Sangameshwar Engineering Services Pvt. Ltd. specializes in handling heavy machinery and cargo. They have experience dismantling, erecting, assembling and transporting heavy equipment over 100 tons. Some of their past projects included installing 1000 ton sheet metal presses, 8000 ton forging presses, and shifting a 750 ton pier leg of a goliath crane. They have the expertise to handle all aspects of heavy lifting projects.
Heavy cargo handling experts with experience in press erection
1. Sangameshwar
ENGINEERING SERVICES PVT. LTD.
HEAVY CARGO LIFTERS MOVERS & ERECTION
Handling of Heavy Projects Works, Dismantling & Erection of Forging Press
& Hammers, Stamping Press erection & Commissioning specialists . Store
handling systems, Transportation & Industrial Manpower & Rigging work.
2. We undertakes the following work:
• Handling of Heavy Machinery.
• Heavy Power & Forgings Project works.
• Dismantling, Erection & Assembly of Heavy
Machinery, Packers & Plant Movers .
• Loading And Unloading of Heavy Machinery.
• Store Handling System & Managements.
• Forging & Stamping Press Erection &
Commissioning.
• We have a specialty in Forging & Stamping Sectors
regarding handling their heavy press & hammers
for new Installation or maintenance.
• Mechanical & Hydraulic Crane & Trailors Suppliers.
3. HAVE A LOOK AT OUR GREAT ACHIEVEMENTS
ALL WORK DONE MANUALLY.
ALL THE JOBS ARE HEAVY CARGO.
4. In 2012
Poshs Metal Industries Pvt. Ltd.
(Karandi, Shikrapur)
Erection & commissioning of 1000 T Sheet metal Press
5. Installation of 1000 T
Sheetmetal Press.
Total Assembled Weight: 240
MT
Bed: 46 MT
Column: 17 Mt each (2 Nos.)
Tierods: 3 MT each (4 nos.)
Ram: 32 MT
Crown: 55 MT
Other Accessories : 50 MT
14. We use 150MT capacity crane for Installation of Tierods (4 nos.),
columns (2nos.), Ram
15.
16.
17. ATO 8000 T Forging
press ready for
electrical work.
18. In 1993,
Unloading, shifting. Erection & Complete Installation of
2500 T Russian Forging Press
2500 T German Forging Press
1250 T Russian Forging Press
1600 T Sharing Machine
6 T Russian numatic Hammer
At
Pradip Metal Ltd.
Navi Mumbai
21. M/s Paramount Forge
32/11,32/5,32/4b,
Village Bhamni, Talika Khalapur,
Raigad Dist. Maharashtra India.
22. Installation of 3500 T Forging
Hydraulic press at PARAMOUNT
FORGE Khopoli. (2010)
Its Total Weight is 500 MT .
Bed: 110 MT
Crown: 145 MT (With Pistons 4Nos.
Moving Ram: 80 MT
Columns: 27 Mt Each ( 2 nos. )
Tie Rods: 14 MT. each (4 Nos.)
Pipeline & other Accessories
weighted 50 MT
23. Bed Erection was Little bit risky
110 MT has to be placed on
foundation which was deep around
3mtr.
Crown (without pistons wt: 105MT)
was easy because pistons were not
installed . But it has to be lifted 18
feet up for installation of tie rods &
pistons.
24. Tie rods (14 Mt each ) were
installed for to maintained the
load balance.
Lifting of crown started
with 5 hydraulic jacks
(cap. 50 T). In 7 days the
desired height (18 ft.)
reach. But we want to
installed pistons at
(15ft.).
25. 4 Nos. of pistons were installed at the height of 15 ft. Each wt. 11 MT.
After installing the pistons cown will be weighted 145 MT.
26. Erection of ram (80 MT) should be placed between crown and bed.
27. Tie rods should be lifted up at 33 meter height to install columns. And
again downed to connect columns', bed & crown together.
33. MAHINDRA UGINE STEEL CO. LTD.
Village Kanhe, Pune-Mumbai Road, Tal: Maval
Dist: Pune Maharashtra India.
34. • Installation of 1000 T Russian
press at Mahindra
Stampings (Kanhe ). (2010)
• Its weighted 475 MT .
• Bed: 85 MT
• Crown: 130 MT (With Gears 4
Nos.)
• Moving Ram: 80 MT
• Columns: 25 Mt Each ( 2 nos. )
• Tie Rods: 6 MT. each (4 Nos.)
• Pipeline & other Accessories
weighted 60 MT
35. •Bed Erection was easy 85
MT has to be placed on
foundation which was deep
around 4 mtr.
Crown (without gear wt: 90 MT)
After fixing gears with the crown its
wt. will be 130 MT.
And it has to be lifted 22 Ft. upward
to install columns.
36.
37. • 4 nos of gears to be installed with the crown and lifted 22
ft. up for erection of columns.
38.
39. •Crown lifted 22 ft height
within 6 days by our
Hydraulic jacking system
49. Smeral 4000 T & Smeral
2500 Forging press
installation at Shree
Ganesh Forgings Ltd.
Navi Mumbai.
50.
51. 50 meter. Shifting of a Pier Leg
Of A Goliath Crane At Pipavav
Shipyard Pipavav, Gujarat.
(2010)
Its Size Details:
Length: 78 MTR.
Width: 50 MTR.
Weight: 750 Metric
Ton
i.e 7,50,000 KG
66. For Any Enquiry please contact
Sangameshwar
Engineering Services Pvt. Ltd
Chinchwad Pune
Mr. B.S.Muley +919960866234
Mr. P.B.Muley +919860099326
Email: info@ses-pune.com
Web Site: www.ses-pune.com