Reasons for Slow
Realization &
Improvements in Existing
Policies
Priyank Jain (92)
India chronology of Policy / Regulation
• Early and late 90s Negotiations for small and medium size
HEPs, Bidding route initiated in early 2000s.Pre 2003
• Gave a framework for development of new capacity on
competitive basis, puts statutory responsibility on
Regulators for market development, also includes concept
of Statutory policy (mainly Electricity and Tariff Policies
Electricity Act
2003
• Hydro power development through private participation,
stresses on the need successful models for Public Private
Partnership.
National
Electricity
Policy 2005
India chronology of Policy / Regulation
• Made competitive bidding mandatory
National
Tariff
Policy 2006
• Stated objective of overcoming the
problems experienced with respect to
tariff based bidding for HEPs
New Hydro
Policy 2008
Agencies Involved in Hydropower
Develpoment
CENTRAL ELECTRICITY AUTHORITY &
CENTRAL WATER COMMISSION
STATE POWER DEPARTMENTS &
ELECTRICITY BOARDS
MNES - MINISTRY OF NON-
CONVENTIONAL ENERGY SOURCES
SEVERAL NGO ORGANIZATIONS (e.g.
TERI)
INTERNATIONAL FUNDING AGENCIES
Slow realization
• Afforestation and rehabilitation are the main
problems
• Environment impact assessment studies
Environmental
Issues
• Land-owners often demand employment and
heavy compensation in some of the power
stations
Land Acquisition
• Major Indian rivers are generally interstateInterstate
Disputes
• The law and order problem areas affected by
insurgency and militant problems.
• Difficulties in arranging manpower deployment.
Insurgency
Environmental Issues…
• Geotechnical investigations avoid
time and cost over-runs.Geological
Surprises
• Land slides, hill slope collapses,
road blocks etc.
• Heavy rains and unprecedented
floods cause severe setbacks in
construction
Natural
Calamities
Policies & Regulations
• Policies and according Status of
Implementation ƒƒCompetitive BiddingƒƒHydel Policy &
Mega Power Policy
• Issues Impacting Delay Hydro Power Project
• Harmonizing Inter-Ministerial Policy
Measures/Initiatives
Environmental and
Forest Regulations
• Time to converge on a Mutual Beneficial Path
Central & State
Hydro Policies
Issues and Challenges
• Integrated Management of Hydro Projects
Power Evacuation
and Transmission
EPC & Construction
Risks
Macro-Economic
Perspective and
Investment
Bottlenecks
environmental
sustainability
Reasons for Slow Development
Long gestation period
Time consuming process for project clearances
Until recently, the national focus has been on
thermal generation
Highly capital intensive and absence of committed
funds
Poor financial health of State Electricity Boards
(SEBs)
Technical constraints due to complex geological
nature of the projects
Absence of long tenure loans makes it
difficult for private investors
Advance against depreciation is
disallowed
Return on equity (ROE) is not attractive
enough for investors
Dearth of competent contracting agencies
to construct the project site
Inter-state disputes as Water is a state
subject
Private sector participation
Bureaucratic delays,
Uncertainty in power payments,
Lack of sanctity regarding contracts,
Insufficient infrastructure,
Unknown hydrology and geology.
Regulatory barriers
High financing costs,
Land acquisition problems,
Rehabilitation and resettlement
Slow legal system,
Availability & reliability of data from the Gov
Interstate matters
Regulatory-related suggestions
• Timely clearances :
– Techno-economic clearance by the Central Electricity
Authority (CEA) and an environmental clearance by the
Ministry of Environment and Forests.
– With regard to the environmental clearance.
– The MoEF give proper guidelines for adverse effect
control.
– Examples include: Effect on the Land, effect on water
quality, effect on flora and fauna.
Regulatory-related suggestions
• The two biggest effects of hydro project development in India
are the cutting of trees & displacement of people living in the
area.
– Recommend the to provide compensatory aforestation –
equivalent to the forest cover lost as a result of the
project.
– Due to law and order problems and judicial interventions.
– The resettlement process should be handled by the
government, as it is very difficult for private project
developer to handle such sensitive issues, and should be
treated as a welfare scheme, with the government bearing
the cost of implementation.
Finance-related suggestions
• Penalize delays in project implementation
– Each developer should be required to submit a bank guarantee of 3 to
5 percent of the cost of the project as a performance guarantee. If
project development is delayed by more than one year due to reasons
attributable to the developer, the contract to develop the project
should be cancelled.
• Offer payment security
– Lack of payment security is a primary reason the private sector shies
away from developing power projects in India.
– Recommend the central government pursue reform more rigorously,
particularly in distribution. This will help ensure that state government
utilities are self-reliant and are able to pay for the power they
purchase.
• Provide funding for report preparation
– Recommend the government create a fund of for use in paying
for preparation of bankable detailed project reports. This
special-purpose funding vehicle is known as a corpus fund.
Funds would be made available through a central hydro
authority to the agencies involved in preparation of the reports.
The cost of report preparation would be recovered from the
developer to whom the project is allotted. Thus, the fund
becomes “revolving.”
– In addition, financial institutions could join together to form a
“hydro bank” specifically to provide loans at attractive rates to
project developers. The hydro bank could offer loans with
interest less than the PLR. In addition, the hydro bank should be
allowed to increase loan repayment periods beyond the typical
ten years. Doubling this repayment period – to 20 years – could
significantly improve the project’s financial position.
• Make purchase of green power compulsory for utilities
• Require ‘time-of-day’ metering
– A significant advantage of a hydroelectric project is the
ability to provide peaking power in the mornings and
evenings when electrical demand is highest.
– Owing to the high demand, the rate paid for this peaking
power is substantially higher than for electricity produced
at non-peak hours. However, to compensate a hydro
project owner, arrangements for “time-of-day” metering –
in which electricity consumed at different times of the day
is recorded – is required.
Development-related suggestions
• The central government can play an important role in
facilitating efficient, effective, and timely project completion
by building access roads to project sites, acquiring land
needed to develop the project, providing telecommunication
facilities, and developing a master plan for transmission.
• Some project sites are not approachable by roads that are
suitable for motorized vehicles. Access roads benefit not only
the project but also adjoining villages. Therefore, access roads
should be constructed by the government, and these costs
should not be loaded on the project.
• Land required for development should be acquired by the
government and made available to the developer at nominal
lease charges.
• The land acquisition process is time-consuming and can meet
roadblocks and judicial intervention, resulting in delays the private
developer cannot absorb.
• Telecommunication facilities on the way to and at each project site
will provide the ability to communicate quickly and effectively.
• Reducing the amount of import duty that hydro project developers
are required to pay for importing construction and generation
equipment will help reduce overall costs for developers.
• A master plan for transmission of electricity generation should be
prepared by the central government for the national grid and by
each state government for the state grids. The master plan should
include transmission schemes for every generating plant in the
state, both existing and future.
Way forward
• Consistent policies and regulations should be made through
the States.
• Large scale hydro projects which involve greater risks due
to geological uncertainties etc should be implemented by
the state nodal agencies, while the relatively safer projects
with reduced risks and smaller capital investments should
be offered to the private entrepreneurs.
• A single window clearance setup for hydro projects will
solve most problems related to the clearances etc
• Renovation and Modernization of existing /old hydro power
plants should be promoted and planned for, instead of
complete focus on setting up of green field power projects
• Financial issue like Long term debt financing / long tenure loans,
differential tariff for pea and off-peak hours need serious thinking
and early implementation
• The private sector participation in the large scale development of
hydropower should be promoted. This can be achieved either
through public-private partnerships or through independent private
projects (IPP way). The Government of India has already recognized
the need to increased private involvement and has referred to it in
the national policy document.
• The hydro sector needs to develop a set of competent civil
engineers / contracting agencies that have the technical and the
management expertise to conceptualize and develop a project of
the required scale. The contract management practices with a
transparent system of selection of contractors and resolve any
disputes that may arise need to be reviewed.
Hydro Priyank jain

More Related Content

What's hot

Anirudh Devanatha and Ashton Walker - Integrated Energy Model
Anirudh Devanatha and Ashton Walker - Integrated Energy ModelAnirudh Devanatha and Ashton Walker - Integrated Energy Model
Anirudh Devanatha and Ashton Walker - Integrated Energy Model
ANUECI
 
Custom o105c399f97286
Custom o105c399f97286Custom o105c399f97286
Custom o105c399f97286
venvetty
 
Green Stimulus Presentation
Green Stimulus PresentationGreen Stimulus Presentation
Green Stimulus Presentation
Ran Tao
 

What's hot (19)

Helen Hoka Osiolo - Green Growth Diagnostics for Africa
Helen Hoka Osiolo - Green Growth Diagnostics for AfricaHelen Hoka Osiolo - Green Growth Diagnostics for Africa
Helen Hoka Osiolo - Green Growth Diagnostics for Africa
 
Day-3, Mr. Rajiv Yadav
Day-3, Mr. Rajiv YadavDay-3, Mr. Rajiv Yadav
Day-3, Mr. Rajiv Yadav
 
Anirudh Devanatha and Ashton Walker - Integrated Energy Model
Anirudh Devanatha and Ashton Walker - Integrated Energy ModelAnirudh Devanatha and Ashton Walker - Integrated Energy Model
Anirudh Devanatha and Ashton Walker - Integrated Energy Model
 
Custom o105c399f97286
Custom o105c399f97286Custom o105c399f97286
Custom o105c399f97286
 
Edwin Nateminya - Green Growth Diagnostics for Africa
Edwin Nateminya - Green Growth Diagnostics for AfricaEdwin Nateminya - Green Growth Diagnostics for Africa
Edwin Nateminya - Green Growth Diagnostics for Africa
 
Insights and recommendations on key policy changes needed to stimulate renewa...
Insights and recommendations on key policy changes needed to stimulate renewa...Insights and recommendations on key policy changes needed to stimulate renewa...
Insights and recommendations on key policy changes needed to stimulate renewa...
 
Kigali | Sep-15 | Uganda country view
Kigali | Sep-15 | Uganda country viewKigali | Sep-15 | Uganda country view
Kigali | Sep-15 | Uganda country view
 
Climate change and energy policy in the construction sector berlin-germany-...
Climate change and energy policy in the construction sector   berlin-germany-...Climate change and energy policy in the construction sector   berlin-germany-...
Climate change and energy policy in the construction sector berlin-germany-...
 
OECD CEFIM Indonesia Questionnaire - Key points
OECD CEFIM Indonesia Questionnaire - Key pointsOECD CEFIM Indonesia Questionnaire - Key points
OECD CEFIM Indonesia Questionnaire - Key points
 
Public private partnerships - the case of lebanon first ppp - pierre el-hnoud
Public private partnerships - the case of lebanon first ppp - pierre el-hnoudPublic private partnerships - the case of lebanon first ppp - pierre el-hnoud
Public private partnerships - the case of lebanon first ppp - pierre el-hnoud
 
Day-3, Mr. Devendra Chaudhry trans chall
Day-3, Mr. Devendra Chaudhry trans challDay-3, Mr. Devendra Chaudhry trans chall
Day-3, Mr. Devendra Chaudhry trans chall
 
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distribution
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distributionDay-3, Mr. Ramesh Narayan BYPL Ippai issues in distribution
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distribution
 
Guy Doyle - Green Growth Diagnostics for Africa
Guy Doyle - Green Growth Diagnostics for AfricaGuy Doyle - Green Growth Diagnostics for Africa
Guy Doyle - Green Growth Diagnostics for Africa
 
Green Stimulus Presentation
Green Stimulus PresentationGreen Stimulus Presentation
Green Stimulus Presentation
 
Power Scenario of Bhutan and Nepal
Power Scenario of  Bhutan and NepalPower Scenario of  Bhutan and Nepal
Power Scenario of Bhutan and Nepal
 
How JICA mobilizes private sector finance and investments for affordable and ...
How JICA mobilizes private sector finance and investments for affordable and ...How JICA mobilizes private sector finance and investments for affordable and ...
How JICA mobilizes private sector finance and investments for affordable and ...
 
RENEWABLE POLICY
RENEWABLE POLICYRENEWABLE POLICY
RENEWABLE POLICY
 
Bhutan - Utility Scale Solar Power Assessment
Bhutan - Utility Scale Solar Power AssessmentBhutan - Utility Scale Solar Power Assessment
Bhutan - Utility Scale Solar Power Assessment
 
Day-3, Mr. Ajay raj
Day-3, Mr. Ajay rajDay-3, Mr. Ajay raj
Day-3, Mr. Ajay raj
 

Similar to Hydro Priyank jain

Indian Hydro Power - A new regulatory effort
Indian Hydro Power - A new regulatory effort Indian Hydro Power - A new regulatory effort
Indian Hydro Power - A new regulatory effort
Priyank Jain
 
P3 presentation - CCA.PPTX
P3 presentation - CCA.PPTXP3 presentation - CCA.PPTX
P3 presentation - CCA.PPTX
Matt Meaker
 
ADB_MYA_RE_Presentation_31_May2013_FINAL.ppt
ADB_MYA_RE_Presentation_31_May2013_FINAL.pptADB_MYA_RE_Presentation_31_May2013_FINAL.ppt
ADB_MYA_RE_Presentation_31_May2013_FINAL.ppt
ssuser32c60a1
 

Similar to Hydro Priyank jain (20)

Indian Hydro Power - A new regulatory effort
Indian Hydro Power - A new regulatory effort Indian Hydro Power - A new regulatory effort
Indian Hydro Power - A new regulatory effort
 
CCXG March 2019 Veronica Gundu Jakarasi Challenges and Opportunities for Impl...
CCXG March 2019 Veronica Gundu Jakarasi Challenges and Opportunities for Impl...CCXG March 2019 Veronica Gundu Jakarasi Challenges and Opportunities for Impl...
CCXG March 2019 Veronica Gundu Jakarasi Challenges and Opportunities for Impl...
 
Lawyer in Vietnam Oliver Massmann Investing in Solar Energy in Vietnam How to...
Lawyer in Vietnam Oliver Massmann Investing in Solar Energy in Vietnam How to...Lawyer in Vietnam Oliver Massmann Investing in Solar Energy in Vietnam How to...
Lawyer in Vietnam Oliver Massmann Investing in Solar Energy in Vietnam How to...
 
Lawyer in Vietnam Oliver Massmann - Investing in Solar Energy - How To Do I...
Lawyer in Vietnam Oliver Massmann  -  Investing in Solar Energy - How To Do I...Lawyer in Vietnam Oliver Massmann  -  Investing in Solar Energy - How To Do I...
Lawyer in Vietnam Oliver Massmann - Investing in Solar Energy - How To Do I...
 
P3 presentation - CCA.PPTX
P3 presentation - CCA.PPTXP3 presentation - CCA.PPTX
P3 presentation - CCA.PPTX
 
World Bank Group’s Support to Renewable Energy Development
World Bank Group’s Support to Renewable Energy DevelopmentWorld Bank Group’s Support to Renewable Energy Development
World Bank Group’s Support to Renewable Energy Development
 
Current Green Energy Financing Programs - Noli Cruz, DBP
Current Green Energy Financing Programs - Noli Cruz, DBPCurrent Green Energy Financing Programs - Noli Cruz, DBP
Current Green Energy Financing Programs - Noli Cruz, DBP
 
Public financial mechanisms that enhance the viability of ESCO projects, Alex...
Public financial mechanisms that enhance the viability of ESCO projects, Alex...Public financial mechanisms that enhance the viability of ESCO projects, Alex...
Public financial mechanisms that enhance the viability of ESCO projects, Alex...
 
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...
 
Options analysis for private sector investment into Vietnam’s transmission ne...
Options analysis for private sector investment into Vietnam’s transmission ne...Options analysis for private sector investment into Vietnam’s transmission ne...
Options analysis for private sector investment into Vietnam’s transmission ne...
 
VIETNAM –SOLAR POWER PROJECTS: HOW TO GET DEALS DONE
VIETNAM –SOLAR POWER PROJECTS: HOW TO GET DEALS DONEVIETNAM –SOLAR POWER PROJECTS: HOW TO GET DEALS DONE
VIETNAM –SOLAR POWER PROJECTS: HOW TO GET DEALS DONE
 
Let there be Light... in Nigeria using PPPs
Let there be Light... in Nigeria using PPPsLet there be Light... in Nigeria using PPPs
Let there be Light... in Nigeria using PPPs
 
Oliver Massmann - Investing in Solar Energy in Vietnam - How to do it right?
Oliver Massmann - Investing in Solar Energy in Vietnam - How to do it right?Oliver Massmann - Investing in Solar Energy in Vietnam - How to do it right?
Oliver Massmann - Investing in Solar Energy in Vietnam - How to do it right?
 
3 energy sector mr sagar raj goutam
3 energy sector mr sagar raj goutam3 energy sector mr sagar raj goutam
3 energy sector mr sagar raj goutam
 
Birendra Behuria ppt.pptx
Birendra Behuria ppt.pptxBirendra Behuria ppt.pptx
Birendra Behuria ppt.pptx
 
Financial Model and Future Operations Plan - Business Case Submission 09
Financial Model and Future Operations Plan - Business Case Submission 09Financial Model and Future Operations Plan - Business Case Submission 09
Financial Model and Future Operations Plan - Business Case Submission 09
 
Feed in-tariff regulations and getting wind power projects done (en)
Feed in-tariff regulations and getting wind power projects done (en)Feed in-tariff regulations and getting wind power projects done (en)
Feed in-tariff regulations and getting wind power projects done (en)
 
A case study presentation on Dabhol Power Plant
A case study presentation on Dabhol Power PlantA case study presentation on Dabhol Power Plant
A case study presentation on Dabhol Power Plant
 
ADB_MYA_RE_Presentation_31_May2013_FINAL.ppt
ADB_MYA_RE_Presentation_31_May2013_FINAL.pptADB_MYA_RE_Presentation_31_May2013_FINAL.ppt
ADB_MYA_RE_Presentation_31_May2013_FINAL.ppt
 
Build Operate Transfer and private sector led hydropower development
Build Operate Transfer and private sector led hydropower developmentBuild Operate Transfer and private sector led hydropower development
Build Operate Transfer and private sector led hydropower development
 

More from PRIYANK JAIN

More from PRIYANK JAIN (20)

Training power exchanges_18-may-2014
Training power exchanges_18-may-2014Training power exchanges_18-may-2014
Training power exchanges_18-may-2014
 
Srldc 28 May2013_congestionEnergy & Power Meet
Srldc 28 May2013_congestionEnergy & Power MeetSrldc 28 May2013_congestionEnergy & Power Meet
Srldc 28 May2013_congestionEnergy & Power Meet
 
Data collection
Data collectionData collection
Data collection
 
Captive power Policy
Captive power PolicyCaptive power Policy
Captive power Policy
 
Hydro Power Harnessing priyank
Hydro Power Harnessing priyankHydro Power Harnessing priyank
Hydro Power Harnessing priyank
 
Priyank jain - Wind detailed project report _12 mw
Priyank jain - Wind detailed project report _12 mwPriyank jain - Wind detailed project report _12 mw
Priyank jain - Wind detailed project report _12 mw
 
Solar ppa guvnl final
Solar ppa guvnl finalSolar ppa guvnl final
Solar ppa guvnl final
 
Canada’s electricity sector reform
Canada’s electricity sector reform Canada’s electricity sector reform
Canada’s electricity sector reform
 
Enterprenure case study
Enterprenure case studyEnterprenure case study
Enterprenure case study
 
Indian eco Reform
Indian eco ReformIndian eco Reform
Indian eco Reform
 
Fuel gap for Power Sector priyank
Fuel gap for Power Sector  priyankFuel gap for Power Sector  priyank
Fuel gap for Power Sector priyank
 
Hydro Power Envirentment interface
Hydro Power Envirentment interfaceHydro Power Envirentment interface
Hydro Power Envirentment interface
 
Assumptions: Strategy already defined Strategy not subject to sudden chang...
Assumptions:  Strategy already defined   Strategy not subject to sudden chang...Assumptions:  Strategy already defined   Strategy not subject to sudden chang...
Assumptions: Strategy already defined Strategy not subject to sudden chang...
 
National housing & habitat policy priyank
National housing & habitat policy priyankNational housing & habitat policy priyank
National housing & habitat policy priyank
 
Knowledge management system priyank
Knowledge management system priyankKnowledge management system priyank
Knowledge management system priyank
 
Kingfisher Airlines Priyank Jain
Kingfisher Airlines Priyank JainKingfisher Airlines Priyank Jain
Kingfisher Airlines Priyank Jain
 
Copyrights priyanksaurabh
Copyrights priyanksaurabhCopyrights priyanksaurabh
Copyrights priyanksaurabh
 
Canada’s electricity sector reform priyank jain
Canada’s electricity sector reform priyank jainCanada’s electricity sector reform priyank jain
Canada’s electricity sector reform priyank jain
 
POWER SYSTEM INTRODUCTION priyank pulkit rads praveer
POWER SYSTEM INTRODUCTION  priyank pulkit rads praveerPOWER SYSTEM INTRODUCTION  priyank pulkit rads praveer
POWER SYSTEM INTRODUCTION priyank pulkit rads praveer
 
Indian eco priyank jain
Indian eco priyank jainIndian eco priyank jain
Indian eco priyank jain
 

Recently uploaded

VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Anamikakaur10
 

Recently uploaded (20)

Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
 
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
 
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
 
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
 

Hydro Priyank jain

  • 1. Reasons for Slow Realization & Improvements in Existing Policies Priyank Jain (92)
  • 2. India chronology of Policy / Regulation • Early and late 90s Negotiations for small and medium size HEPs, Bidding route initiated in early 2000s.Pre 2003 • Gave a framework for development of new capacity on competitive basis, puts statutory responsibility on Regulators for market development, also includes concept of Statutory policy (mainly Electricity and Tariff Policies Electricity Act 2003 • Hydro power development through private participation, stresses on the need successful models for Public Private Partnership. National Electricity Policy 2005
  • 3. India chronology of Policy / Regulation • Made competitive bidding mandatory National Tariff Policy 2006 • Stated objective of overcoming the problems experienced with respect to tariff based bidding for HEPs New Hydro Policy 2008
  • 4. Agencies Involved in Hydropower Develpoment CENTRAL ELECTRICITY AUTHORITY & CENTRAL WATER COMMISSION STATE POWER DEPARTMENTS & ELECTRICITY BOARDS MNES - MINISTRY OF NON- CONVENTIONAL ENERGY SOURCES SEVERAL NGO ORGANIZATIONS (e.g. TERI) INTERNATIONAL FUNDING AGENCIES
  • 5. Slow realization • Afforestation and rehabilitation are the main problems • Environment impact assessment studies Environmental Issues • Land-owners often demand employment and heavy compensation in some of the power stations Land Acquisition • Major Indian rivers are generally interstateInterstate Disputes • The law and order problem areas affected by insurgency and militant problems. • Difficulties in arranging manpower deployment. Insurgency
  • 6. Environmental Issues… • Geotechnical investigations avoid time and cost over-runs.Geological Surprises • Land slides, hill slope collapses, road blocks etc. • Heavy rains and unprecedented floods cause severe setbacks in construction Natural Calamities
  • 7. Policies & Regulations • Policies and according Status of Implementation ƒƒCompetitive BiddingƒƒHydel Policy & Mega Power Policy • Issues Impacting Delay Hydro Power Project • Harmonizing Inter-Ministerial Policy Measures/Initiatives Environmental and Forest Regulations • Time to converge on a Mutual Beneficial Path Central & State Hydro Policies
  • 8. Issues and Challenges • Integrated Management of Hydro Projects Power Evacuation and Transmission EPC & Construction Risks Macro-Economic Perspective and Investment Bottlenecks environmental sustainability
  • 9. Reasons for Slow Development Long gestation period Time consuming process for project clearances Until recently, the national focus has been on thermal generation Highly capital intensive and absence of committed funds Poor financial health of State Electricity Boards (SEBs) Technical constraints due to complex geological nature of the projects
  • 10. Absence of long tenure loans makes it difficult for private investors Advance against depreciation is disallowed Return on equity (ROE) is not attractive enough for investors Dearth of competent contracting agencies to construct the project site Inter-state disputes as Water is a state subject
  • 11. Private sector participation Bureaucratic delays, Uncertainty in power payments, Lack of sanctity regarding contracts, Insufficient infrastructure, Unknown hydrology and geology. Regulatory barriers High financing costs, Land acquisition problems, Rehabilitation and resettlement Slow legal system, Availability & reliability of data from the Gov Interstate matters
  • 12. Regulatory-related suggestions • Timely clearances : – Techno-economic clearance by the Central Electricity Authority (CEA) and an environmental clearance by the Ministry of Environment and Forests. – With regard to the environmental clearance. – The MoEF give proper guidelines for adverse effect control. – Examples include: Effect on the Land, effect on water quality, effect on flora and fauna.
  • 13. Regulatory-related suggestions • The two biggest effects of hydro project development in India are the cutting of trees & displacement of people living in the area. – Recommend the to provide compensatory aforestation – equivalent to the forest cover lost as a result of the project. – Due to law and order problems and judicial interventions. – The resettlement process should be handled by the government, as it is very difficult for private project developer to handle such sensitive issues, and should be treated as a welfare scheme, with the government bearing the cost of implementation.
  • 14. Finance-related suggestions • Penalize delays in project implementation – Each developer should be required to submit a bank guarantee of 3 to 5 percent of the cost of the project as a performance guarantee. If project development is delayed by more than one year due to reasons attributable to the developer, the contract to develop the project should be cancelled. • Offer payment security – Lack of payment security is a primary reason the private sector shies away from developing power projects in India. – Recommend the central government pursue reform more rigorously, particularly in distribution. This will help ensure that state government utilities are self-reliant and are able to pay for the power they purchase.
  • 15. • Provide funding for report preparation – Recommend the government create a fund of for use in paying for preparation of bankable detailed project reports. This special-purpose funding vehicle is known as a corpus fund. Funds would be made available through a central hydro authority to the agencies involved in preparation of the reports. The cost of report preparation would be recovered from the developer to whom the project is allotted. Thus, the fund becomes “revolving.” – In addition, financial institutions could join together to form a “hydro bank” specifically to provide loans at attractive rates to project developers. The hydro bank could offer loans with interest less than the PLR. In addition, the hydro bank should be allowed to increase loan repayment periods beyond the typical ten years. Doubling this repayment period – to 20 years – could significantly improve the project’s financial position.
  • 16. • Make purchase of green power compulsory for utilities • Require ‘time-of-day’ metering – A significant advantage of a hydroelectric project is the ability to provide peaking power in the mornings and evenings when electrical demand is highest. – Owing to the high demand, the rate paid for this peaking power is substantially higher than for electricity produced at non-peak hours. However, to compensate a hydro project owner, arrangements for “time-of-day” metering – in which electricity consumed at different times of the day is recorded – is required.
  • 17. Development-related suggestions • The central government can play an important role in facilitating efficient, effective, and timely project completion by building access roads to project sites, acquiring land needed to develop the project, providing telecommunication facilities, and developing a master plan for transmission. • Some project sites are not approachable by roads that are suitable for motorized vehicles. Access roads benefit not only the project but also adjoining villages. Therefore, access roads should be constructed by the government, and these costs should not be loaded on the project. • Land required for development should be acquired by the government and made available to the developer at nominal lease charges.
  • 18. • The land acquisition process is time-consuming and can meet roadblocks and judicial intervention, resulting in delays the private developer cannot absorb. • Telecommunication facilities on the way to and at each project site will provide the ability to communicate quickly and effectively. • Reducing the amount of import duty that hydro project developers are required to pay for importing construction and generation equipment will help reduce overall costs for developers. • A master plan for transmission of electricity generation should be prepared by the central government for the national grid and by each state government for the state grids. The master plan should include transmission schemes for every generating plant in the state, both existing and future.
  • 19. Way forward • Consistent policies and regulations should be made through the States. • Large scale hydro projects which involve greater risks due to geological uncertainties etc should be implemented by the state nodal agencies, while the relatively safer projects with reduced risks and smaller capital investments should be offered to the private entrepreneurs. • A single window clearance setup for hydro projects will solve most problems related to the clearances etc • Renovation and Modernization of existing /old hydro power plants should be promoted and planned for, instead of complete focus on setting up of green field power projects
  • 20. • Financial issue like Long term debt financing / long tenure loans, differential tariff for pea and off-peak hours need serious thinking and early implementation • The private sector participation in the large scale development of hydropower should be promoted. This can be achieved either through public-private partnerships or through independent private projects (IPP way). The Government of India has already recognized the need to increased private involvement and has referred to it in the national policy document. • The hydro sector needs to develop a set of competent civil engineers / contracting agencies that have the technical and the management expertise to conceptualize and develop a project of the required scale. The contract management practices with a transparent system of selection of contractors and resolve any disputes that may arise need to be reviewed.