SlideShare ist ein Scribd-Unternehmen logo
1 von 3
CURRICU LUM VITAE
G Pardha saradhi
H.No: 81Gowri Nagar, Manapakam,Chennai,Tamilanadu, India • 9940448505 •parthu234@gmail.com
Objec tive
To work in a technically challenging environment, and serve to the best of my abilities, contributing
towards the growth of organization as well as my own growth as an individual in all aspects.
Educa tion
Master of Technology- Power Systems 2009- 2011.
Sri Venkateswara University, Tirupati, Andhra Pradesh, India.
Bachelor of Technology- Electrical & Electronics Engineering 2005-2009.
JNT University, Anantapur, Andhra Pradesh, India.
Orga nizational Experience : Orga nizatio nal Expe rience : 4 years
2011 to 2014: Worked as Senior Design Engineer (Electrical) at L&T Construction.
2014 to till now: Working as Engineer (Electrical) at Ramboll Oil&Gas.
ROLES AND RESPO NSIBILITIES:
 Design and Detailed engineering of electrical system for LV, HV & EHV substations (Air insulated)
up to 220kV systems including Tender Preparation & Evaluation.
 Vendor drawing approval and getting approval from client.
 Preparation of Technical Specifications of various electrical equipment.
 Preparation/checking of Overall and Detailed SLDs, GA layout, Equipment layout, Earthing layout,
Lightning protection layout, Cable trench layout, Lighting Layout, Power & Control cable schedules.
 Master’s Degree in Power system and about almost 5 years of work experience. Experienced in the
following Power System Study concepts by using ETAP and EDSA,
o Load flow studies
o Fault analysis
o Relay co-ordination
o Harmonic Analysis
o Motor Starting Analysis
o Earthing.
 Experienced in the following Design and Detailed engineering of electrical system,
o Load estimation
o Transformer & DG sizing
o Short circuit Calculations
o Cable sizing(EHV/HV/LV) and voltage drop
o APFC calculation
o Illumination level Design
o Lighting / Power Distribution board schedule
o Earthing Systems
o Lightning protection system
o Cable tray sizing
o UPS Sizing
o Battery sizing Calculations
o Heat load calculation for UPS, battery and panels
o NGR sizing calculation.
o Transmission line sag calculation.
o Relay co-ordination.
o Solar systems.
o Hazardous area classification.
 Preparation of Design Guidelines for ETAP
 Preparation of Detailed Master Single line diagram from HT supply to LT Power distribution
 Preparation of Single line diagram for Rising main distribution
 Validation of Equipment datasheets and vendor documents.
 Pre-Tender Engineering and preparation of BOQ for EPC projects.
 Pre-Bid discussions with clients for design proposals and optimizations.
 Discussions with Clients and Consultants for drawing Approvals & Design issues.
 Co-ordination with Inter departments, Site, Vendor for design related issues and adherence to the
target schedules as a lead engineer for the respective jobs.
 Conversant with Electrical Standards – BIS, IEC, IEEE, ANSI, ADCO, ADMA & Shell DEP’s.
 Responsible for Preparation of Design basis Report & Engineering schedules for the projects,
releasing of procurement BOQ, Specifications, and releasing of GFC electrical drawings to site,
checking of individual service drawings, CSD (Coordinated service drawings) etc.
 Releasing/Preparation of BOQ, Design basis report, Risk assessment for Design built Tender jobs.
 Responsible for preparation of Drawings, review and releasing of all Good for construction electrical
drawings and getting approvals for all Major Equipment in co-ordination with
consultant/PMC/Client.
 Preparation of BOQ and specifications for the design built tenders/ Projects.
 Familiar with ISO, MS WORD, ETAP, EDSA, MATLAB, AUTOCAD, DIALUX etc.
PROJECTS
a) FEED Engineering for Process Control System & Power System Upgarde Project-
ADCO-UAE
The process Control system upgarde and Electical System upgrade on RDS1 to 5, Electrical System
upgrade Water injection cluster at 21 loactions. New Solar power system design for 119 water
injection cluster. Electrical scope is involved in this project and deliverables prepared as per project
requirements, 33kV, 3.3kV, 415V and 240V distribution system, spec and data sheets for major
equipments 3.3kv Switchgear, Transformer, LV switchgear, AC / DC UPS Emergency generator,
etc., SLD, Power System study, Equipment, power and earthing layouts, sizing calculations,
schedules and MTO etc.
b) Select Study for Long Term Accom m odation
ADMA - OPCO, United Arab Emirates
The existing accommodation facilities at Umm shaif and Lower Zakum are not adequate to support
requirement due to ongoing and future development activities. ADMA OPCO did an in-house
feasibility study and identified various available options. Based on the findings, it is intended to
carryout SELECT study covering both Umm Shaif and Lower Zakum fields. Electrical scope is
involved in this project and deliverables prepared as per project requirements, 11kV, 415V and 240V
distribution system, spec and data sheets for major equipments 11kv Switchgear, Transformer, LV
switchgear, UPS etc., SLD, Equipment, power and earthing layouts, sizing calculations, Power
system study, schedules and MTO etc.,
c) Electric al G/P - ETAP Design Guideline s –Stan dards Developm e nt
Preparation of ETAP Design Guidelines for load flow, short circuit, motor starting and advanced
studies.
d) CTS– SHOLIN GAN A LLUR –C HENN AI
Total electrification of entire campus and total load is around 17MVA.Complete electrification
includes 110kV switch yard, 33/0.433kV Substation consisting of 7 Nos Transformers and 10 Nos
DGs, DG synchronizing, Main PCCs and Complete distribution.
e) L&T SEAW OOD S-M U M BA I (TEN D ER PROJEC T)
Total electrification of entire project integrated development is programmed to be developed in 3
phases. Total load is around 74.65MVA.Complete electrification includes 220KV GIS switch yard,
11/0.433KV Substation consisting of distribution Transformers and DGs, DG synchronizing, Main
PCCs and Complete distribution.
f) ASCEND AS-PU NE(TEN D ER PROJEC T)
Total electrification of entire campus consisting Software Development Block. Total load is around
7MVA.Complete electrification includes 22/11KV Substation consisting of Power transformer and
distribution Transformers and DGs, DG synchronizing, Main HT Panel and Complete distribution.
Achieve me nts / Extra curricular Activities :
Published a paper in IEEE Conference-2014 with the title of “Real and reactive power
control distribution network by using SMES and Capacitor:”
http://ieeexplore.ieee.org/xpl/articleDetails.jsp?tp=&arnumber=7054954&searchWithin%3Dp_Authors%3A.QT
.Pardhasaradhi%2C+G.QT.
Secured GATE score of 86.77 percentile in 2008 & 92.33 percentile in 2010.
Participated in Technical workshops and national conferences held at university.
Lang uages Known:
1.English,2.Telugu,3.Tamil,4.Hindi
DATE:
Signature
PLACE: Chennai. G Pardhasaradhi

Weitere ähnliche Inhalte

Was ist angesagt?

CV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalCV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalSAYANTAN GHOSH
 
Mostafa Yunis_original
Mostafa Yunis_originalMostafa Yunis_original
Mostafa Yunis_originalMostafa yunis
 
QuarshieGeorge Power Engineering Resume-2ABCW
QuarshieGeorge Power Engineering Resume-2ABCWQuarshieGeorge Power Engineering Resume-2ABCW
QuarshieGeorge Power Engineering Resume-2ABCWGEORGE EBO QUARSHIE
 
Sr.Electrical Engineer_13years of Experinece
Sr.Electrical Engineer_13years of ExperineceSr.Electrical Engineer_13years of Experinece
Sr.Electrical Engineer_13years of ExperineceNagaraj Maradi
 
Resume graceson cv solar pdf
Resume graceson cv solar pdfResume graceson cv solar pdf
Resume graceson cv solar pdfGRACESON JACOB
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016Sher Chuhan
 
EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limitedHimanshu9974
 
DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)Sunrator Technologies LLP
 
Balaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical DesignerBalaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical DesignerBala G
 
Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...Ashish Verma
 
CS Design Engineer
CS Design EngineerCS Design Engineer
CS Design EngineerJOSE MANAHAN
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesPuneet Jaggi
 

Was ist angesagt? (18)

resume
resumeresume
resume
 
CV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalCV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_Electrical
 
Mostafa Yunis_original
Mostafa Yunis_originalMostafa Yunis_original
Mostafa Yunis_original
 
QuarshieGeorge Power Engineering Resume-2ABCW
QuarshieGeorge Power Engineering Resume-2ABCWQuarshieGeorge Power Engineering Resume-2ABCW
QuarshieGeorge Power Engineering Resume-2ABCW
 
Sr.Electrical Engineer_13years of Experinece
Sr.Electrical Engineer_13years of ExperineceSr.Electrical Engineer_13years of Experinece
Sr.Electrical Engineer_13years of Experinece
 
Balaji Resume
Balaji ResumeBalaji Resume
Balaji Resume
 
Resume graceson cv solar pdf
Resume graceson cv solar pdfResume graceson cv solar pdf
Resume graceson cv solar pdf
 
Resume
ResumeResume
Resume
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
 
EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limited
 
tufail CV dxb
tufail CV dxbtufail CV dxb
tufail CV dxb
 
DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
 
Resume
ResumeResume
Resume
 
Balaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical DesignerBalaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical Designer
 
Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...
 
Resume 2018
Resume  2018Resume  2018
Resume 2018
 
CS Design Engineer
CS Design EngineerCS Design Engineer
CS Design Engineer
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best Practices
 

Andere mochten auch

Andere mochten auch (7)

Mapping Currikulum Perusahaan
Mapping Currikulum PerusahaanMapping Currikulum Perusahaan
Mapping Currikulum Perusahaan
 
CIA CREATIVE CV
CIA CREATIVE CVCIA CREATIVE CV
CIA CREATIVE CV
 
13 resume, curriculum vitae & bio data
13 resume, curriculum vitae & bio data13 resume, curriculum vitae & bio data
13 resume, curriculum vitae & bio data
 
Perfect Tenses
Perfect TensesPerfect Tenses
Perfect Tenses
 
Format research cha 1 3
Format research cha 1  3Format research cha 1  3
Format research cha 1 3
 
Resume sofia p.
Resume  sofia p.Resume  sofia p.
Resume sofia p.
 
Dana resume1
Dana resume1Dana resume1
Dana resume1
 

Ähnlich wie Electrical engineer 5 Years Exp

Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Akhtar
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of expSubhash +966535838322
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpSubhash +966535838322
 
Bidhan R DEY-Resume
Bidhan R DEY-ResumeBidhan R DEY-Resume
Bidhan R DEY-ResumeBidhan Dey
 
Sam res (houston) o & g
Sam res (houston) o & gSam res (houston) o & g
Sam res (houston) o & gSam Mehta
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBShiva Y Cmath
 
Amol bakane update rockstar
Amol bakane    update rockstarAmol bakane    update rockstar
Amol bakane update rockstaramol bakane
 
SK RABANI Electrical engg
SK RABANI  Electrical enggSK RABANI  Electrical engg
SK RABANI Electrical enggSEIKH RABANI
 
CV_ADS_oman_JULY_16_int
CV_ADS_oman_JULY_16_intCV_ADS_oman_JULY_16_int
CV_ADS_oman_JULY_16_intashish saxena
 
Subhankar resumé-2016
Subhankar  resumé-2016Subhankar  resumé-2016
Subhankar resumé-2016subhankar saha
 

Ähnlich wie Electrical engineer 5 Years Exp (20)

PROJECT ENGINEER- ELECTRICAL._L
PROJECT ENGINEER-  ELECTRICAL._LPROJECT ENGINEER-  ELECTRICAL._L
PROJECT ENGINEER- ELECTRICAL._L
 
CV_Krishnanand
CV_KrishnanandCV_Krishnanand
CV_Krishnanand
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of exp
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
Bidhan R DEY-Resume
Bidhan R DEY-ResumeBidhan R DEY-Resume
Bidhan R DEY-Resume
 
Sam res (houston) o & g
Sam res (houston) o & gSam res (houston) o & g
Sam res (houston) o & g
 
Mehtab Niazi CV
Mehtab Niazi CVMehtab Niazi CV
Mehtab Niazi CV
 
Jaydeep_Resume
Jaydeep_ResumeJaydeep_Resume
Jaydeep_Resume
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KB
 
DESIGN
DESIGNDESIGN
DESIGN
 
Amol bakane update rockstar
Amol bakane    update rockstarAmol bakane    update rockstar
Amol bakane update rockstar
 
SK RABANI Electrical engg
SK RABANI  Electrical enggSK RABANI  Electrical engg
SK RABANI Electrical engg
 
Athavulla khan (2)
Athavulla khan (2)Athavulla khan (2)
Athavulla khan (2)
 
Athavulla khan (2)
Athavulla khan (2)Athavulla khan (2)
Athavulla khan (2)
 
Sathish Kumar-Resume.
Sathish Kumar-Resume.Sathish Kumar-Resume.
Sathish Kumar-Resume.
 
CV_ADS_oman_JULY_16_int
CV_ADS_oman_JULY_16_intCV_ADS_oman_JULY_16_int
CV_ADS_oman_JULY_16_int
 
ajit-cv-updated
ajit-cv-updatedajit-cv-updated
ajit-cv-updated
 
Subhankar resumé-2016
Subhankar  resumé-2016Subhankar  resumé-2016
Subhankar resumé-2016
 

Electrical engineer 5 Years Exp

  • 1. CURRICU LUM VITAE G Pardha saradhi H.No: 81Gowri Nagar, Manapakam,Chennai,Tamilanadu, India • 9940448505 •parthu234@gmail.com Objec tive To work in a technically challenging environment, and serve to the best of my abilities, contributing towards the growth of organization as well as my own growth as an individual in all aspects. Educa tion Master of Technology- Power Systems 2009- 2011. Sri Venkateswara University, Tirupati, Andhra Pradesh, India. Bachelor of Technology- Electrical & Electronics Engineering 2005-2009. JNT University, Anantapur, Andhra Pradesh, India. Orga nizational Experience : Orga nizatio nal Expe rience : 4 years 2011 to 2014: Worked as Senior Design Engineer (Electrical) at L&T Construction. 2014 to till now: Working as Engineer (Electrical) at Ramboll Oil&Gas. ROLES AND RESPO NSIBILITIES:  Design and Detailed engineering of electrical system for LV, HV & EHV substations (Air insulated) up to 220kV systems including Tender Preparation & Evaluation.  Vendor drawing approval and getting approval from client.  Preparation of Technical Specifications of various electrical equipment.  Preparation/checking of Overall and Detailed SLDs, GA layout, Equipment layout, Earthing layout, Lightning protection layout, Cable trench layout, Lighting Layout, Power & Control cable schedules.  Master’s Degree in Power system and about almost 5 years of work experience. Experienced in the following Power System Study concepts by using ETAP and EDSA, o Load flow studies o Fault analysis o Relay co-ordination o Harmonic Analysis o Motor Starting Analysis o Earthing.  Experienced in the following Design and Detailed engineering of electrical system, o Load estimation o Transformer & DG sizing o Short circuit Calculations o Cable sizing(EHV/HV/LV) and voltage drop o APFC calculation o Illumination level Design o Lighting / Power Distribution board schedule o Earthing Systems o Lightning protection system o Cable tray sizing o UPS Sizing o Battery sizing Calculations o Heat load calculation for UPS, battery and panels
  • 2. o NGR sizing calculation. o Transmission line sag calculation. o Relay co-ordination. o Solar systems. o Hazardous area classification.  Preparation of Design Guidelines for ETAP  Preparation of Detailed Master Single line diagram from HT supply to LT Power distribution  Preparation of Single line diagram for Rising main distribution  Validation of Equipment datasheets and vendor documents.  Pre-Tender Engineering and preparation of BOQ for EPC projects.  Pre-Bid discussions with clients for design proposals and optimizations.  Discussions with Clients and Consultants for drawing Approvals & Design issues.  Co-ordination with Inter departments, Site, Vendor for design related issues and adherence to the target schedules as a lead engineer for the respective jobs.  Conversant with Electrical Standards – BIS, IEC, IEEE, ANSI, ADCO, ADMA & Shell DEP’s.  Responsible for Preparation of Design basis Report & Engineering schedules for the projects, releasing of procurement BOQ, Specifications, and releasing of GFC electrical drawings to site, checking of individual service drawings, CSD (Coordinated service drawings) etc.  Releasing/Preparation of BOQ, Design basis report, Risk assessment for Design built Tender jobs.  Responsible for preparation of Drawings, review and releasing of all Good for construction electrical drawings and getting approvals for all Major Equipment in co-ordination with consultant/PMC/Client.  Preparation of BOQ and specifications for the design built tenders/ Projects.  Familiar with ISO, MS WORD, ETAP, EDSA, MATLAB, AUTOCAD, DIALUX etc. PROJECTS a) FEED Engineering for Process Control System & Power System Upgarde Project- ADCO-UAE The process Control system upgarde and Electical System upgrade on RDS1 to 5, Electrical System upgrade Water injection cluster at 21 loactions. New Solar power system design for 119 water injection cluster. Electrical scope is involved in this project and deliverables prepared as per project requirements, 33kV, 3.3kV, 415V and 240V distribution system, spec and data sheets for major equipments 3.3kv Switchgear, Transformer, LV switchgear, AC / DC UPS Emergency generator, etc., SLD, Power System study, Equipment, power and earthing layouts, sizing calculations, schedules and MTO etc. b) Select Study for Long Term Accom m odation ADMA - OPCO, United Arab Emirates The existing accommodation facilities at Umm shaif and Lower Zakum are not adequate to support requirement due to ongoing and future development activities. ADMA OPCO did an in-house feasibility study and identified various available options. Based on the findings, it is intended to carryout SELECT study covering both Umm Shaif and Lower Zakum fields. Electrical scope is involved in this project and deliverables prepared as per project requirements, 11kV, 415V and 240V
  • 3. distribution system, spec and data sheets for major equipments 11kv Switchgear, Transformer, LV switchgear, UPS etc., SLD, Equipment, power and earthing layouts, sizing calculations, Power system study, schedules and MTO etc., c) Electric al G/P - ETAP Design Guideline s –Stan dards Developm e nt Preparation of ETAP Design Guidelines for load flow, short circuit, motor starting and advanced studies. d) CTS– SHOLIN GAN A LLUR –C HENN AI Total electrification of entire campus and total load is around 17MVA.Complete electrification includes 110kV switch yard, 33/0.433kV Substation consisting of 7 Nos Transformers and 10 Nos DGs, DG synchronizing, Main PCCs and Complete distribution. e) L&T SEAW OOD S-M U M BA I (TEN D ER PROJEC T) Total electrification of entire project integrated development is programmed to be developed in 3 phases. Total load is around 74.65MVA.Complete electrification includes 220KV GIS switch yard, 11/0.433KV Substation consisting of distribution Transformers and DGs, DG synchronizing, Main PCCs and Complete distribution. f) ASCEND AS-PU NE(TEN D ER PROJEC T) Total electrification of entire campus consisting Software Development Block. Total load is around 7MVA.Complete electrification includes 22/11KV Substation consisting of Power transformer and distribution Transformers and DGs, DG synchronizing, Main HT Panel and Complete distribution. Achieve me nts / Extra curricular Activities : Published a paper in IEEE Conference-2014 with the title of “Real and reactive power control distribution network by using SMES and Capacitor:” http://ieeexplore.ieee.org/xpl/articleDetails.jsp?tp=&arnumber=7054954&searchWithin%3Dp_Authors%3A.QT .Pardhasaradhi%2C+G.QT. Secured GATE score of 86.77 percentile in 2008 & 92.33 percentile in 2010. Participated in Technical workshops and national conferences held at university. Lang uages Known: 1.English,2.Telugu,3.Tamil,4.Hindi DATE: Signature PLACE: Chennai. G Pardhasaradhi