Annexure-2
Sl.
No.
Ref. RFP
Para No.
Description
Essential/
Desirable/
For Information
Complied/
Not Complied
1 4.iii
Development agency will prepare the Technical Specification Document for each individual SRU and
will get it approved by airworthiness agency through HAL. Also, the electrical ICD need to be
generated by Development agency.
Essential
2 4.iv
Development agency will submit the application for airworthiness assessment of store, TAB (Type
approval basis), ACP (Airworthiness Certification Plan) and Quality Assurance Plan (QAP) documents
in co-ordination with HAL to airworthiness agencies for approval.
Essential
3 4.v
Development agency will carry out the TRR, PDR, CDR & TARB with prior intimation (min. 15 working
days) to HAL and airworthiness agencies. Essential
4 4.vi
Development agency will develop all necessary Design documents, Process documents & Test
Documents required for airworthiness certification and will get the approval by airworthiness agency
through HAL.
Essential
5 4.vii
Development agency will do necessary procurement of raw material required for fabrication of
prototypes, along with CoC traceable to OEM as per approved Bill of Material. Essential
6 4.viii
Development agency will develop tools and fixtures required for fabrication of prototypes and get it
approved from airworthiness agencies. Essential
7 4.ix
Development agency will fabricate the prototype (02 nos. of each types of SRU) as per approved
design / process document to meet the requirement of approved Technical Specification. Essential
8 4.x
The fabricated SRU will be Form, Fit, Function and Integration (FFFI) substitution of required
respective SRU. Essential
9 4.xi
A test rig is to be developed and fabricated for carrying out the functional tests and get it approved
from airworthiness agencies. Essential
Technical Compliance Matrix
Ref. RFP No.HAL/AD/KORWA/IND/RFP/2022/14 Date: 07/09/2022
REQUEST FOR PROPOAL (RFP) FOR INDIGENISATION OF SHOP REPLACEABLE UNITS (SRU) FOR MILITARY AIRCRAFT (BATCH – 02)
Page 1 of 3
Sl.
No.
Ref. RFP
Para No.
Description
Essential/
Desirable/
For Information
Complied/
Not Complied
10 4.xii
Development agency will carry out functional tests as per approved Acceptance Procedure (ATP)
document to meet the requirement mentioned in the approved Technical Specification document. Essential
11 4.xiii
Development agency will provide all necessary test reports of offered SRUs in support of the technical
parameter / environmental / life / safety / reliability etc. in order to ascertain the airworthiness of the
SRUs.
Essential
12 4.xiv
HAL will carry out integration test of prototypes with respective Avionics System and do the
performance evaluation. If required some environmental test may be carried out by HAL on system
fitted with prototypes.
For Information
13 4.xv
Development agency will provide necessary support with respect to all aspects including resolution of
technical problems, snags / defects / failure observed during the activities to be done by HAL. Essential
14 4.xvi
The special fixture is to be made for qualification test, if required and get it approved from
airworthiness agencies. Essential
15 4.xvii
Development agency will carry out qualification tests as per approved Qualification Test Procedure
(QTP) to meet the requirement of approved Technical Specification Document. Essential
16 4.xviii
HAL will carry out the Performance evaluation of Prototype during flight, if required for airworthiness
certification. For Information
17 4.xix
Development agency will absorb any minor changes in design and fabrication, if encountered during
technical requirement review, integration and certification of the SRUs. Essential
18 4.xx
On completion of development activities, Development agency will take Letter of Technical Approval
(LoTA) for indigenous SRUs jointly with HAL Korwa from airworthiness agencies. For Information
19 4.xxi
All activities done by Development agency will be as defined in the DDPMAS Ver 1.0, IMTAR-21Ver
1.0 & AFQMS and revision received during the process. Essential
Page 2 of 3
Sl.
No.
Ref. RFP
Para No.
Description
Essential/
Desirable/
For Information
Complied/
Not Complied
20 4.xxii
Development period (from issuance of Indigenization order to certification from airworthiness agency)
may vary for each SRU depending upon the technological criticality, however development period will
not be more than 24 month for any SRU.
Essential
21 4.xxiii
HAL will be the primary interface between Development agency and airworthiness agencies during all
Indigenization process. For Information
22 5.i
Development agency must be an Indian Original Equipment Manufacturer (OEM) with proven expertise
in design, development & manufacture of similar items for airborne application. Supportive document
will be submitted in this regard with RFP response.
Essential
23 5.ii
The Development agency will be AS9100D or equivalent certified. Supportive document will be
submitted in this regard with RFP response. Essential
24 5.iii
The Development agency will provide details of manufacturing facilities, current capabilities (technical
expertise) related to design & certification, maintenance and supply of the AIRBORNE system /
subsystems / spares with RFP response.
Essential
25 5.iv
The Development agency will be audited as per AFQMS guidelines and first off article will be subjected
to first article inspection as per AFQMS guidelines.
Essential
26 5.v
Development agency will be able to provide supply support of Indigenous SRU / SRUs for minimum 10
years after certification.
Essential
27 5.vii
The information provided by HAL Korwa is the proprietary information & is to be kept strictly
confidential and should not be shared to other agencies, development agencies and outside world
without written permission from competent authority of HAL Korwa.
Essential
28 5.ix
Selected Development agency has to get registered at HAL Korwa before the placement of
Indigenization Order and will have to provide all the necessary documents as required.If Development
agency is already registered in any other division of HAL for similar activity, Development agency
registration letter issued by the division will be required for registration at HAL Korwa.
Essential
Page 3 of 3
Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022
Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022
Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022
Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022
Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022
Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022
Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022
Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022
Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022
Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022
Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022
Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022
Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022
Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022
Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022
Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022
Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022
Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022
Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022
Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022
Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022
Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022
Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022
Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022
Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022
Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022
Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022
Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022
Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022
Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022
Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022
Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022
Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022
Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022
Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022
Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022
Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022
Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022
Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022
Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022
Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022
Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022
Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022
Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022
Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022
Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022
Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022
Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022
Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022
Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022
Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022
Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022
Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022
Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022
Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022
Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022
Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022
Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022
Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022
Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022
Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022
Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022
Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022
Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022
Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022
Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022
Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022
Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022
Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022
Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022
Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022
Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022
Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022
Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022
Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022
Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022
Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022

Weitere ähnliche Inhalte

Ähnlich wie Annexure-2.pdf

RDSO Guidelines for new Vendors- Rajni Ranjan
RDSO Guidelines for new Vendors- Rajni RanjanRDSO Guidelines for new Vendors- Rajni Ranjan
RDSO Guidelines for new Vendors- Rajni RanjanRajni Ranjan
 
Rdso vendor registration guideline
Rdso vendor registration guidelineRdso vendor registration guideline
Rdso vendor registration guidelineSamsher Singh
 
Project procurement Management final report.docx
Project procurement Management final report.docxProject procurement Management final report.docx
Project procurement Management final report.docxZiyad Zaidi
 
Request for Proposal (RFP) For Deployment of Video ...
Request for Proposal (RFP) For Deployment of Video ...Request for Proposal (RFP) For Deployment of Video ...
Request for Proposal (RFP) For Deployment of Video ...Videoguy
 
Scope of work and terms and conditions fin al
Scope of work and terms and conditions fin alScope of work and terms and conditions fin al
Scope of work and terms and conditions fin alAshish Khandelwal
 
Multi Role Carrier Borne Fighter Aircraft
Multi Role Carrier Borne Fighter AircraftMulti Role Carrier Borne Fighter Aircraft
Multi Role Carrier Borne Fighter AircraftAnkur Gupta
 
Mode of Tendering.pptx
 Mode of Tendering.pptx Mode of Tendering.pptx
Mode of Tendering.pptxssuser4ae21a
 
SPECS-Guidelines-Presentation.pdf
SPECS-Guidelines-Presentation.pdfSPECS-Guidelines-Presentation.pdf
SPECS-Guidelines-Presentation.pdfApoorvaR18
 
Services Offered by Chartered Engineer | Approved Valuer H S Mishra
Services Offered by Chartered Engineer | Approved Valuer H S MishraServices Offered by Chartered Engineer | Approved Valuer H S Mishra
Services Offered by Chartered Engineer | Approved Valuer H S MishraHimanshu Shekhar Mishra
 
AirportCreators Compliance Management Tooling
AirportCreators Compliance Management ToolingAirportCreators Compliance Management Tooling
AirportCreators Compliance Management ToolingFrank Schellenberg
 
Tendernotice_1 of Washery for coal washing.pdf
Tendernotice_1 of Washery for coal washing.pdfTendernotice_1 of Washery for coal washing.pdf
Tendernotice_1 of Washery for coal washing.pdfCILPS1
 
Hatem El Karnshawy . BSc, PMP, MASCE
Hatem El Karnshawy . BSc, PMP, MASCEHatem El Karnshawy . BSc, PMP, MASCE
Hatem El Karnshawy . BSc, PMP, MASCEenghatem
 
UON-Project-Handover-Guideline-v1.2-010920.pdf
UON-Project-Handover-Guideline-v1.2-010920.pdfUON-Project-Handover-Guideline-v1.2-010920.pdf
UON-Project-Handover-Guideline-v1.2-010920.pdfHabtamuGaroma3
 

Ähnlich wie Annexure-2.pdf (20)

RDSO Guidelines for new Vendors- Rajni Ranjan
RDSO Guidelines for new Vendors- Rajni RanjanRDSO Guidelines for new Vendors- Rajni Ranjan
RDSO Guidelines for new Vendors- Rajni Ranjan
 
Rdso vendor registration guideline
Rdso vendor registration guidelineRdso vendor registration guideline
Rdso vendor registration guideline
 
Project procurement Management final report.docx
Project procurement Management final report.docxProject procurement Management final report.docx
Project procurement Management final report.docx
 
Request for Proposal (RFP) For Deployment of Video ...
Request for Proposal (RFP) For Deployment of Video ...Request for Proposal (RFP) For Deployment of Video ...
Request for Proposal (RFP) For Deployment of Video ...
 
Scope of work and terms and conditions fin al
Scope of work and terms and conditions fin alScope of work and terms and conditions fin al
Scope of work and terms and conditions fin al
 
Multi Role Carrier Borne Fighter Aircraft
Multi Role Carrier Borne Fighter AircraftMulti Role Carrier Borne Fighter Aircraft
Multi Role Carrier Borne Fighter Aircraft
 
PPP in Indian airports
PPP in Indian airportsPPP in Indian airports
PPP in Indian airports
 
Mode of Tendering.pptx
 Mode of Tendering.pptx Mode of Tendering.pptx
Mode of Tendering.pptx
 
SPECS-Guidelines-Presentation.pdf
SPECS-Guidelines-Presentation.pdfSPECS-Guidelines-Presentation.pdf
SPECS-Guidelines-Presentation.pdf
 
An eye in the sky?
An eye in the sky?  An eye in the sky?
An eye in the sky?
 
Services Offered by Chartered Engineer | Approved Valuer H S Mishra
Services Offered by Chartered Engineer | Approved Valuer H S MishraServices Offered by Chartered Engineer | Approved Valuer H S Mishra
Services Offered by Chartered Engineer | Approved Valuer H S Mishra
 
My Resume
My ResumeMy Resume
My Resume
 
NCRB AFRS proposal
NCRB AFRS proposalNCRB AFRS proposal
NCRB AFRS proposal
 
AirportCreators Compliance Management Tooling
AirportCreators Compliance Management ToolingAirportCreators Compliance Management Tooling
AirportCreators Compliance Management Tooling
 
Tendernotice_1 of Washery for coal washing.pdf
Tendernotice_1 of Washery for coal washing.pdfTendernotice_1 of Washery for coal washing.pdf
Tendernotice_1 of Washery for coal washing.pdf
 
1217 loc tenders
1217 loc tenders1217 loc tenders
1217 loc tenders
 
Hatem El Karnshawy . BSc, PMP, MASCE
Hatem El Karnshawy . BSc, PMP, MASCEHatem El Karnshawy . BSc, PMP, MASCE
Hatem El Karnshawy . BSc, PMP, MASCE
 
UON-Project-Handover-Guideline-v1.2-010920.pdf
UON-Project-Handover-Guideline-v1.2-010920.pdfUON-Project-Handover-Guideline-v1.2-010920.pdf
UON-Project-Handover-Guideline-v1.2-010920.pdf
 
Nit55
Nit55Nit55
Nit55
 
Ms.jkr.20800.2005
Ms.jkr.20800.2005Ms.jkr.20800.2005
Ms.jkr.20800.2005
 

Kürzlich hochgeladen

ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.Christina Parmionova
 
Call Girls Near Surya International Hotel New Delhi 9873777170
Call Girls Near Surya International Hotel New Delhi 9873777170Call Girls Near Surya International Hotel New Delhi 9873777170
Call Girls Near Surya International Hotel New Delhi 9873777170Sonam Pathan
 
2024: The FAR, Federal Acquisition Regulations - Part 25
2024: The FAR, Federal Acquisition Regulations - Part 252024: The FAR, Federal Acquisition Regulations - Part 25
2024: The FAR, Federal Acquisition Regulations - Part 25JSchaus & Associates
 
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...saminamagar
 
Nietzsche on "Will To Power" and "Superman"Layout
Nietzsche on "Will To Power" and "Superman"LayoutNietzsche on "Will To Power" and "Superman"Layout
Nietzsche on "Will To Power" and "Superman"LayoutMoamine3
 
Stop throwing your old clothes and start donating
Stop throwing your old clothes and start donatingStop throwing your old clothes and start donating
Stop throwing your old clothes and start donatingSERUDS INDIA
 
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
call girls in Mehrauli DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mehrauli  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Mehrauli  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mehrauli DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
How to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptxHow to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptxTechSoupConnectLondo
 
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...Christina Parmionova
 
NO1 Certified Best vashikaran specialist in UK USA UAE London Dubai Canada Am...
NO1 Certified Best vashikaran specialist in UK USA UAE London Dubai Canada Am...NO1 Certified Best vashikaran specialist in UK USA UAE London Dubai Canada Am...
NO1 Certified Best vashikaran specialist in UK USA UAE London Dubai Canada Am...Amil Baba Dawood bangali
 
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFOPEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFOMAIRIEORGERUS
 
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.Christina Parmionova
 
办理约克大学毕业证成绩单|购买加拿大文凭证书
办理约克大学毕业证成绩单|购买加拿大文凭证书办理约克大学毕业证成绩单|购买加拿大文凭证书
办理约克大学毕业证成绩单|购买加拿大文凭证书zdzoqco
 
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...Christina Parmionova
 
Press Freedom in Europe - Time to turn the tide.
Press Freedom in Europe - Time to turn the tide.Press Freedom in Europe - Time to turn the tide.
Press Freedom in Europe - Time to turn the tide.Christina Parmionova
 
Uk-NO1 Black magic Specialist Expert in Uk Usa Uae London Canada England Amer...
Uk-NO1 Black magic Specialist Expert in Uk Usa Uae London Canada England Amer...Uk-NO1 Black magic Specialist Expert in Uk Usa Uae London Canada England Amer...
Uk-NO1 Black magic Specialist Expert in Uk Usa Uae London Canada England Amer...Amil baba
 
ECOSOC YOUTH FORUM 2024 Side Events Schedule-18 April.
ECOSOC YOUTH FORUM 2024 Side Events Schedule-18 April.ECOSOC YOUTH FORUM 2024 Side Events Schedule-18 April.
ECOSOC YOUTH FORUM 2024 Side Events Schedule-18 April.Christina Parmionova
 
Laws on Women-and Children in the philippines
Laws on Women-and Children in the philippinesLaws on Women-and Children in the philippines
Laws on Women-and Children in the philippineskoijosephusmd
 

Kürzlich hochgeladen (20)

ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
 
Call Girls Near Surya International Hotel New Delhi 9873777170
Call Girls Near Surya International Hotel New Delhi 9873777170Call Girls Near Surya International Hotel New Delhi 9873777170
Call Girls Near Surya International Hotel New Delhi 9873777170
 
2024: The FAR, Federal Acquisition Regulations - Part 25
2024: The FAR, Federal Acquisition Regulations - Part 252024: The FAR, Federal Acquisition Regulations - Part 25
2024: The FAR, Federal Acquisition Regulations - Part 25
 
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
 
Nietzsche on "Will To Power" and "Superman"Layout
Nietzsche on "Will To Power" and "Superman"LayoutNietzsche on "Will To Power" and "Superman"Layout
Nietzsche on "Will To Power" and "Superman"Layout
 
Stop throwing your old clothes and start donating
Stop throwing your old clothes and start donatingStop throwing your old clothes and start donating
Stop throwing your old clothes and start donating
 
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
call girls in Mehrauli DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mehrauli  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Mehrauli  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mehrauli DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
How to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptxHow to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptx
 
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
 
NO1 Certified Best vashikaran specialist in UK USA UAE London Dubai Canada Am...
NO1 Certified Best vashikaran specialist in UK USA UAE London Dubai Canada Am...NO1 Certified Best vashikaran specialist in UK USA UAE London Dubai Canada Am...
NO1 Certified Best vashikaran specialist in UK USA UAE London Dubai Canada Am...
 
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFOPEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
 
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
 
办理约克大学毕业证成绩单|购买加拿大文凭证书
办理约克大学毕业证成绩单|购买加拿大文凭证书办理约克大学毕业证成绩单|购买加拿大文凭证书
办理约克大学毕业证成绩单|购买加拿大文凭证书
 
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
 
Press Freedom in Europe - Time to turn the tide.
Press Freedom in Europe - Time to turn the tide.Press Freedom in Europe - Time to turn the tide.
Press Freedom in Europe - Time to turn the tide.
 
Uk-NO1 Black magic Specialist Expert in Uk Usa Uae London Canada England Amer...
Uk-NO1 Black magic Specialist Expert in Uk Usa Uae London Canada England Amer...Uk-NO1 Black magic Specialist Expert in Uk Usa Uae London Canada England Amer...
Uk-NO1 Black magic Specialist Expert in Uk Usa Uae London Canada England Amer...
 
ECOSOC YOUTH FORUM 2024 Side Events Schedule-18 April.
ECOSOC YOUTH FORUM 2024 Side Events Schedule-18 April.ECOSOC YOUTH FORUM 2024 Side Events Schedule-18 April.
ECOSOC YOUTH FORUM 2024 Side Events Schedule-18 April.
 
Laws on Women-and Children in the philippines
Laws on Women-and Children in the philippinesLaws on Women-and Children in the philippines
Laws on Women-and Children in the philippines
 

Annexure-2.pdf

  • 1. Annexure-2 Sl. No. Ref. RFP Para No. Description Essential/ Desirable/ For Information Complied/ Not Complied 1 4.iii Development agency will prepare the Technical Specification Document for each individual SRU and will get it approved by airworthiness agency through HAL. Also, the electrical ICD need to be generated by Development agency. Essential 2 4.iv Development agency will submit the application for airworthiness assessment of store, TAB (Type approval basis), ACP (Airworthiness Certification Plan) and Quality Assurance Plan (QAP) documents in co-ordination with HAL to airworthiness agencies for approval. Essential 3 4.v Development agency will carry out the TRR, PDR, CDR & TARB with prior intimation (min. 15 working days) to HAL and airworthiness agencies. Essential 4 4.vi Development agency will develop all necessary Design documents, Process documents & Test Documents required for airworthiness certification and will get the approval by airworthiness agency through HAL. Essential 5 4.vii Development agency will do necessary procurement of raw material required for fabrication of prototypes, along with CoC traceable to OEM as per approved Bill of Material. Essential 6 4.viii Development agency will develop tools and fixtures required for fabrication of prototypes and get it approved from airworthiness agencies. Essential 7 4.ix Development agency will fabricate the prototype (02 nos. of each types of SRU) as per approved design / process document to meet the requirement of approved Technical Specification. Essential 8 4.x The fabricated SRU will be Form, Fit, Function and Integration (FFFI) substitution of required respective SRU. Essential 9 4.xi A test rig is to be developed and fabricated for carrying out the functional tests and get it approved from airworthiness agencies. Essential Technical Compliance Matrix Ref. RFP No.HAL/AD/KORWA/IND/RFP/2022/14 Date: 07/09/2022 REQUEST FOR PROPOAL (RFP) FOR INDIGENISATION OF SHOP REPLACEABLE UNITS (SRU) FOR MILITARY AIRCRAFT (BATCH – 02) Page 1 of 3
  • 2. Sl. No. Ref. RFP Para No. Description Essential/ Desirable/ For Information Complied/ Not Complied 10 4.xii Development agency will carry out functional tests as per approved Acceptance Procedure (ATP) document to meet the requirement mentioned in the approved Technical Specification document. Essential 11 4.xiii Development agency will provide all necessary test reports of offered SRUs in support of the technical parameter / environmental / life / safety / reliability etc. in order to ascertain the airworthiness of the SRUs. Essential 12 4.xiv HAL will carry out integration test of prototypes with respective Avionics System and do the performance evaluation. If required some environmental test may be carried out by HAL on system fitted with prototypes. For Information 13 4.xv Development agency will provide necessary support with respect to all aspects including resolution of technical problems, snags / defects / failure observed during the activities to be done by HAL. Essential 14 4.xvi The special fixture is to be made for qualification test, if required and get it approved from airworthiness agencies. Essential 15 4.xvii Development agency will carry out qualification tests as per approved Qualification Test Procedure (QTP) to meet the requirement of approved Technical Specification Document. Essential 16 4.xviii HAL will carry out the Performance evaluation of Prototype during flight, if required for airworthiness certification. For Information 17 4.xix Development agency will absorb any minor changes in design and fabrication, if encountered during technical requirement review, integration and certification of the SRUs. Essential 18 4.xx On completion of development activities, Development agency will take Letter of Technical Approval (LoTA) for indigenous SRUs jointly with HAL Korwa from airworthiness agencies. For Information 19 4.xxi All activities done by Development agency will be as defined in the DDPMAS Ver 1.0, IMTAR-21Ver 1.0 & AFQMS and revision received during the process. Essential Page 2 of 3
  • 3. Sl. No. Ref. RFP Para No. Description Essential/ Desirable/ For Information Complied/ Not Complied 20 4.xxii Development period (from issuance of Indigenization order to certification from airworthiness agency) may vary for each SRU depending upon the technological criticality, however development period will not be more than 24 month for any SRU. Essential 21 4.xxiii HAL will be the primary interface between Development agency and airworthiness agencies during all Indigenization process. For Information 22 5.i Development agency must be an Indian Original Equipment Manufacturer (OEM) with proven expertise in design, development & manufacture of similar items for airborne application. Supportive document will be submitted in this regard with RFP response. Essential 23 5.ii The Development agency will be AS9100D or equivalent certified. Supportive document will be submitted in this regard with RFP response. Essential 24 5.iii The Development agency will provide details of manufacturing facilities, current capabilities (technical expertise) related to design & certification, maintenance and supply of the AIRBORNE system / subsystems / spares with RFP response. Essential 25 5.iv The Development agency will be audited as per AFQMS guidelines and first off article will be subjected to first article inspection as per AFQMS guidelines. Essential 26 5.v Development agency will be able to provide supply support of Indigenous SRU / SRUs for minimum 10 years after certification. Essential 27 5.vii The information provided by HAL Korwa is the proprietary information & is to be kept strictly confidential and should not be shared to other agencies, development agencies and outside world without written permission from competent authority of HAL Korwa. Essential 28 5.ix Selected Development agency has to get registered at HAL Korwa before the placement of Indigenization Order and will have to provide all the necessary documents as required.If Development agency is already registered in any other division of HAL for similar activity, Development agency registration letter issued by the division will be required for registration at HAL Korwa. Essential Page 3 of 3 Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022 Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022 Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022 Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022 Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022 Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022 Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022 Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022 Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022 Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022 Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022 Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022 Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022 Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022 Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022 Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022 Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022 Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022 Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022 Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022 Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022 Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022 Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022 Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022 Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022 Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022 Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022 Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022 Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022 Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022 Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022 Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022 Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022 Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022 Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022 Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022 Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022 Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022 Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022 Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022 Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022 Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022 Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022 Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022 Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022 Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022 Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022 Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022 Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022 Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022 Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022 Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022 Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022 Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022 Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022 Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022 Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022 Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022 Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022 Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022 Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022 Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022 Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022 Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022 Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022 Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022 Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022 Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022 Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022 Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022 Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Approved by -APURBA ROY(EXECUTIVE DIRECTOR) -12/09/2022 Concurred by -BIBHUTI BHUSAN MALLICK(CHIEF OF PROJECTS) -12/09/2022 Concurred by -PRASHANT KUMAR SINGH(DEPUTY GENERAL MANAGER-IMM) -10/09/2022 Concurred by -MANOJ YADAV(ADDITIONAL GENERAL MANAGER-PLANNING & PROJECTS) -10/09/2022 Concurred by -NEERAJ SAXENA(CHIEF MANAGER-INDIGENISATION) -09/09/2022 Concurred by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022 Prepared by -RAMA PATI TIWARI(MANAGER-INDIGENISATION) -09/09/2022