pdf
 
Highway drainage
Highway drainageHighway drainage
Highway drainage
 
Module 5: Highway Drainage and Highway Economics
Module 5: Highway Drainage and Highway EconomicsModule 5: Highway Drainage and Highway Economics
Module 5: Highway Drainage and Highway Economics
 
14 d&i design of surface drainage
14 d&i design of surface drainage14 d&i design of surface drainage
14 d&i design of surface drainage
 
Drainage engineering presentation work done
Drainage engineering presentation work doneDrainage engineering presentation work done
Drainage engineering presentation work done
 
Chapter Four -4 Highway Drainage slide.pdf
Chapter Four -4 Highway Drainage slide.pdfChapter Four -4 Highway Drainage slide.pdf
Chapter Four -4 Highway Drainage slide.pdf
 
Irrigation_methods__96_slayt.ppt
Irrigation_methods__96_slayt.pptIrrigation_methods__96_slayt.ppt
Irrigation_methods__96_slayt.ppt
 
Lec 9 Border irrigation – Design and hydraulics.ppt
Lec 9 Border irrigation – Design and hydraulics.pptLec 9 Border irrigation – Design and hydraulics.ppt
Lec 9 Border irrigation – Design and hydraulics.ppt
 
Highway drainage system
Highway drainage systemHighway drainage system
Highway drainage system
 
To be presented
To be presentedTo be presented
To be presented
 
Highway Drainage System
Highway Drainage SystemHighway Drainage System
Highway Drainage System
 
chapt 6.pptx
chapt 6.pptxchapt 6.pptx
chapt 6.pptx
 
Chapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of roadChapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of road
 
Management & mitigation of groundwater infiltration within underground excava...
Management & mitigation of groundwater infiltration within underground excava...Management & mitigation of groundwater infiltration within underground excava...
Management & mitigation of groundwater infiltration within underground excava...
 
Methods of Dewatering
Methods of DewateringMethods of Dewatering
Methods of Dewatering
 
Storm drainage design
Storm drainage designStorm drainage design
Storm drainage design
 
Water logging.pptx
Water logging.pptxWater logging.pptx
Water logging.pptx
 
Highway Drainage (Highway Engineering)
Highway Drainage (Highway Engineering)Highway Drainage (Highway Engineering)
Highway Drainage (Highway Engineering)
 
DESIGN OF SUBSURFACE DRAINAGE SYSTEM
DESIGN OF SUBSURFACE DRAINAGE SYSTEMDESIGN OF SUBSURFACE DRAINAGE SYSTEM
DESIGN OF SUBSURFACE DRAINAGE SYSTEM
 

Recently uploaded

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 

Recently uploaded (20)

Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 

Drainage system

  • 1. A PRESENTATION ON WATER DRAINAGE SYSTEM TAKEN AT PWD, GANGAPUR CITY (SWM) SUBMITTED TO: SUBMITTED BY: Mr. Himanshu Singh Sitaram Meena (HOD, Deptt OF CE ) (12EJJCE099)
  • 2. I. INTRODUCTION • Provision of adequate drainage is an essential part of pavement design. – Protection of pavement structure – Improves road safety • Can be categorically studied in three parts: 1. Surface Drainage • Drainage on the adjoining land and roadway surface • Side Drainage and Cross Drainage 2. Sub-surface Drainage
  • 3. I. INTRODUCTION • Effects of water on the pavement structure • Presence of moisture causes: o reduction in the stability of the soil mass. o considerable variation in volume of subgrade in clayey soils. o Waves and corrugations failure in flexible pavements. o Stripping failure in flexible pavements. o Mud pumping failure in rigid pavements.
  • 4. II.DESIGN OFSURFACE DRAINAGE SYSTEMS • Can be divided into three phases: i. Estimation of the quantity of water that can iii. reach any element of the system. ii. Hydraulic design of each element of the system. Comparison of alternative systems and materials • Criteria-Lowest annual cost alternative
  • 5. II.DESIGN OFSURFACE DRAINAGE SYSTEMS 1. Rainfall Intensity • Runoff is obtained by considering expected sever storm.  Return period of 5, 10, 20, 25, 50, and 1 0 0 years • Quantity of runoff depends on intensity and duration. • Duration= Time of Concentration • The time required for water from the remotest place to reach a specific point on the drainage system. • =T1 +T2 • T1 = over land flow time • T2 = time of flow in the longitudinal drain
  • 6. II.DESIGN OFSURFACE DRAINAGE SYSTEMS Source: ERA Manual, 2002
  • 7. II. DESIGN OF SURFACE DRAINAGE SYSTEMS Source: ERA Manual, 2002
  • 8. II.DESIGN OFSURFACE DRAINAGE SYSTEMS 2. Computation of Runoff • Rain water expelled from the road surface i. Infiltration ii. Runoff iii. Evaporation- insignificant • Infiltration depends on: • Type and gradation of soil • Soil covers, moisture content of the soil • Presence of impervious layers near the surface.
  • 9. II.DESIGN OFSURFACE DRAINAGE SYSTEMS • Infiltration contd. • Rate of infiltration on bare soil is less than on a turfed soil. constant • Frozen soil is impervious • Rate of infiltration is assumed to be during any specific design storm. • Runoff depends on: • Nature of the ground, degree of saturation, and slope of the surface • Rate of runoff greater on smooth surfaces.
  • 10. II.DESIGN OFSURFACE DRAINAGE SYSTEMS • Rational Formula- accurate way of estimating runoff up to areas of 0.5 km2 Q  0.00278 CIA C 1 A1  C 2 A 2 C  A1 A 2 • If the water shade is made up of different surfaces • = runoff (m3/sec) • C=coefficient, representing ratio of runoff to rainfall • I = intensity of rainfall (mm/hr)for a duration equal to the time of concentration • A = catchment area tributary to the design location, ha
  • 12. II.DESIGN OFSURFACE DRAINAGE SYSTEMS • tc=distance/velocity of flow • tc is then used to determine the rainfall intensity (I)
  • 13. II.DESIGN OFSURFACE DRAINAGE SYSTEMS • This chart can also be alternatively used to determinec.
  • 14. III.DESIGN OFSIDE DITCHESAND OPEN CHANNELS • THE MANNING’S FORMULA • Once the quantity of runoff is known, the design of ditches and similar structures is based on the principles of open channel flow. • Mannings’s formula assumes steady flow in a uniform channel. V  1 R 2 / 3 S1 / 2 n Q  V  A Where: • V = mean velocity (m/sec) • R = hydraulic radius (m)= Area/wetted perimeter • S=slope of the channel (m/m) • n=Manning’s roughness coefficient
  • 15. III.DESIGN OFSIDE DITCHESAND OPEN CHANNELS • The Manning’s Formula
  • 16. III.DESIGN OFSIDE DITCHESAND OPEN CHANNELS • Capacity of a Trapezoidal Channel
  • 17. III.DESIGN OFSIDE DITCHESAND OPEN CHANNELS • Examples: 1. The maximum quantity of water expected in one of the open longitudinal drains on clayey soil is 0.9 m3/sec. Design the cross section and longitudinal slope of trapezoidal drain assuming the bottom width of the trapezoidal section to be 1.0 m and cross slopes to be 1V:1.5H. The allowable velocity of flow in the drain is 1.2 m/sec and Manning’s roughness coefficient is 0.02.
  • 18. III.DESIGN OFSIDE DITCHESAND OPEN CHANNELS • Examples: 2. The surface water from road side is drained to the longitudinal side drain from across one half a bituminous pavement surface of total width 7.0 m, shoulder and adjoining land of width 8.0 m one side of the drain. On the other side of the longitudinal drain, water flows across from reserved land with grass and 2% cross slope towards the side drain, the width of this strip of land being 2 5 m. The run off coefficients of the pavement, shoulder and reserve land with grass surface are 0.8, 0.25, and 0 3 5 respectively. The length of the stretch of land parallel to the road from where water is expected to flow to the side drain is about 4 0 0 m. Estimate the quantity of run-off flowing in the drain assuming 2 5 years period of frequency.
  • 19. IV.SUBSURFACE DRAINAGE 1. Lowering of Water Table • Highest level of water table should be below the subgrade. • Practically 1.0 to 1.2 m below subgrade • Relatively permeable soil- • Longitudinal drains are mainly used • Impermeable soils- • Transverse drains may be necessary inaddition to longitudinal drains
  • 20. IV.SUBSURFACE DRAINAGE 1. Lowering of Water Table Fig. Symmetrical longitudinal drains used to lower the groundwater table and to collect water infiltrating the pavement.
  • 21. • Lowering of Water Table IV. SUBSURFACE DRAINAGE Longitudinal Drain Transverse Drains Fig. Lowering of water table using Transverse Drains (Plan View)
  • 22. IV.SUBSURFACE DRAINAGE 2. Seepage Control • If seepage zone is at a depth less than 0.6 to 0.9 m below subgrade level, • Use longitudinal pipe drain in trench with filter material to intercept the seepage flow. • This phenomenon can be explained using figures.
  • 23. IV.SUBSURFACE DRAINAGE 2. Seepage Control Fig. Longitudinal interceptor drain used to cut off seepage and lower the groundwater table.
  • 24. IV.SUBSURFACE DRAINAGE  2. Seepage Control  Groundwater seeps through the slope where the water table intersects the land slope, and  Groundwater flows beneath the pavement while also entering the pavement foundation materials. Fig. (A) Illustration of ground water flow along a sloping impervious layer toward a roadway.
  • 25. IV.SUBSURFACE DRAINAGE 2. Seepage Control Fig. (B) Illustration of interceptor drain on the drawdown of the groundwater table.
  • 26. IV.SUBSURFACE DRAINAGE 2. Seepage Control Fig. Longitudinal collector drain used to remove water seeping into the pavement structural section.
  • 27. IV.SUBSURFACE DRAINAGE 3. Control of Capillary Rise • Capillary rise can be controlled by  Using a layer of granular material of suitable thickness.  Using a layer of impermeable capillary cutoff.  Capillary water should not rise above the thickness of the granular layer Granular material Capillary rise Highest water Fig. Gtraabnleularcapillary cutoff
  • 28. IV.SUBSURFACE DRAINAGE 3. Control of Capillary Rise • Bituminous layer or other geo-textiles can be used as an impermeable layer. Impermeable layer Capillary rise Highest water table Fig. Impermeable layer capillary cutoff
  • 29. IV.SUBSURFACE DRAINAGE 4. Design of Filter Material • Proper filter material should be used for:  Subsurface drainage system and backfilling the drainage trenches and  Criteria:  Permeability and Piping  5 Permeability criteria D15 offilter D15 of foundation  5 D15 of filter of foundationD85 Piping criteria
  • 30. IV.SUBSURFACE DRAINAGE 1 0 4. Design of Filter Material  DP=size of perforation in drain pipe  D85 Filter = 2DP 0 8 0 2DP○ 6 0 4 0 Foundation soil Filter Material The area between the two red curves represents the filler material. Percent passing 1.0 0. 0 2 0 0.0 5 ○ ○5D1 85D 5 0. Particle siz1e (mm), l1og scale 0 .00 1 1. 0 Fig. Design of Filter Material
  • 31. • REFERENCES: 1. Highway Engineering, 7th Ed. Paul H. Wright and Karen K. Dixon. Wiley (2004) 2. Highway Engineering, 8th Ed. S.K. Khanna and C.E.G. Justo. (2001)