Large scale projects will in the majority
(if not all) of cases involve obtaining
a huge amount of information, from
environmental assessments to transport
reports, with the more organised
developer front loading any application
to meet the high expectations of
Local Planning Authorities. From the
landowner’s perspective this process is
often taken out of their hands, with the
developer/operator progressing any
planning application at their cost. If the
landowner is to contribute in any way to
these costs then care will always need
to be taken in order to limit this liability
as the planning process can often be
both time consuming and expensive.
The grant of planning permission will
usually be subject to a number of
conditions. Often these conditions will
need to be discharged either prior to
commencement of the development
or prior to use. Conditions will also
often be imposed during the course
of the construction of the works and
thereafter for the duration that the
development remains in use. It is
common practice for certain types of
development, such as wind turbines,
to have finite periods of use, with
decommissioning requirements being
imposed in planning agreements.
Failure to discharge or comply with
these conditions can risk enforcement
action from the Local Authority and
given the contentious nature of many
renewable energy projects there is
a very good chance that any failures
would be brought to the attention of an
enforcement officer and acted upon.
Knowing who is responsible for
discharging and complying with
these planning conditions (be it the
landowner, developer and/or operator)
is therefore of significant importance.
Small scale microgeneration renewable
energy projects can often benefit from
permitted development rights whereby
a formal planning application would not
be required. It must however be noted
that any landowner should discuss
the proposed project with the Local
Planning Authority before attempting
to rely on these permitted development
rights if there is any doubt as to
whether they apply. Equally, in some
cases the permitted development rights
will still impose conditions that must be
complied with.
In brief, the planning system when
considering a renewable energy project
should not be taken lightly. Yes, it is
accepted by Local Planning Authorities
that there is a need for renewable
energy, but material considerations
such as the effect on local amenity
can often override this. Even where
planning permission has been granted,
be it in the case of small or large scale
projects, the requirements of the Local
Planning Authority do not end at this
point as conditions dealing with a
variety of issues from noise control to
landscaping must be complied with.
Given that the landowner is generally
the first port of call for any Local
Authority wishing to bring enforcement
action care must at all times be taken
to ensure that the conditions have been
complied with and (if the developer/
operator is responsible for planning)
adequate protection is in place.
David Myers
www.rollits.com
January 2015
Renewables Focus
Obtaining planning permission for renewable energy projects
remains one of the most significant barriers faced by landowners,
developers and operators to date.
Planning
back to basics
Also in this issue
Leases of ground based solar PV
development – some considerations
Solar energy – back to the rooftops?
No such thing as a secret?
Page 2
Renewables Focus
January 2015
An important issues from the
landowner’s point of view is that the
lease will need to be excluded from
the provisions of Part II of the Landlord
and Tenant Act 1954 so that at the
end of the term the developer will
not have security of tenure and the
landowner will have no difficulty getting
his land back. Note that this is in stark
contrast to the powers enjoyed by
telecommunications operators.
Particular concerns of the landowner
1.​ What will the rent be? Could there
be an additional rent based on a
percentage of the revenue generated
by solar panels?
2.​ Security of decommissioning and
re-instatement. The Landowner will
want to ensure that the developer has
the resources to remove all the plant
and equipment and make good at the
end of the term, otherwise he will be
left with that expense.
​Some landowners will seek a bond or
up-front escrow account up front to
guarantee payment of this expense.
​Alternatively, the energy company could
agree to set up a decommissioning
fund say 5 years before the end of the
terms and pay a sum of money in each
of the remaining years in order to pay
for the work.
3. ​If the landowner is a farmer he will
probably require grazing rights which
will enable him to claim the single farm
payment. In our experience the energy
company will usually permit this but it is
a consideration which needs to be raised
early on as the panels will need to be
designed to fixed in a elevated position
in order to allow for grazing. This will
have cost implications and possibly also
planning issues as the panels may be more
visible. We are probably only talking about
grazing sheep here as pigs will affect the
stability of the ground, and it would be
unfeasible to raise the panels sufficiently
to allow horses underneath; and
4.​ The farmer landowner will also be
concerned about damage to crops and
ensuring that compensation is payable
when development commences.
Particular concerns of the
energy company
1.​ The Developer will want to resist any
break rights in the lease. He is the one
going to the expense of the planning
application, and the supply installation
and management of the plant and
equipment so he will not want the
landowner to be able to terminate the
arrangements early;
2. ​A related point – the developer will
be seeking to protect the revenue to be
generated by the apparatus;
3.​ If the district network operator
requires a substation lease and any
wayleaves then the Developer will need
to ensure that the landowner is required
to grant these at no additional cost.
Otherwise the Developer could find
himself held to ransom;
4. ​Grid connections may be required
over third party land in which case the
energy company will be concerned
to negotiate the necessary rights at
an economically viable price before
committing himself to the lease or
leases by exercising the option;
5.​ The ownership of the equipment
may be a concern. The lease should
be carefully drafted to ensure that
ownership reverts to the developer
upon termination of the lease
howsoever arising. This will be a
particular concern of any funder and/or
investor in the scheme;
6.​ The ability to assign the lease to
a funder will be a key consideration.
Should the developer go bust then any
funder will want to be able to step into
its shoes and realise the returns from
the investment. Therefore the forfeiture
clause in the lease will usually provide
that any funder is notified of any
breach and is given the opportunity of
remedying it.
A lease of land for solar PV development will usually be for a term of around 25 years, commonly with
an option for the tenant to require a short extension, perhaps a further 5 years. This will give the energy
company comfort that it can obtain a return on its investment and the flexibility to extend further should
Government policy alter in its favour during the initial term. This sort of term should not prove to be too
onerous on the landowner either as the land is not being tied up for generations.
Leases of ground based solar PV
development – some considerations
Page 3
Renewables Focus
January 2015
Clearly, however, a move in Government
policy is occurring. For some time now
in planning terms, development of
solar installations on brown field sites
has been seen as far preferable to
the use of agricultural land. However,
it seems less and less likely that
good quality agricultural land will be
permitted for development.
In October 2014 various
announcements showed a desire by
the Government to support smaller,
most likely roof-based, schemes rather
than larger field based ones. Briefly,
the Renewables Obligation Scheme for
larger sites is to end and be replaced
by an auctioned system (Contracts for
Difference CFD). However Feed-in-
Tariff changes could lead to benefits for
those installing solar panels on roofs as
opposed to stand-alone installations.
The Department of Energy and Climate
Change is proposing that developers of
schemes larger than 250KW will have to
show that a proportion of the electricity
generated can be used in the buildings
to which the panels are wired. This
could be a benefit to owners of farm
and other industrial buildings.
Also in October, George Eustace,
the Farming Minster, announced the
Government’s proposal to end the
payment of single farm payment to land
occupied by solar farms. So, although
grazing between the panels would be
permitted, no central payments could
be claimed.
Many will argue that the proposals
are wrong and that green energy
targets will be missed. Others will point
to the vast quantity of solar fields in
Cornwall and the West Country and
say that the changes are needed to
avoid further blighting the countryside.
Whatever the view it appears that more
panels are likely to be going on to roof
tops and less into fields in the
immediate future.
Neil Franklin
The Government has recently admitted that it has no idea as to
how much agricultural land has been lost to solar fields and clearly
will not know the quality of the land lost either. To complicate the
issue, many ground based solar installations are grazed by sheep
and this (in part at least) remains in agricultural use. It has been
suggested anecdotally that lamb production can even be boosted
in these fields as the panels can provide shelter. Others cite the
benefits of lack of use of pesticides.
Solar energy
back to the rooftops?
Dealing with protestors unlawfully
trespassing on land
In recent months, there have been a
number of high profile protests outside
proposed fracking sites. Such protests
are not exclusive to fracking sites, rather
fracking just happens to be the current
‘hot’ topic that has captured both the
public’s and the media’s attention.
It is not uncommon for wind farms,
proposed biowaste sites, hydro-
projects and PV panel farms to be met
by protesters and, in some instances,
protests encampments on or in close
proximity to the proposed site.
Prevention is always better than cure.
However, that is easier said than done,
especially when the land in question
comprises many acres of land.
Landowners faced with protestors
trespassing upon their land and/or
obstructing access to land have a number
of options at their disposal, including:-
• issue possession proceedings to
recover possession of land;
• pursue an injunction to prevent any
ongoing and/or future trespass;
• employ a private certified bailiff to
remove any trespassers - care should
be exercised here as the landowner
may be liable for any unlawful act
undertaken, or any damage caused,
by the bailiff;
• under section 61 of the Criminal
Justice  Public Order Act 1994,
provided certain criteria are satisfied,
the police have the power (but not a
duty) to remove trespassers. Unless
the protest poses a risk to, or impacts
upon, the wider public, or unless
there is a threat to person or property,
ordinarily the police will be reluctant
to get involved in what they will state
is a civil matter;
• under section 77 of the Criminal
Justice  Public Order Act 1994 local
authorities have the power (but again,
not a duty) to make a direction that
trespassers have to leave the land.
If the trespassers fail to do so it is
a criminal offence. However, Local
Authorities rarely exercise this power.
Careful consideration must be given
by landowners as to how they address
any protests taking place on, or in
the vicinity of their land. Rollits can
provide proactive and reactive advice
and assistance to assist landowners to
minimise disruption and costs arising
from any protestors trespassing on
their land.
Chris Drinkall
Page 4
Renewables Focus
January 2015
Information
If you have any queries on any issues raised
in this newsletter, or any renewables matters
in general please contact Neil Franklin on
01482 337250.
This newsletter is for the use of clients and
will be supplied to others on request. It is
for general guidance only. It provides
useful information in a concise form.
Action should not be taken without
obtaining specific advice. We hope you
have found this newsletter useful.
If, however, you do not wish to receive
further mailings from us, please write to
Pat Coyle, Rollits, Wilberforce Court,
High Street, Hull, HU1 1YJ.
The law stated is as at 20 January 2015.
Hull Office
Wilberforce Court, High Street,
Hull HU1 1YJ
Tel +44 (0)1482 323239
York Office
Rowntree Wharf, Navigation Road,
York YO1 9WE
Tel +44 (0)1904 625790
www.rollits.com
Authorised and Regulated by the Solicitors
Regulation Authority under number 524629
Rollits is a trading name of Rollits LLP.
Rollits LLP is a limited liability partnership,
registered in England and Wales,
registered number OC 348965, registered
office Wilberforce Court, High Street, Hull
HU1 1YJ.
A list of members’ names is available for
inspection at our offices. We use the term
‘partner’ to denote members of Rollits LLP.
For example, when applying for a grant
from, or entering into a lease with, a
public authority, be aware that information
relating to the project and your
organisation may have to be disclosed
by the authority should they receive a
request for information from a third party
under the Freedom of Information Act
2000 or the Environmental Information
Regulations 2004.
Anybody can make such a request without
having to give a reason although, if an
authority with which a private organisation
is dealing receives such a request, it is
good practice for the authority to contact
the organisation for representations as to
whether or not information relating to that
organisation should be disclosed.
Whilst the two aforementioned pieces of
legislation each cover different types of
information (details of which are beyond
the scope of this article), both share the
same core principles. Each has the overall
intention to be “pro-disclosure” and, as
such, works on the basis that requested
information should be disclosed unless it
is not held by or on behalf of the authority
or a statutory exemption applies.
This outcome often contradicts the
wishes of private organisations, but
the statutory exemptions are limited
in scope. Many of them only apply in
specific circumstances such as where
national security is at stake. Two more
general exemptions that businesses
often wish to cite in representations
are that disclosure (i) would/would
likely prejudice a person’s commercial
interests, and (ii) may result in an
actionable breach of confidence.
Given the risk of these exemptions being
routinely cited to withhold disclosure,
in practice the standard set by the
Information Commissioner’s Office in
its acceptance of their application is
high – meaning strong arguments
against disclosure are required. It is
therefore not necessarily possible to use
these exemptions in practice.
In any event, even if the organisation
makes such representations the
authority retains the final decision-
making power and may ultimately
disclose the information notwithstanding
representations to the contrary.
Our advice to any client involved in a
project with a public authority is to be
aware of these risks when considering
the amount and type of information to
be shared, and to agree a contractual
protocol at the outset (or at least
before any request for disclosure is
made) to govern how the public authority
will go about consulting with the client
prior to making its decision as to whether
to disclose.
James Peel
No such thing as a secret?
Often forgotten amidst the financial, technical and other specific details of a renewables project are the
implications of freedom of information legislation should the project involve a public authority (including
private companies wholly owned by public authorities).

Weitere ähnliche Inhalte

Ähnlich wie Rollits Renewables Focus January 2015

Leasing Municipal & Private Property for Solar: Key Steps & Considerations
Leasing Municipal & Private Property for Solar: Key Steps & ConsiderationsLeasing Municipal & Private Property for Solar: Key Steps & Considerations
Leasing Municipal & Private Property for Solar: Key Steps & ConsiderationsThe Solar Foundation
 
Wind_Energy_Law_2014_Amanda James _Avoiding Regulatory Missteps for Developer...
Wind_Energy_Law_2014_Amanda James _Avoiding Regulatory Missteps for Developer...Wind_Energy_Law_2014_Amanda James _Avoiding Regulatory Missteps for Developer...
Wind_Energy_Law_2014_Amanda James _Avoiding Regulatory Missteps for Developer...Amanda James
 
The power purchase agreement (ppa) presentation
The power purchase agreement (ppa) presentationThe power purchase agreement (ppa) presentation
The power purchase agreement (ppa) presentationAudrey Mwala
 
Energy Act 2011 - more grey than green
Energy Act 2011 - more grey than greenEnergy Act 2011 - more grey than green
Energy Act 2011 - more grey than greenOTBEveling
 
PVN SOQ Presentation 2016 Final
PVN SOQ Presentation 2016 FinalPVN SOQ Presentation 2016 Final
PVN SOQ Presentation 2016 FinalRobert Potter
 
Session 16 contract structure & agreement
Session 16   contract structure & agreementSession 16   contract structure & agreement
Session 16 contract structure & agreementChirag Jain
 
Power Finance And Risk - Defense Energy Projects - Latest Trends and Key Risk...
Power Finance And Risk - Defense Energy Projects - Latest Trends and Key Risk...Power Finance And Risk - Defense Energy Projects - Latest Trends and Key Risk...
Power Finance And Risk - Defense Energy Projects - Latest Trends and Key Risk...Harry Clark
 
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: ...
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS:  ...FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS:  ...
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: ...FEF Philippines
 
WIND RESOURCES, INC. In July 2005, Mr. Charl.docx
 WIND RESOURCES, INC.    In July 2005, Mr. Charl.docx WIND RESOURCES, INC.    In July 2005, Mr. Charl.docx
WIND RESOURCES, INC. In July 2005, Mr. Charl.docxmayank272369
 
Feed in-tariff regulations and getting wind power projects done (en)
Feed in-tariff regulations and getting wind power projects done (en)Feed in-tariff regulations and getting wind power projects done (en)
Feed in-tariff regulations and getting wind power projects done (en)Dr. Oliver Massmann
 
Cutting Transaction Costs For Solar PPAs
Cutting Transaction Costs For Solar PPAsCutting Transaction Costs For Solar PPAs
Cutting Transaction Costs For Solar PPAsGreenzu Solar
 
Truly Sustainable Housing in the Green Mountain State
Truly Sustainable Housing in the Green Mountain StateTruly Sustainable Housing in the Green Mountain State
Truly Sustainable Housing in the Green Mountain StateDylan McNeil
 
POWER PURCHASE AGREEMENT.pptx
POWER PURCHASE AGREEMENT.pptxPOWER PURCHASE AGREEMENT.pptx
POWER PURCHASE AGREEMENT.pptxmohammedmarzook1
 
Site analysis and documentation
Site analysis and documentation Site analysis and documentation
Site analysis and documentation Lawin Langat
 
Vijay Swel Jan15th
Vijay Swel Jan15thVijay Swel Jan15th
Vijay Swel Jan15thenergyvijay
 

Ähnlich wie Rollits Renewables Focus January 2015 (20)

Leasing Municipal & Private Property for Solar: Key Steps & Considerations
Leasing Municipal & Private Property for Solar: Key Steps & ConsiderationsLeasing Municipal & Private Property for Solar: Key Steps & Considerations
Leasing Municipal & Private Property for Solar: Key Steps & Considerations
 
Wind_Energy_Law_2014_Amanda James _Avoiding Regulatory Missteps for Developer...
Wind_Energy_Law_2014_Amanda James _Avoiding Regulatory Missteps for Developer...Wind_Energy_Law_2014_Amanda James _Avoiding Regulatory Missteps for Developer...
Wind_Energy_Law_2014_Amanda James _Avoiding Regulatory Missteps for Developer...
 
The power purchase agreement (ppa) presentation
The power purchase agreement (ppa) presentationThe power purchase agreement (ppa) presentation
The power purchase agreement (ppa) presentation
 
Energy Act 2011 - more grey than green
Energy Act 2011 - more grey than greenEnergy Act 2011 - more grey than green
Energy Act 2011 - more grey than green
 
PVN SOQ Presentation 2016 Final
PVN SOQ Presentation 2016 FinalPVN SOQ Presentation 2016 Final
PVN SOQ Presentation 2016 Final
 
Session 16 contract structure & agreement
Session 16   contract structure & agreementSession 16   contract structure & agreement
Session 16 contract structure & agreement
 
Power Finance And Risk - Defense Energy Projects - Latest Trends and Key Risk...
Power Finance And Risk - Defense Energy Projects - Latest Trends and Key Risk...Power Finance And Risk - Defense Energy Projects - Latest Trends and Key Risk...
Power Finance And Risk - Defense Energy Projects - Latest Trends and Key Risk...
 
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: ...
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS:  ...FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS:  ...
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: ...
 
Solar on Landfills - Trash or Treasure
Solar on Landfills - Trash or TreasureSolar on Landfills - Trash or Treasure
Solar on Landfills - Trash or Treasure
 
Potential next steps for developers if URD 14D/114 is passed
Potential next steps for developers if URD 14D/114 is passedPotential next steps for developers if URD 14D/114 is passed
Potential next steps for developers if URD 14D/114 is passed
 
Presentation by MNRE on Solar Parks
Presentation by MNRE on Solar ParksPresentation by MNRE on Solar Parks
Presentation by MNRE on Solar Parks
 
WIND RESOURCES, INC. In July 2005, Mr. Charl.docx
 WIND RESOURCES, INC.    In July 2005, Mr. Charl.docx WIND RESOURCES, INC.    In July 2005, Mr. Charl.docx
WIND RESOURCES, INC. In July 2005, Mr. Charl.docx
 
Feed in-tariff regulations and getting wind power projects done (en)
Feed in-tariff regulations and getting wind power projects done (en)Feed in-tariff regulations and getting wind power projects done (en)
Feed in-tariff regulations and getting wind power projects done (en)
 
Cutting Transaction Costs For Solar PPAs
Cutting Transaction Costs For Solar PPAsCutting Transaction Costs For Solar PPAs
Cutting Transaction Costs For Solar PPAs
 
Truly Sustainable Housing in the Green Mountain State
Truly Sustainable Housing in the Green Mountain StateTruly Sustainable Housing in the Green Mountain State
Truly Sustainable Housing in the Green Mountain State
 
Epc contracts-in-the-power-sector
Epc contracts-in-the-power-sectorEpc contracts-in-the-power-sector
Epc contracts-in-the-power-sector
 
Synopsis_Solar Farms 25-04-16
Synopsis_Solar Farms 25-04-16Synopsis_Solar Farms 25-04-16
Synopsis_Solar Farms 25-04-16
 
POWER PURCHASE AGREEMENT.pptx
POWER PURCHASE AGREEMENT.pptxPOWER PURCHASE AGREEMENT.pptx
POWER PURCHASE AGREEMENT.pptx
 
Site analysis and documentation
Site analysis and documentation Site analysis and documentation
Site analysis and documentation
 
Vijay Swel Jan15th
Vijay Swel Jan15thVijay Swel Jan15th
Vijay Swel Jan15th
 

Mehr von Pat Coyle

Rollits' Education Focus - Schools Edition Autumn2019
Rollits' Education Focus - Schools Edition Autumn2019Rollits' Education Focus - Schools Edition Autumn2019
Rollits' Education Focus - Schools Edition Autumn2019Pat Coyle
 
Rollits' Planning & Property Development Newsletter Autumn 2019
Rollits' Planning & Property Development Newsletter Autumn 2019Rollits' Planning & Property Development Newsletter Autumn 2019
Rollits' Planning & Property Development Newsletter Autumn 2019Pat Coyle
 
Rollits' Agricultural Law Update - July 2019
Rollits' Agricultural Law Update - July 2019Rollits' Agricultural Law Update - July 2019
Rollits' Agricultural Law Update - July 2019Pat Coyle
 
Rollits Private Client newsletter - May 2019
Rollits Private Client newsletter -  May 2019Rollits Private Client newsletter -  May 2019
Rollits Private Client newsletter - May 2019Pat Coyle
 
Rollits' Charity Law Newsletter - February 2019
Rollits'  Charity Law Newsletter - February 2019 Rollits'  Charity Law Newsletter - February 2019
Rollits' Charity Law Newsletter - February 2019 Pat Coyle
 
Rollits Planning Law and Policy Newsletter - February 2019
Rollits Planning Law and Policy Newsletter - February 2019 Rollits Planning Law and Policy Newsletter - February 2019
Rollits Planning Law and Policy Newsletter - February 2019 Pat Coyle
 
Rollits Regulatory Review - November 2018
Rollits Regulatory Review - November 2018Rollits Regulatory Review - November 2018
Rollits Regulatory Review - November 2018Pat Coyle
 
Rollits Employment Update - November 2018
Rollits Employment Update - November 2018Rollits Employment Update - November 2018
Rollits Employment Update - November 2018Pat Coyle
 
Rollits Agricultural Law Update July 2018
Rollits Agricultural Law Update July 2018Rollits Agricultural Law Update July 2018
Rollits Agricultural Law Update July 2018Pat Coyle
 
Rollits Charity Law Update july 2018
Rollits Charity Law Update july 2018Rollits Charity Law Update july 2018
Rollits Charity Law Update july 2018Pat Coyle
 
Rollits Education Focus July 2018
Rollits Education Focus July 2018Rollits Education Focus July 2018
Rollits Education Focus July 2018Pat Coyle
 
Rollits Employment Law Update
Rollits Employment Law UpdateRollits Employment Law Update
Rollits Employment Law UpdatePat Coyle
 
Rollits Charity Law Update
Rollits Charity Law Update Rollits Charity Law Update
Rollits Charity Law Update Pat Coyle
 
Rollits Education Focus Winter 2017
Rollits Education Focus Winter 2017Rollits Education Focus Winter 2017
Rollits Education Focus Winter 2017Pat Coyle
 
Rollits Education Focus Spring 2018
Rollits Education Focus Spring 2018Rollits Education Focus Spring 2018
Rollits Education Focus Spring 2018Pat Coyle
 
Rollits Employment Focus Summer 2017
Rollits Employment Focus Summer 2017Rollits Employment Focus Summer 2017
Rollits Employment Focus Summer 2017Pat Coyle
 
Rollits Education Focus Summer 2017
Rollits Education Focus Summer 2017Rollits Education Focus Summer 2017
Rollits Education Focus Summer 2017Pat Coyle
 
Rollits Agriculture Focus Summer 2017
Rollits Agriculture Focus Summer 2017 Rollits Agriculture Focus Summer 2017
Rollits Agriculture Focus Summer 2017 Pat Coyle
 
Rollits Education Focus Autumn 2016
Rollits Education Focus  Autumn 2016 Rollits Education Focus  Autumn 2016
Rollits Education Focus Autumn 2016 Pat Coyle
 
Rollits Employment Focus April 2016
Rollits Employment Focus April 2016 Rollits Employment Focus April 2016
Rollits Employment Focus April 2016 Pat Coyle
 

Mehr von Pat Coyle (20)

Rollits' Education Focus - Schools Edition Autumn2019
Rollits' Education Focus - Schools Edition Autumn2019Rollits' Education Focus - Schools Edition Autumn2019
Rollits' Education Focus - Schools Edition Autumn2019
 
Rollits' Planning & Property Development Newsletter Autumn 2019
Rollits' Planning & Property Development Newsletter Autumn 2019Rollits' Planning & Property Development Newsletter Autumn 2019
Rollits' Planning & Property Development Newsletter Autumn 2019
 
Rollits' Agricultural Law Update - July 2019
Rollits' Agricultural Law Update - July 2019Rollits' Agricultural Law Update - July 2019
Rollits' Agricultural Law Update - July 2019
 
Rollits Private Client newsletter - May 2019
Rollits Private Client newsletter -  May 2019Rollits Private Client newsletter -  May 2019
Rollits Private Client newsletter - May 2019
 
Rollits' Charity Law Newsletter - February 2019
Rollits'  Charity Law Newsletter - February 2019 Rollits'  Charity Law Newsletter - February 2019
Rollits' Charity Law Newsletter - February 2019
 
Rollits Planning Law and Policy Newsletter - February 2019
Rollits Planning Law and Policy Newsletter - February 2019 Rollits Planning Law and Policy Newsletter - February 2019
Rollits Planning Law and Policy Newsletter - February 2019
 
Rollits Regulatory Review - November 2018
Rollits Regulatory Review - November 2018Rollits Regulatory Review - November 2018
Rollits Regulatory Review - November 2018
 
Rollits Employment Update - November 2018
Rollits Employment Update - November 2018Rollits Employment Update - November 2018
Rollits Employment Update - November 2018
 
Rollits Agricultural Law Update July 2018
Rollits Agricultural Law Update July 2018Rollits Agricultural Law Update July 2018
Rollits Agricultural Law Update July 2018
 
Rollits Charity Law Update july 2018
Rollits Charity Law Update july 2018Rollits Charity Law Update july 2018
Rollits Charity Law Update july 2018
 
Rollits Education Focus July 2018
Rollits Education Focus July 2018Rollits Education Focus July 2018
Rollits Education Focus July 2018
 
Rollits Employment Law Update
Rollits Employment Law UpdateRollits Employment Law Update
Rollits Employment Law Update
 
Rollits Charity Law Update
Rollits Charity Law Update Rollits Charity Law Update
Rollits Charity Law Update
 
Rollits Education Focus Winter 2017
Rollits Education Focus Winter 2017Rollits Education Focus Winter 2017
Rollits Education Focus Winter 2017
 
Rollits Education Focus Spring 2018
Rollits Education Focus Spring 2018Rollits Education Focus Spring 2018
Rollits Education Focus Spring 2018
 
Rollits Employment Focus Summer 2017
Rollits Employment Focus Summer 2017Rollits Employment Focus Summer 2017
Rollits Employment Focus Summer 2017
 
Rollits Education Focus Summer 2017
Rollits Education Focus Summer 2017Rollits Education Focus Summer 2017
Rollits Education Focus Summer 2017
 
Rollits Agriculture Focus Summer 2017
Rollits Agriculture Focus Summer 2017 Rollits Agriculture Focus Summer 2017
Rollits Agriculture Focus Summer 2017
 
Rollits Education Focus Autumn 2016
Rollits Education Focus  Autumn 2016 Rollits Education Focus  Autumn 2016
Rollits Education Focus Autumn 2016
 
Rollits Employment Focus April 2016
Rollits Employment Focus April 2016 Rollits Employment Focus April 2016
Rollits Employment Focus April 2016
 

Kürzlich hochgeladen

Illinois Department Of Corrections reentry guide
Illinois Department Of Corrections reentry guideIllinois Department Of Corrections reentry guide
Illinois Department Of Corrections reentry guideillinoisworknet11
 
Special Accounting Areas - Hire purchase agreement
Special Accounting Areas - Hire purchase agreementSpecial Accounting Areas - Hire purchase agreement
Special Accounting Areas - Hire purchase agreementShubhiSharma858417
 
Understanding Cyber Crime Litigation: Key Concepts and Legal Frameworks
Understanding Cyber Crime Litigation: Key Concepts and Legal FrameworksUnderstanding Cyber Crime Litigation: Key Concepts and Legal Frameworks
Understanding Cyber Crime Litigation: Key Concepts and Legal FrameworksFinlaw Associates
 
Good Governance Practices for protection of Human Rights (Discuss Transparen...
Good Governance Practices for protection  of Human Rights (Discuss Transparen...Good Governance Practices for protection  of Human Rights (Discuss Transparen...
Good Governance Practices for protection of Human Rights (Discuss Transparen...shubhuc963
 
Comparison of GenAI benchmarking models for legal use cases
Comparison of GenAI benchmarking models for legal use casesComparison of GenAI benchmarking models for legal use cases
Comparison of GenAI benchmarking models for legal use casesritwikv20
 
Guide for Drug Education and Vice Control.docx
Guide for Drug Education and Vice Control.docxGuide for Drug Education and Vice Control.docx
Guide for Drug Education and Vice Control.docxjennysansano2
 
SecuritiesContracts(Regulation)Act,1956.pdf
SecuritiesContracts(Regulation)Act,1956.pdfSecuritiesContracts(Regulation)Act,1956.pdf
SecuritiesContracts(Regulation)Act,1956.pdfDrNiteshSaraswat
 
Wurz Financial - Wealth Counsel to Law Firm Owners Services Guide.pdf
Wurz Financial - Wealth Counsel to Law Firm Owners Services Guide.pdfWurz Financial - Wealth Counsel to Law Firm Owners Services Guide.pdf
Wurz Financial - Wealth Counsel to Law Firm Owners Services Guide.pdfssuser3e15612
 
Analysis on Law of Domicile under Private International laws.
Analysis on Law of Domicile under Private International laws.Analysis on Law of Domicile under Private International laws.
Analysis on Law of Domicile under Private International laws.2020000445musaib
 
Sarvesh Raj IPS - A Journey of Dedication and Leadership.pptx
Sarvesh Raj IPS - A Journey of Dedication and Leadership.pptxSarvesh Raj IPS - A Journey of Dedication and Leadership.pptx
Sarvesh Raj IPS - A Journey of Dedication and Leadership.pptxAnto Jebin
 
Alexis O'Connell Lexileeyogi 512-840-8791
Alexis O'Connell Lexileeyogi 512-840-8791Alexis O'Connell Lexileeyogi 512-840-8791
Alexis O'Connell Lexileeyogi 512-840-8791BlayneRush1
 
Alexis O'Connell Alexis Lee mugshot Lexileeyogi 512-840-8791
Alexis O'Connell Alexis Lee mugshot Lexileeyogi 512-840-8791Alexis O'Connell Alexis Lee mugshot Lexileeyogi 512-840-8791
Alexis O'Connell Alexis Lee mugshot Lexileeyogi 512-840-8791BlayneRush1
 
citizenship in the Philippines as to the laws applicable
citizenship in the Philippines as to the laws applicablecitizenship in the Philippines as to the laws applicable
citizenship in the Philippines as to the laws applicableSaraSantiago44
 
The Patents Act 1970 Notes For College .pptx
The Patents Act 1970 Notes For College .pptxThe Patents Act 1970 Notes For College .pptx
The Patents Act 1970 Notes For College .pptxAdityasinhRana4
 
John Hustaix - The Legal Profession: A History
John Hustaix - The Legal Profession:  A HistoryJohn Hustaix - The Legal Profession:  A History
John Hustaix - The Legal Profession: A HistoryJohn Hustaix
 
昆士兰科技大学毕业证学位证成绩单-补办步骤澳洲毕业证书
昆士兰科技大学毕业证学位证成绩单-补办步骤澳洲毕业证书昆士兰科技大学毕业证学位证成绩单-补办步骤澳洲毕业证书
昆士兰科技大学毕业证学位证成绩单-补办步骤澳洲毕业证书1k98h0e1
 
Are There Any Alternatives To Jail Time For Sex Crime Convictions in Los Angeles
Are There Any Alternatives To Jail Time For Sex Crime Convictions in Los AngelesAre There Any Alternatives To Jail Time For Sex Crime Convictions in Los Angeles
Are There Any Alternatives To Jail Time For Sex Crime Convictions in Los AngelesChesley Lawyer
 
Grey Area of the Information Technology Act, 2000.pptx
Grey Area of the Information Technology Act, 2000.pptxGrey Area of the Information Technology Act, 2000.pptx
Grey Area of the Information Technology Act, 2000.pptxBharatMunjal4
 
Alexis O'Connell lexileeyogi Bond revocation for drug arrest Alexis Lee
Alexis O'Connell lexileeyogi Bond revocation for drug arrest Alexis LeeAlexis O'Connell lexileeyogi Bond revocation for drug arrest Alexis Lee
Alexis O'Connell lexileeyogi Bond revocation for drug arrest Alexis LeeBlayneRush1
 
Rights of under-trial Prisoners in India
Rights of under-trial Prisoners in IndiaRights of under-trial Prisoners in India
Rights of under-trial Prisoners in IndiaAbheet Mangleek
 

Kürzlich hochgeladen (20)

Illinois Department Of Corrections reentry guide
Illinois Department Of Corrections reentry guideIllinois Department Of Corrections reentry guide
Illinois Department Of Corrections reentry guide
 
Special Accounting Areas - Hire purchase agreement
Special Accounting Areas - Hire purchase agreementSpecial Accounting Areas - Hire purchase agreement
Special Accounting Areas - Hire purchase agreement
 
Understanding Cyber Crime Litigation: Key Concepts and Legal Frameworks
Understanding Cyber Crime Litigation: Key Concepts and Legal FrameworksUnderstanding Cyber Crime Litigation: Key Concepts and Legal Frameworks
Understanding Cyber Crime Litigation: Key Concepts and Legal Frameworks
 
Good Governance Practices for protection of Human Rights (Discuss Transparen...
Good Governance Practices for protection  of Human Rights (Discuss Transparen...Good Governance Practices for protection  of Human Rights (Discuss Transparen...
Good Governance Practices for protection of Human Rights (Discuss Transparen...
 
Comparison of GenAI benchmarking models for legal use cases
Comparison of GenAI benchmarking models for legal use casesComparison of GenAI benchmarking models for legal use cases
Comparison of GenAI benchmarking models for legal use cases
 
Guide for Drug Education and Vice Control.docx
Guide for Drug Education and Vice Control.docxGuide for Drug Education and Vice Control.docx
Guide for Drug Education and Vice Control.docx
 
SecuritiesContracts(Regulation)Act,1956.pdf
SecuritiesContracts(Regulation)Act,1956.pdfSecuritiesContracts(Regulation)Act,1956.pdf
SecuritiesContracts(Regulation)Act,1956.pdf
 
Wurz Financial - Wealth Counsel to Law Firm Owners Services Guide.pdf
Wurz Financial - Wealth Counsel to Law Firm Owners Services Guide.pdfWurz Financial - Wealth Counsel to Law Firm Owners Services Guide.pdf
Wurz Financial - Wealth Counsel to Law Firm Owners Services Guide.pdf
 
Analysis on Law of Domicile under Private International laws.
Analysis on Law of Domicile under Private International laws.Analysis on Law of Domicile under Private International laws.
Analysis on Law of Domicile under Private International laws.
 
Sarvesh Raj IPS - A Journey of Dedication and Leadership.pptx
Sarvesh Raj IPS - A Journey of Dedication and Leadership.pptxSarvesh Raj IPS - A Journey of Dedication and Leadership.pptx
Sarvesh Raj IPS - A Journey of Dedication and Leadership.pptx
 
Alexis O'Connell Lexileeyogi 512-840-8791
Alexis O'Connell Lexileeyogi 512-840-8791Alexis O'Connell Lexileeyogi 512-840-8791
Alexis O'Connell Lexileeyogi 512-840-8791
 
Alexis O'Connell Alexis Lee mugshot Lexileeyogi 512-840-8791
Alexis O'Connell Alexis Lee mugshot Lexileeyogi 512-840-8791Alexis O'Connell Alexis Lee mugshot Lexileeyogi 512-840-8791
Alexis O'Connell Alexis Lee mugshot Lexileeyogi 512-840-8791
 
citizenship in the Philippines as to the laws applicable
citizenship in the Philippines as to the laws applicablecitizenship in the Philippines as to the laws applicable
citizenship in the Philippines as to the laws applicable
 
The Patents Act 1970 Notes For College .pptx
The Patents Act 1970 Notes For College .pptxThe Patents Act 1970 Notes For College .pptx
The Patents Act 1970 Notes For College .pptx
 
John Hustaix - The Legal Profession: A History
John Hustaix - The Legal Profession:  A HistoryJohn Hustaix - The Legal Profession:  A History
John Hustaix - The Legal Profession: A History
 
昆士兰科技大学毕业证学位证成绩单-补办步骤澳洲毕业证书
昆士兰科技大学毕业证学位证成绩单-补办步骤澳洲毕业证书昆士兰科技大学毕业证学位证成绩单-补办步骤澳洲毕业证书
昆士兰科技大学毕业证学位证成绩单-补办步骤澳洲毕业证书
 
Are There Any Alternatives To Jail Time For Sex Crime Convictions in Los Angeles
Are There Any Alternatives To Jail Time For Sex Crime Convictions in Los AngelesAre There Any Alternatives To Jail Time For Sex Crime Convictions in Los Angeles
Are There Any Alternatives To Jail Time For Sex Crime Convictions in Los Angeles
 
Grey Area of the Information Technology Act, 2000.pptx
Grey Area of the Information Technology Act, 2000.pptxGrey Area of the Information Technology Act, 2000.pptx
Grey Area of the Information Technology Act, 2000.pptx
 
Alexis O'Connell lexileeyogi Bond revocation for drug arrest Alexis Lee
Alexis O'Connell lexileeyogi Bond revocation for drug arrest Alexis LeeAlexis O'Connell lexileeyogi Bond revocation for drug arrest Alexis Lee
Alexis O'Connell lexileeyogi Bond revocation for drug arrest Alexis Lee
 
Rights of under-trial Prisoners in India
Rights of under-trial Prisoners in IndiaRights of under-trial Prisoners in India
Rights of under-trial Prisoners in India
 

Rollits Renewables Focus January 2015

  • 1. Large scale projects will in the majority (if not all) of cases involve obtaining a huge amount of information, from environmental assessments to transport reports, with the more organised developer front loading any application to meet the high expectations of Local Planning Authorities. From the landowner’s perspective this process is often taken out of their hands, with the developer/operator progressing any planning application at their cost. If the landowner is to contribute in any way to these costs then care will always need to be taken in order to limit this liability as the planning process can often be both time consuming and expensive. The grant of planning permission will usually be subject to a number of conditions. Often these conditions will need to be discharged either prior to commencement of the development or prior to use. Conditions will also often be imposed during the course of the construction of the works and thereafter for the duration that the development remains in use. It is common practice for certain types of development, such as wind turbines, to have finite periods of use, with decommissioning requirements being imposed in planning agreements. Failure to discharge or comply with these conditions can risk enforcement action from the Local Authority and given the contentious nature of many renewable energy projects there is a very good chance that any failures would be brought to the attention of an enforcement officer and acted upon. Knowing who is responsible for discharging and complying with these planning conditions (be it the landowner, developer and/or operator) is therefore of significant importance. Small scale microgeneration renewable energy projects can often benefit from permitted development rights whereby a formal planning application would not be required. It must however be noted that any landowner should discuss the proposed project with the Local Planning Authority before attempting to rely on these permitted development rights if there is any doubt as to whether they apply. Equally, in some cases the permitted development rights will still impose conditions that must be complied with. In brief, the planning system when considering a renewable energy project should not be taken lightly. Yes, it is accepted by Local Planning Authorities that there is a need for renewable energy, but material considerations such as the effect on local amenity can often override this. Even where planning permission has been granted, be it in the case of small or large scale projects, the requirements of the Local Planning Authority do not end at this point as conditions dealing with a variety of issues from noise control to landscaping must be complied with. Given that the landowner is generally the first port of call for any Local Authority wishing to bring enforcement action care must at all times be taken to ensure that the conditions have been complied with and (if the developer/ operator is responsible for planning) adequate protection is in place. David Myers www.rollits.com January 2015 Renewables Focus Obtaining planning permission for renewable energy projects remains one of the most significant barriers faced by landowners, developers and operators to date. Planning back to basics Also in this issue Leases of ground based solar PV development – some considerations Solar energy – back to the rooftops? No such thing as a secret?
  • 2. Page 2 Renewables Focus January 2015 An important issues from the landowner’s point of view is that the lease will need to be excluded from the provisions of Part II of the Landlord and Tenant Act 1954 so that at the end of the term the developer will not have security of tenure and the landowner will have no difficulty getting his land back. Note that this is in stark contrast to the powers enjoyed by telecommunications operators. Particular concerns of the landowner 1.​ What will the rent be? Could there be an additional rent based on a percentage of the revenue generated by solar panels? 2.​ Security of decommissioning and re-instatement. The Landowner will want to ensure that the developer has the resources to remove all the plant and equipment and make good at the end of the term, otherwise he will be left with that expense. ​Some landowners will seek a bond or up-front escrow account up front to guarantee payment of this expense. ​Alternatively, the energy company could agree to set up a decommissioning fund say 5 years before the end of the terms and pay a sum of money in each of the remaining years in order to pay for the work. 3. ​If the landowner is a farmer he will probably require grazing rights which will enable him to claim the single farm payment. In our experience the energy company will usually permit this but it is a consideration which needs to be raised early on as the panels will need to be designed to fixed in a elevated position in order to allow for grazing. This will have cost implications and possibly also planning issues as the panels may be more visible. We are probably only talking about grazing sheep here as pigs will affect the stability of the ground, and it would be unfeasible to raise the panels sufficiently to allow horses underneath; and 4.​ The farmer landowner will also be concerned about damage to crops and ensuring that compensation is payable when development commences. Particular concerns of the energy company 1.​ The Developer will want to resist any break rights in the lease. He is the one going to the expense of the planning application, and the supply installation and management of the plant and equipment so he will not want the landowner to be able to terminate the arrangements early; 2. ​A related point – the developer will be seeking to protect the revenue to be generated by the apparatus; 3.​ If the district network operator requires a substation lease and any wayleaves then the Developer will need to ensure that the landowner is required to grant these at no additional cost. Otherwise the Developer could find himself held to ransom; 4. ​Grid connections may be required over third party land in which case the energy company will be concerned to negotiate the necessary rights at an economically viable price before committing himself to the lease or leases by exercising the option; 5.​ The ownership of the equipment may be a concern. The lease should be carefully drafted to ensure that ownership reverts to the developer upon termination of the lease howsoever arising. This will be a particular concern of any funder and/or investor in the scheme; 6.​ The ability to assign the lease to a funder will be a key consideration. Should the developer go bust then any funder will want to be able to step into its shoes and realise the returns from the investment. Therefore the forfeiture clause in the lease will usually provide that any funder is notified of any breach and is given the opportunity of remedying it. A lease of land for solar PV development will usually be for a term of around 25 years, commonly with an option for the tenant to require a short extension, perhaps a further 5 years. This will give the energy company comfort that it can obtain a return on its investment and the flexibility to extend further should Government policy alter in its favour during the initial term. This sort of term should not prove to be too onerous on the landowner either as the land is not being tied up for generations. Leases of ground based solar PV development – some considerations
  • 3. Page 3 Renewables Focus January 2015 Clearly, however, a move in Government policy is occurring. For some time now in planning terms, development of solar installations on brown field sites has been seen as far preferable to the use of agricultural land. However, it seems less and less likely that good quality agricultural land will be permitted for development. In October 2014 various announcements showed a desire by the Government to support smaller, most likely roof-based, schemes rather than larger field based ones. Briefly, the Renewables Obligation Scheme for larger sites is to end and be replaced by an auctioned system (Contracts for Difference CFD). However Feed-in- Tariff changes could lead to benefits for those installing solar panels on roofs as opposed to stand-alone installations. The Department of Energy and Climate Change is proposing that developers of schemes larger than 250KW will have to show that a proportion of the electricity generated can be used in the buildings to which the panels are wired. This could be a benefit to owners of farm and other industrial buildings. Also in October, George Eustace, the Farming Minster, announced the Government’s proposal to end the payment of single farm payment to land occupied by solar farms. So, although grazing between the panels would be permitted, no central payments could be claimed. Many will argue that the proposals are wrong and that green energy targets will be missed. Others will point to the vast quantity of solar fields in Cornwall and the West Country and say that the changes are needed to avoid further blighting the countryside. Whatever the view it appears that more panels are likely to be going on to roof tops and less into fields in the immediate future. Neil Franklin The Government has recently admitted that it has no idea as to how much agricultural land has been lost to solar fields and clearly will not know the quality of the land lost either. To complicate the issue, many ground based solar installations are grazed by sheep and this (in part at least) remains in agricultural use. It has been suggested anecdotally that lamb production can even be boosted in these fields as the panels can provide shelter. Others cite the benefits of lack of use of pesticides. Solar energy back to the rooftops? Dealing with protestors unlawfully trespassing on land In recent months, there have been a number of high profile protests outside proposed fracking sites. Such protests are not exclusive to fracking sites, rather fracking just happens to be the current ‘hot’ topic that has captured both the public’s and the media’s attention. It is not uncommon for wind farms, proposed biowaste sites, hydro- projects and PV panel farms to be met by protesters and, in some instances, protests encampments on or in close proximity to the proposed site. Prevention is always better than cure. However, that is easier said than done, especially when the land in question comprises many acres of land. Landowners faced with protestors trespassing upon their land and/or obstructing access to land have a number of options at their disposal, including:- • issue possession proceedings to recover possession of land; • pursue an injunction to prevent any ongoing and/or future trespass; • employ a private certified bailiff to remove any trespassers - care should be exercised here as the landowner may be liable for any unlawful act undertaken, or any damage caused, by the bailiff; • under section 61 of the Criminal Justice Public Order Act 1994, provided certain criteria are satisfied, the police have the power (but not a duty) to remove trespassers. Unless the protest poses a risk to, or impacts upon, the wider public, or unless there is a threat to person or property, ordinarily the police will be reluctant to get involved in what they will state is a civil matter; • under section 77 of the Criminal Justice Public Order Act 1994 local authorities have the power (but again, not a duty) to make a direction that trespassers have to leave the land. If the trespassers fail to do so it is a criminal offence. However, Local Authorities rarely exercise this power. Careful consideration must be given by landowners as to how they address any protests taking place on, or in the vicinity of their land. Rollits can provide proactive and reactive advice and assistance to assist landowners to minimise disruption and costs arising from any protestors trespassing on their land. Chris Drinkall
  • 4. Page 4 Renewables Focus January 2015 Information If you have any queries on any issues raised in this newsletter, or any renewables matters in general please contact Neil Franklin on 01482 337250. This newsletter is for the use of clients and will be supplied to others on request. It is for general guidance only. It provides useful information in a concise form. Action should not be taken without obtaining specific advice. We hope you have found this newsletter useful. If, however, you do not wish to receive further mailings from us, please write to Pat Coyle, Rollits, Wilberforce Court, High Street, Hull, HU1 1YJ. The law stated is as at 20 January 2015. Hull Office Wilberforce Court, High Street, Hull HU1 1YJ Tel +44 (0)1482 323239 York Office Rowntree Wharf, Navigation Road, York YO1 9WE Tel +44 (0)1904 625790 www.rollits.com Authorised and Regulated by the Solicitors Regulation Authority under number 524629 Rollits is a trading name of Rollits LLP. Rollits LLP is a limited liability partnership, registered in England and Wales, registered number OC 348965, registered office Wilberforce Court, High Street, Hull HU1 1YJ. A list of members’ names is available for inspection at our offices. We use the term ‘partner’ to denote members of Rollits LLP. For example, when applying for a grant from, or entering into a lease with, a public authority, be aware that information relating to the project and your organisation may have to be disclosed by the authority should they receive a request for information from a third party under the Freedom of Information Act 2000 or the Environmental Information Regulations 2004. Anybody can make such a request without having to give a reason although, if an authority with which a private organisation is dealing receives such a request, it is good practice for the authority to contact the organisation for representations as to whether or not information relating to that organisation should be disclosed. Whilst the two aforementioned pieces of legislation each cover different types of information (details of which are beyond the scope of this article), both share the same core principles. Each has the overall intention to be “pro-disclosure” and, as such, works on the basis that requested information should be disclosed unless it is not held by or on behalf of the authority or a statutory exemption applies. This outcome often contradicts the wishes of private organisations, but the statutory exemptions are limited in scope. Many of them only apply in specific circumstances such as where national security is at stake. Two more general exemptions that businesses often wish to cite in representations are that disclosure (i) would/would likely prejudice a person’s commercial interests, and (ii) may result in an actionable breach of confidence. Given the risk of these exemptions being routinely cited to withhold disclosure, in practice the standard set by the Information Commissioner’s Office in its acceptance of their application is high – meaning strong arguments against disclosure are required. It is therefore not necessarily possible to use these exemptions in practice. In any event, even if the organisation makes such representations the authority retains the final decision- making power and may ultimately disclose the information notwithstanding representations to the contrary. Our advice to any client involved in a project with a public authority is to be aware of these risks when considering the amount and type of information to be shared, and to agree a contractual protocol at the outset (or at least before any request for disclosure is made) to govern how the public authority will go about consulting with the client prior to making its decision as to whether to disclose. James Peel No such thing as a secret? Often forgotten amidst the financial, technical and other specific details of a renewables project are the implications of freedom of information legislation should the project involve a public authority (including private companies wholly owned by public authorities).