Outline
Introduction
Construction Techniques
Problems Encountered In
Construction
Risks Control In Construction
undergrOund wOrks
Shelters and Fully-Designed Homes..
Basic protection from enemies and
elements..
Partially-modified for added protection
and comfort..
Built to drawings and
specifications..
Mining Operations..
Open Pits transitioning to
Underground mines.. exploiting lodes to
depth and reducing environmental
footprints
water systems..
Collection/Supply/Irrigation/Distribution
Underground Sewage Treatment
Plant, BondiCanal
mass transit systems..
rOad traffic..
HydrO-electric
POwer Plants..
Surge Shaft
Powerhouse
High Pressure Tunnel
fuel stOrage..
Other Ground Storage Media..
–Solution-Mined Salt Domes
–Depleted “Reservoir Rocks”(CO2)
–Lined Hard Rock Caverns (Compressed and
Liquified Natural Gas, LNG)
Packaged and Bulk
materials..
•Silo/Bunker Storage..
–Coal, Grains, Ore..
•Warehousing
–often in converted mine space
critical infrastructure..
•Secure sites with network
-wide access
–Controlled exit/entry
–Atmospheric control (temp., humidity, dust..)
–Ready access for modification and maintenance
•Space and Cost Saving Opportunities (“Utilidors”)..
–Heating/Cooling
–Communications
–Data transfer
–Wastewater
–Freshwater
–Transport
–Power
–etcetera..
researcH
facilities•
Worldwide, many
underground research
laboratories and test sites
(waste repository
characterization, physics,
geo-’bio-sciences,
engineering research,
education/training..)
Public
Facilities
Pretty Much anything you
Want
Temppeliaukio Church
Le Grand Louvre
reasons to go underground
urban congestion..
• Go underground to avoid..
–Road pavement
–Buried infrastructure
–Basements & foundations
–Surface condemnations
–Right of way interruptions
–Minimize surface disruption
create green sPace..
•“The Central
Artery/Tunnel
Project will
create more
than 300 acres
of landscaped
and restored
open space,
including over
45 parks and
major public
plazas”.
Protection..Kobe Earthquake (Japan – 1995)
Severe damage to the Kobe City Hall
No damage to the underground shopping
mall located below
isolation
Stable, Quiet and Shielded
–Waste Isolation
–Experiments and Testing..
underground construction
techniQues
Methods for underground construction
• Cut and cover method in open excavation;
• Cut and cover method between earth retaining walls with lowering of the
ground water levels;
• Cut and cover method between earth retaining walls without lowering of
the ground water levels;
• Wall and roof method;
• Pneumatic caisson method;
• Immersed tunnel method;
• Bored tunnel method;
• Top Down method.
EXCAVATION BY TUNNEL BORING
MACHINE
1. Excavation and support of working shafts
2. Excavation and support of undercut and tail tunnel
3. Excavation of the tunnel itself
4. Disposal of soil from tunnel face
5. Hoisting the soil to ground level
6. Lining the tunnel
7. Extending services and rail tracks (if necessary)
Shielded TBM involve The following acTiviTieS:
excavaTion in dRY SoilS
Earth Pressure Balance Digger Shield”
excavaTion in weT SoilS
• Slurry Shield
excavaTion in RockS
Mechanical
Equipment
Or
Explosive
Blasting.
• The person in charge of blasting shall be
the last to leave the blast area, shall see
that no one remains in the blast area, and
shall operate the sectioning switches in
the firing line while proceeding out of the
blast area.
• No persons shall enter the tunnel blast
area until the ventilation system has
cleared the heading of harmful gases,
smoke, and dust.
• After each blast, the underground
supports in the blast area shall be
inspected and secured as necessary work
is resumed. Rock surfaces shall be
inspected, scaled, and if required,
provided with shoring, bracing, rock bolts,
Shotcrete, or chain link fabric, before
mucking is started. Rock bolts within 100
ft (30.4 m) of a blast shall be tested after
each blast before drilling for the next
round begins.
• The muck pile shall be wet down prior to
and kept wet during operations.
SoMe gRound iMpRoveMenT
opTionS..
Freezing.. to stabilize the ground and/or
preserve the water table Grouting.. to
stabilize the ground and/or render it ~
watertight
SoMe gRound SuppoRT
SYSTeMS..
Rock Bolts and Steel Channel
Steel Arches
Pre-Cast Concrete Segments
Shotcrete
Integrated Waterproofing
Cast Iron Segments
The Technique Of
Jacked Box
Tunneling:
 simplest form
 A purpose designed tunnel shield
is cast on to the leading end of
the box, and thrust jacks are
provided at the rear end reacting
against the jacking base
 Control of Ground Disturbance
 Constructional Tolerances
 Particular hazards
 Alternative method for such case
pRoBleMS encounTeRed in
undeRgRound
conSTRucTion
gRound SuRpRiSeS..
• Geo-material properties vary in time/space (e.g.
geo-statistics..)
–Strengths
–Loads/Stresses
–Deformations (elastic and plastic)
• Sometimes the engineering process fails to
account for the impacts of geo-variability on..
–Designed structures..
–Surrounding structures/environment
MajoR excavaTion happen..
Shanghai
Singapore
London
Munich
WorldWide, Major Projects..
Major losses
• –1999 Hull Yorkshire Tunnel, UK Collapse
• –1999 TAV Bologna -Florence, Italy Collapse
• –1999 Anatolia Motorway, Turkey Earthquake
• –2000 Metro Taegu, Korea Collapse
• –2000 TAV Bologna -Florence, Italy Collapse
• –2002 Taiwan High Speed Railway Collapse
• –2003 Shanghai Metro, PRC Collapse
• –2004 Singapore Metro, Singapore Collapse.
• –2005 Barcelona Metro, Spain Collapse
• –2005 Lausanne Metro, Switzerland Collapse
• –2005 Lane Cove Tunnel, Sydney Collapse
• –2005 Kaohsiung Metro, Taiwan
• ………etcetera..
Fractured rock subject to
stress & Gravity
Observed at the engineering scale
rock is rarely solid..A “hard” rock
mass may contain weak clays or
even voids..
Ravelling
Alteration
Spalling/Bursting
chanGinG GroundWater
conditions• “High Water
Pressure
Complicates
Arrowhead
Tunnels..”
risks controls
in studyinG the reGional
GeoloGy
• Benefit from the
experience of others..–
Same/similar rock–
Same/similar needs–
Much of the early work
can be done from
behind the desk
Putting the Site in Context..
in scoPinG the site
investiGation (si)
• Mixed-scale data sets..
• experience needed
• Field Investigation..
–Exposures
–Geophysics
–Boreholes
–Testing
•Field
•Lab
characterizinG subsurFace
site
• 3-D Geo-Models
–From cms to kms
–Basis of Design..
• Conditions;
dry, damp, wet, massive, hard, stratified, seamy, schistose,
jointed, blocky, crushed, soil-like..
• •Behaviors;
raveling, running, flowing, squeezing, swelling, spalling, rock
burst..
• –Deciding between options..
•Siting
•Design
•Construction
desiGn & sPeciFy For Geo-
diversity
• Plan for Variation..
–Geologic
Uncertainties
–Design &
Construction Changes
Many
Designs..One
Tunnel
in conclusion..
Reference
• American society of civil engineers - technical committee on contracting practices
of the underground technology research council. 1991.
• The equipment magazine for the underground construction industry
• Forensic engineering for underground construction-e. T. Brown
• Journal of geotechnical engineering, asce, 115(11): 1513-1531.
• Seismic analysis of underground structures-kazuhiko kawashima
• Underground structures engineering services for owners and contractors
• Geoengineering considerations in the optimum use of underground space -
raymond l. Sterling
• Support in underground hard rock mines
• Drilling and blasting for underground space
Underground construction Techniques civil final year seminar

More Related Content

What's hot

Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
Ashish Parihar
 

What's hot (20)

Pile foundations Case Study Delhi Metro Site Visit
Pile foundations Case Study  Delhi Metro Site VisitPile foundations Case Study  Delhi Metro Site Visit
Pile foundations Case Study Delhi Metro Site Visit
 
Prefabrication​ structure ppt
Prefabrication​ structure pptPrefabrication​ structure ppt
Prefabrication​ structure ppt
 
What is post tensioning
What is post tensioningWhat is post tensioning
What is post tensioning
 
Bridges
BridgesBridges
Bridges
 
Underwater construction
Underwater construction Underwater construction
Underwater construction
 
High rise building construction
High rise building constructionHigh rise building construction
High rise building construction
 
suspension bridge ppt
suspension bridge pptsuspension bridge ppt
suspension bridge ppt
 
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
 
PRECAST CONCRETE STAIRS
  PRECAST CONCRETE STAIRS  PRECAST CONCRETE STAIRS
PRECAST CONCRETE STAIRS
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONS
 
1. classification of urban roads 28 jun
1. classification of urban roads 28 jun1. classification of urban roads 28 jun
1. classification of urban roads 28 jun
 
metro station planning ar.ravi sankar alumni(auce architecture)
metro station planning ar.ravi sankar alumni(auce architecture)metro station planning ar.ravi sankar alumni(auce architecture)
metro station planning ar.ravi sankar alumni(auce architecture)
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Basement construction report
Basement construction reportBasement construction report
Basement construction report
 
Raft foundation ppt by kamal bhatia
Raft foundation ppt by kamal bhatiaRaft foundation ppt by kamal bhatia
Raft foundation ppt by kamal bhatia
 
Coffer dam and its type
Coffer dam and its typeCoffer dam and its type
Coffer dam and its type
 
High rise building
High rise buildingHigh rise building
High rise building
 
Sheet pile presentation
Sheet pile presentationSheet pile presentation
Sheet pile presentation
 
Reports on Precast System
Reports on Precast System Reports on Precast System
Reports on Precast System
 

Similar to Underground construction Techniques civil final year seminar

Tunnelling Methods.pdf
Tunnelling Methods.pdfTunnelling Methods.pdf
Tunnelling Methods.pdf
SuryoNegoro3
 
tunnelsppt-170126104231-converted (1)-converted.pdf
tunnelsppt-170126104231-converted (1)-converted.pdftunnelsppt-170126104231-converted (1)-converted.pdf
tunnelsppt-170126104231-converted (1)-converted.pdf
BalpreetSingh47890
 
Michalis presentation_2015
Michalis presentation_2015Michalis presentation_2015
Michalis presentation_2015
ILIAS MICHALIS
 

Similar to Underground construction Techniques civil final year seminar (20)

UNDERGROUND-CONSTRUCTION.pptx
UNDERGROUND-CONSTRUCTION.pptxUNDERGROUND-CONSTRUCTION.pptx
UNDERGROUND-CONSTRUCTION.pptx
 
NATM ppt sumit
NATM ppt sumitNATM ppt sumit
NATM ppt sumit
 
Tunnels concepts
Tunnels conceptsTunnels concepts
Tunnels concepts
 
Tunnelling
TunnellingTunnelling
Tunnelling
 
Excavation of Tunnels
Excavation of TunnelsExcavation of Tunnels
Excavation of Tunnels
 
Tunnels, types & importance
Tunnels, types &  importanceTunnels, types &  importance
Tunnels, types & importance
 
Tunneling
TunnelingTunneling
Tunneling
 
Tunneling exploration
Tunneling explorationTunneling exploration
Tunneling exploration
 
Study of tunnel engineering
Study of tunnel engineeringStudy of tunnel engineering
Study of tunnel engineering
 
Tunnelling Methods.pdf
Tunnelling Methods.pdfTunnelling Methods.pdf
Tunnelling Methods.pdf
 
NATM Tunneling ppt
NATM Tunneling pptNATM Tunneling ppt
NATM Tunneling ppt
 
Tunnelling
TunnellingTunnelling
Tunnelling
 
Blast hole drill
Blast hole drillBlast hole drill
Blast hole drill
 
OIL EXPLORATION | Offshore Drilling Operation| Deilling Rig operation | Types
OIL EXPLORATION | Offshore Drilling Operation| Deilling Rig operation | TypesOIL EXPLORATION | Offshore Drilling Operation| Deilling Rig operation | Types
OIL EXPLORATION | Offshore Drilling Operation| Deilling Rig operation | Types
 
Basics for oil riggers
Basics for oil riggersBasics for oil riggers
Basics for oil riggers
 
Lecture 6 p
Lecture 6 pLecture 6 p
Lecture 6 p
 
tunnelsppt-170126104231-converted (1)-converted.pdf
tunnelsppt-170126104231-converted (1)-converted.pdftunnelsppt-170126104231-converted (1)-converted.pdf
tunnelsppt-170126104231-converted (1)-converted.pdf
 
Tunnel Engineering.pptx
Tunnel Engineering.pptxTunnel Engineering.pptx
Tunnel Engineering.pptx
 
Michalis presentation_2015
Michalis presentation_2015Michalis presentation_2015
Michalis presentation_2015
 
Tunnels ppt
Tunnels pptTunnels ppt
Tunnels ppt
 

More from Pavan Kumar N (13)

Seismic behavior of beam column Joint
Seismic behavior of beam column JointSeismic behavior of beam column Joint
Seismic behavior of beam column Joint
 
Repair and strengthening of reinforced concrete beam column joints
Repair and strengthening of reinforced concrete beam column jointsRepair and strengthening of reinforced concrete beam column joints
Repair and strengthening of reinforced concrete beam column joints
 
Theory of plates and shells timoshenko
Theory of plates and shells timoshenkoTheory of plates and shells timoshenko
Theory of plates and shells timoshenko
 
Structural anlysis
Structural anlysisStructural anlysis
Structural anlysis
 
Vol.3 session4 1917
Vol.3 session4 1917Vol.3 session4 1917
Vol.3 session4 1917
 
Unit5 pn
Unit5 pnUnit5 pn
Unit5 pn
 
Unit7 skp
Unit7 skpUnit7 skp
Unit7 skp
 
Unit8 skp
Unit8 skpUnit8 skp
Unit8 skp
 
Unit3 hbn
Unit3 hbnUnit3 hbn
Unit3 hbn
 
Unit1 hbn
Unit1 hbnUnit1 hbn
Unit1 hbn
 
Unit2 hbn
Unit2 hbnUnit2 hbn
Unit2 hbn
 
Unit4 kvv
Unit4 kvvUnit4 kvv
Unit4 kvv
 
Unit6 svd
Unit6 svdUnit6 svd
Unit6 svd
 

Recently uploaded

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 

Underground construction Techniques civil final year seminar

  • 2. Outline Introduction Construction Techniques Problems Encountered In Construction Risks Control In Construction
  • 4. Shelters and Fully-Designed Homes.. Basic protection from enemies and elements.. Partially-modified for added protection and comfort.. Built to drawings and specifications..
  • 5. Mining Operations.. Open Pits transitioning to Underground mines.. exploiting lodes to depth and reducing environmental footprints
  • 10. fuel stOrage.. Other Ground Storage Media.. –Solution-Mined Salt Domes –Depleted “Reservoir Rocks”(CO2) –Lined Hard Rock Caverns (Compressed and Liquified Natural Gas, LNG)
  • 11. Packaged and Bulk materials.. •Silo/Bunker Storage.. –Coal, Grains, Ore.. •Warehousing –often in converted mine space
  • 12. critical infrastructure.. •Secure sites with network -wide access –Controlled exit/entry –Atmospheric control (temp., humidity, dust..) –Ready access for modification and maintenance •Space and Cost Saving Opportunities (“Utilidors”).. –Heating/Cooling –Communications –Data transfer –Wastewater –Freshwater –Transport –Power –etcetera..
  • 13. researcH facilities• Worldwide, many underground research laboratories and test sites (waste repository characterization, physics, geo-’bio-sciences, engineering research, education/training..)
  • 15. Pretty Much anything you Want Temppeliaukio Church Le Grand Louvre
  • 16. reasons to go underground
  • 17. urban congestion.. • Go underground to avoid.. –Road pavement –Buried infrastructure –Basements & foundations –Surface condemnations –Right of way interruptions –Minimize surface disruption
  • 18. create green sPace.. •“The Central Artery/Tunnel Project will create more than 300 acres of landscaped and restored open space, including over 45 parks and major public plazas”.
  • 19. Protection..Kobe Earthquake (Japan – 1995) Severe damage to the Kobe City Hall No damage to the underground shopping mall located below
  • 20. isolation Stable, Quiet and Shielded –Waste Isolation –Experiments and Testing..
  • 22. Methods for underground construction • Cut and cover method in open excavation; • Cut and cover method between earth retaining walls with lowering of the ground water levels; • Cut and cover method between earth retaining walls without lowering of the ground water levels; • Wall and roof method; • Pneumatic caisson method; • Immersed tunnel method; • Bored tunnel method; • Top Down method.
  • 23.
  • 24.
  • 25.
  • 26. EXCAVATION BY TUNNEL BORING MACHINE
  • 27. 1. Excavation and support of working shafts 2. Excavation and support of undercut and tail tunnel 3. Excavation of the tunnel itself 4. Disposal of soil from tunnel face 5. Hoisting the soil to ground level 6. Lining the tunnel 7. Extending services and rail tracks (if necessary) Shielded TBM involve The following acTiviTieS:
  • 28. excavaTion in dRY SoilS Earth Pressure Balance Digger Shield”
  • 29. excavaTion in weT SoilS • Slurry Shield
  • 31. Blasting. • The person in charge of blasting shall be the last to leave the blast area, shall see that no one remains in the blast area, and shall operate the sectioning switches in the firing line while proceeding out of the blast area. • No persons shall enter the tunnel blast area until the ventilation system has cleared the heading of harmful gases, smoke, and dust. • After each blast, the underground supports in the blast area shall be inspected and secured as necessary work is resumed. Rock surfaces shall be inspected, scaled, and if required, provided with shoring, bracing, rock bolts, Shotcrete, or chain link fabric, before mucking is started. Rock bolts within 100 ft (30.4 m) of a blast shall be tested after each blast before drilling for the next round begins. • The muck pile shall be wet down prior to and kept wet during operations.
  • 32. SoMe gRound iMpRoveMenT opTionS.. Freezing.. to stabilize the ground and/or preserve the water table Grouting.. to stabilize the ground and/or render it ~ watertight
  • 33.
  • 34. SoMe gRound SuppoRT SYSTeMS.. Rock Bolts and Steel Channel Steel Arches Pre-Cast Concrete Segments Shotcrete Integrated Waterproofing Cast Iron Segments
  • 35. The Technique Of Jacked Box Tunneling:  simplest form  A purpose designed tunnel shield is cast on to the leading end of the box, and thrust jacks are provided at the rear end reacting against the jacking base  Control of Ground Disturbance  Constructional Tolerances  Particular hazards  Alternative method for such case
  • 36.
  • 38. gRound SuRpRiSeS.. • Geo-material properties vary in time/space (e.g. geo-statistics..) –Strengths –Loads/Stresses –Deformations (elastic and plastic) • Sometimes the engineering process fails to account for the impacts of geo-variability on.. –Designed structures.. –Surrounding structures/environment
  • 40. WorldWide, Major Projects.. Major losses • –1999 Hull Yorkshire Tunnel, UK Collapse • –1999 TAV Bologna -Florence, Italy Collapse • –1999 Anatolia Motorway, Turkey Earthquake • –2000 Metro Taegu, Korea Collapse • –2000 TAV Bologna -Florence, Italy Collapse • –2002 Taiwan High Speed Railway Collapse • –2003 Shanghai Metro, PRC Collapse • –2004 Singapore Metro, Singapore Collapse. • –2005 Barcelona Metro, Spain Collapse • –2005 Lausanne Metro, Switzerland Collapse • –2005 Lane Cove Tunnel, Sydney Collapse • –2005 Kaohsiung Metro, Taiwan • ………etcetera..
  • 41. Fractured rock subject to stress & Gravity Observed at the engineering scale rock is rarely solid..A “hard” rock mass may contain weak clays or even voids.. Ravelling Alteration Spalling/Bursting
  • 42. chanGinG GroundWater conditions• “High Water Pressure Complicates Arrowhead Tunnels..”
  • 44. in studyinG the reGional GeoloGy • Benefit from the experience of others..– Same/similar rock– Same/similar needs– Much of the early work can be done from behind the desk Putting the Site in Context..
  • 45. in scoPinG the site investiGation (si) • Mixed-scale data sets.. • experience needed • Field Investigation.. –Exposures –Geophysics –Boreholes –Testing •Field •Lab
  • 46. characterizinG subsurFace site • 3-D Geo-Models –From cms to kms –Basis of Design.. • Conditions; dry, damp, wet, massive, hard, stratified, seamy, schistose, jointed, blocky, crushed, soil-like.. • •Behaviors; raveling, running, flowing, squeezing, swelling, spalling, rock burst.. • –Deciding between options.. •Siting •Design •Construction
  • 47. desiGn & sPeciFy For Geo- diversity • Plan for Variation.. –Geologic Uncertainties –Design & Construction Changes Many Designs..One Tunnel
  • 49. Reference • American society of civil engineers - technical committee on contracting practices of the underground technology research council. 1991. • The equipment magazine for the underground construction industry • Forensic engineering for underground construction-e. T. Brown • Journal of geotechnical engineering, asce, 115(11): 1513-1531. • Seismic analysis of underground structures-kazuhiko kawashima • Underground structures engineering services for owners and contractors • Geoengineering considerations in the optimum use of underground space - raymond l. Sterling • Support in underground hard rock mines • Drilling and blasting for underground space