1
MEDI-CAPS INSTITUTE OF SCIENCE & TECHNOLOGY
A
Brief report on
“The group visit at Indira Sagar (Punasa) dam”
Submitted to:- Submitted by:-
Dr. Rajeev kumar Priyanshu kumar
(Hod- Civil dept.) 0876CE141113
2
Abstract
Indira Sagar Power Station is situated at 10 Km from the village Punasa in Khandwa District
of Madhya Pradesh. The foundation stone of this project was laid by the then Hon’ble Prime
Minister of India Late Smt. Indira Gandhi on 23.10.1984. It is a multipurpose project on the river
Narmada with installed capacity of 1000 Megawatt (8X125). It will generate 2698 MUs energy,
annually. The project will irrigate 2.70 lakh ha land annually. As per CCEA sanction the project
cost is Rs. 4355.57 Crores (Sept. 2000 Price Level). Due to early commissioning of units,
substantial amount of savings has been made in the actual completion cost. The project consists of
Concrete gravity dam of length 653 meter at top with maximum height (above deepest foundation
level) of 92 meter. The dam involved pouring of 14.00 lacs cubic meter concrete. It consists of 12
main spillway blocks with effective width of 20 m each. 20 no. radial gates of size 20 m X 17 m
have been erected for regulation of flood water. The surface Power House is situated on the right
bank of the river, with Machine hall (202 meter long, 23 meter wide, 53 meter high), service bay
(42 meter long, 23 meter wide, 24 meter high) and transformer yard (202 meter long, 20 meter
wide) to house 8 Nos. Francis type turbines of 125 MW each. The water conductor system consists
of one Head Race Channel of length 530 meter, width 75 meter and depth 50 meter with water
carrying capacity of 2200 cumecs. Water enter into turbine fron intake structure by 8 Nos. Penstock
of 8 meter diameter and 157 meter length each. Water flow capacity of each Penstock is 275
cumecs. After power generation water is discharged back into river Narmada through 850 m long
Tail Race Channel.
3
Features Information
Location Access to Project
District :
Latitude :
Longitude :
Airport :
Rail Head :
Seaport :
East Nimad, Kh
22'17'00 N
76'28'00 E
Indore 140Km
Khandw a 70 K
Mumbai 650 K
4
Reservoir Level
Top of
Dam(TOD)
:
Max Water
Level(MWL)
:
Full
Reservoir
Level (FSL)
:
Submergence
Area At FRL
:
Crest
Level
(Spillway)
:
Max Tail
Water
Level
:
Min Tail
Water
Level
:
Min Tail Water Level
(i)Head Race Channel (iii)Tail Race Channel
Length *
Width
:
Discharge
Capacity
:
Min Tail Water
Level
:
River Diversion
Work(Diversion
Tunnel)
:
(ii) Penstock
Diameter :
Hydrology
River Diversion Work(Diversion
Tunnel)
Cathment
Area
:
90%
Dependable
Yield
:
Max Flood
Outflow
:
Length :
Diameter :
Design
Discharge
:
Storage Capacity Concrete Gravity Dam
Gross :
Live :
Total
Length
:
Max
Height
:
267.00 m
263.35 m
262.13 m
913.48 Sq Km
245.13 m
196.60 m
193.54 m
530 X 75 m
2200.00 cume
850 X 30 m
2200.00 cume
8.00 m
61642 Sq Km
18.184 Billion m
83543 Cumesc
390.00 m
8.00 m
368.00 Cumec
12.22 Billion m
9.75 Billion m c
653.00 m
92.00 m
5
Intake Structure Radial Gates
Length :
Switch Yard
Switch
Yard
:
Size(Nos.) :
Power House
Type :
Installed
Capacity
:
Type Of
Turbine
:
Machine
Hall
:
Design
Head
:
Benefits Stage-III Stage-II Stage-III
Power(Initial
Phase)
:
Irrigation(CCA) :
PUNASA LIFT IRRIGATION SCHEME
208.00 m
400 kV (Open
20 X 17 m (20
Surface
8 X 125(1000M
Francis
202 X 23 X 53
60.00 m
2698 MUs 1840 MUs 1515 MUs
6
Introduction:-
The Punasa Lift Irrigation Scheme is located near village Chandel in Khandwa
(East Nimar) district, proposed for development of irrigation facilities in East Nimar district of
M.P. This area has been declared as a drought prone area The Project is proposed as an extension
of command from on-going Indira Sagar Project (ISP). The scheme is proposed in lieu of Chhota
Tawa Project which was earlier proposed across Chhota Tawa river, a tributary of river Narmada.
The PLIS is proposed to lift water directly from the ISP reservoir and irrigate CCA of 35008 ha at
105% intensity of irrigation, thus proposing annual irrigation to an area of 36758 ha. The project
shall provide drinking water and irrigation facilities to 110 villages including 25 affected villages
of ISP and resettled population of ISP oustees and habilitation sites.
Composite Control Structure Cum Canal Head Power House
PLIS is proposed and linked up with the composite control structure
at R.D.3045 M. of Punasa Facilities. This work comprises of head regulator and a
Canal Head Power House with 3 units of 5 MW each.
7
Salient Features:-
A provision to irrigate about 35008 hact.of land by lift is alrady considered in the design of Intake
component of Indira Sagar Project canal. It will serve the areas around Punasa and Mundi village
in command of the earlier proposed Chhota Tawa Project. The Administrative Approval has been
accorded to the scheme by the Govt. of M.P. N.V.D.D. vide No. F-2/28/27/2/2005/2817 dated
19.9.2005 for an estimated cost of Rs. 185.04 crores.
Principal Features:-
River/Intake Narmada, Main canal head
HFL 263.35 m
MDDL 243.13 m
Floor level of pump 246 m
Ist stage lift ISP Reservoir level to 283.5 m
IInd stage lift ISP Reservoir level to 283.5 m
III rd stage lift 300 m to 324 m
Gross Command Area 53708 Ha.
Culturable Command Area 35008 Ha.
Annual Irrigation 36758 Ha.Benefit cost ratio 1.56
8
Completion Schedule and target for Irrigation potential from construction
period
1st Year 30%
2nd Year 70%
3rd Year 100%
9
Contents
 1 Indira Sagar Project
o 1.1 Introduction
o 1.2 Project features
o 1.3 Rehabilitation and resettlement
The Indirasagar Dam is a multipurpose project of Madhya Pradesh on the Narmada River at
Narmadanagar in the Khandwa district of Madhya Pradesh in India. The foundation stone of the
project was laid by late Smt Indira Gandhi, former Prime Minister of India on 23 October 1984.
The construction of main dam started in 1992. The downstream projects of ISP are Omkareshwar,
Maheshwar, and Sardar Sarovar Project.
The Project envisages construction of a 92 meters high and 653 meters long concrete gravity dam.
It provides Irrigation in 1,230 square kilometres of land with annual production of 2.7 billion units
in the districts of Khandwa and Khargone in Madhya Pradesh and power generation of 1,000 MW
installed capacity (8x125). The reservoir of 12,200,000,000 m3
(9,890,701 acre·ft) was created. In
terms of storage of water, it withholds the largest reservoir in India, with capacity of 12.22 billion
cu m, followed by Bharkra Nangal in Himachal Pradesh. The dam, built as a joint venture between
Madhya Pradesh irrigation and National Hydroelectric Power Corporation is the source of the
Indira Gandhi Canal. It was commissioned on May 2005.
10
Indira Sagar Project
Introduction
River Narmada, fifth largest river in India, with a river flow length of 1,312 km originates from
Amarkantak in Anuppur district of Madhya Pradesh. Narmada flows westward and after passing
through Madhya Pradesh, Gujarat, and Maharashtra, it drains into Arabian Sea near Gulf of
Combay. Indira Sagar Project (ISP) situated on River Narmada, 10 km from village Punasa in
Khandwa district of Madhya Pradesh is commissioned on 31 March 2005.
Indira Sagar Project is a multipurpose Project with an installed capacity of 1,000 MW, with annual
energy generation of 2,698 million units in Stage I, 1,850 million units in Stage II, and
1,515 million units in Stage III, and annual irrigation of 2.65 Lac. Ha on a Culturable Command
Area (CCA) of 1.23 Lac. Ha. Total catchment area at the dam site is 61,642 km2
. Indira Sagar
Project is the mother project for the downstream projects on Narmada Basin with largest reservoir
in India, having 12.22 Bm3 storage capacity. All the eight units commissioned by March 2005
ahead of schedule while generation from first unit was started from January 2004. The powerhouse
is the second-largest surface powerhouse in India. Indian National Human Rights commission
takes complaint of Salem-News.com’s Human Rights Ambassador complain into note regarding
Omkareshwar and Indira Sagar Dams.Complaints cited by our Human Rights Ambassador
William Nicholas Gomes, over water levels being raised to the point that they literally drowned a
local community, have been recognized by the National Human Rights Commission in India.
Official notification to human rights ambassador william nicholas gomes from national human
rights comission -
11
12
Project features
A model of the Indira Sagar Power Station at the Regional Science Centre, Bhopal
Brief details of major components of project:
 No. of Units, their rating and capacity : 8 Units of 125 MW each – 1000 MW
 Concrete Gravity dam : 653 m Long & 92 m Height
 Diversion Tunnel : 688 m Long & 8 m Height
 Radial Gates : 20 Nos., 20 Long & 17 m height
 Power House : Surface with Francis Turbine Size – 200 m x 23m x 53 m
 Intake Structure : 208 m Long
 Water Conductor System : 8 Nos. Penstocks with 8 m dia.
 Head race Channel : 530 m Long & 75 m wide.
 Tail Race Channel : 850m Long & 30 m wide.
 Switchyard : 400 Kv, Open type.
Rehabilitation and resettlement
 Villages affected: 249
 Family affected: 39179 PAF’s
 Land Submerged: 91348 Ha.
13
Indira Sagar Project is a Multipurpose project will have the largest storage capacity in the country.
It will have an installed capacity of 1000 MW and annual irrigation of 2.65 Lakh Ha. on a CCA of
1.23 Lakh Ha. The project provides regulated releases of 8.12 MAF to Gujrat ex-Maheshwar project
after power generation at down stream projects viz., Omkareshwar and Maheshwar project in Madhya
Pradesh.
Indira Sagar Project is the key project on Narmada river providing excellent storage site. The Dam
is proposed on the main river near village Narmadanagar of Punasa Block in the District.
Omkareshwar and Maheshwar projects are proposed in the downstream to utilize the regulated
releases of Indira Sagar project of irrigation and power generation. Hence, the cascade of Indira Sagar,
Omkareshwar and Maheshwar projects, together,are known as"Narmada Sagar Complex".The total
drainage area at the proposed dam site of Indira Sagar Project is 61642 Sq. Kms. The main dam is
located on quartzite's of reddish colour and with small interbedding of silt stone of purple colour
belonging to Vindhyans (Super Group). The power house is located on the stable right bank in deep
pit which is geologically less disturbed. The project command area encompasses the Narmada Sone
lineament. The command area is mostly composed of basaltic lava flows. These flows are designated
as deccan traps. The thickness of lava flows ranges from 6.5 m to 30 m with presence of vesicular
and amydaloidal in basaltic flow with appreciable weathering on top. Detailed seismological studies
have been got done and based on the recommendation of the Dam Review Panel, detailed designs for
the dam have been prepared by the Central Water Commission. A network for ten seismological
stations is proposed to be established through Indian Meteorological Department covering the area of
the project of Narmada Sagar Complex.The dam is proposed to be 92 m (302 Ft.) high and 653 m
(2142 ft.) in length with a slightly curved alignment of 880 m radius across river Narmada near village
14
Narmada Nagar of Development Block Punasa of the district about 845 Kms. from the source of origin
with a gross storage of 12.22 Bm3
and a live storage of 9.75 Bm3
A sub surface powerhouse on the
right bank is proposed to house 8 units of 125 MW each with conventional Francis Turbines.
(Construction Site-View- 1)
A lined gravity canal takes off from the reservoir
with FSL of 239.15 m through a 3.67 Kms long tunnel
named Punasa tunnel. The total length of the left bank
main canal is 24s8.65 Kms. It is proposed to irrigate
about 98475 Ha. of land in the District and West Nimar
District of Madhya Pradesh State. The distribution
system is proposed to be lined. The left canal is
proposed to takeoff from 92.10 Km of the main flow
canal. It is 83 Kms. long and involves 38m lift. It is
proposed to irrigate about 24282 Ha. of land in higher
elevated areas of West Nimar District in Bhikangaon
and Kasarawad Tehsils.A provision for further
expansion to irrigate about 26000 Ha. of land by lift is
also considered in the basin of intake components of
Indira Sagar Project Canal.The submergence of Indira
Sagar Project is 91348 Ha. including forest and revenue
land extending to 249 villages of East Nimar,
Hoshangabad and Dewas Districts. Out of 249 villages
going under submergence, 12 are forest villages and the
remaining 237 are revenue villages. The submergence
area is consisting of forest area of 41420 ha. , cultivated
area of 44363 Ha. and 5565 ha. of other area.
15
(Construction Site- View 2)
S.No. Description Particular
A. General
1. District
East
Nimar,Khandwa
2. Latitude 22*17'00"
3. Longitude 76*28'00"
B. Hydrology
4. Catchment area (Sq.Kms.) 61642
C. Storage Capacity
5. Gross (cubic BM) 12.220
6. Live (cubic BM) 9.750
7. Dead (cubic BM) 2.470
D. Concrete Gravity Dam
8. Total Length (m) 653
9. Maximum height(m) 92
E.Earth Dam (Saddle)
10. Length(m) 815
11. Height(m) 10.7)
F.Radial Crest Gates
12. Number 20
13. Length (m) 20
14. Height (m) 17
G. Power House
16
15. Type of Power house Sub-Surface
16. Installed Capacity(MW) 1000(8x125)
H. Submergence
17.1 Fully submerged(Number) 69
17.2 Partially affected 180
17.3 Total 249
I. Command Area Details
18.
Gross Command area
(Lakh ha.)
2.10
19.
Culturable Command area
(Lakh ha.)
1.75
20. Irrigated area(Lakh Ha.) 1.23
20.a.
Main Flow Canal (left)
1.East Nimar Khandwa
2. West Nimar Khargone
18979 Ha.
79496 Ha.
20.b
Khargone lift canal (left)
west Nimar Khargone 24282 Ha.
J.Cost Estimates( In crores) at 1988 price level
21. Unit-1 Head work 832.32
22. Unit-2 Canals 541.98
23. Unit-3 Power 619.37
24.
Command area
Development
50.00
25. Catchment area treatment 124.00
Grand Total 2167.67

More Related Content

What's hot

What's hot (20)

Traffic regulatory measures subjective assignment 2 - academic writing
Traffic regulatory measures   subjective assignment 2 - academic writingTraffic regulatory measures   subjective assignment 2 - academic writing
Traffic regulatory measures subjective assignment 2 - academic writing
 
Highway Cross-sectional Elements
Highway Cross-sectional ElementsHighway Cross-sectional Elements
Highway Cross-sectional Elements
 
MultiModal Transportation in New DElhi
MultiModal Transportation in New DElhiMultiModal Transportation in New DElhi
MultiModal Transportation in New DElhi
 
Design of rotary
Design of rotaryDesign of rotary
Design of rotary
 
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORTROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
 
Rapid transit system
Rapid transit systemRapid transit system
Rapid transit system
 
Runway resurfacing and repairing using modern materials and
Runway resurfacing and repairing using modern materials andRunway resurfacing and repairing using modern materials and
Runway resurfacing and repairing using modern materials and
 
Dholera Smart City and SIR Prospects
Dholera Smart City and SIR ProspectsDholera Smart City and SIR Prospects
Dholera Smart City and SIR Prospects
 
India's Water Policy and Strategy for Implementation
India's Water Policy and Strategy for ImplementationIndia's Water Policy and Strategy for Implementation
India's Water Policy and Strategy for Implementation
 
Anisha lalu housing policy of maharashtra
Anisha lalu housing  policy of maharashtraAnisha lalu housing  policy of maharashtra
Anisha lalu housing policy of maharashtra
 
Roads & bridges
Roads & bridgesRoads & bridges
Roads & bridges
 
Principles and Practices of Tod
Principles and Practices  of Tod Principles and Practices  of Tod
Principles and Practices of Tod
 
Highway Drainage System
Highway Drainage SystemHighway Drainage System
Highway Drainage System
 
BITUMINOUS ROAD PPT
BITUMINOUS ROAD PPTBITUMINOUS ROAD PPT
BITUMINOUS ROAD PPT
 
Unit 1
Unit 1Unit 1
Unit 1
 
river training work
river training workriver training work
river training work
 
Ganga path project report BSRDCL by Deepak Kumar
Ganga path project report BSRDCL by Deepak KumarGanga path project report BSRDCL by Deepak Kumar
Ganga path project report BSRDCL by Deepak Kumar
 
Street furniture
Street furnitureStreet furniture
Street furniture
 
Mrt
MrtMrt
Mrt
 
Metro presentation
Metro presentationMetro presentation
Metro presentation
 

Similar to Punasa report on indra sagar Dam, 9608684800

Presentation on two major hydro electric power plants in india
Presentation on two major hydro electric power plants in indiaPresentation on two major hydro electric power plants in india
Presentation on two major hydro electric power plants in india
Saikat Ghosh
 
Report of Sardar Sarovar Hydro Power Plant
Report of Sardar Sarovar Hydro Power Plant Report of Sardar Sarovar Hydro Power Plant
Report of Sardar Sarovar Hydro Power Plant
Sheel Shah
 
Pakistandams 150815052252-lva1-app6891
Pakistandams 150815052252-lva1-app6891Pakistandams 150815052252-lva1-app6891
Pakistandams 150815052252-lva1-app6891
usman ijaz
 

Similar to Punasa report on indra sagar Dam, 9608684800 (20)

55661002-Hydro-Electric-Power-Plant.pptx
55661002-Hydro-Electric-Power-Plant.pptx55661002-Hydro-Electric-Power-Plant.pptx
55661002-Hydro-Electric-Power-Plant.pptx
 
Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic project
 
Presentation on two major hydro electric power plants in india
Presentation on two major hydro electric power plants in indiaPresentation on two major hydro electric power plants in india
Presentation on two major hydro electric power plants in india
 
Srisailam project final
Srisailam project finalSrisailam project final
Srisailam project final
 
Report of Sardar Sarovar Hydro Power Plant
Report of Sardar Sarovar Hydro Power Plant Report of Sardar Sarovar Hydro Power Plant
Report of Sardar Sarovar Hydro Power Plant
 
Prospect of Small Hydro Power in Uttarakhand
Prospect of Small Hydro Power in UttarakhandProspect of Small Hydro Power in Uttarakhand
Prospect of Small Hydro Power in Uttarakhand
 
Hydro Power Plant -Surya
Hydro Power Plant -SuryaHydro Power Plant -Surya
Hydro Power Plant -Surya
 
hydro power
hydro power hydro power
hydro power
 
Gis hydrology river_in_summary of river link project_with images_05.08.2013
Gis hydrology river_in_summary of river link project_with images_05.08.2013Gis hydrology river_in_summary of river link project_with images_05.08.2013
Gis hydrology river_in_summary of river link project_with images_05.08.2013
 
Tidal Power in India
Tidal Power in IndiaTidal Power in India
Tidal Power in India
 
Project report
Project reportProject report
Project report
 
26900721058_OE-ME701D.pptx
26900721058_OE-ME701D.pptx26900721058_OE-ME701D.pptx
26900721058_OE-ME701D.pptx
 
Pakistandams 150815052252-lva1-app6891
Pakistandams 150815052252-lva1-app6891Pakistandams 150815052252-lva1-app6891
Pakistandams 150815052252-lva1-app6891
 
Pakistan dams
Pakistan damsPakistan dams
Pakistan dams
 
Neelum jehlum hydropower project
Neelum jehlum hydropower projectNeelum jehlum hydropower project
Neelum jehlum hydropower project
 
Subansiri Lower Hydroelectric Project.pptx
Subansiri Lower Hydroelectric Project.pptxSubansiri Lower Hydroelectric Project.pptx
Subansiri Lower Hydroelectric Project.pptx
 
IVRCL - Company Profile.
IVRCL - Company Profile.IVRCL - Company Profile.
IVRCL - Company Profile.
 
Canal Network of UPID.ppt
Canal Network of UPID.pptCanal Network of UPID.ppt
Canal Network of UPID.ppt
 
final-170310124056.pdf
final-170310124056.pdffinal-170310124056.pdf
final-170310124056.pdf
 
Sardar Sarovar Dam, Gujarat, India.
Sardar Sarovar Dam, Gujarat, India.Sardar Sarovar Dam, Gujarat, India.
Sardar Sarovar Dam, Gujarat, India.
 

More from PRIYANSHU KUMAR

More from PRIYANSHU KUMAR (15)

irc 073,2018 document uploaded by Priyanshu Kumar,9608684800
irc 073,2018 document uploaded by Priyanshu Kumar,9608684800irc 073,2018 document uploaded by Priyanshu Kumar,9608684800
irc 073,2018 document uploaded by Priyanshu Kumar,9608684800
 
FWD report by priyanshu kumar ,960868480
FWD report by priyanshu kumar ,960868480FWD report by priyanshu kumar ,960868480
FWD report by priyanshu kumar ,960868480
 
irc 37 2018 pdf uploaded by priyanshu kumar,9608684800
irc 37 2018  pdf uploaded by priyanshu kumar,9608684800irc 37 2018  pdf uploaded by priyanshu kumar,9608684800
irc 37 2018 pdf uploaded by priyanshu kumar,9608684800
 
Methodology of Flexible road work report by PRIYANSHU kumar,9608684800
Methodology of Flexible road work report by PRIYANSHU kumar,9608684800Methodology of Flexible road work report by PRIYANSHU kumar,9608684800
Methodology of Flexible road work report by PRIYANSHU kumar,9608684800
 
Pavement Design Report by priyanshu kumar 9608684800
Pavement Design Report by priyanshu kumar 9608684800Pavement Design Report by priyanshu kumar 9608684800
Pavement Design Report by priyanshu kumar 9608684800
 
Retro Report Road Signage by Priyanshu Kumar 9608684800
Retro Report Road Signage by Priyanshu Kumar 9608684800Retro Report Road Signage by Priyanshu Kumar 9608684800
Retro Report Road Signage by Priyanshu Kumar 9608684800
 
Retro Report Road Marking by Priyanshu,9608684800
Retro Report Road Marking by Priyanshu,9608684800Retro Report Road Marking by Priyanshu,9608684800
Retro Report Road Marking by Priyanshu,9608684800
 
nsv REPORT BY PRIYANSHU KUMAR 9608684800
nsv REPORT BY PRIYANSHU KUMAR 9608684800nsv REPORT BY PRIYANSHU KUMAR 9608684800
nsv REPORT BY PRIYANSHU KUMAR 9608684800
 
green building by Priyanshu kumar,9608684800
green building by Priyanshu kumar,9608684800green building by Priyanshu kumar,9608684800
green building by Priyanshu kumar,9608684800
 
Remote sensing by Priyanshu kumar, 9608684800
Remote sensing by Priyanshu kumar, 9608684800Remote sensing by Priyanshu kumar, 9608684800
Remote sensing by Priyanshu kumar, 9608684800
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800
 
Remote sensing by priyanshu kumar,9608684800
Remote sensing by priyanshu kumar,9608684800Remote sensing by priyanshu kumar,9608684800
Remote sensing by priyanshu kumar,9608684800
 
Gajra gear ppt
Gajra gear pptGajra gear ppt
Gajra gear ppt
 
indian railway
indian railwayindian railway
indian railway
 
gammon report by priyanshu kumar, 9608684800
gammon report by priyanshu kumar, 9608684800gammon report by priyanshu kumar, 9608684800
gammon report by priyanshu kumar, 9608684800
 

Recently uploaded

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 

Recently uploaded (20)

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 

Punasa report on indra sagar Dam, 9608684800

  • 1. 1 MEDI-CAPS INSTITUTE OF SCIENCE & TECHNOLOGY A Brief report on “The group visit at Indira Sagar (Punasa) dam” Submitted to:- Submitted by:- Dr. Rajeev kumar Priyanshu kumar (Hod- Civil dept.) 0876CE141113
  • 2. 2 Abstract Indira Sagar Power Station is situated at 10 Km from the village Punasa in Khandwa District of Madhya Pradesh. The foundation stone of this project was laid by the then Hon’ble Prime Minister of India Late Smt. Indira Gandhi on 23.10.1984. It is a multipurpose project on the river Narmada with installed capacity of 1000 Megawatt (8X125). It will generate 2698 MUs energy, annually. The project will irrigate 2.70 lakh ha land annually. As per CCEA sanction the project cost is Rs. 4355.57 Crores (Sept. 2000 Price Level). Due to early commissioning of units, substantial amount of savings has been made in the actual completion cost. The project consists of Concrete gravity dam of length 653 meter at top with maximum height (above deepest foundation level) of 92 meter. The dam involved pouring of 14.00 lacs cubic meter concrete. It consists of 12 main spillway blocks with effective width of 20 m each. 20 no. radial gates of size 20 m X 17 m have been erected for regulation of flood water. The surface Power House is situated on the right bank of the river, with Machine hall (202 meter long, 23 meter wide, 53 meter high), service bay (42 meter long, 23 meter wide, 24 meter high) and transformer yard (202 meter long, 20 meter wide) to house 8 Nos. Francis type turbines of 125 MW each. The water conductor system consists of one Head Race Channel of length 530 meter, width 75 meter and depth 50 meter with water carrying capacity of 2200 cumecs. Water enter into turbine fron intake structure by 8 Nos. Penstock of 8 meter diameter and 157 meter length each. Water flow capacity of each Penstock is 275 cumecs. After power generation water is discharged back into river Narmada through 850 m long Tail Race Channel.
  • 3. 3 Features Information Location Access to Project District : Latitude : Longitude : Airport : Rail Head : Seaport : East Nimad, Kh 22'17'00 N 76'28'00 E Indore 140Km Khandw a 70 K Mumbai 650 K
  • 4. 4 Reservoir Level Top of Dam(TOD) : Max Water Level(MWL) : Full Reservoir Level (FSL) : Submergence Area At FRL : Crest Level (Spillway) : Max Tail Water Level : Min Tail Water Level : Min Tail Water Level (i)Head Race Channel (iii)Tail Race Channel Length * Width : Discharge Capacity : Min Tail Water Level : River Diversion Work(Diversion Tunnel) : (ii) Penstock Diameter : Hydrology River Diversion Work(Diversion Tunnel) Cathment Area : 90% Dependable Yield : Max Flood Outflow : Length : Diameter : Design Discharge : Storage Capacity Concrete Gravity Dam Gross : Live : Total Length : Max Height : 267.00 m 263.35 m 262.13 m 913.48 Sq Km 245.13 m 196.60 m 193.54 m 530 X 75 m 2200.00 cume 850 X 30 m 2200.00 cume 8.00 m 61642 Sq Km 18.184 Billion m 83543 Cumesc 390.00 m 8.00 m 368.00 Cumec 12.22 Billion m 9.75 Billion m c 653.00 m 92.00 m
  • 5. 5 Intake Structure Radial Gates Length : Switch Yard Switch Yard : Size(Nos.) : Power House Type : Installed Capacity : Type Of Turbine : Machine Hall : Design Head : Benefits Stage-III Stage-II Stage-III Power(Initial Phase) : Irrigation(CCA) : PUNASA LIFT IRRIGATION SCHEME 208.00 m 400 kV (Open 20 X 17 m (20 Surface 8 X 125(1000M Francis 202 X 23 X 53 60.00 m 2698 MUs 1840 MUs 1515 MUs
  • 6. 6 Introduction:- The Punasa Lift Irrigation Scheme is located near village Chandel in Khandwa (East Nimar) district, proposed for development of irrigation facilities in East Nimar district of M.P. This area has been declared as a drought prone area The Project is proposed as an extension of command from on-going Indira Sagar Project (ISP). The scheme is proposed in lieu of Chhota Tawa Project which was earlier proposed across Chhota Tawa river, a tributary of river Narmada. The PLIS is proposed to lift water directly from the ISP reservoir and irrigate CCA of 35008 ha at 105% intensity of irrigation, thus proposing annual irrigation to an area of 36758 ha. The project shall provide drinking water and irrigation facilities to 110 villages including 25 affected villages of ISP and resettled population of ISP oustees and habilitation sites. Composite Control Structure Cum Canal Head Power House PLIS is proposed and linked up with the composite control structure at R.D.3045 M. of Punasa Facilities. This work comprises of head regulator and a Canal Head Power House with 3 units of 5 MW each.
  • 7. 7 Salient Features:- A provision to irrigate about 35008 hact.of land by lift is alrady considered in the design of Intake component of Indira Sagar Project canal. It will serve the areas around Punasa and Mundi village in command of the earlier proposed Chhota Tawa Project. The Administrative Approval has been accorded to the scheme by the Govt. of M.P. N.V.D.D. vide No. F-2/28/27/2/2005/2817 dated 19.9.2005 for an estimated cost of Rs. 185.04 crores. Principal Features:- River/Intake Narmada, Main canal head HFL 263.35 m MDDL 243.13 m Floor level of pump 246 m Ist stage lift ISP Reservoir level to 283.5 m IInd stage lift ISP Reservoir level to 283.5 m III rd stage lift 300 m to 324 m Gross Command Area 53708 Ha. Culturable Command Area 35008 Ha. Annual Irrigation 36758 Ha.Benefit cost ratio 1.56
  • 8. 8 Completion Schedule and target for Irrigation potential from construction period 1st Year 30% 2nd Year 70% 3rd Year 100%
  • 9. 9 Contents  1 Indira Sagar Project o 1.1 Introduction o 1.2 Project features o 1.3 Rehabilitation and resettlement The Indirasagar Dam is a multipurpose project of Madhya Pradesh on the Narmada River at Narmadanagar in the Khandwa district of Madhya Pradesh in India. The foundation stone of the project was laid by late Smt Indira Gandhi, former Prime Minister of India on 23 October 1984. The construction of main dam started in 1992. The downstream projects of ISP are Omkareshwar, Maheshwar, and Sardar Sarovar Project. The Project envisages construction of a 92 meters high and 653 meters long concrete gravity dam. It provides Irrigation in 1,230 square kilometres of land with annual production of 2.7 billion units in the districts of Khandwa and Khargone in Madhya Pradesh and power generation of 1,000 MW installed capacity (8x125). The reservoir of 12,200,000,000 m3 (9,890,701 acre·ft) was created. In terms of storage of water, it withholds the largest reservoir in India, with capacity of 12.22 billion cu m, followed by Bharkra Nangal in Himachal Pradesh. The dam, built as a joint venture between Madhya Pradesh irrigation and National Hydroelectric Power Corporation is the source of the Indira Gandhi Canal. It was commissioned on May 2005.
  • 10. 10 Indira Sagar Project Introduction River Narmada, fifth largest river in India, with a river flow length of 1,312 km originates from Amarkantak in Anuppur district of Madhya Pradesh. Narmada flows westward and after passing through Madhya Pradesh, Gujarat, and Maharashtra, it drains into Arabian Sea near Gulf of Combay. Indira Sagar Project (ISP) situated on River Narmada, 10 km from village Punasa in Khandwa district of Madhya Pradesh is commissioned on 31 March 2005. Indira Sagar Project is a multipurpose Project with an installed capacity of 1,000 MW, with annual energy generation of 2,698 million units in Stage I, 1,850 million units in Stage II, and 1,515 million units in Stage III, and annual irrigation of 2.65 Lac. Ha on a Culturable Command Area (CCA) of 1.23 Lac. Ha. Total catchment area at the dam site is 61,642 km2 . Indira Sagar Project is the mother project for the downstream projects on Narmada Basin with largest reservoir in India, having 12.22 Bm3 storage capacity. All the eight units commissioned by March 2005 ahead of schedule while generation from first unit was started from January 2004. The powerhouse is the second-largest surface powerhouse in India. Indian National Human Rights commission takes complaint of Salem-News.com’s Human Rights Ambassador complain into note regarding Omkareshwar and Indira Sagar Dams.Complaints cited by our Human Rights Ambassador William Nicholas Gomes, over water levels being raised to the point that they literally drowned a local community, have been recognized by the National Human Rights Commission in India. Official notification to human rights ambassador william nicholas gomes from national human rights comission -
  • 11. 11
  • 12. 12 Project features A model of the Indira Sagar Power Station at the Regional Science Centre, Bhopal Brief details of major components of project:  No. of Units, their rating and capacity : 8 Units of 125 MW each – 1000 MW  Concrete Gravity dam : 653 m Long & 92 m Height  Diversion Tunnel : 688 m Long & 8 m Height  Radial Gates : 20 Nos., 20 Long & 17 m height  Power House : Surface with Francis Turbine Size – 200 m x 23m x 53 m  Intake Structure : 208 m Long  Water Conductor System : 8 Nos. Penstocks with 8 m dia.  Head race Channel : 530 m Long & 75 m wide.  Tail Race Channel : 850m Long & 30 m wide.  Switchyard : 400 Kv, Open type. Rehabilitation and resettlement  Villages affected: 249  Family affected: 39179 PAF’s  Land Submerged: 91348 Ha.
  • 13. 13 Indira Sagar Project is a Multipurpose project will have the largest storage capacity in the country. It will have an installed capacity of 1000 MW and annual irrigation of 2.65 Lakh Ha. on a CCA of 1.23 Lakh Ha. The project provides regulated releases of 8.12 MAF to Gujrat ex-Maheshwar project after power generation at down stream projects viz., Omkareshwar and Maheshwar project in Madhya Pradesh. Indira Sagar Project is the key project on Narmada river providing excellent storage site. The Dam is proposed on the main river near village Narmadanagar of Punasa Block in the District. Omkareshwar and Maheshwar projects are proposed in the downstream to utilize the regulated releases of Indira Sagar project of irrigation and power generation. Hence, the cascade of Indira Sagar, Omkareshwar and Maheshwar projects, together,are known as"Narmada Sagar Complex".The total drainage area at the proposed dam site of Indira Sagar Project is 61642 Sq. Kms. The main dam is located on quartzite's of reddish colour and with small interbedding of silt stone of purple colour belonging to Vindhyans (Super Group). The power house is located on the stable right bank in deep pit which is geologically less disturbed. The project command area encompasses the Narmada Sone lineament. The command area is mostly composed of basaltic lava flows. These flows are designated as deccan traps. The thickness of lava flows ranges from 6.5 m to 30 m with presence of vesicular and amydaloidal in basaltic flow with appreciable weathering on top. Detailed seismological studies have been got done and based on the recommendation of the Dam Review Panel, detailed designs for the dam have been prepared by the Central Water Commission. A network for ten seismological stations is proposed to be established through Indian Meteorological Department covering the area of the project of Narmada Sagar Complex.The dam is proposed to be 92 m (302 Ft.) high and 653 m (2142 ft.) in length with a slightly curved alignment of 880 m radius across river Narmada near village
  • 14. 14 Narmada Nagar of Development Block Punasa of the district about 845 Kms. from the source of origin with a gross storage of 12.22 Bm3 and a live storage of 9.75 Bm3 A sub surface powerhouse on the right bank is proposed to house 8 units of 125 MW each with conventional Francis Turbines. (Construction Site-View- 1) A lined gravity canal takes off from the reservoir with FSL of 239.15 m through a 3.67 Kms long tunnel named Punasa tunnel. The total length of the left bank main canal is 24s8.65 Kms. It is proposed to irrigate about 98475 Ha. of land in the District and West Nimar District of Madhya Pradesh State. The distribution system is proposed to be lined. The left canal is proposed to takeoff from 92.10 Km of the main flow canal. It is 83 Kms. long and involves 38m lift. It is proposed to irrigate about 24282 Ha. of land in higher elevated areas of West Nimar District in Bhikangaon and Kasarawad Tehsils.A provision for further expansion to irrigate about 26000 Ha. of land by lift is also considered in the basin of intake components of Indira Sagar Project Canal.The submergence of Indira Sagar Project is 91348 Ha. including forest and revenue land extending to 249 villages of East Nimar, Hoshangabad and Dewas Districts. Out of 249 villages going under submergence, 12 are forest villages and the remaining 237 are revenue villages. The submergence area is consisting of forest area of 41420 ha. , cultivated area of 44363 Ha. and 5565 ha. of other area.
  • 15. 15 (Construction Site- View 2) S.No. Description Particular A. General 1. District East Nimar,Khandwa 2. Latitude 22*17'00" 3. Longitude 76*28'00" B. Hydrology 4. Catchment area (Sq.Kms.) 61642 C. Storage Capacity 5. Gross (cubic BM) 12.220 6. Live (cubic BM) 9.750 7. Dead (cubic BM) 2.470 D. Concrete Gravity Dam 8. Total Length (m) 653 9. Maximum height(m) 92 E.Earth Dam (Saddle) 10. Length(m) 815 11. Height(m) 10.7) F.Radial Crest Gates 12. Number 20 13. Length (m) 20 14. Height (m) 17 G. Power House
  • 16. 16 15. Type of Power house Sub-Surface 16. Installed Capacity(MW) 1000(8x125) H. Submergence 17.1 Fully submerged(Number) 69 17.2 Partially affected 180 17.3 Total 249 I. Command Area Details 18. Gross Command area (Lakh ha.) 2.10 19. Culturable Command area (Lakh ha.) 1.75 20. Irrigated area(Lakh Ha.) 1.23 20.a. Main Flow Canal (left) 1.East Nimar Khandwa 2. West Nimar Khargone 18979 Ha. 79496 Ha. 20.b Khargone lift canal (left) west Nimar Khargone 24282 Ha. J.Cost Estimates( In crores) at 1988 price level 21. Unit-1 Head work 832.32 22. Unit-2 Canals 541.98 23. Unit-3 Power 619.37 24. Command area Development 50.00 25. Catchment area treatment 124.00 Grand Total 2167.67