Personal Achievements
1. Control on common spares inventory by planning Similar ranges , model , make and shuffling
of spares in SID , SMS , CPP , PELLET and 110 / 33 KV MRSS.
2. Control on Man powerrecruitment and right utilization by inter office transfers based onthe
performance , work load and requirement.
3. Utilization of non- movable items like cables , motors , contactors , common spares and
consumables.
4. Implementation of SMS messaging and Web link at AFBC and PELLET, by this break down
and Plant operation information to right persons without any human or operatorinteractions.
5. Implementation of analytical way log books and e-log books for analyzing and reducing the
regular break downs & investments.
6. 5-why why analysis foreach breakdowns, to increase the equipment availability by proper
analysing , training or permanent modifications.
7. The great achievement is involving in Pellet plant project from know how to commissioning
and entire project co-ordination with various suppliers and consultants' of Process , Mechanical ,
Electrical and Automation section.
8. Implementation in high end automation like IMCC's , 690V & 415V drives in AFBC and
PELLET plant to reduce the investment on cables and gives more information on equipments in
online .
9. Travelled for study , understand the technology , techno-commercial discussions and
Inspections before dispatches in various cities in India , China and Russia.
10. Installations of Air Handling Units instead of Air conditioners in ECR first and second floor
forcooling electrical drives and DCS by this we can reduce operating cost as wellas huge
investment in project.
11. HT Capacitorinstallations in MRSS to maintain Plant Powerfactorto frequent penalties.
12. Implemented stand by UPS connections to captive powerplant DCS from AFBC - DCS control
room by this we avoided investment and maximum utilization of asset.
13. Installation of stand by UPS in sponge iron division PLC's , by this we avoided frequent PLC
processorlogic failures and licensed systems.
14. Mastercomputerinstallation at sponge iron division to avoid kiln shut downwhile
independent systemfailures.
15. Establishment of Data and Control communication betweenCPP , AFBC and SID on common
network plat form forCritical parameters monitoring , Safety interlocks betweenboth the units
and plan of daily Auto report generation at one point.
16.Regulaortime based CBT maintenance implementation at 33KV Substation equipments and
OLTC oil filtration.

Weitere ähnliche Inhalte

Ähnlich wie Acheivements pkk

MohdRiyazKhan_Resume
MohdRiyazKhan_ResumeMohdRiyazKhan_Resume
MohdRiyazKhan_ResumeRIYAZ Khan
 
Real Time and Wireless Smart Faults Detection Device for Wind Turbines
Real Time and Wireless Smart Faults Detection Device for Wind TurbinesReal Time and Wireless Smart Faults Detection Device for Wind Turbines
Real Time and Wireless Smart Faults Detection Device for Wind Turbineschokrio
 
Development of of power plants functionality
Development of of power plants functionality Development of of power plants functionality
Development of of power plants functionality Hossam Zein
 
Introduction of 132/11 kV Digitally Optimized Substation for Protection, Cont...
Introduction of 132/11 kV Digitally Optimized Substation for Protection, Cont...Introduction of 132/11 kV Digitally Optimized Substation for Protection, Cont...
Introduction of 132/11 kV Digitally Optimized Substation for Protection, Cont...IRJET Journal
 
Peter Whalley RGE6Tele
Peter Whalley RGE6TelePeter Whalley RGE6Tele
Peter Whalley RGE6TelePeter Whalley
 
PEckardt Resume 2014
PEckardt Resume 2014PEckardt Resume 2014
PEckardt Resume 2014Paul Eckardt
 
PEckardt Resume 2014
PEckardt Resume 2014PEckardt Resume 2014
PEckardt Resume 2014Paul Eckardt
 
Company_IPP_Profile_Template
Company_IPP_Profile_TemplateCompany_IPP_Profile_Template
Company_IPP_Profile_TemplateAlan Simon
 
Tech reportese01 09
Tech reportese01 09Tech reportese01 09
Tech reportese01 09liangflying
 
Sondus Ahmed - CV - 2016
Sondus Ahmed - CV - 2016Sondus Ahmed - CV - 2016
Sondus Ahmed - CV - 2016Sondus Ahmed
 
Husam Sabbah CV2015
Husam Sabbah CV2015Husam Sabbah CV2015
Husam Sabbah CV2015Husam Sabbah
 
Fault Management of Electrical Drives Onboard Ship using Power Line Communica...
Fault Management of Electrical Drives Onboard Ship using Power Line Communica...Fault Management of Electrical Drives Onboard Ship using Power Line Communica...
Fault Management of Electrical Drives Onboard Ship using Power Line Communica...IRJET Journal
 
Powering-Up the Industrial Network
Powering-Up the Industrial NetworkPowering-Up the Industrial Network
Powering-Up the Industrial NetworkPanduit
 
Wireless meter reading system
Wireless meter reading systemWireless meter reading system
Wireless meter reading systemmangal das
 

Ähnlich wie Acheivements pkk (20)

MAC_Resume171214
MAC_Resume171214 MAC_Resume171214
MAC_Resume171214
 
MohdRiyazKhan_Resume
MohdRiyazKhan_ResumeMohdRiyazKhan_Resume
MohdRiyazKhan_Resume
 
Real Time and Wireless Smart Faults Detection Device for Wind Turbines
Real Time and Wireless Smart Faults Detection Device for Wind TurbinesReal Time and Wireless Smart Faults Detection Device for Wind Turbines
Real Time and Wireless Smart Faults Detection Device for Wind Turbines
 
GRA16-8
GRA16-8GRA16-8
GRA16-8
 
Development of of power plants functionality
Development of of power plants functionality Development of of power plants functionality
Development of of power plants functionality
 
HUMS-Final-PPT.pptx
HUMS-Final-PPT.pptxHUMS-Final-PPT.pptx
HUMS-Final-PPT.pptx
 
Amarjeet Copy
Amarjeet   CopyAmarjeet   Copy
Amarjeet Copy
 
Introduction of 132/11 kV Digitally Optimized Substation for Protection, Cont...
Introduction of 132/11 kV Digitally Optimized Substation for Protection, Cont...Introduction of 132/11 kV Digitally Optimized Substation for Protection, Cont...
Introduction of 132/11 kV Digitally Optimized Substation for Protection, Cont...
 
Peter Whalley RGE6Tele
Peter Whalley RGE6TelePeter Whalley RGE6Tele
Peter Whalley RGE6Tele
 
PEckardt Resume 2014
PEckardt Resume 2014PEckardt Resume 2014
PEckardt Resume 2014
 
PEckardt Resume 2014
PEckardt Resume 2014PEckardt Resume 2014
PEckardt Resume 2014
 
Company_IPP_Profile_Template
Company_IPP_Profile_TemplateCompany_IPP_Profile_Template
Company_IPP_Profile_Template
 
Tech reportese01 09
Tech reportese01 09Tech reportese01 09
Tech reportese01 09
 
Sondus Ahmed - CV - 2016
Sondus Ahmed - CV - 2016Sondus Ahmed - CV - 2016
Sondus Ahmed - CV - 2016
 
Husam Sabbah CV2015
Husam Sabbah CV2015Husam Sabbah CV2015
Husam Sabbah CV2015
 
Fault Management of Electrical Drives Onboard Ship using Power Line Communica...
Fault Management of Electrical Drives Onboard Ship using Power Line Communica...Fault Management of Electrical Drives Onboard Ship using Power Line Communica...
Fault Management of Electrical Drives Onboard Ship using Power Line Communica...
 
Powering-Up the Industrial Network
Powering-Up the Industrial NetworkPowering-Up the Industrial Network
Powering-Up the Industrial Network
 
My new cv
My new cvMy new cv
My new cv
 
Rudra Jena CV
Rudra Jena CVRudra Jena CV
Rudra Jena CV
 
Wireless meter reading system
Wireless meter reading systemWireless meter reading system
Wireless meter reading system
 

Acheivements pkk

  • 1. Personal Achievements 1. Control on common spares inventory by planning Similar ranges , model , make and shuffling of spares in SID , SMS , CPP , PELLET and 110 / 33 KV MRSS. 2. Control on Man powerrecruitment and right utilization by inter office transfers based onthe performance , work load and requirement. 3. Utilization of non- movable items like cables , motors , contactors , common spares and consumables. 4. Implementation of SMS messaging and Web link at AFBC and PELLET, by this break down and Plant operation information to right persons without any human or operatorinteractions. 5. Implementation of analytical way log books and e-log books for analyzing and reducing the regular break downs & investments. 6. 5-why why analysis foreach breakdowns, to increase the equipment availability by proper analysing , training or permanent modifications. 7. The great achievement is involving in Pellet plant project from know how to commissioning and entire project co-ordination with various suppliers and consultants' of Process , Mechanical , Electrical and Automation section. 8. Implementation in high end automation like IMCC's , 690V & 415V drives in AFBC and PELLET plant to reduce the investment on cables and gives more information on equipments in online . 9. Travelled for study , understand the technology , techno-commercial discussions and Inspections before dispatches in various cities in India , China and Russia. 10. Installations of Air Handling Units instead of Air conditioners in ECR first and second floor forcooling electrical drives and DCS by this we can reduce operating cost as wellas huge investment in project. 11. HT Capacitorinstallations in MRSS to maintain Plant Powerfactorto frequent penalties. 12. Implemented stand by UPS connections to captive powerplant DCS from AFBC - DCS control room by this we avoided investment and maximum utilization of asset. 13. Installation of stand by UPS in sponge iron division PLC's , by this we avoided frequent PLC processorlogic failures and licensed systems. 14. Mastercomputerinstallation at sponge iron division to avoid kiln shut downwhile independent systemfailures. 15. Establishment of Data and Control communication betweenCPP , AFBC and SID on common network plat form forCritical parameters monitoring , Safety interlocks betweenboth the units and plan of daily Auto report generation at one point. 16.Regulaortime based CBT maintenance implementation at 33KV Substation equipments and OLTC oil filtration.